This document is Section 32 84 00 of the bid specifications for a Planting Irrigation project at Camp Nelson National Cemetery and Beaufort National Cemetery, issued October 31, 2024 and March 8, 2024 respectively, under contract numbers 833CM3030 and 831CM3016.

The contractor must design, furnish, and install a complete programmable fully automatic irrigation system with 100 percent head-to-head coverage plus 10 percent in designated areas. The scope includes procurement of licenses and permits, utility locates coordination, maintenance period services, and pipe sleeving beneath hardscape surfaces. The irrigation contractor must demonstrate experience with at least five large-diameter gasketed pipe systems (4-inch and larger) with centralized control systems, hardwired or radio communication, electrically operated remote control valves, large radius rotary sprinklers, and prefabricated pump stations, and must be licensed in Kentucky. Mainline pipe options include Ductile Iron (AWWA C151, minimum 1025 kPa working pressure), PVC Class 200 (solvent weld for 3-inch and smaller, gasketed for 4-inch and larger), or HDPE (AWWA C901). Lateral piping must be rigid, unplasticized PVC 1120/1220. Remote control valves must be 24-volt AC electric solenoid-operated globe type with minimum 1025 kPa working pressure. Sprinkler components include pop-up gear-driven rotary sprinklers with integral anti-drain valves and pop-up spray heads. All electrical components must be listed and labeled per NFPA 70. Minimum cover requirements are 900mm over mainline pipe in landscaped areas, 450mm over lateral pipe, and 450mm over control wire. Contractor must perform volumetric leakage testing for gasketed mainline pipe at 700 kPa for two hours, hydrostatic pressure testing for solvent weld lateral pipe at 550 kPa, operational testing of remote control valves and sprinklers, distribution uniformity testing per Irrigation Association standards, control system grounding testing (5 ohms or less), and a 14-day burn-in acceptance test with no system faults. The contractor must provide maintenance for 30 calendar days post-final inspection, complete operation and maintenance manuals with 16 hours of training, video training on DVD/CD, and specified spare parts including rotary heads, shrub sprinkler bodies, and valve assemblies.

View the file

Other files

File Type Posted
Amendment 4-833CM3030 - CD1 - Historic Hardware.pdf PDF
Amendment 4-833CM3030 - BID - HA-001 from 20260422 - 833CM3030 - BID - SET.pdf PDF
Amendment 4-833CM3030 - BID - CU-105 from 20260107 - 833CM3030 - BID - SET.pdf PDF
Amendment 4-833CM3030 - BID - 23 11 13 Fuel Storage Tanks.pdf PDF
Amendment 4-833CM3030 - BID - 037 - CU-105 UTILITY PLAN (R2).pdf PDF
Amendment 4-833CM3030 - BID - 26 29 23 Engine Control and Monitoring.pdf PDF
Amendment 4-833CM3030 - BID - 028 - CP-105 PAVING PLAN (R2).pdf PDF
Amendment 4-833CM3030 - BID - SN-104 105 and X-series from 20260107 - 833CM3030 - BID - SET.pdf PDF
Amendment 4-833CM3030 - BID - Historic Pages from 20260422 - 833CM3030 - BID - SET A-004 005 132 133 154 155.pdf PDF
Amendment 4-ConVault Specification with UL 752 Level 8.pdf PDF
Amendment 4-Convault Storage tank 500 GL-telford.pdf PDF
Amendment 4-Convault Brochure 2019 (003).pdf PDF
Amendment 4-833CM3030 - BID - 020 - CG-201 POND AND CRYPT FIELD SECTIONS (R1).pdf PDF
Amendment 4-AE-113 from 20260422 - 833CM3030 - BID - SET.pdf PDF
Amendment 4-AE-113 833CM3030 - BID - SET.pdf PDF
S02 36C78626R0058 Amendment 0004.docx DOCX document
Amendment 4-833CM3030 - CD1 - Historic Preservation.pdf PDF
Amendment 4-SED FCA - 04212022_Camp Nelson.pdf PDF
Amendment 4-833CM3030 - BID - AE-110 from 20260422 - 833CM3030 - BID - SET.pdf PDF
Amendment 4- 36C78626R0058 FuelForce 814 Advanced Fuel Controller Brochure.pdf PDF
Amendment 4-240524-Camp Nelson National Cemetery - KY- SUE Field Report Deliverable.pdf PDF
Amendment 4-833CM3030 - BID - AE-150 from 20260422 - 833CM3030 - BID - SET.pdf PDF
Amendment 4-833CM3030 - BID - 07 42 43 Plastic Panel.pdf PDF
Amendment 4-833CM3030 - BID- EQUIPMENT STORAGE GARAGE-AE-141.pdf PDF
Amendment 4-GI-104 from 20260107 - 833CM3030 - BID - SET.pdf PDF
Amendment 4-833CM3030 - BID - 231123 NatGas.pdf PDF
Amendment 4- 833CM3030 - BID - 072727 - BARRIER VAPOR.pdf PDF
Amendment 4-3189 ECS Geotechnical Engineering Report - Expansion Area.pdf PDF
Amendment 4-833CM3030 - BID - 329000 Planting.pdf PDF
Amendment 4-3189 ECS Geotechnical Engineering Report - Camp Nelson Cemetery.pdf PDF
Amendment 4-833CM3030 - BID - 050 - S-101 STRUCTURAL PLAN (R2).pdf PDF
Amendment 4-Lightning Protection Asmnt Report_Camps Nelson Cemetery.pdf PDF
Amendment 4-Dispensing System Controller-SafeSite DSC with specs.pdf PDF
Amendment 4-833CM3030 - BID - CD-102 from 20260107 - 833CM3030 - BID - SET.pdf PDF
Amendment 4-AD-150 from 20260107 - 833CM3030 - BID - SET.pdf PDF
Amendment 4-833CM3030 - BID - 33 56 10 Temporary Fuel Storage Tanks.pdf PDF
Amendment 4-833CM3030 - BID - 052 - S-202 MATERIALS STORAGE BLDG. FRAMING (R2).pdf PDF
Amendment 4-3189 ECS Geotechnical Engineering Report - Maintenance Area.pdf PDF
S06_36C78626R0058 Amend. 0003.pdf PDF
S02 Amendement 36C78626R0058 0002.pdf PDF
S02 amendment 2.pdf PDF
S02 Fire Alarm Panel.pdf PDF
S02 Liquidated Damages 833CM3030_CNNC FCA Corrections CONS.pdf PDF
S02 12 from 833CM3030_CNNC FCA Corrections_CONS_BD DRAWINGS_VOL 1_addendum01.pdf PDF
S02 Amendment 36C78626R0058 0001.pdf PDF
P07 Jessamine Camp Nelson Building.pdf PDF
S02_Price Proposal Breakdown.docx DOCX document
S02_Attachment - Past Performance Questionnaire.docx DOCX document
P07 Jessamine Camp Nelson Highway.pdf PDF
S02_Attachment - DOL Payroll Form.pdf PDF
Show 40 more

Latest 50 of 67 listed here. See the rest on GovTribe.

