This is an NFPA 780 Lightning Risk Assessment report prepared by Astute Engineering PLLC for the Camps Nelson National Cemetery project (Project No. 833CM3030) dated July 24, 2024, addressing correctable Facility Condition Assessment (FCA) deficiencies related to lightning protection.
The assessment evaluates six buildings at the facility: Public Restroom Building (18'-3" height), Wash Bay Building (19'-8"), Historic Maintenance Building (19'-3"), Maintenance Storage Building (22'-11"), Horse Stall Building (20'-11"), and Equipment Storage Building (29'-3"). All structures feature masonry construction with concrete slab foundations and gable asphalt shingle roofs. Using the 2023 version of NFPA 780 Annex L simplified risk assessment methodology, the report compares the annual threat occurrence (ND) against tolerable lightning frequency (NC) for each building. The assessment incorporates Lightning Flash Density data from the Vaisala National Lightning Detection Network (NG = 34.43 flashes per square kilometer annually) and applies location factors, construction coefficients, contents coefficients, occupancy coefficients, and consequence coefficients from NFPA 780 tables. Risk calculations for each building demonstrate that the expected annual threat occurrence exceeds the tolerable lightning frequency for all structures, with ND values ranging from 0.00990 to 0.0591 events per year against NC values ranging from 0.0003 to 0.0030 events per year. Based on this analysis, the assessment concludes that installation of new Lightning Protection Systems is recommended for all six buildings at Camps Nelson National Cemetery to mitigate the identified lightning strike risk.
View the file
Other files
Show 40 more
Latest 50 of 67 listed here. See the rest on GovTribe.
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
WALKER FEDERAL SERVICES
7820B Wormans Mill Road, Suite 162, Frederick, Maryland 21701
Project: Camps Nelson National Cemetery Correct FCA Deficiencies
Project No.: 833CM3030
Date: 07/24/2024
NFPA 780 Lightning Risk Assessment
1. Introduction Astute Engineering PLLC (Astute), the electrical engineers on the subject project, performed an NFPA 780 lightning risk assessment for the public restroom/ wash bay building, Historic maintenance Building, Maintenance storage building, Horse stall Building, and Maintenance storage building.
The buildings are surrounded by tall trees and structures. The buildings included in the assessment currently do not have a lightning protection system.
Using the data available for the building structures a simplified risk assessment was performed to determine the necessity of the lightning protection system for both the buildings, per the 2023 version of NFPA 780 Annex L.
This report presents the data used, the assessment/evaluation, and the recommended action based on the analysis. The tolerable lightning frequency (NC) is compared with the annual threat occurrence (ND).
The result of this comparison is used to decide if a lightning protection system is needed. The conclusion is provided based on a two-level system of “recommended” and “optional”, per NFPA 780.
2. Building structure description:
2.1. Public Restroom Building Description:
Foundation Concrete slab on grade Structure Masonry Roof Gable and Asphalt shingles Number of stories 1 Height 18’-3”
2.2. Wash Bay Building Description:
Foundation Concrete slab on grade Structure Masonry Roof Gable and Asphalt shingles
Height 19’-8”
2.3. Historic Maintenance Building Description:
Structure Masonry Roof Gable and Asphalt shingles
Height 19’-3”
2.4. Maintenance Storage Building Description:
Structure Masonry Roof Gable and Asphalt shingles
Height 22’-11”
2.5. Horse Stall Building Description:
Structure Masonry Roof Gable and Asphalt shingles
Height 20’-11”
2.6. Equipment Storage Building Description:
Structure Masonry Roof Gable and Asphalt shingles
Height 29’-3” ft.
3. Data utilized in the analysis
The focus of the analysis was to assess the risk of a lightning strike occurring near or at the structures on the site. Parameter values used in the assessment & calculation are obtained from Tables L.4.2, L.5.1.2(a), L.5.1.2(b), L.5.1.2(c), L.5.1.2(d), and Figure L.2 of NFPA 780 based on statistical lighting density, lightning risk, environmental conditions, and structure construction. Building dimensions obtained from “Google Earth” are verified with available records and field measurements. The following sections include the selections and descriptions of the parameter values used to perform the risk assessment calculations for the structures in question.
3.1. Terms & Definitions
Lightning Protection Systems (LPS) Lightning Flash Density (NG) = Yearly number of flashes to ground per square kilometer.
Refer to Vaisala National Lightning Detection Network (2021)
Annual threat of occurrence (ND) = Yearly annual threat of occurrence (lightning strike frequency) (ND) to a structure is determined by the following equation:
ND = (NG) (AE) (C1) Potential events/year
Equivalent ground collection area (AE) = Area having equivalent lightning flash vulnerability (km2) as the structure.
(AE) = LW + 6H (L+ W) + 9𝜋𝐻ଶ
Where L= length, W = width, H= height of the structure
Tolerable lightning frequency (NC) = Calculated tolerable lightning events per year.
