This is an amendment to a federal construction solicitation that addresses questions submitted during the Request for Information (RFI) period.

The amendment clarifies several key aspects of the project. Fire alarm modifications are included in the scope, with the required equipment specified as a FireWarden-100-2/E/C/ Addressable Fire Control Panel. Missing drawings from the original submission have been provided in an addendum package titled "12 from 833CM3030_CNNC FCA Corrections_CONS_BD Drawings_VOL 1_addendum01," which includes drawings EN-101, EN-102, EN-103, and X-101 through X-109. Administrative clarifications confirm that an RFI form is not required for submitting questions and that advance registration is not necessary for the September 25 site visit. Regarding contract terms, liquidated damages are applicable to this construction project under FAR clause 52.211-12, with the specific daily liquidated damages amount provided in an attached worksheet referenced in the amendment.

View the file

Other files

File Type Posted
S06_Amendment 0005 36C78626R0058_11.25.2026.pdf PDF
Amendment 4-833CM3030 - CD1 - Historic Hardware.pdf PDF
Amendment 4-833CM3030 - BID - HA-001 from 20260422 - 833CM3030 - BID - SET.pdf PDF
Amendment 4-833CM3030 - BID - CU-105 from 20260107 - 833CM3030 - BID - SET.pdf PDF
Amendment 4-833CM3030 - BID - 23 11 13 Fuel Storage Tanks.pdf PDF
Amendment 4-833CM3030 - BID - 037 - CU-105 UTILITY PLAN (R2).pdf PDF
Amendment 4-833CM3030 - BID - 26 29 23 Engine Control and Monitoring.pdf PDF
Amendment 4-833CM3030 - BID - 028 - CP-105 PAVING PLAN (R2).pdf PDF
Amendment 4-833CM3030 - BID - SN-104 105 and X-series from 20260107 - 833CM3030 - BID - SET.pdf PDF
Amendment 4-833CM3030 - BID - Historic Pages from 20260422 - 833CM3030 - BID - SET A-004 005 132 133 154 155.pdf PDF
Amendment 4-ConVault Specification with UL 752 Level 8.pdf PDF
Amendment 4-Convault Storage tank 500 GL-telford.pdf PDF
Amendment 4-Convault Brochure 2019 (003).pdf PDF
Amendment 4-833CM3030 - BID - 020 - CG-201 POND AND CRYPT FIELD SECTIONS (R1).pdf PDF
Amendment 4-AE-113 from 20260422 - 833CM3030 - BID - SET.pdf PDF
Amendment 4-AE-113 833CM3030 - BID - SET.pdf PDF
S02 36C78626R0058 Amendment 0004.docx DOCX document
Amendment 4-833CM3030 - CD1 - Historic Preservation.pdf PDF
Amendment 4-SED FCA - 04212022_Camp Nelson.pdf PDF
Amendment 4-833CM3030 - BID - AE-110 from 20260422 - 833CM3030 - BID - SET.pdf PDF
Amendment 4-833CM3030 - BID - 328400 Plant Irrigation_10-31-24.pdf PDF
Amendment 4- 36C78626R0058 FuelForce 814 Advanced Fuel Controller Brochure.pdf PDF
Amendment 4-240524-Camp Nelson National Cemetery - KY- SUE Field Report Deliverable.pdf PDF
Amendment 4-833CM3030 - BID - AE-150 from 20260422 - 833CM3030 - BID - SET.pdf PDF
Amendment 4-833CM3030 - BID - 07 42 43 Plastic Panel.pdf PDF
Amendment 4-833CM3030 - BID- EQUIPMENT STORAGE GARAGE-AE-141.pdf PDF
Amendment 4-GI-104 from 20260107 - 833CM3030 - BID - SET.pdf PDF
Amendment 4-833CM3030 - BID - 231123 NatGas.pdf PDF
Amendment 4- 833CM3030 - BID - 072727 - BARRIER VAPOR.pdf PDF
Amendment 4-3189 ECS Geotechnical Engineering Report - Expansion Area.pdf PDF
Amendment 4-833CM3030 - BID - 329000 Planting.pdf PDF
Amendment 4-3189 ECS Geotechnical Engineering Report - Camp Nelson Cemetery.pdf PDF
Amendment 4-833CM3030 - BID - 050 - S-101 STRUCTURAL PLAN (R2).pdf PDF
Amendment 4-Lightning Protection Asmnt Report_Camps Nelson Cemetery.pdf PDF
Amendment 4-Dispensing System Controller-SafeSite DSC with specs.pdf PDF
Amendment 4-833CM3030 - BID - CD-102 from 20260107 - 833CM3030 - BID - SET.pdf PDF
Amendment 4-AD-150 from 20260107 - 833CM3030 - BID - SET.pdf PDF
Amendment 4-833CM3030 - BID - 33 56 10 Temporary Fuel Storage Tanks.pdf PDF
Amendment 4-833CM3030 - BID - 052 - S-202 MATERIALS STORAGE BLDG. FRAMING (R2).pdf PDF
Amendment 4-3189 ECS Geotechnical Engineering Report - Maintenance Area.pdf PDF
S06_36C78626R0058 Amend. 0003.pdf PDF
S02 Amendement 36C78626R0058 0002.pdf PDF
S02 Fire Alarm Panel.pdf PDF
S02 Liquidated Damages 833CM3030_CNNC FCA Corrections CONS.pdf PDF
S02 12 from 833CM3030_CNNC FCA Corrections_CONS_BD DRAWINGS_VOL 1_addendum01.pdf PDF
S02 Amendment 36C78626R0058 0001.pdf PDF
P07 Jessamine Camp Nelson Building.pdf PDF
S02_Price Proposal Breakdown.docx DOCX document
S02_Attachment - Past Performance Questionnaire.docx DOCX document
P07 Jessamine Camp Nelson Highway.pdf PDF
Show 40 more

Latest 50 of 68 listed here. See the rest on GovTribe.

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

The purpose of this amendment is to answer questions posed during the RFI period of the solicitation.

Question: confirm whether the work includes fire alarm modifications? If so, what is the existing/required manufacturer and panel model?

Response; Scope is in the project documents. Manufacturer and panel model is “FireWarden-100-2/E/C/ Addressable Fire Control Panel.” Picture of Fire Alarm Panel provided.

Question: The RFP states that contractors are required to use the attached RFI form for submitting questions; however, no RFI form appears to have been provided with the solicitation documents for this project.

Response: RFI form not required.

Question: The following drawings appear to be missing from the drawing sets provided:

o EN-101 o EN-102 o EN-103 o X-101 o X-102 o X-103 o X-104 o X-105 o X-106 o X-107 o X-108 o X-109 Please provide the above-referenced drawings to ensure complete and accurate contractor pricing.

Response: See attached drawing set “12 from 833CM3030_CNNC FCA Corrections_CONS_BD Drawings_VOL 1_addendum01.”

Question: Please also confirm whether advance registration is required for the September 25 site visit.

Response: Registration is not required.

Question: Liquidated Damages – Section F, Deliveries or Performance Section F.1 of the solicitation incorporates FAR clause 52.211-12 LIQUIDATED DAMAGES—CONSTRUCTION (SEPT 2000). However, we noticed that there is no daily liquidated damages amount provided.

Could you please confirm what amount this will be, or advise whether liquidated damages are not applicable to this solicitation?

Response: Yes, LDs are included. Please see attached worksheet.