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Correct FCA Deficiencies Bid Documents

Camp Nelson National Cemetery October 31, 2024

833CM3030

PLANTING IRRIGATION 32 84 00 - 1

SECTION 32 84 00 - PLANTING IRRIGATION

PART 1 - GENERAL

1.1 DESCRIPTION

A. Contractor is responsible for providing a programmable fully automatic system with full and complete coverage within the areas indicated on the drawings. Furnish all labor, materials, supplies, equipment, tools, and transportation, and perform all operations in connection with and reasonably incidental to the complete installation of the fully functional irrigation system, and warranty as shown on the drawings, the installation details, and as specified.

Other items of work specifically included are:

1. Procurement of all applicable licenses, permits, and payment of required fees.

2. Coordination of Utility Locates ("Call Before You Dig").

3. Maintenance period services.

4. Sleeving for irrigation pipes and wires as indicated, and/or beneath all hardscape surfaces.

1.2 DEFINITIONS

A. Lateral Piping: Piping located downstream from control valves to sprinklers, specialties, and drain valves. Piping is under pressure during flow.

B. Mainline Piping: Located downstream from point of connection to water distribution piping to, and including, control valves. Piping is under system pressure.

C. Low Voltage: As defined in NFPA 70 for circuits and equipment operating at less than 50 V or for remote-control, signaling power-limited circuits.

D. Hardscape: Site roads, walks, walls, or any other surface improvements for which removal for excavation to perform maintenance or replacement of the irrigation system pipes, or wires will require disturbance of other than landscape materials.

1.3 RELATED WORK

A. Maintenance of Existing Utilities: Section 01 00 00, GENERAL REQUIREMENTS.

B. Submittals: SECTION 01 33 23 SHOP DRAWINGS, PRODUCT DATA, AND SAMPLES

C. Concrete: Section 03 30 53, CAST-IN-PLACE CONCRETE (SHORT FORM).

D. Excavation, Backfill: Section 31 20 00, EARTH MOVING.

E. Division 26, Electrical

Cemetery Expansion Bid Documents

Beaufort National Cemetery March 8, 2024

831CM3016

PLANTING IRRIGATION 32 84 00 - 2

F. Section 32 90 00, PLANTING

1.4 QUALITY ASSURANCE

A. Irrigation Contractor:

1. Irrigation Contractor must have demonstrated, using persons directly employed by the

Contractor, experience with the construction of at least five (5) irrigation systems having large diameter gasketed pipe (4-inch and larger), centralized control systems with hardwired or radio communication, electrically operated remote control valves, large radius rotary sprinklers (minimum 1-inch inlet with swing joint) and pre-fabricated pump stations.

2. Irrigation Contractor must be licensed in the State of Kentucky.

B. Equipment Manufacturer:

1. Manufacturer regularly and presently manufactures the item submitted as one of their principal products.

2. There is a permanent service organization, maintained or trained by the manufacturer, which will render satisfactory service within 24 hours of receipt of notification that service is requested.

3. Installer, or supplier of a service, has technical qualifications, experience, and trained personnel and facilities to perform the specified work.

C. Products Criteria:

1. Multiple Units: When two or more units of the same type or class of materials or equipment are required, these units are products of one manufacturer.

2. Assembled Units: Manufacturers of equipment assemblies, which use components made by others, assume complete responsibility for the final assembled product.

a. All components of an assembled unit need not be products of the same manufacturer but component parts which are alike are the product of a single manufacturer.

b. Components are compatible with each other and with the total assembly for the intended service.

3. Nameplates: Nameplate bearing manufacturer's name or identification trademark shall be securely affixed in a conspicuous place on equipment, or name or trademark cast

PLANTING IRRIGATION 32 84 00 - 3

integrally with equipment, stamped, or otherwise permanently marked on each item of equipment.

D. System Requirements:

1. Full (head to head plus 10%) and complete coverage of the irrigated areas is required.

Contractor shall, at no additional cost to the Government, make necessary adjustments to head locations as required to achieve full coverage of irrigated areas.

2. Layout work as closely as possible to drawings. Drawings are diagrammatic to the extent that swing joints, offsets and all fittings are not shown. Diagrammatic also refers to the location of the pipelines and valves, which may have been adjusted for clarity of the drawings. Lines are to be common trenched wherever possible. Irrigation heads along roadways shall be placed between 6” and 8”,unless otherwise specified.

3. Locations of remote control valves is schematic. Remote control valves shall be grouped wherever possible and aligned at a set dimension back of curb along roads. Remote control valves shall be located individually or in groups of two, to minimize tripping hazards. Where the exact location for the valves has not been set, or there are any conflicts, the location shall be coordinated with the Owner’s Representative before installation.

4. Irrigation lines and control wire shall run at boundaries of graves, thru designated utility lanes or beside roadways so that any gravesite may be opened in the future without disruption of the irrigation system.

5. Irrigation lines, control wires and power wires shall be run in trenches as indicated on the drawings or as typical for industry standards, if not indicated.

6. Connect new system to existing mains. Disconnect and abandon existing irrigation system, only where noted on plans. Connect to new mains.

7. Unless noted otherwise, all irrigation lines, power wires and control wires shall be run in sleeves or conduit where installed beneath any site hardscape materials.

E. Electrical Components, Devices, and Accessories: Listed and labeled as defined in NFPA 70 by a qualified testing agency, and marked for intended location and application.

F. Completely program central controller and satellite controllers according to approved master irrigation schedule.

G. Upgrade existing controllers as noted on plans.

Beaufort National Cemetery March 8, 2024

PLANTING IRRIGATION 32 84 00 - 4

H. Follow manufacturer's instructions for installation.

I. Manufacturer of Control Systems to certify Control System is complete, including all related components, and totally operational. Submit certificate to Owner’s Representative.

1.5 SUBMITTALS

A. Make submittals and provide number of copies per Specifications Section 01 33 23. Unless otherwise noted, provide four (4) copies of irrigation information in a 3-ring binder with table of contents and index sheet. Provide sections that are indexed and labeled for valves, sprinklers, pipe and fittings, wire and wire connectors, ID tags, shop drawings, “DO NOT

DRINK” sign and all other irrigation equipment shown or described on the drawings and within these specifications. Highlight items being supplied on the catalog cut sheets.

Submittal package must be complete prior to being reviewed by the Owner’s Representative.

Incomplete submittals will be returned without review. Sequentially number each page of the submittal for ease in referencing during submittal review. Pages within a letter or number identified Tab section may be numbered sequentially as long as the process is consistent and provide unique page identification for each page of the submittal.

