S02_Attachment - Past Performance Questionnaire.docx

DOCX document 68 KB Posted

Attached to
CAMP NELSON NATIONAL CEMETERY, KY 833CM3030 – CORRECT FCA DEFICIENCIES
Solicitation number
36C78626R0058
Issued by

About this file

This file is a Past Performance Questionnaire template designed for contractors to document their performance on previous federal contracts. The form collects comprehensive contractor information including company name, division, address, CAGE code, DUNS number, and NAICS code. It requires detailed contract information such as contract number, contracting agency, responsible officer contact details, work location, award date, effective date, completion date, and both awarded and current contract dollar values.

The questionnaire requests identification of key subcontractors with their contact information and roles, along with a description of contract effort, project title, and small business utilization percentage. Contractors are evaluated across multiple performance areas including quality, schedule, cost control, management, small business utilization, and regulatory compliance, with ratings assigned using a six-point adjective scale: Exceptional (E), Very Good (VG), Satisfactory (S), Marginal (M), Unsatisfactory (U), and Not Applicable (N). The form includes detailed rating definitions explaining that Satisfactory represents minimum contractual compliance and that contractors will not receive ratings below Satisfactory solely for failing to exceed contract requirements per DOD policy. The assessing official provides overall comments and a recommendation, with their name, title, organization, phone number, email address, and date of assessment. This template is a standardized tool for evaluating contractor past performance on federal contracts, likely used in the National Cemetery Administration procurement for Camp Nelson National Cemetery involving construction services estimated between $20 million and $30 million.

View the file

Other files

File Type Posted
S06_Amendment 0005 36C78626R0058_11.25.2026.pdf PDF
Amendment 4-833CM3030 - CD1 - Historic Hardware.pdf PDF
Amendment 4-833CM3030 - BID - HA-001 from 20260422 - 833CM3030 - BID - SET.pdf PDF
Amendment 4-833CM3030 - BID - CU-105 from 20260107 - 833CM3030 - BID - SET.pdf PDF
Amendment 4-833CM3030 - BID - 23 11 13 Fuel Storage Tanks.pdf PDF
Amendment 4-833CM3030 - BID - 037 - CU-105 UTILITY PLAN (R2).pdf PDF
Amendment 4-833CM3030 - BID - 26 29 23 Engine Control and Monitoring.pdf PDF
Amendment 4-833CM3030 - BID - 028 - CP-105 PAVING PLAN (R2).pdf PDF
Amendment 4-833CM3030 - BID - SN-104 105 and X-series from 20260107 - 833CM3030 - BID - SET.pdf PDF
Amendment 4-833CM3030 - BID - Historic Pages from 20260422 - 833CM3030 - BID - SET A-004 005 132 133 154 155.pdf PDF
Amendment 4-ConVault Specification with UL 752 Level 8.pdf PDF
Amendment 4-Convault Storage tank 500 GL-telford.pdf PDF
Amendment 4-Convault Brochure 2019 (003).pdf PDF
Amendment 4-833CM3030 - BID - 020 - CG-201 POND AND CRYPT FIELD SECTIONS (R1).pdf PDF
Amendment 4-AE-113 from 20260422 - 833CM3030 - BID - SET.pdf PDF
Amendment 4-AE-113 833CM3030 - BID - SET.pdf PDF
S02 36C78626R0058 Amendment 0004.docx DOCX document
Amendment 4-833CM3030 - CD1 - Historic Preservation.pdf PDF
Amendment 4-SED FCA - 04212022_Camp Nelson.pdf PDF
Amendment 4-833CM3030 - BID - AE-110 from 20260422 - 833CM3030 - BID - SET.pdf PDF
Amendment 4-833CM3030 - BID - 328400 Plant Irrigation_10-31-24.pdf PDF
Amendment 4- 36C78626R0058 FuelForce 814 Advanced Fuel Controller Brochure.pdf PDF
Amendment 4-240524-Camp Nelson National Cemetery - KY- SUE Field Report Deliverable.pdf PDF
Amendment 4-833CM3030 - BID - AE-150 from 20260422 - 833CM3030 - BID - SET.pdf PDF
Amendment 4-833CM3030 - BID - 07 42 43 Plastic Panel.pdf PDF
Amendment 4-833CM3030 - BID- EQUIPMENT STORAGE GARAGE-AE-141.pdf PDF
Amendment 4-GI-104 from 20260107 - 833CM3030 - BID - SET.pdf PDF
Amendment 4-833CM3030 - BID - 231123 NatGas.pdf PDF
Amendment 4- 833CM3030 - BID - 072727 - BARRIER VAPOR.pdf PDF
Amendment 4-3189 ECS Geotechnical Engineering Report - Expansion Area.pdf PDF
Amendment 4-833CM3030 - BID - 329000 Planting.pdf PDF
Amendment 4-3189 ECS Geotechnical Engineering Report - Camp Nelson Cemetery.pdf PDF
Amendment 4-833CM3030 - BID - 050 - S-101 STRUCTURAL PLAN (R2).pdf PDF
Amendment 4-Lightning Protection Asmnt Report_Camps Nelson Cemetery.pdf PDF
Amendment 4-Dispensing System Controller-SafeSite DSC with specs.pdf PDF
Amendment 4-833CM3030 - BID - CD-102 from 20260107 - 833CM3030 - BID - SET.pdf PDF
Amendment 4-AD-150 from 20260107 - 833CM3030 - BID - SET.pdf PDF
Amendment 4-833CM3030 - BID - 33 56 10 Temporary Fuel Storage Tanks.pdf PDF
Amendment 4-833CM3030 - BID - 052 - S-202 MATERIALS STORAGE BLDG. FRAMING (R2).pdf PDF
Amendment 4-3189 ECS Geotechnical Engineering Report - Maintenance Area.pdf PDF
S06_36C78626R0058 Amend. 0003.pdf PDF
S02 Amendement 36C78626R0058 0002.pdf PDF
S02 amendment 2.pdf PDF
S02 Fire Alarm Panel.pdf PDF
S02 Liquidated Damages 833CM3030_CNNC FCA Corrections CONS.pdf PDF
S02 12 from 833CM3030_CNNC FCA Corrections_CONS_BD DRAWINGS_VOL 1_addendum01.pdf PDF
S02 Amendment 36C78626R0058 0001.pdf PDF
P07 Jessamine Camp Nelson Building.pdf PDF
S02_Price Proposal Breakdown.docx DOCX document
P07 Jessamine Camp Nelson Highway.pdf PDF
Show 40 more

