Amendment 4-ConVault Specification with UL 752 Level 8.pdf

UL Standard Amendment 4 PDF 24 KB Posted

Attached to
CAMP NELSON NATIONAL CEMETERY, KY 833CM3030 – CORRECT FCA DEFICIENCIES
Solicitation number
36C78626R0058
Issued by

About this file

This document is a product specification for a ConVault® UL 752 and UL 2085 Listed Rectangular Protected/Secondarily Contained Aboveground Tank system for flammable and combustible liquid storage.

The tank system must be constructed and listed in accordance with UL Standard 2085 for protected-type, non-metallic secondary containment with vehicle impact and projectile resistance, and carry ballistics protection listings under UL Standard 752 at Levels 5, 6, and 8. The system must comply with UFC 79-7 Appendix A-II-F, NFPA 30 and 30A, and IFC Chapters 22 and 34, and be certified and approved for vapor recovery by the California Air Resources Board under Executive Order VR-302-B. The manufacturer must warrant the tank system against defects in material or workmanship for 30 years following delivery, with no restrictions limiting coverage to shorter periods or non-corrosion-related failures only.

The tank comprises a rectangular primary steel tank with continuous welds and pressure tested at 5 psig for minimum 24 hours, surrounded by a 30 Mil high-density polyethylene geomembrane secondary containment with insulation material for corrosion protection. A vaulted concrete encasement of 6 inches thick with minimum 4000 psi design strength, including air entrainment and steel reinforcement, provides physical protection and must be monolithically poured with support legs raised minimum 3 inches above ground. The system includes 1/4 inch polystyrene foam panels and 6 inches of reinforced concrete for thermal insulation, anti-oxidant powder coating meeting ASTM B117 for corrosion protection, a UL-listed 7-gallon spill/overfill container with stick port and drain valve, and a thru-tank leak detection monitoring tube. The tank system must provide 2-hour fire protection with primary tank temperature not exceeding 260°F average or 400°F maximum at any single point. The system must resist high explosive blast effects per FEMA 426 scenarios including 50-pound man-portable devices at 5 feet and 500-pound vehicle-borne devices at 20 feet, with tank remaining intact and movement not exceeding 2 inches. The manufacturer must demonstrate minimum 10 years of experience producing the specified tank for commercial use with documentation of at least 10 satisfactory installations. Installation must follow manufacturer recommendations, industry standards, and applicable fire and environmental codes with all state and local permits obtained prior to installation.

View the file

Who attaches UL 752

Other files

File Type Posted
Amendment 4-833CM3030 - CD1 - Historic Hardware.pdf PDF
Amendment 4-833CM3030 - BID - HA-001 from 20260422 - 833CM3030 - BID - SET.pdf PDF
Amendment 4-833CM3030 - BID - CU-105 from 20260107 - 833CM3030 - BID - SET.pdf PDF
Amendment 4-833CM3030 - BID - 23 11 13 Fuel Storage Tanks.pdf PDF
Amendment 4-833CM3030 - BID - 037 - CU-105 UTILITY PLAN (R2).pdf PDF
Amendment 4-833CM3030 - BID - 26 29 23 Engine Control and Monitoring.pdf PDF
Amendment 4-833CM3030 - BID - 028 - CP-105 PAVING PLAN (R2).pdf PDF
Amendment 4-833CM3030 - BID - SN-104 105 and X-series from 20260107 - 833CM3030 - BID - SET.pdf PDF
Amendment 4-833CM3030 - BID - Historic Pages from 20260422 - 833CM3030 - BID - SET A-004 005 132 133 154 155.pdf PDF
Amendment 4-Convault Storage tank 500 GL-telford.pdf PDF
Amendment 4-Convault Brochure 2019 (003).pdf PDF
Amendment 4-833CM3030 - BID - 020 - CG-201 POND AND CRYPT FIELD SECTIONS (R1).pdf PDF
Amendment 4-AE-113 from 20260422 - 833CM3030 - BID - SET.pdf PDF
Amendment 4-AE-113 833CM3030 - BID - SET.pdf PDF
S02 36C78626R0058 Amendment 0004.docx DOCX document
Amendment 4-833CM3030 - CD1 - Historic Preservation.pdf PDF
Amendment 4-SED FCA - 04212022_Camp Nelson.pdf PDF
Amendment 4-833CM3030 - BID - AE-110 from 20260422 - 833CM3030 - BID - SET.pdf PDF
Amendment 4-833CM3030 - BID - 328400 Plant Irrigation_10-31-24.pdf PDF
Amendment 4- 36C78626R0058 FuelForce 814 Advanced Fuel Controller Brochure.pdf PDF
Amendment 4-240524-Camp Nelson National Cemetery - KY- SUE Field Report Deliverable.pdf PDF
Amendment 4-833CM3030 - BID - AE-150 from 20260422 - 833CM3030 - BID - SET.pdf PDF
Amendment 4-833CM3030 - BID - 07 42 43 Plastic Panel.pdf PDF
Amendment 4-833CM3030 - BID- EQUIPMENT STORAGE GARAGE-AE-141.pdf PDF
Amendment 4-GI-104 from 20260107 - 833CM3030 - BID - SET.pdf PDF
Amendment 4-833CM3030 - BID - 231123 NatGas.pdf PDF
Amendment 4- 833CM3030 - BID - 072727 - BARRIER VAPOR.pdf PDF
Amendment 4-3189 ECS Geotechnical Engineering Report - Expansion Area.pdf PDF
Amendment 4-833CM3030 - BID - 329000 Planting.pdf PDF
Amendment 4-3189 ECS Geotechnical Engineering Report - Camp Nelson Cemetery.pdf PDF
Amendment 4-833CM3030 - BID - 050 - S-101 STRUCTURAL PLAN (R2).pdf PDF
Amendment 4-Lightning Protection Asmnt Report_Camps Nelson Cemetery.pdf PDF
Amendment 4-Dispensing System Controller-SafeSite DSC with specs.pdf PDF
Amendment 4-833CM3030 - BID - CD-102 from 20260107 - 833CM3030 - BID - SET.pdf PDF
Amendment 4-AD-150 from 20260107 - 833CM3030 - BID - SET.pdf PDF
Amendment 4-833CM3030 - BID - 33 56 10 Temporary Fuel Storage Tanks.pdf PDF
Amendment 4-833CM3030 - BID - 052 - S-202 MATERIALS STORAGE BLDG. FRAMING (R2).pdf PDF
Amendment 4-3189 ECS Geotechnical Engineering Report - Maintenance Area.pdf PDF
S06_36C78626R0058 Amend. 0003.pdf PDF
S02 Amendement 36C78626R0058 0002.pdf PDF
S02 amendment 2.pdf PDF
S02 Fire Alarm Panel.pdf PDF
S02 Liquidated Damages 833CM3030_CNNC FCA Corrections CONS.pdf PDF
S02 12 from 833CM3030_CNNC FCA Corrections_CONS_BD DRAWINGS_VOL 1_addendum01.pdf PDF
S02 Amendment 36C78626R0058 0001.pdf PDF
P07 Jessamine Camp Nelson Building.pdf PDF
S02_Price Proposal Breakdown.docx DOCX document
S02_Attachment - Past Performance Questionnaire.docx DOCX document
P07 Jessamine Camp Nelson Highway.pdf PDF
S02_Attachment - DOL Payroll Form.pdf PDF
Show 40 more