B. Materials List: Include all materials and products that are part of the irrigation system including, but not limited to: pipe, fittings, valves, mainline components, water filtration components, electrical components and control system components. Quantities of materials need not be included.

C. Manufacturers' Data: Submit manufacturers' catalog cuts and specifications for equipment to be included in the project work. For rotary sprinklers include Center for Irrigation Technology

Space Pro Single Leg Profile showing the Distribution Uniformity and Scheduling Coefficient for the nozzles being used at the specified spacing.

D. Shop Drawings: Complete detailed layout shop drawings covering design of system showing pipe sizes and lengths; fittings, locations, types and sizes of sprinkler heads; controls;

backflow preventers; valves; drainage pits; location and mounting details of electrical control equipment; complete wiring diagram showing routes and wire sizes; wiring details and source of current and connections to existing services. Do not start work before final shop drawing approval.

E. Testing: Submit a proof of testing report following completion of each test listed in Part 1 of these specifications. Unless otherwise noted, include name of test, date of test, name of the

PLANTING IRRIGATION 32 84 00 - 5

individual completing the test, name of the company completing the test and a summary of the test results. If system fails test, document any and all retests until system passes test.

F. Maintenance and Operation Instructions: Submit information listed in Part 3 of these specifications.

G. Record Drawings: Submit information listed in Parts 1 and 3 of these specifications.

H. Name and address of a permanent service organization maintained or trained by the manufacturers that will as a result of determined warranty work, or after warranty period following execution of a service contract for this facility, render satisfactory service within 24 hours of receipt of notification that service is requested.

I. Reproducible "as-built" drawings drawn in Autocad (2010) format. Submit information indicating the “as-built” conditions for the irrigation system to the Owner’s Representative as electronic DWG files of the original bid drawings posted with all addendum, clarifications, and approved modifications. Owner’s Representative

After electronic "as-built" drawing(s) have been approved, the Contractor shall utilize them to prepare an overall irrigation system drawing to replace the existing one with this expansion area included of a size suitable for display at the location determined appropriate by the Cemetery operations staff proximate to the irrigation central control computer at the location determined in the field. The As-built Drawings shall include cross-measured locations of all irrigation valves and control/pumping related equipment.

J. Controller Chart:

1. Prepare a map diagram showing location of all valves, lateral lines, and route of the control wires. Identify all valves as to size, station, number and type of irrigation. "As-built" drawings must be submitted and approved before charts are prepared.

2. Provide one controller chart showing the area covered by controller for each automatic controller supplied at the maximum size controller door will allow. Chart shall be a reduced drawing of the actual "as-built" system. If controller sequence is not legible when the drawing is reduced to door size, the drawing shall be enlarged to a size that is readable and placed folded, in a sealed plastic container, inside the controller door.

3. Chart shall be a print with a different color used to show area of coverage for each station.

Charts must be completed and approved prior to final inspection of the irrigation system.

Beaufort National Cemetery March 8, 2024

PLANTING IRRIGATION 32 84 00 - 6

1.6 SUBSTITUTIONS

A. Unless otherwise noted, use specified equipment to match existing equipment. Owner’s

Representative must approve equipment prior to construction. Changes and associated design costs to accommodate alternative equipment are Contractor’s responsibility. “As-

Built” information shall show the sizes installed.

B. Pipe sizes referenced in the construction documents are minimum sizes, and may be increased at Contractor’s option.

1.7 PERFORMANCE REQUIREMENTS

A. Minimum Working Pressures: The following are minimum pressure requirements for piping, valves, and appurtenances unless otherwise indicated.

1. Irrigation Mainline Piping: 1380 kPa (200 psig).

2. Lateral Piping: 1035 kPa (200 psig).

1.8 CODES AND REGULATIONS

A. Work and materials will be in accordance with the latest edition of the National Electric Code, the Uniform Plumbing Code, and applicable laws and regulations of the governing authorities.

B. When the contract documents call for materials or construction of a better quality or larger size than required by the above-mentioned rules and regulations, provide the quality and size required by the contract documents.

C. If quantities are provided either in these specifications or on the drawings, these quantities are provided for information only. It is the Contractor's responsibility to determine the actual quantities of all material, equipment, and supplies required by the project and to complete an independent estimate of quantities and wastage.

1.9 AVAILABILITY AND USE OF UTILITY SERVICES

A. The government shall make NO utilities available to the Contractor from existing outlets and supplies except as follows. Upon completion of the new irrigation system for this project or completion of portions thereof, the contractor through the permanent connection of the new irrigation system to the existing fully functional irrigation system and new fully operational irrigation water source of supply constructed as part of this project, shall be provided water at available flow and pressure, for use by the Contractor, with Contractor provided additional facilities and/or equipment as required to perform the required flushing and testing of the new irrigation system. Contractor shall coordinate the construction of the

PLANTING IRRIGATION 32 84 00 - 7

new irrigation water source of supply with the irrigation system construction to insure that water is available for irrigation purposes, or shall provide for irrigation water by other means at no cost to the Government. Once the irrigation system and irrigation water source of supply are deemed operable and approved, and prior to the final inspection, the contractor may use water at no cost through the irrigation system for establishing turf and maintaining plant material. The use of water for new landscape establishment shall be coordinated, with the existing Cemetery irrigation operations so as to not adversely effect their operations or the existing irrigated landscape materials. No other expressed or implied uses of government furnished water exist.

B. The Contractor, at Contractor's expense and in a workmanlike manner satisfactory to the

Owner’s Representative, shall install and maintain all necessary temporary connections and distribution lines, and meters required by the public utilities for providing temporary irrigation water. Before final acceptance of the work by the Government, the Contractor shall remove all the temporary connections, distribution lines, meters, and associated appurtenances.

1.10 TESTING

A. Notify the Owner’s Representative three days in advance of testing.

B. All newly installed irrigation pipelines shall be subject to pressure and leakage testing after partial completion of backfill. Pipelines jointed with solvent-welded PVC joints will be allowed to cure at least 24 hours before testing.

C. Subsections of mainline pipe may be tested independently, subject to the review of the

Owner’s Representative.

D. Furnish clean, clear water, pumps, labor, fittings, power and equipment necessary to conduct tests or retests.

E. Volumetric Leakage Test – Gasketed Mainline Pipe:

1. Backfill to prevent pipe from moving under pressure. Expose couplings and fittings.

2. Purge all air from the pipeline before test.

3. Provide all necessary pumps, bypass piping, storage tanks, meters, 75 mm (3-inch) test gauge, supply piping, and fittings in order to properly perform testing. Testing pump must provide a continuous 700 kPa (100 psi) pressure to the mainline pipe. Where main lines are installed with significant elevation change, perform the test at the mid elevation of the segment being tested. Main lines may be tested in segments where the

Beaufort National Cemetery March 8, 2024

PLANTING IRRIGATION 32 84 00 - 8

terrain makes it difficult to maintain the test pressure throughout. The test pressure is the minimum pressure on the line at the highest point of the line segment being tested.

