Amendment 4-833CM3030 - BID - 020 - CG-201 POND AND CRYPT FIELD SECTIONS (R1).pdf

PDF 1 MB Posted

Attached to
CAMP NELSON NATIONAL CEMETERY, KY 833CM3030 – CORRECT FCA DEFICIENCIES
Solicitation number
36C78626R0058
Issued by

About this file

This document is a technical drawing set for construction work at Camp Nelson National Cemetery in Covington, Louisiana. The drawings detail the design and installation specifications for a wet detention pond and crypt field sections, prepared by Walker Federal Services, LLC as the prime consultant with Principal Engineering and AL Engineering as supporting consultants. The project is identified as Drawing CG-201 in the 128 Bid Set, dated January 7, 2026, with an RFI Amendment 003 issued on October 6, 2026.

The construction specifications include detailed cross-sections and installation procedures for a pond liner system utilizing 45 mil EPDM liner (Firestone Pondguard or approved equivalent) positioned between geotextile layers. Key construction elements include over-excavation to 2.5 feet below the pond floor with compacted subgrade preparation, sand identification courses, existing clay liner replacement in kind, and specific seam joining procedures using EPDM primer (Quickprime Plus or approved equivalent) and 3-inch wide butyl adhesive seam tape (Firestone Quickseam Splice Tape or approved equivalent). The pond design incorporates water surface elevation at 893.25 feet with a 3:1 slope ratio and includes removal and replacement of existing precast lawn crypts, topsoil, compacted fill, hardened identifier layers, and existing irrigation lines. The drawing also specifies contractor requirements for excavation, compacted backfill, turf/sod replacement, and restoration of landscape elements in accordance with associated landscape plans.

View the file

Other files

File Type Posted
Amendment 4-833CM3030 - CD1 - Historic Hardware.pdf PDF
Amendment 4-833CM3030 - BID - HA-001 from 20260422 - 833CM3030 - BID - SET.pdf PDF
Amendment 4-833CM3030 - BID - CU-105 from 20260107 - 833CM3030 - BID - SET.pdf PDF
Amendment 4-833CM3030 - BID - 23 11 13 Fuel Storage Tanks.pdf PDF
Amendment 4-833CM3030 - BID - 037 - CU-105 UTILITY PLAN (R2).pdf PDF
Amendment 4-833CM3030 - BID - 26 29 23 Engine Control and Monitoring.pdf PDF
Amendment 4-833CM3030 - BID - 028 - CP-105 PAVING PLAN (R2).pdf PDF
Amendment 4-833CM3030 - BID - SN-104 105 and X-series from 20260107 - 833CM3030 - BID - SET.pdf PDF
Amendment 4-833CM3030 - BID - Historic Pages from 20260422 - 833CM3030 - BID - SET A-004 005 132 133 154 155.pdf PDF
Amendment 4-ConVault Specification with UL 752 Level 8.pdf PDF
Amendment 4-Convault Storage tank 500 GL-telford.pdf PDF
Amendment 4-Convault Brochure 2019 (003).pdf PDF
Amendment 4-AE-113 from 20260422 - 833CM3030 - BID - SET.pdf PDF
Amendment 4-AE-113 833CM3030 - BID - SET.pdf PDF
S02 36C78626R0058 Amendment 0004.docx DOCX document
Amendment 4-833CM3030 - CD1 - Historic Preservation.pdf PDF
Amendment 4-SED FCA - 04212022_Camp Nelson.pdf PDF
Amendment 4-833CM3030 - BID - AE-110 from 20260422 - 833CM3030 - BID - SET.pdf PDF
Amendment 4-833CM3030 - BID - 328400 Plant Irrigation_10-31-24.pdf PDF
Amendment 4- 36C78626R0058 FuelForce 814 Advanced Fuel Controller Brochure.pdf PDF
Amendment 4-240524-Camp Nelson National Cemetery - KY- SUE Field Report Deliverable.pdf PDF
Amendment 4-833CM3030 - BID - AE-150 from 20260422 - 833CM3030 - BID - SET.pdf PDF
Amendment 4-833CM3030 - BID - 07 42 43 Plastic Panel.pdf PDF
Amendment 4-833CM3030 - BID- EQUIPMENT STORAGE GARAGE-AE-141.pdf PDF
Amendment 4-GI-104 from 20260107 - 833CM3030 - BID - SET.pdf PDF
Amendment 4-833CM3030 - BID - 231123 NatGas.pdf PDF
Amendment 4- 833CM3030 - BID - 072727 - BARRIER VAPOR.pdf PDF
Amendment 4-3189 ECS Geotechnical Engineering Report - Expansion Area.pdf PDF
Amendment 4-833CM3030 - BID - 329000 Planting.pdf PDF
Amendment 4-3189 ECS Geotechnical Engineering Report - Camp Nelson Cemetery.pdf PDF
Amendment 4-833CM3030 - BID - 050 - S-101 STRUCTURAL PLAN (R2).pdf PDF
Amendment 4-Lightning Protection Asmnt Report_Camps Nelson Cemetery.pdf PDF
Amendment 4-Dispensing System Controller-SafeSite DSC with specs.pdf PDF
Amendment 4-833CM3030 - BID - CD-102 from 20260107 - 833CM3030 - BID - SET.pdf PDF
Amendment 4-AD-150 from 20260107 - 833CM3030 - BID - SET.pdf PDF
Amendment 4-833CM3030 - BID - 33 56 10 Temporary Fuel Storage Tanks.pdf PDF
Amendment 4-833CM3030 - BID - 052 - S-202 MATERIALS STORAGE BLDG. FRAMING (R2).pdf PDF
Amendment 4-3189 ECS Geotechnical Engineering Report - Maintenance Area.pdf PDF
S06_36C78626R0058 Amend. 0003.pdf PDF
S02 Amendement 36C78626R0058 0002.pdf PDF
S02 amendment 2.pdf PDF
S02 Fire Alarm Panel.pdf PDF
S02 Liquidated Damages 833CM3030_CNNC FCA Corrections CONS.pdf PDF
S02 12 from 833CM3030_CNNC FCA Corrections_CONS_BD DRAWINGS_VOL 1_addendum01.pdf PDF
S02 Amendment 36C78626R0058 0001.pdf PDF
P07 Jessamine Camp Nelson Building.pdf PDF
S02_Price Proposal Breakdown.docx DOCX document
S02_Attachment - Past Performance Questionnaire.docx DOCX document
P07 Jessamine Camp Nelson Highway.pdf PDF
S02_Attachment - DOL Payroll Form.pdf PDF
Show 40 more

