Amendment 4-833CM3030 - BID - 020 - CG-201 POND AND CRYPT FIELD SECTIONS (R1).pdf
PDF 1 MB Posted
- Solicitation number
- 36C78626R0058
About this file
This document is a technical drawing set for construction work at Camp Nelson National Cemetery in Covington, Louisiana. The drawings detail the design and installation specifications for a wet detention pond and crypt field sections, prepared by Walker Federal Services, LLC as the prime consultant with Principal Engineering and AL Engineering as supporting consultants. The project is identified as Drawing CG-201 in the 128 Bid Set, dated January 7, 2026, with an RFI Amendment 003 issued on October 6, 2026.
The construction specifications include detailed cross-sections and installation procedures for a pond liner system utilizing 45 mil EPDM liner (Firestone Pondguard or approved equivalent) positioned between geotextile layers. Key construction elements include over-excavation to 2.5 feet below the pond floor with compacted subgrade preparation, sand identification courses, existing clay liner replacement in kind, and specific seam joining procedures using EPDM primer (Quickprime Plus or approved equivalent) and 3-inch wide butyl adhesive seam tape (Firestone Quickseam Splice Tape or approved equivalent). The pond design incorporates water surface elevation at 893.25 feet with a 3:1 slope ratio and includes removal and replacement of existing precast lawn crypts, topsoil, compacted fill, hardened identifier layers, and existing irrigation lines. The drawing also specifies contractor requirements for excavation, compacted backfill, turf/sod replacement, and restoration of landscape elements in accordance with associated landscape plans.
View the file
Other files
Show 40 more
Latest 50 of 67 listed here. See the rest on GovTribe.
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
EX. DRAIN
INLET EL. 893.25
EX. BERM
EXISTING SWM OUTLET
STRUCTURE
MODIFY EX. SWM INLET
EX. POND
PROFILE
EL. 898.0'
DRAIN INV. EL. 893.5
EL. 889.25'
WSE = 893.25'
EL. 886.75'
EX. POND PROFILE DESIGN STANDING
WSE = 893.25'
12'-0" (TYP.)
12'-0" (TYP.)
EL. 889.25'
EL. 886.75'
NEW AGGREGATE, LINER, AND SAND
3'-0"1'-6"
VA
RI
ES
2' -0
TOPSOIL
12" AGGREGATE COVER
EPDM LINER, 45 MIL
BETWEEN TWO
GEOTEXTILE LAYERS
ANCHOR TRENCH. BACKFILL W/
EXCAVATED MATERIAL
WSE = 893.25'
CG-201
SAND
TOP OF LINER
EL. = 896.0
3' GEOTEXTILE INTERFACE STRIP B/T
AGGREGATE & CLAY
EXISTING CLAY LINER
EXISTING CLAY LINER
(TO REMAIN)
REMOVE
CLAY LINER
CLAY LINER REPLACED IN KIND
1' -1
0" M
AX
CO
VE
R
1' -8
" M
IN
CO
VE
R
1' -8
" M
IN
1' -1
0" M
AX
CO
VE
R
12" AGGREGATE
45 MIL EPDM LINER B/T TWO GEOTEXTILE LAYERS,
FIRESTONE PONDGUARD OR APPROVED EQUIVALENT
COMPACTED SUBGRADE
1' -0
SAND
1' -6
"GEOTEXTILE
45 MIL EPDM POND LINER,
FIRESTONE PONDGUARD
OR APPROVED EQUIVALENT
EPDM PRIMER, QUICKPRIME PLUS OR
APPROVED EQUIVALENT (SEE NOTE 1)3" WIDE BUTYL ADHESIVE SEAM TAPE,
FIRESTONE QUCKSEAM SPLICE TAPE
OR APPROVED EQUIVALENT (SEE NOTE 2)
45 MIL EPDM POND LINER,
FIRESTONE PONDGUARD
OR APPROVED EQUIVALENT
DIRECTION OF WATER FLOW
1'-0" 1'-0"
UN
I TED
STATES OF AMER
I C
A
EN
T
OF VETERANS
AFFA
IRS
N C A
ATIONAL
EMETERY
DMINISTRATION
Revisions Date
Drawing Title
Approved:
Approved:
Project Title
Building Number Checked Drawn
Location
Date
DRAWING NO.