4. Allowable deviation in test pressure is 35 kPa (5 psi) during test period. Average pressure during the test shall be 700 kPa (100 psi) therefore the pressure shall start at 5 psi above and be re-pressurized when the pressure is 5 psi below the test pressure.

Restore test pressure to 700 kPa (100 psi) at end of test. Water added to mainline pipe must be measured volumetrically to nearest 10 ml (0.025 gallons).

5. Subject mainline pipe to the anticipated operating pressure of 700 kPa (100 psi) for two hours. The amount of additional water pumped in during the test will not exceed the value in the table, or the calculated value using the formula below, based upon differing number of joints, duration or pressure of the test:

Leakage Allowable (Gallons per (100 Joints) / Hour)

Test Pressure (PSI)

PIPE SIZE

mm

(INCHES)

63mm (2 ½”) 0.26 0.28 0.30 0.32 0.34 0.35 0.37 0.39 0.40

75mm (3”) 0.31 0.34 0.36 0.38 0.41 0.43 0.44 0.46 0.48

100 mm (4") 0.42 0.45 0.48 0.51 0.54 0.57 0.59 0.62 0.64

150 mm (6") 0.63 0.68 0.73 0.77 0.81 0.85 0.89 0.92 0.96

200 mm (8”) 0.84 0.90 0.97 1.03 1.08 1.13 1.18 1.23 1.28

250 mm (10") 1.05 1.13 1.21 1.28 1.35 1.42 1.48 1.54 1.60

300 mm (12”) 1.26 1.36 1.45 1.54 1.62 1.70 1.78 1.85 1.92

Note: Allowable Leakage calculated using L = (ND√P)/7400

Where: L = Allowable Leakage (gph)

N = Number of Joints

D = Nominal Diameter of Pipe (inches)

P = Average Test Pressure (psi)

PLANTING IRRIGATION 32 84 00 - 9

The following are the values for a 2 hour duration test at 100 psi for pipe length containing

100 joints.

a. 3.10 l (0.82 gallons) per 100 joints of 75 mm (3-inch) diameter pipe

b. 4.09 l (1.08 gallons) per 100 joints of 100 mm (4-inch) diameter pipe

c. 6.13 l (1.62 gallons) per 100 joints of 150 mm (6-inch) diameter pipe

d. 8.18 l (2.16 gallons) per 100 joints of 200 mm (8-inch) diameter pipe

e. 10.22 l (2.70 gallons) per 100 joints of 250 mm (10-inch) diameter pipe

f. 12.26 l (3.24 gallons) per 100 joints of 300 mm (12-inch) diameter pipe

Volumetric leakage exceeding the amounts indicated above, adjusted for system test pressure, number of joints and shall be a failure of the test. Replace defective pipe, fitting, joint, valve, or appurtenance. Repeat the test until the pipe passes test.

6. Cement or caulking to seal leaks is prohibited.

7. Contractor may sub-contract testing to pipeline testing company approved by Owner’s

Representative.

F. Hydrostatic Pressure Test – Solvent Weld Lateral Pipe:

1. Subject lateral pipe to a hydrostatic pressure equal to the anticipated operating pressure of 550 kpa (80 psi) for 30 minutes.

2. Cap all sprinkler risers.

3. Backfill to prevent pipe from moving under pressure. Expose couplings and fittings.

4. Leakage will be detected by visual inspection. Replace defective pipe, fitting, joint, valve, or appurtenance. Repeat the test until the pipe passes test.

5. Cement or caulking to seal leaks is prohibited.

6. After lateral passes test and prior to operational test, install sprinklers and backfill and compact all pipe, fittings, joints, or appurtenance.

G. Operational Test – Remote Control Valves, Lateral Piping and Sprinklers:

1. Activate each remote control valve in sequence from each new satellite controller manually at the controller, automatically from the Central Computer, and via any handheld units through the central controller and/or through their stand alone communication system. Manual operation on the valves from the bleed valve on the

Beaufort National Cemetery March 8, 2024

PLANTING IRRIGATION 32 84 00 - 10

remote control valve is not an acceptable method of activation. The Owner’s

Representative will visually observe operation, water application patterns, and leakage.

2. Replace defective remote control valve, solenoid, wiring, or appurtenance to correct operational deficiencies.

3. Replace, adjust, add, or move water emission devices to correct operational or coverage deficiencies.

4. Replace defective pipe, fitting, joint, valve, sprinkler, or appurtenance to correct leakage problems. Cement or caulking to seal leaks is prohibited.

5. Repeat test(s) until each lateral passes all tests. Repeat tests, replace components, and correct deficiencies at no additional cost to the Owner.

H. Distribution Uniformity (DU):

1. Perform a DU Test on one zone of burial section rotors and one zone of tree lawn rotors per satellite controller. Verify that DU meets submittal 1.5C.

2. In conjunction with the Owner’s Representative, select the zones of sprinklers that are representative of the area being irrigated by the satellite controller.

3. Perform a catch can test using procedures recommended by the Irrigation Association.

4. Where DU test fails adjust zone pressures and/or nozzle sizes to meet required

Distribution Uniformity.

5. Calculate and provide a written documentation of the DU for each zone tested.

6. An Irrigation Association Certified Landscape Irrigation Auditor must perform the test.

Provide written evidence of certification prior to conducting test.

I. Control System Grounding:

1. Test all new satellite controllers for proper grounding of control system with installed grounding equipment that creates grounding resistance readings of 5 ohms or less or higher levels not to exceed 15 ohms, if acceptable by equipment manufacturer without equipment warranty invalidation. Test results must meet or exceed control system manufacturer's requirements for acceptance, while maintaining equipment warranty.

2. Replace defective wire, grounding rod or appurtenances. Repeat the test until the manufacturer's requirements are met. Add grounding rods as needed, bond all rods together.

PLANTING IRRIGATION 32 84 00 - 11

3. If the test is acceptable, the individual completing the test must document the results of the grounding test on the inside of each satellite controller pedestal door and via a written report submitted to the Owner’s Representative. Documentation should include satellite name or number, date of test, name or initials of the individual completing the test, and the ohms resistance to ground. The test results should be marked on the inside of each satellite controller pedestal door using a permanent marker.

4. A written report of the test data listing satellite name or number, date of test, name of the individual completing the test, name of the company completing the test and the ohms resistance to the local ground for each satellite must be submitted to the Owner’s

Representative.

J. Irrigation System Acceptance Test (Burn in) Prior to Final Inspection:

1. Upon completion of construction and prior to Final Inspection, an Acceptance Test(Burn

in) must be passed.