Latest 50 of 67 listed here. See the rest on GovTribe.

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

EX. DRAIN

INLET EL. 893.25

EX. BERM

EXISTING SWM OUTLET

STRUCTURE

MODIFY EX. SWM INLET

EX. POND

PROFILE

EL. 898.0'

DRAIN INV. EL. 893.5

EL. 889.25'

WSE = 893.25'

EL. 886.75'

EX. POND PROFILE DESIGN STANDING

WSE = 893.25'

12'-0" (TYP.)

12'-0" (TYP.)

EL. 889.25'

EL. 886.75'

NEW AGGREGATE, LINER, AND SAND

3'-0"1'-6"

VA

RI

ES

2' -0

TOPSOIL

12" AGGREGATE COVER

EPDM LINER, 45 MIL

BETWEEN TWO

GEOTEXTILE LAYERS

ANCHOR TRENCH. BACKFILL W/

EXCAVATED MATERIAL

WSE = 893.25'

CG-201

SAND

TOP OF LINER

EL. = 896.0

3' GEOTEXTILE INTERFACE STRIP B/T

AGGREGATE & CLAY

EXISTING CLAY LINER

EXISTING CLAY LINER

(TO REMAIN)

REMOVE

CLAY LINER

CLAY LINER REPLACED IN KIND

1' -1

0" M

AX

CO

VE

R

1' -8

" M

IN

CO

VE

R

1' -8

" M

IN

1' -1

0" M

AX

CO

VE

R

12" AGGREGATE

45 MIL EPDM LINER B/T TWO GEOTEXTILE LAYERS,

FIRESTONE PONDGUARD OR APPROVED EQUIVALENT

COMPACTED SUBGRADE

1' -0

SAND

1' -6

"GEOTEXTILE

45 MIL EPDM POND LINER,

FIRESTONE PONDGUARD

OR APPROVED EQUIVALENT

EPDM PRIMER, QUICKPRIME PLUS OR

APPROVED EQUIVALENT (SEE NOTE 1)3" WIDE BUTYL ADHESIVE SEAM TAPE,

FIRESTONE QUCKSEAM SPLICE TAPE

OR APPROVED EQUIVALENT (SEE NOTE 2)

