This document is a structural plan drawing set for correcting FCA deficiencies at Camp Nelson National Cemetery in Covington, Louisiana. The project, designated 833CM3030, involves three primary work areas: a maintenance garage floor, a brick stable floor, and weatherproof storage slab, with detailed specifications provided by Walker Federal Services, LLC as the prime consultant and Principal Engineering as a structural consultant. The drawing is marked as a bid set dated January 7, 2026, with RFI Amendment 004 issued on October 22, 2026.
The structural plans specify concrete slab preparation and epoxy coating systems for both the maintenance garage and brick stable floors, requiring surface cleaning to remove contaminants, mechanical preparation to achieve ICRI CSP 3 standards, and moisture verification per manufacturer specifications. The coating system includes priming with Tnemec Series 66, 161, or 205 epoxy at 3.0-5.0 dry mils, patching with Tnemec Series 237 mortar, crack repair using Series 206 Subflex with fine sand broadcast, application of Series 206 at 40-50 dry mils, light sanding for deglossing, and a final coat of Tnemec Series 248 at 2.0-3.0 dry mils for the brick stable. The weatherproof storage slab construction includes expansion joints, crushed aggregate base, geotextile fabric, reinforcement with #4 bars and #4 hoops at 12-inch on-center spacing, with a 2% slope and elevation at 936.0. All work is under the Department of Veterans Affairs, National Cemetery Administration, with the project intended to correct identified facility deficiencies.
View the file
Other files
Show 40 more
Latest 50 of 67 listed here. See the rest on GovTribe.
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
58'-11 4"
'-1
32'-8" 21'-111 4"
32'-8"
'-1
8' -0
7'
-9
17'-1"
2' -0
'-2
26'-8"
29'-6"
'-4
S-101
1' -6
6"
UN
I TED
STATES OF AMER
I C
A
EN
T
OF VETERANS
AFFA
IRS
N C A
ATIONAL
EMETERY
DMINISTRATION
Revisions Date
Drawing Title
Approved:
Approved:
Project Title
Building Number Checked Drawn
Location
Date
DRAWING NO.
Dwg. Of
1 2 4 5 6 7 8 9
1 2 3 4 5 6 7 8 9
A B
C D
E F
A B
C D
E F
© COPYRIGHT 2022, Walker Federal Services, LLC
PRIME CONSULTANT
Walker Federal Services, LLC 7820B-162 Wormans Mill Road Frederick, Maryland 21701
CONSULTANTS
WFS
Correct FCA Deficiencies
CAMP NELSON NATIONAL CEMETERY
833CM3030
ACM LMR
JANUARY 7, 2026
Bid Set
128 NORTHPARK BLVD.,
COVINGTON, LA 70433
ALAL
Engineering
PRINCIPPRINCIP
STRUCTURAL PLAN
S-101
KEYNOTES
CLEAN, PATCH, AND LEVEL CONCRETE SLAB AND COVER WITH
AN APPLICATION OF A PAINTED EPOXY FINISH WITH NON-SLIP
GRIT ADDED. SEE MAINTENANCE GARAGE NOTES.
02 CLEAN AND RESEAL CONCRETE SLAB.
03 PCC SLAB
STRUCTURAL PLAN - MAINTENANCE GARAGE
SCALE: 1/4" = 1'-0"
STRUCTURAL PLAN - BRICK STABLE
SCALE: 1/4" = 1'-0"3
SECTION - WEATHERPROOF STORAGE SLAB
SCALE: 1-1/2" = 1'-0"
04 EXPANSION JOINT
REQ'D PCC SLAB
REQ'D CRUSHED
AGGREGATE
REQ'D GEOTEXTILE
FABRIC
(6) #4 BAR
#4 HOOP @ 12" O.C.
NOTES
MAINTENANCE GARAGE FLOOR
1. SURFACE PREPARATION:
CLEAN TO REMOVE ALL SOLUBLE SURFACE CONTAMINANTS.
REMOVE ALL UNSOUND CONCRETE. MECHANICALLY PREPARE TO
REMOVE ALL INSOLUBLE SURFACE CONTAMINANTS AND ACHIEVE
AN ICRI CSP 3. VERIFY MOISTURE LEVELS ARE IN ACCORDANCE
WITH MANUFACTURER'S INSTRUCTIONS.
2. COATING SYSTEM:
· PRIME ALL SURFACES WITH TNEMEC SERIES 66, 161OR
205 EPOXY AT 3.0-5.0 DRY MILS.
· PATCH ALL VOIDS AND FILL TO FLUSH WITH A MORTAR
MIX OF TNEMEC SERIES 237 AND SAND.
· V-GROOVE THE CRACK 1/8” WIDE AND FILL TO FLUSH
SERIES 206 SUBFLEX.
· BROADCAST FINE SAND INTO THE SERIES 206 TO KEEP
RECOAT WINDOW OPEN.
· APPLY TNEMEC SERIES 206 TO ALL SURFACES AT 40-50
DRY MILS (35-45 SQ FT/GAL).
· LIGHTLY SAND THE SERIES 206 TO DEGLOSS.
· APPLY FINAL COAT (SEE AE-602)
BRICK STABLE FLOOR
1. SURFACE PREPARATION:
CLEAN TO REMOVE ALL SOLUBLE SURFACE CONTAMINANTS.
REMOVE ALL UNSOUND CONCRETE. MECHANICALLY PREPARE TO
REMOVE ALL INSOLUBLE SURFACE CONTAMINANTS AND ACHIEVE
AN ICRI CSP 3. VERIFY MOISTURE LEVELS ARE IN ACCORDANCE
WITH MANUFACTURER'S INSTRUCTIONS.
2. COATING SYSTEM & CRACK REPAIR:
· PRIME ALL SURFACES WITH TNEMEC SERIES 66, 161OR
205 EPOXY AT 3.0-5.0 DRY MILS.
· PATCH ALL VOIDS AND FILL TO FLUSH WITH A MORTAR
MIX OF TNEMEC SERIES 237 AND SAND.
· V-GROOVE THE CRACK 1/8” WIDE AND FILL TO FLUSH
SERIES 206 SUBFLEX.
· BROADCAST FINE SAND INTO THE SERIES 206 TO KEEP
RECOAT WINDOW OPEN.
· APPLY TNEMEC SERIES 206 TO ALL SURFACES AT 40-50
DRY MILS (35-45 SQ FT/GAL).
· LIGHTLY SAND THE SERIES 206 TO DEGLOSS.
· APPLY TNEMEC SERIES 248 AT 2.0-3.0 DRY MILS.
WEATHERPROOF STORAGE, SEE SHEET AE-131.
ANCHORAGE TO SLAB IN ACCORDANCE WITH
MANUFACTURER'S RECOMMENDATIONS
EXPANSION JOINT
05 SAWCUT 1 4"x1
4" GROOVE TO BULLNOSE COATING EDGE.
COORDINATE LOCATION WITH THRESHOLD INSTALL.
EL. 936.0
05 05
2% SLOPE
RFI - AMMENDMENT 004 10/22/26