2. Coordinate start of Test with Owner’s Representative.

3. During the Test, the irrigation system must be fully operational from the central control system and/or stand alone programs at the individual satellites// for the system. The irrigation system, must operate with no faults for 14 consecutive days. If at any time during the 14 day test period, a system fault occurs, the source of the fault must be determined and corrected and the 14 day evaluation period will start again. If a system fault occurs, make repairs within 24 hours of notification from Owner’s Representative.

Document any faults in the proof of test report listing date of fault, fault, cause of the fault and the corrective action taken.

4. When the system has operated for 14 days without fault, contact the Owner’s

Representative to schedule Final Inspection.

5. If the system is designed to detect flow and shut down and this condition happens during test, this is considered a success and test continues; if it does not shut down the test starts over

K. Central Control to Supervisory Control and Data Acquisition (SCADA) System Communication

Test:

Beaufort National Cemetery March 8, 2024

PLANTING IRRIGATION 32 84 00 - 12

1. Replace defective wire, wire connections or appurtenances. Repeat the test until the manufacturer's guidelines are met.

2. Test communication between the irrigation central control computer and the SCADA equipment.

3. The Irrigation Delivery Software (IDS) shall function in coordination with the SCADA System for the Irrigation Water Supply Source (IWSS) and IDS systems to operate on fully automatic mode for 14 consecutive daysas described herein and in particular in the Section describing the installation and operation of the SCADA system.

1.11 WARRANTY AND REPLACEMENT

A. The purpose of the warranty is to insure that the Government receives irrigation materials of prime quality, installed and maintained in a thorough and careful manner.

1. Warranty irrigation materials, equipment, and workmanship against defects for a period of one year from Final Acceptance by Owner’s Representative. Fill and repair depressions. Restore landscape, utilities, structures or site features damaged by the settlement of irrigation trenches or excavations. Repair damage to the premises caused by construction or a defective item. Make repairs within 24 hours of notification from

Owner’s Representative.

2. Replace damaged items with identical materials and methods per contract documents or applicable codes. Make replacements at no additional cost to the contract price.

3. Warranty applies to originally installed materials and equipment and replacements made during the Warranty period.

1.12 GENERAL CONSTRUCTION REQUIREMENTS

A. Coordinate construction of irrigation system with Owner’s Representative or Cemetery Staff.

Coordinate temporary shut-down of existing system with Cemetery Staff prior to construction. Disturbance to cemetery operations must be minimized. See irrigation plans and installation details and Specifications Sections for required coordination efforts related to the installation of specific irrigation components.

B. Connections to the existing mainline must be approved by the Owner’s Representative while minimizing the impact on the operation of the existing irrigation system.

PLANTING IRRIGATION 32 84 00 - 13

C. Install irrigation mainline and control and power wiring in sleeves under new roads prior to installation of road base, and under all other concrete or asphalt, either existing or new for this project.

D. Install irrigation components in landscaped areas unless specifically indicated otherwise.

Irrigation components in other than landscaped areas shall be in sleeves//placed utilizing

HDPE pipe, with no joints beneath the non-landscaped areas, unless otherwise noted on plans.

E. Construction cannot proceed unless staking of irrigation mainline, remote control valve locations, and sprinkler locations are reviewed and accepted by the Owner’s Representative.

1.13 APPLICABLE PUBLICATIONS

A. The publications listed below form a part of this specification to the extent referenced. The publications are referenced in the text by the basic designation only.

B. American National Standard Institute (ANSI):

B40.1-05 Gauges-Pressure Indicating Dial Type-Elastic Element

C. American Society of Sanitary Engineers (ASSE):

1013-2005 Reduced Pressure Principle Backflow Preventers

D. American Society for Testing and Materials (ASTM):

A242/A242M-04 (2009) High Strength Low-Alloy Structural Steel

A536-84 (2009) Ductile Iron Castings

B61-08 Steam or Valve Bronze Castings

B62-09 Composition Bronze or Ounce Metal Castings

D1785-06 Poly(Vinyl Chloride) (PVC) Plastic Pipe, Schedule 40, 80, and 120

D1238-04c Standard Test Method for Melt Flow Rates of

Thermoplastics by Extrusion Plastometer

D1784-08 Rigid Poly(Vinyl Chloride)(PVC) Compounds and

Chlorinated Poly(Vinyl Chloride) (CPVC) Compounds

D1785-06 Poly(Vinyl Chloride) (PVC) Plastic Pipe, Schedules 40, 80, D1894-08 Standard Test Method for Static and Kinetic Coefficients of Friction of Plastic Film and Sheeting

Beaufort National Cemetery March 8, 2024

PLANTING IRRIGATION 32 84 00 - 14

D2241-05 Poly(Vinyl Chloride) (PVC) Pressure-Rated Pipe (SDR

Series)

D2464-06 Threaded Poly (Vinyl Chloride) (PVC) Plastic Pipe

Fittings, Schedule 80

D2466-06 Poly(Vinyl Chloride) (PVC) Plastic Pipe Fittings, Schedule

D2564-04e1 Solvent Cements for Poly (Vinyl Chloride) (PVC)

Plastic Piping Systems

D2657-07 Standard Practice for Heat Fusion Joining of Polyolefin

Pipe and Fittings

D3139-98 (2005) Joints for Plastic Pressure Pipes Using Flexible

Elastomeric Seals

D3350-10 Standard Specification for PE Pipe & Fittings Materials

F477-08 Elastomeric Seals (Gaskets) for Joining Plastic Pipe

E. American Water Works Association (AWWA):

C110/A21.10-08 Ductile-Iron and Gray-Iron Fittings, 3-Inch

Through 48-Inch for Water

C111/A21.11-06 Rubber-Gasket Joints for Ductile-Iron Pressure

Pipe and Fittings.

C115/A21.15-05 Flanged Ductile-Iron Pipe with Ductile-Iron or

Gray-Iron Threaded Flanges

C151/A21.51-09 Ductile-Iron Pipe, Centrifugally Cast, for Water

C153/A21.53-00 Ductile-Iron Compact Fittings for Water

Service

C504-06 Rubber Seated Butterfly Valves

C509-09 Resilient-Seated Gate Valves for Water Supply Service

C901-08 AWWA Standard for Polyethylene (PE) Pressure Pipe and Tubing, 13 mm (½ In.) through 76 mm (3 In.), for Water

Service

F. Manufacturers Standardization Society (MSS):

SP70-2006 Cast Iron gate Valves, Flanged and Thread Ends

PLANTING IRRIGATION 32 84 00 - 15

G. National Electrical Manufacturers Association (NEMA):

250-2008 Enclosures for Electrical Equipment (1000 Volts

Maximum);

PART 2 - PRODUCTS

2.1 QUALITY

A. Use new materials without flaws or defects.

2.2 SUBSTITUTIONS

A. Unless noted otherwise, use specified equipment. Equipment used will match the equipment installed in the previous phase as noted. Owner’s Representative must approve equipment prior to construction. The Contactor through written request prior to purchase or installation may request substitutions to the approved equals listed herein. Changes and associated design costs to accommodate alternative equipment are Contractor’s. No substitutions will be accepted without written approval by Owner’s Representative.