45 MIL EPDM POND LINER,

FIRESTONE PONDGUARD

OR APPROVED EQUIVALENT

DIRECTION OF WATER FLOW

1'-0" 1'-0"

UN

I TED

STATES OF AMER

I C

A

EN

T

OF VETERANS

AFFA

IRS

N C A

ATIONAL

EMETERY

DMINISTRATION

Revisions Date

Drawing Title

Approved:

Approved:

Project Title

Building Number Checked Drawn

Location

Date

DRAWING NO.

Dwg. Of

1 2 4 5 6 7 8 9

1 2 3 4 5 6 7 8 9

A B

C D

E F

A B

C D

E F

© COPYRIGHT 2022, Walker Federal Services, LLC

PRIME CONSULTANT

Walker Federal Services, LLC 7820B-162 Wormans Mill Road Frederick, Maryland 21701

CONSULTANTS

WFS

Correct FCA Deficiencies

CAMP NELSON NATIONAL CEMETERY

833CM3030

ACM LMR

JANUARY 7, 2026

Bid Set

128 NORTHPARK BLVD.,

COVINGTON, LA 70433

ALAL

Engineering

PRINCIPPRINCIP

POND AND CRYPT

FIELD SECTIONS

CG-201

SECTION - WET DETENTION POND

3/16" = 1'-0"

SECTION - WET DETENTION POND (LONGITUDINAL)

3/16" = 1'-0"

POND LINER INSTALLATION INTO SLOPE

1/4" = 1'-0" 5

4" IDENTIFIER LAYER REMOVE AND REPLACE

1/2" = 1'-0"

REPLACEMENT (SIDE VIEW) REPLACEMENT (END VIEW)

REPLACE TOPSOIL. CONTRACTOR TO

USE NEWLY IMPORTED TOPSOIL

COMPACTED BACKFILL

REPLACE EXISTING TURF/SOD

(SEE LANDSCAPE)

REPLACE TOPSOIL. CONTRACTOR TO

USE NEWLY IMPORTED TOPSOIL

COMPACTED BACKFILLREPLACE EXISTING TURF/SOD

SAND IDENTIFICATION COURSE;

4" NATURAL SAND LAYER

SAND IDENTIFICATION COURSE;

4" NATURAL SAND LAYER

NOTE:

CONTRACTOR SHALL OVER-EXCAVATE TO 2.5' DEPTH BELOW POND FLOOR. COMPACT SUBGRADE.

SURFACE OF COMPACTED SUBGRADE SHALL BE SMOOTH AND FREE OF STONES, STICKS, AND DEBRIS.

SECTION - POND LINER INSTALLATION

3/4" = 1'-0"

CU-201

EPDM POND LINER SEAM JOINING

N.T.S.

NOTES:

1. CLEAN AND DRY THE AREAS TO BE JOINED WITH A LINT-FREE CLOTH AND APPROVED CLEANER, THEN APPLY EPDM PRIMER TO SEAM

AREAS OF BOTH LINERS. ALLOW PRIMER TO FLASH BEFORE APPLYING SEAM TAPE.

2. CAREFULLY ALIGN AND APPLY DOUBLE-SIDED SEAM TAPE TO LOWER LINER FIRST. ROLL TO ELIMINATE AIR POCKETS. REMOVE BACKING FROM TOP OF SEAM TAPE AND LAY UPPER LINER SECTION ONTO IT. USING A WEIGHTED ROLLER, COMPRESS ENTIRE SEAM

TO ENSURE COMPLETE ADHESIVE CONTACT AND REMOVE AIR BUBBLES.

3" SEAM OVERLAP

CG-201

REMOVAL

EX. PRECAST

LAWN CRYPTS

REMOVE TOPSOIL &

COMPACTED FILL

REMOVE HARDENED

IDENTIFIER LAYER

EX. CLEANOUT

EX. CLEANOUT

EX. PRECAST

LAWN CRYPTS

GRAVESITE GRID

MONUMENT

EX. IRRIGATION LINE

CG-201

EXCAVATION

RFI - AMMENDMENT 003 10/6/26

Sheets and Views
CG-201

File details come from the government source that posted it. Updated .