This is a Utility Plan drawing set for corrective work at Camp Nelson National Cemetery in Nicholasville, Kentucky, prepared as part of a federal contracting bid package for the National Cemetery Administration.
The project scope encompasses corrective facilities and infrastructure deficiency work, including: servicing and repairing an existing 1,000-gallon septic tank (dewatering, cleaning, and replacing damaged baffles with fiber-reinforced polymer or PVC components); performing closed-circuit television (CCTV) investigation and selective point repairs on approximately 60 linear feet of lateral drain pipe across 12 individual excavations; reconnecting existing sanitary services with new fittings; installing a new 500-gallon fuel storage tank; temporarily relocating a propane storage tank; and installing temporary water service infrastructure including a 3/4-inch reduced pressure backflow preventer and water line to a temporary restroom trailer. All work on the septic system must be performed by a certified onsite sewage system installer licensed in Kentucky. The contractor must submit video documentation and recommended repair locations for approval, perform exploratory excavations prior to construction to identify existing utilities and conflicts, conduct post-repair CCTV investigation at no additional cost, and handle all solid and liquid waste disposal and utility reconnection at no additional cost to the government. The drawings include utility plan details for the maintenance area, temporary restroom trailer installation, and a section view of the leach field with specific invert elevations and pipe specifications.
View the file
Other files
Show 40 more
Latest 50 of 67 listed here. See the rest on GovTribe.
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
D
G
CO
B-1
B-2
EX. 1000 GALLON TANK
EX. DISTRIBUTION BOX
NEW 6" SCH 40 PVC
SANITARY SEWER LINE
(SEE NOTE 4)
LATERAL DRAIN TO
BE SELECTIVELY
REPAIRED
EX. 4" LEACH
FIELD LATERAL
LATERAL DRAIN TO
BE SELECTIVELY
REPAIRED
EX. 4" LEACH
FIELD LATERAL
EX. 4" LEACH
FIELD LATERAL
EX. 4" LEACH
FIELD LATERAL
SEE PLAN FOR APPROXIMATE
CROSSING UTILITY LOCATIONS
EX. SURFACE
SERVICE EX. 1000 GAL SEPTIC
TANK (SEE NOTES 1 & 2)
NEWLY IMPORTED TOPSOIL
COMPACTED GRANULAR FILL
(SEE SPEC SECTION 31 20 00)
APPROX. 6.25'
N C A
ATIONAL
EMETERY
DMINISTRATION
Revisions Date
Drawing Title
Approved:
Approved:
Project Title
Building Number Checked Drawn
Location
Date
DRAWING NO.
Dwg. Of
1 2 4 5 6 7 8 9
1 2 3 4 5 6 7 8 9
A B
C D
E F
A B
C D
E F
© COPYRIGHT 2022, Walker Federal Services, LLC
Walker Federal Services, LLC 7820B-162 Wormans Mill Road Frederick, Maryland 21701
WFS
Correct FCA Deficiencies
CAMP NELSON NATIONAL CEMETERY
833CM3030
ACM LMR
JANUARY 7, 2026
Bid Set
NOT TO SCALE
KEY
128 NORTHPARK BLVD.,
COVINGTON, LA 70433
ALAL
Engineering
PRINCIPPRINCIP
UTILITY PLAN
CU-105
1. ALL WORK ON SEPTIC SYSTEM SHALL BE A PERFORMED CERTIFIED ONSITE SEWAGE SYSTEM
INSTALLER, LICENSED IN THE STATE OF KENTUCKY.
2. DEWATER AND CLEAN EXISTING SEPTIC TANK. DAMAGED OR BROKEN BAFFLES SHALL BE REMOVED AND REPLACEMENTS CUSTOM-FABRICATED FROM FIBER REINFORCED POLYMER (FRP) OR PVC. ALL
SOLID AND LIQUID WASTE SHALL BE TRANSPORTED OFFSITE AND LEGALLY DISPOSED OF.
3. PRIOR TO CONSTRUCTION, VERIFY LOCATION OF ALL EXISTING SANITARY CONNECTIONS TO SEPTIC TANK AND UTILITIES ADJACENT PIPE TO BE REPLACED. CONFIGURATION MAY VARY FROM THAT SHOWN, RECONNECT EXISTING UTILITIES AND RESTORE SERVICE AT NO ADDITIONAL COST TO THE
GOVERNMENT.
4. SANITARY PIPE DEPTH ESTIMATED AND SHOWN. LOCATE, UNCOVER, PROTECT, AND ACCOMODATE
EXISTING UTILITIES DURING REPLACEMENT.
5. SUBMIT VIDEO AND RECOMMENDED POINT REPAIR LOCATIONS FOR APPROVAL. BASIS OF BID SHALL
BE 60 LF OF LATERAL DRAIN PIPE, AT 12 INDIVIDUAL EXCAVATIONS.
6. AT COLLAPSED LATERAL DRAINS, RECOMMENCE CCTV INVESTIGATION AFTER REPAIR, AT NO
ADDITIONAL COST TO THE GOVERNMENT.