B. Pipe sizes referenced in the construction documents are minimum sizes, and may be increased at Contractor’s option.

2.3 SLEEVING

A. Provide sleeves beneath all hardscape for irrigation pipe and all wiring. Provide separate sleeves beneath hardscape for wiring.

B. Use rigid, unplasticized polyvinyl chloride (PVC) 1120, 1220 National Sanitation Foundation

(NSF) approved pipe, extruded from material meeting the requirements of Cell Classification

12454-A or 12454-B, ASTM Standard D1784, with an integral belled end.

D. Use Class 200, SDR-21, rated at 1375 kPa (200 psi), conforming to dimensions and tolerances established by ASTM Standard D2241 or AWWA C905, DR-25 rated at 1135 kPa (165 psi) conforming to AWWA Standard C905, or use C-900 PVC pipe, rated at 1375 kPa (200 psi).

E. Sleeve sizes are to be as shown on the drawings or twice the nominal diameter of pipe if not shown. The wiring bundle area may not exceed more than 40% of the sleeve cross sectional area, per NEC recommendations.

F. Restrained Casing Spacers:

Beaufort National Cemetery March 8, 2024

PLANTING IRRIGATION 32 84 00 - 16

Use restrained casing spacers on gasketed mainline pipe contained in a sleeve. Provide restrained casing spacers for gasketed joints that occur within sleeve and as necessary along pipe length.

2. Sleeve Size: As shown in the Casing Spacer Installation Detail.

3. Use casing spacers manufactured from high strength ductile iron, per ASTM A536, Grade 65-

45-12. Use restraining rods manufactured from high strength low alloy material meeting the requirements of ASTM A242 and ANSI/AWWA C111/A21.11. Use runners manufactured from ultra high molecular weight polymer with a tensile impact of 175-350 Joules/cm (600-

1200 ft-lbs./in.) and a coefficient of friction of 0.14-0.17 per ASTM D-1894.

2.4 PIPE AND FITTINGS

A. Irrigation Mains:

1. Provide one of the following materials (must be pipe type noted on plans):

a. Ductile Iron, AWWA C151, minimum working pressure 1025 kPa (150 psi), cement lined, exterior bituminous coated.

b. Polyvinyl Chloride (PVC) Pressure Pipe, Class 200 PVC , solvent weld for all mainline 3” and smaller, Class, 200, SDR 21, Gaskted for all mainline 4” and larger), conforming to dimensions and tolerances established by ASTM Standard D2241.

c. High Density Polyethylene (HDPE) pipes shall comply with AWWA Specifications

C901. Materials used for the manufacture of polyethylene pipe and fittings shall be made from a PE 3408 high density polyethylene resin compound meeting cell classification 345434C per ASTM D3350; and meeting Type lll, Class C, Category

5, Grade P34 per ASTM D1238.

2. Except for HDPE pipe, for all mainline 4” size and larger, use rubber-gasketed pipe equipped with factory installed reinforced gaskets for mainline pipe. Gasketed pipe joints must conform to the “Laboratory Qualifying Tests” section of ASTM D3139.

Gasket material must conform to ASTM F477. Use push-on rubber-gasketed ductile iron fittings according to 2.4.E. For all mainline 3” and smaller utilize Solvent weld pipe and fittings. Thrust Blocks and Restraints shall be utilized on all mainline fittings (see below).

3. Mainline pipe within sleeves: Provide restrained casing spacers for gasketed joints that occur within sleeve and as necessary along pipe length.

B. Lateral Pipe and Fittings:

PLANTING IRRIGATION 32 84 00 - 17

1. Use rigid, unplasticized polyvinyl chloride (PVC) 1120, 1220 National Sanitation

Foundation (NSF) approved pipe, extruded from material meeting the requirements of

Cell Classification 12454-A or 12454-B, ASTM Standard D1784, with an integral belled end suitable for solvent welding.

2. Use Class 200 PVC, SDR 21, solvent weld pipe for lateral piping..

3. Use solvent weld pipe for lateral pipe. Use Schedule 40, Type 1, PVC solvent weld fittings conforming to ASTM Standards D2466 and D1784 for PVC pipe. Use primer approved by pipe manufacturer. Solvent cement to conform to ASTM Standard D2564, of type approved by pipe manufacturer.

C. Threaded Pipe:

1. Polyvinyl Chloride, ASTM D1785, PVC 1120, Schedule 80, for threaded connections, risers and swing joints.

D. Pipe Above Grade and in Concrete Structures:

1. AWWA C115, flanged joints and fittings working pressure 1025 kPa (150 psi).

E. Fittings:

1. Irrigation Mains:

a. Ductile Iron and PVC Pipe:

Use mechanical joints conforming to ANSI A 21.10 (AWWA C110) and ANSI

A21.11 (AWWA C111) or flanged fittings conforming to ANSI/AWWA C110 and

ANSI B16.1 850 kPa(125#). All fittings shall be installed with retainer glands designed for the pipe material, and shall be manufactured with twist off screws that sheer off at the proper force to anchor the retainer gland to the pipe at the pressure rating for the pipe, or at the test pressure for the pipe, whichever is higher, without causing damage to the pipe.

b. High Density Polyethylene:

The pipe shall be joined with butt, heat fusion joints as outlined in ASTM D2657 and conform to the Generic Butt Fusion Joining Procedure for Field Joining of

Polyethylene Pipe, Technical Report TR-33/2005, published by the Plastic Pipe

Institute (PPI). All joints shall be made in strict compliance with the manufacturer’s recommendations. A factory qualified joining technician as designated by pipe manufacturer or experienced, trained technician shall

Beaufort National Cemetery March 8, 2024

PLANTING IRRIGATION 32 84 00 - 18

perform all heat fusion joints. Lengths of pipe shall be assembled into suitable installation lengths by the butt-fusion process. All pipes so joined shall be made from the same class and type of raw material made by the same raw material supplier

2. Irrigation Laterals:

PVC, schedule 40, solvent welded socket type, ASTM D2466.

3. Threaded Pipe:

PVC, schedule 80, ASTM D2464.

4. Swing Joints:

Shall be a standard complete assembly by a manufacture, with elastomeric seals that allow

360 degree rotation, and are designed for minimum 1375 kPa (200 psig) working pressure.

F. Jointing Materials:

1. Irrigation Mains: Rubber gaskets, AWWA C111.

2. Irrigation Laterals: Use Schedule 40, Type 1, PVC solvent weld fittings conforming to ASTM

Standards D2466 and D1784 for PVC pipe. Use primer approved by pipe manufacturer.