Latest 50 of 68 listed here. See the rest on GovTribe.

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

NCA PAST PERFORMANCE QUESTIONNAIRE

Name/Address of Contractor

Company Name: Click here to enter text.

Division Name: Click here to enter text.

Address: Click here to enter text.

Click here to enter text.
CAGE Code:Click here to enter text.
DUNS Number:Click here to enter text.
NAICS Code:Click here to enter text.

Click here to enter text.

Work Performance Contract Percent Complete: Click here to enter text.

Contract information Contract Number: Click here to enter text.

Contracting Agency: Click here to enter text.

Responsible Officer: Click here to enter text.

Phone Number: Click here to enter text.

Location of Work: Click here to enter text.

Award Date: date Effective Date: date Completion Date: date Estimated/Actual Completion Date: date Awarded Value: $Click here to enter text.

Current Contract Dollar Value: $Click here to enter text.

Key Subcontractors and Effort Performed

1. Name __________________________________

2. Name __________________________________

3. Name __________________________________

4. Name __________________________________

5. Name __________________________________

Phone# xxx-xxx-xxxxRole: Click here to enter text.
Phone# xxx-xxx-xxxxRole: Click here to enter text.
Phone# xxx-xxx-xxxxRole: Click here to enter text.
Phone# xxx-xxx-xxxxRole: Click here to enter text.
Phone# xxx-xxx-xxxxRole: Click here to enter text.
Project Number:Click here to enter text.
Project Title:Click here to enter text.

Contract Effort Description: Click here to enter text.

Small Business Utilization (%): Click here to enter text.

Evaluation Areas
Rating
Quality:
Click here to enter text.
Schedule:
Click here to enter text.
Cost Control:
Click here to enter text.
Management:
Click here to enter text.
Utilization of Small Business:
Click here to enter text.
Regulatory Compliance:
Click here to enter text.
Other Areas:
Click here to enter text.
(1) :
Click here to enter text.
(2) :
Click here to enter text.
(3) :
Click here to enter text.

Assessing Official Comments:

Additional/Other:

Click here to enter text.

Recommendation:

Click here to enter text.

Name and Title of Assessing Official:

Name: Click here to enter text.

Title: Click here to enter text.

Organization: Click here to enter text.

Phone Number: xxx-xxx-xxxx Email Address: Click here to enter text.

Date: date

ADJECTIVE RATING GUIDE

Rating Definition Note

(E) Exceptional

Performance meets contractual requirements and exceeds many to the Government/Owner’s benefit. The contractual performance of the element or sub‐element being assessed was accomplished with few minor problems for which corrective actions taken by the contractor was highly effective.

An Exceptional rating is appropriate when the Contractor successfully performed multiple significant events that were of benefit to the Government/Owner. A singular benefit, however, could be of such magnitude that it alone constitutes an Exceptional rating. Also, there should have been NO significant weaknesses identified.

(VG) Very Good

Performance meets contractual requirements and exceeds some to the Government /Owner’s benefit. The contractual performance of the element or sub‐element being assessed was accomplished with some minor problems for which corrective actions taken by the contractor were effective.

A Very Good rating is appropriate when the Contractor successfully performed a significant event that was a benefit to the Government/Owner. There should have been no significant weaknesses identified.

(S) Satisfactory

Performance meets minimum contractual requirements. The contractual performance of the element or sub‐element contains some minor problems for which corrective actions taken by the contractor appear or were satisfactory.

A Satisfactory rating is appropriate when there were only minor problems, or major problems that the contractor recovered from without impact to the contract. There should have been NO significant weaknesses identified. Per DOD policy, a fundamental principle of assigning ratings is that contractors will not be assessed a rating lower than Satisfactory solely for not performing beyond the requirements of the contract.

(M) Marginal

Performance does not meet some contractual requirements. The contractual performance of the element or sub‐element being assessed reflects a serious problem for which the contractor has not yet identified corrective actions. The contractor's proposed actions appear only marginally effective or were not fully implemented.

A Marginal is appropriate when a significant event occurred that the contractor had trouble overcoming which impacted the Government/Owner.

(U) Unsatisfactory

Performance does not meet most contractual requirements and recovery is not likely in a timely manner. The contractual performance of the element or sub‐element contains serious problem(s) for which the contractor's corrective actions appear or were ineffective.

An Unsatisfactory rating is appropriate when multiple significant events occurred that the contractor had trouble overcoming and which impacted the Government/Owner. A singular problem, however, could be of such serious magnitude that it alone constitutes an unsatisfactory rating.

(N) Not Applicable

No information or did not apply to your contract Ra Rating will be neither positive nor negative.