Dwg. Of
1 2 4 5 6 7 8 9
1 2 3 4 5 6 7 8 9
A B
C D
E F
A B
C D
E F
© COPYRIGHT 2022, Walker Federal Services, LLC
PRIME CONSULTANT
Walker Federal Services, LLC 7820B-162 Wormans Mill Road Frederick, Maryland 21701
CONSULTANTS
WFS
Correct FCA Deficiencies
CAMP NELSON NATIONAL CEMETERY
833CM3030
ACM LMR
JANUARY 7, 2026
Bid Set
128 NORTHPARK BLVD.,
COVINGTON, LA 70433
ALAL
Engineering
PRINCIPPRINCIP
POND AND CRYPT
FIELD SECTIONS
CG-201
SECTION - WET DETENTION POND
3/16" = 1'-0"
SECTION - WET DETENTION POND (LONGITUDINAL)
3/16" = 1'-0"
POND LINER INSTALLATION INTO SLOPE
1/4" = 1'-0" 5
4" IDENTIFIER LAYER REMOVE AND REPLACE
1/2" = 1'-0"
REPLACEMENT (SIDE VIEW) REPLACEMENT (END VIEW)
REPLACE TOPSOIL. CONTRACTOR TO
USE NEWLY IMPORTED TOPSOIL
COMPACTED BACKFILL
REPLACE EXISTING TURF/SOD
(SEE LANDSCAPE)
REPLACE TOPSOIL. CONTRACTOR TO
USE NEWLY IMPORTED TOPSOIL
COMPACTED BACKFILLREPLACE EXISTING TURF/SOD
SAND IDENTIFICATION COURSE;
4" NATURAL SAND LAYER
SAND IDENTIFICATION COURSE;
4" NATURAL SAND LAYER
NOTE:
CONTRACTOR SHALL OVER-EXCAVATE TO 2.5' DEPTH BELOW POND FLOOR. COMPACT SUBGRADE.
SURFACE OF COMPACTED SUBGRADE SHALL BE SMOOTH AND FREE OF STONES, STICKS, AND DEBRIS.
SECTION - POND LINER INSTALLATION
3/4" = 1'-0"
CU-201
EPDM POND LINER SEAM JOINING
N.T.S.
NOTES:
1. CLEAN AND DRY THE AREAS TO BE JOINED WITH A LINT-FREE CLOTH AND APPROVED CLEANER, THEN APPLY EPDM PRIMER TO SEAM
AREAS OF BOTH LINERS. ALLOW PRIMER TO FLASH BEFORE APPLYING SEAM TAPE.
2. CAREFULLY ALIGN AND APPLY DOUBLE-SIDED SEAM TAPE TO LOWER LINER FIRST. ROLL TO ELIMINATE AIR POCKETS. REMOVE BACKING FROM TOP OF SEAM TAPE AND LAY UPPER LINER SECTION ONTO IT. USING A WEIGHTED ROLLER, COMPRESS ENTIRE SEAM
TO ENSURE COMPLETE ADHESIVE CONTACT AND REMOVE AIR BUBBLES.
3" SEAM OVERLAP
CG-201
REMOVAL
EX. PRECAST
LAWN CRYPTS
REMOVE TOPSOIL &
COMPACTED FILL
REMOVE HARDENED
IDENTIFIER LAYER
EX. CLEANOUT
EX. CLEANOUT
EX. PRECAST
LAWN CRYPTS
GRAVESITE GRID
MONUMENT
EX. IRRIGATION LINE
CG-201
EXCAVATION
RFI - AMMENDMENT 003 10/6/26
| Sheets and Views |
| CG-201 |
File details come from the government source that posted it. Updated .