NC =
ଵ.ହ୶ଵషయ
𝐂 events/year
Where C = (C2) (C3) (C4) (C5)
(C1) = Location factor - Table L.4.2, NFPA 780 (C2) = Determination of construction coefficient - Table L.5.1.2(a), NFPA 780 (C3) = Determination of structure contents coefficient - Table L.5.1.2(b), NFPA 780 (C4) = Determination of structure occupancy coefficient - Table L.5.1.2(c), NFPA 780 (C5) = Determination of Lightning consequence coefficient - Table L.5.1.2(d), NFPA 780
4. Risk evaluation Tables 4.1 to 4.6 below present the Simplified Risk Calculations (Per NFPA 780, Table L.5.2.2) for the assessment/analysis of the public restroom/ wash bay building, Historic maintenance Building, Maintenance storage building, Horse stall Building, and Maintenance storage building.
Table 4.1: Public Restroom Building Data Input Equations Data Input Results
(AE) = LW + 6H (L+W) + 9𝜋𝐻ଶ L = 15 ft W = 13 ft H = 18 ft, H2 = 324 Sqft
AE =12379.88 Sqft AE =0.001150 Km2
Expected annual threat occurrence
ND = (NG) (AE) (C1)
NG = 34.43
AE = 0.001150
C1 = 0.25
ND = 0.00990
Tolerable lightning frequency to the structure
NC = (1.5×10-3) /C
Where C = (C2) (C3) (C4) (C5)
C2 = 1
C3 = 1
C4 = 1
C5 = 5
C = 5
NC = 0.0003
Table 4.2: Wash Bay Building Data Input Equations Data Input Results
(AE) = LW + 6H (L+W) + 9𝜋𝐻ଶ L = 9 ft W = 11 ft H = 20 ft, H2 = 400 Sqft
AE =13808.73 Sqft AE =0.001283 Km2
NG = 34.43
AE = 0.001283
C1 = 0.5
ND = 0.0221
Tolerable lightning frequency to the structure
NC = (1.5×10-3) /C
Where C = (C2) (C3) (C4) (C5)
C2 = 1
C3 = 1
C4 = 0.5
C5 = 1
C = 0.5
NC = 0.0030
Table 4.3: Historic Maintenance Building
(AE) = LW + 6H (L+W) + 9𝜋𝐻ଶ L = 58 ft W = 19 ft H = 19 ft, H2 = 361 Sqft
AE =20087.03 Sqft AE =0.001866 Km2
NG = 34.43
AE = 0.001866
C1 = 0.25
ND = 0.0161
Tolerable lightning frequency to the structure
NC = (1.5×10-3) /C
Where C = (C2) (C3) (C4) (C5)
C2 = 1
C3 = 1
C4 = 1
C5 = 1
C = 1
NC = 0.0015
Table 4.4: Maintenance Storage Building
(AE) = LW + 6H (L+W) + 9𝜋𝐻ଶ L = 26 ft W = 30 ft H = 23 ft, H2 = 529 Sqft
AE =23465.12 Sqft AE =0.002180 Km2
NG = 34.43
AE = 0.002180
C1 = 0.5
ND = 0.0375
Tolerable lightning frequency to the structure
NC = (1.5×10-3) /C
Where C = (C2) (C3) (C4) (C5)
C2 = 1
C3 = 1
C4 =0.5
C5 = 1
Table 4.5: Horse Stall Building
(AE) = LW + 6H (L+W) + 9𝜋𝐻ଶ L = 59 ft W = 36 ft H = 21 ft, H2 = 441 Sqft
AE =26562.98 Sqft AE =0.002468 Km2
NG = 34.43
AE = 0.002468
C1 = 0.5
ND = 0.0425
Tolerable lightning frequency to the structure
NC = (1.5×10-3) /C
Where C = (C2) (C3) (C4) (C5)
C2 = 1
C3 = 1
C4 = 0.5
C5 = 1
Table 4.6: Equipment Storage Building
(AE) = LW + 6H (L+W) + 9𝜋𝐻ଶ L = 38 ft W = 31 ft H = 29 ft, H2 = 841 Sqft
AE =36962.71 Sqft AE =0.003434 Km2
NG = 34.43
AE = 0.003434
C1 = 0.5
ND = 0.0591
Tolerable lightning frequency to the structure
NC = (1.5×10-3) /C
Where C = (C2) (C3) (C4) (C5)
C2 = 1
C3 = 1
C4 = 0.5
C5 = 1
5. Results According to NFPA 780 guidelines:
If (ND) ≤ (NC), then LPS is optional, If (ND) > (NC), then LPS is recommended
As assessed in Tables 4.1, 4.2, 4.3, 4.4, 4.5 and 4.6 above, calculated value of “ND” > “NC”, suggesting that Lightning Protection System is recommended for all buildings.
6. Conclusion & Recommendation:
Based on the above assessment, Astute concludes and recommends providing new Lightning Protection Systems at the Public restroom, Wash Bay building, Historic maintenance Building, Maintenance storage building, Horse stall Building, and Maintenance storage building.