Solvent cement to conform to ASTM Standard D2564, of type approved by pipe manufacturer.

3. Threaded pipes: Use only Teflon-type tape or Teflon based paste pipe joint sealant on plastic threads. Use non-hardening, non-toxic pipe joint sealant formulated for use on water-carrying pipes on metal threaded connections.

2.5 RESTRAINTS

A. Thrust Blocks:

1. Use thrust blocks for fittings on pipe greater than or equal to 75 mm (3-inch) diameter or any diameter rubber gasketed pipe. Use of mechanical restraints does not eliminate the need for installation of thrust blocks as specified.

2. Use 20 MPa(3,000-psi) concrete.

3. Use 50 micrometers (2-mil) plastic.

4. Use 12.7 mm (No. 4) Rebar wrapped or painted with asphalt tar based mastic coating.

B. Joint Restraint Harness:

PLANTING IRRIGATION 32 84 00 - 19

1. Use a joint restraint harness as presented in the installation details and wherever joints are not positively restrained by flanged fittings, threaded fittings, and/or retainer glands and thrust blocks.

2. Use a joint restraint harness with all ductile iron fittings 150 mm (6-inch) and larger, transition fittings between metal and PVC pipe, where weak trench banks do not allow the use of thrust blocks, or where extra support is required to retain a fitting or joint.

3. Use a joint restraint harness or retainer glands with preset torque shearing set screws, on all mainline gate valve assemblies 100 mm (4-inch) and larger.

4. Use bolts, nuts, retaining clamps, all-thread, or other joint restraint harness materials that are stainless steel. Use retainer conforming to ASTM A536. Use high strength, low alloy steel bolts and connecting hardware conforming to ANSI/AWWA C111/A21.11.

2.6 MAINLINE COMPONENTS

A. Valves (Except remote control valves):

1. General valve installation shall be as presented in the installation details. Unless specifically noted otherwise, valves for existing facilities shall match the existing, of the same type. All valves shall meet or exceed any specified parameters identified herein, or the parameters for the existing valves being matched, whichever provided the higher quality product.

a. Underground Shut-Off Valves: Provide One or more of the following based upon project specific conditions. Use type in paragraph 1) unless there are special circumstances that require the other types:

1) Gate valves 50 mm (2 inches) and larger: Iron body, bronze mounted, double disc with parallel or inclined seats, non-rising stem turning clockwise to close, //1025 kPa (150 psi)//1375 kPa (200 psi)// minimum working pressure. AWWA C509.

2) Butterfly valves 80 mm (3 inches) and larger: cast iron body with stainless steel shaft, ductile iron valve disc and resilient rubber coated, //1025 kPa

(150 psi)//1375 kPa (200psi) minimum pressure. AWWA C504.

b. Check Valves: Swing.

1) Smaller than 100 mm (4 inches): Bronze body and bonnet, ASTM B61 or

B62, 850 kPa (125 pound) WSP.

Beaufort National Cemetery March 8, 2024

PLANTING IRRIGATION 32 84 00 - 20

2) One hundred mm (4 inches) and larger: Iron body, bronze trim, vertical or horizontal installation, flange connection, 1375 kPa (200 pound) WOG.

c. Pressure Reducing Valve:

Cast steel body with renewable seats, with stainless steel trim. Flow passages and all parts designed to withstand high velocity applications, flange connected.

Unless otherwise noted, pressure reducing valves shall be adjustable to the desired pressure, within the selected range of operation specified.

d. Air-Vacuum Relief Valve:

1) Cast Iron body with epoxy coating, polypropylene float, glass fiber reinforced nylon kinetic float, Buna-N seals and O-rings, stainless steel nuts and bolts, pressure range 14 kPa to 1580 kPa(2 psi to 230 psi). Use a continuous acting combination air and vacuum and air release valve.

e. PVC Ball Valve:

Use a true union ball rated to 1620 kPa (235 psi). Use valve with safe-t-blocked seal carrier (full rated pressured) safe-t-shear stem, and self adjusting floating seat.

f. Quick Coupling Valve Assembly:

1) As presented in the installation details.

2) Brass construction, 1-inch nominal size, operating pressure 35-860 kPa(5-

125 psi) with locking rubber or vinyl cover. Acceptable manufacturer and model is //(fill in based upon the existing acceptable products)// to match existing equipment or approved equal. //For new installations use high quality brass, bronze or stainless steel manufacturer’s equipment for similar golf course or lite commercial applications.

3) Swing Joint: Use pre-manufactured triple swing joint. Quality of manufactured product shall meet or exceed that of products manufactured by Spears, Lasko, or approved equal.

4) Quick Coupler Anchor: Use pre-manufactured bolt on anchor.

5) Valve Box: Use plastic (ABS) 10-inch round valve box with black lid.

Product quality shall meet or exceed that of Brooks Products or approved equal.

PLANTING IRRIGATION 32 84 00 - 21

6) Filter Fabric: Use a spunbond polyester 3.5 oz per square yard landscape fabric.

B. Flower Water Station Spigot Connection Assembly:

1. As presented in the installation details.

2. Flower Watering Station Spigot: As specified in Section 323000, Site Furnishings

3. Curb Stop Valve: Brass body, 2070 kPa (300 psi) minimum working pressure. ASTM B-62, female threaded connections, with stop and waste feature.

4. Inline pressure regulator, 275 kPa (40 psi) maximum, 1-inch maximum inlet and outlet.

5. Copper Pipe: Use Type “M” soft tubing conforming to ASTM Standard B88. Use wrought copper or cast bronze fittings, soldered, flared mechanical, or threaded joint per installation details. Use a 95-percent tin and 5-percent antimony solder.

6. Valve Box: Use a concrete curb valve box with cast iron lid sized 200 mm ID x 300mm (8”

ID x 12”). Valve box must be capable of being face anchored in concrete.

7. The final approved configuration, including the mounting method shall be as approved during the submittal process.

C. Valve Box:

1. Gate and Butterfly Valve:

a. Valve boxes in pavement shall be precast concrete with compressive strength of the concrete in excess of 30 Mpa (4000 psi). In turf and planter areas valve boxes shall be HDPE structural foam Type A, Class III, //black//green//tan// in color.

Box shall be minimum 475 mm (19 inches) long by 350 mm (14 inches) deep with key-lockable hinged lid.

b. Box shall be of such length to be adapted to depth of cover required over pipe at valve location. Mark box cover to differentiate between lawn irrigation system and domestic water supply system and set flush with finished grade. Provide 2

"T" handle socket wrenches of 15 mm (5/8 inch) round stock with sufficient length to extend 600 mm (2 feet) above top of deepest valve box cover.

c. Operations:

1) Underground: furnish valves with 50 mm (2 inch) nut for T-Handle socket wrench operation.

2) Above ground and in pits: MSS SP70, with handwheels.