7. INSTALL 3 4" BFP & ENCLOSURE ON 4" TEMPORARY CONCRETE PAD. BFP, ENCLOSURE & TEMPORARY PAD TO REMAIN FOR DURATION OF CONSTRUCTION. REMOVE BFP, DEMOLISH 4" CONCRETE PAD, CUT AND CAP 3 4" WATER LINE AT SADDLE, AND REMOVE BURIED PVC SERVICE LINE AFTER
CONSTRUCTION.
8. PERFORM EXPLORATORY EXCAVATIONS PRIOR TO CONSTRUCTION TO IDENTIFY EXISTING 2" WATER
AT TIE-IN, LOCATION OF EXISTING UTILITIES, AND REPORT ANY CONFLICT.
KEYNOTES
PERFORM PIPE CCTV INVESTIGATION
& SELECTED LATERAL DRAIN POINT
REPAIRS (SEE NOTE 5)
03 SERVICE EXISTING 1000 GAL SEPTIC TANK,
INV. 934.16 (SEE NOTE 2)
04 SHIELDED TRANSITION COUPLING
LEACH FIELD POINT REPAIR
CU-201
EX. SEPTIC DISTRIBUTION BOX,
APPROX. INV. DEPTH 934.1002
6" GRAVITY DISTRIBUTION PIPING
EXISTING SANITARY SEWER LINE
NOTES
SEWER CLEANOUT 2
CU-201
CU-102
UTILITY PLAN - MAINTENANCE AREA
SCALE: 1" = 10'-0"
SECTION - LEACH FIELD
SCALE: 1/2" = 1'-0"
RECONNECT EXISTING 4" SANITARY
SERVICE FROM REST & WASH HOUSE
WITH NEW FITTINGS (SEE NOTE 3)
REINSTALL/RETURN PROPANE STORAGE
TANK TO SERVICE. PROVIDE ALL NECESSARY
FITTINGS, HARDWARE, & SPECIALS.
09 NEW 500 GALLON FUEL STORAGE TANK.
(SEE SPEC SECTION 23 11 13)
SOIL BORINGS
07 BRACE POLE DURING EXCAVATION.
COORDINATE WITH UTILITY PROVIDER.
EX. LEACH FIELD LATERAL
6" SCH 40 PVC SANITARY SEWER PIPE,
PROFILE SMOOTHLY BETWEEN EXISTING
INVERTS (SEE NOTE 4)
LEGEND
DE-ENERGIZE, TEMPORARILY RELOCATE OR
EXCAVATE AROUND WHILE IN PLACE, AND
REINSTALL BURIED ELECTRICAL SERVICE IF
NECESSARY FOR POINT REPAIR.
UTILITY PLAN - TEMP. RESTROOM TRAILER
SCALE: 1" = 10'-0"
4 " SCH 40 PVC WATER LINE TO TEMP.
RESTROOM TRAILER, TEMPORARY
(SEE NOTE 7)
S.S. FULL BODY SERVICE TAP, ROMAC
(SEE NOTE 7 & 8)12
4" REDUCED PRESSURE BACKFLOW PREVENTER
IN HEATED ENCLOSURE (WATTS 009M3-QT &
WATTS BOX WB-1 OR APPROVED EQUALS)
(SEE NOTE 7)
AutoCAD SHX Text
HISTORIC MAINT. BUILDING
AutoCAD SHX Text
EQUIPMENT STORAGE BUILDING
AutoCAD SHX Text
HISTORIC BRICK STABLE
AutoCAD SHX Text
MAINTENANCE STORAGE BUILDING
AutoCAD SHX Text
REST & WASH HOUSE
AutoCAD SHX Text 6"
AutoCAD SHX Text 6"
AutoCAD SHX Text 6"
AutoCAD SHX Text 6"
AutoCAD SHX Text 6"
AutoCAD SHX Text
REST & WASH HOUSE
AutoCAD SHX Text
BFP
AutoCAD SHX Text U
AutoCAD SHX Text N
AutoCAD SHX Text I
AutoCAD SHX Text T
AutoCAD SHX Text E
AutoCAD SHX Text D
AutoCAD SHX Text S
AutoCAD SHX Text T
AutoCAD SHX Text A
AutoCAD SHX Text T
AutoCAD SHX Text E
AutoCAD SHX Text S
AutoCAD SHX Text O
AutoCAD SHX Text F
AutoCAD SHX Text A
AutoCAD SHX Text M
AutoCAD SHX Text E
AutoCAD SHX Text R
AutoCAD SHX Text I
AutoCAD SHX Text C
AutoCAD SHX Text A
AutoCAD SHX Text E
AutoCAD SHX Text N
AutoCAD SHX Text T
AutoCAD SHX Text O
AutoCAD SHX Text F
AutoCAD SHX Text V
AutoCAD SHX Text E
AutoCAD SHX Text T
AutoCAD SHX Text E
AutoCAD SHX Text R
AutoCAD SHX Text A
AutoCAD SHX Text N
AutoCAD SHX Text S
AutoCAD SHX Text A
AutoCAD SHX Text F
AutoCAD SHX Text F
AutoCAD SHX Text A
AutoCAD SHX Text I
AutoCAD SHX Text R
AutoCAD SHX Text S
AutoCAD SHX Text
PRIME CONSULTANT
AutoCAD SHX Text
CONSULTANTS
File details come from the government source that posted it. Updated .