Beaufort National Cemetery March 8, 2024

PLANTING IRRIGATION 32 84 00 - 22

3) All butterfly valves 150 mm (6 inches) and above shall have enclosed gear drive operators.

4) Ends of valves shall accommodate the type of pipe installed. Valves on buried irrigation mains shall have Mechanical Joint ends with retainer glands.

2. Remote Control Valves:

a. When in pavement, valve boxes shall be precast concrete with compressive strength of the concrete in excess of 30 MPa (4000 psi). In planter areas, valve boxes shall be HDPE structural foam Type A, Class III, green in color. Box shall be minimum 475 mm (19 inches) long by 350 mm (14 inches) deep with key-lockable hinged lid.

SPEC WRITER NOTE:

1. Modify subparagraph 1 and 2 as required to match the existing conditions, or as directed by the project area MSN Engineer during project design review.

1) After installation hot brand into lid of valve boxes boxes 75 mm (3-inch) high, 1 mm (3/16”) deep labels designating the size stencils designated controller and circuit numbers with permanent white epoxy paint.

Numbers shall be placed at center of valve cover and shall face nearest main road or service road.

b. Furnish ____ 750 mm (30 inch) long valve adjustment keys.

2.7 SPRINKLER IRRIGATION COMPONENTS

A. Remote Control Valve Assembly:

1. Remote control valve:

a. As presented in the installation details. Installation shall result in the control valve being installed underground and operated by a 24-volt AC electric solenoid

Valves shall be globe type of heavy duty construction and shall have manual shut-off and flow control adjustment and provide for manual operation. Install valves with unions on each side to allow for easy removal. Valves shall have a minimum of 1025 kPa (150 psi) working pressure. Higher working pressure valves shall be provided for systems that operate with working pressures above 140 psi.

Install assembly over gravel sump as presented in the installation details.

PLANTING IRRIGATION 32 84 00 - 23

b. Valves shall be of all brass or plastic construction furnished as straight or angle pattern type, or valve body shall be cast-iron with brass bonnet, trim and renewable seat and have two inlet tappings (furnished with one plugged) to allow installation as either a straight or angle pattern valve.

c. Valves shall contain pressure regulators.

d. Valves shall be completely serviceable from the top without removing valve body from the system. Furnish 2 750 mm (30 inch) long adjustment keys. Valves to operate at no more than 50 kPa (7 psi) pressure loss at manufacturers maximum recommended flow rate.

2. PVC Ball Valve: Use a true union ball rated to 235 PSI. Use valve with safe-t-blocked seal carrier (full rated pressured) safe-t-shear stem, and self adjusting floating seat.

Acceptable manufacturer is Spears or approved equal.

3. PVC Union: Use a Schedule 40 threaded union with O-ring seal. Acceptable manufacturer is Spears or approved equal.

4. Filter Fabric: Use a spun bond polyester 3.5 oz. per square yard landscape fabric.

5. Wire connectors: Use 3M DBY or DBR.

6. Use standard Christy I.D. tags with hot-stamped black letters on a yellow background.

B. Pop-Up Gear-Driven Rotary Sprinkler Assembly:

1. Full Circle Sprinklers: To be a dual or tri-nozzle combination type with positive drive by means of a gear assembly. Sprinkler head to rotate uniformly and to be driven by means of a train of gears. Sprinklers to be equipped with an integral anti-drain valve to be self-closing at pressures of 3.0 m (10 feet) of head or less. Gears and pinions shall be assembled on stainless steel spindles in a water-lubricated sand proof gear case. An inlet screen shall prevent debris from entering the sprinkler and shall be removable with the ``internal assembly. Sprinklers outer case shall be constructed of corrosion resistant, impact resistant, heavy-duty ABS.

2. Part circle sprinklers to be variable arc type as required with same type drive used for full circle heads.

C. Spray Heads:

Nozzle shall be pop-up or fixed spray type of standard, undersize or oversize configuration as noted on plans. The sprinkler body, stem, nozzle and screen shall be constructed of heavy-

Beaufort National Cemetery March 8, 2024

PLANTING IRRIGATION 32 84 00 - 24

duty, ultraviolet resistant plastic. It shall have a heavy duty stainless steel retract spring and a ratcheting system for alignment of the pattern. The sprinkler shall have a soft elastomer pressure-activated comolded wiper seal for cleaning debris from the pop-up stem. The sprinkler shall have a plastic or brass nozzle with an adjusting screw capable of regulating the radius and flow. The sprinkler shall be capable of housing protective, non-clogging filter screens or pressure compensating screens (PCS) under the nozzle.

E. Low Voltage Control Valve Wire:

1. Wire for Non-Decoder based controls: Solid copper wire, Underwriters Laboratories Inc.

approved for direct burial in ground. Size of wire shall be in accordance with manufacturer's recommendations, but in no case less than No. 14. All common wiring shall be No. 12 gauge size (white in color). Control Wiring shall be red in color.

2. Splicing Materials: Epoxy waterproof sealing packet, 3M DBR/Y-6 or approved equal.

3. Low voltage controller cable: Multi-strand cable, Underwriters Laboratories Inc.

approved for direct burial in ground. Size and type of wire shall be in accordance with manufacturer’s recommendations.

F. Warning Tape:

1. Standard, 4-Mil polyethylene 76 mm (3 inch) wide tape, detectable type blue with black letters (if potable water), or purple with black letters (if reclaimed or untreated well water), and imprinted with “CAUTION BURIED IRRIGATION WATER LINE BELOW”.”

G. Tracer Wires:

1. No. 14, Green, Type TW plastic-coated copper tracer wire shall be installed with non-metallic irrigation main lines.

2.8 CONTROL SYSTEM COMPONENTS

A. Irrigation Contractor shall relocate the controller to inside the pump/filtration room and upgrade as noted on plans.Existing Control System will remain in place. Refer to notes on plans.

PART 3 - EXECUTION

3.1 INSPECTIONS AND REVIEWS

A. Site Inspections:

1. The Contractor Shall verify construction site conditions and note irregularities affecting work of this section. Report irregularities to the Owner’s Representative prior to beginning work.

PLANTING IRRIGATION 32 84 00 - 25

B. Utility Locates ("Call Before You Dig"):

1. Arrange for and coordinate with local authorities the location of all underground utilities, and with cemetery maintenance personnel.

2. Repair any underground utilities damaged during construction. Make repairs at no additional cost to the contract price.

C. Irrigation System Layout Review: Irrigation system layout review will occur after the staking has been completed. Notify the Owner’s Representative one week in advance of review. The

Owner’s Representative will identify and approve modifications during this review.

3.2 LAYOUT OF WORK

A. Stake locations of alley and sprinklers in existing burial sections…

This is the start of the file's text. The full file is on GovTribe.

File details come from the government source that posted it. Updated .