Latest 50 of 67 listed here. See the rest on GovTribe.

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

SPECIFICATIONS

ConVault® UL 752 and UL 2085 Listed Rectangular Protected/Secondarily Contained Aboveground Tank

1.0 GENERAL DESCRIPTION AND STANDARDS

1.1. Provide the rectangular ConVault® Aboveground Tank system constructed and listed in accordance with Underwriters Laboratories, Inc. (UL) Standard 2085, Aboveground Storage Tanks for Flammable and Combustible Liquids, Protected Type, Non-Metallic Secondary Containment with Vehicle Impact and Projectile Resistance. The tank system shall be listed for ballistics protection in accordance with UL Standard 752, Levels 5, 6 and 8.

1.2. The tank system must comply with all provisions of: 1) UFC 79-7, Appendix A-II-F, for both Vehicle Impact Protection and Projectile Resistance; 2) NFPA 30 and 30A; 3) IFC Chapter 22; and 4) IFC Chapter 34.

1.3. The tank system shall be tested, certified and approved for Vapor Recovery by the State of California Air Resource

Board (CARB) under Executive Order VR-302-B Standing Loss Control Recovery System for New Installations of Aboveground Storage Tanks effective 11/30/09.

1.4. The tank system shall be warranted by the manufacturer against defects in material or workmanship for 30 years following the delivery of the tank. Warranties that limit such coverage for shorter periods and/or limit the primary tank warranty to failure solely due to non-corrosion related cracking, breakup or collapse will not be permitted. See warranty documents.

1.5. The tank system shall be manufactured and labeled in strict accordance with Convault® standards as applied by a licensee of Convault, Inc. The tank system shall be subject to the Convault Quality Assurance Program.

2.0 DESIGN AND CONSTRUCTION

2.1 Tank: The primary tank shall be rectangular in shape and listed per UL Standard 142. Welds shall be continuous on all sides and exterior seams, conforming to the American Welding Society Standard for continuous weld. The primary steel tank shall be pressure tested at 5 psig for a minimum of 24 hours. All openings shall be from the top only.

2.2 Secondary Containment and Corrosion Protection: The tank system shall include secondary containment consisting of an impervious barrier of 30 Mil (0.76 mm) High-Density Polyethylene geomembrane enclosing the primary steel tank and insulation material to contain leaks from the primary tank and isolating the primary tank from the concrete to protect against corrosion. The secondary containment shall be impervious to corrosion, including damage or failure due to microbial infestation.

Secondary containment comprised of a steel jacket not encased with concrete will not be permitted.

2.3 Concrete Encasement: A vaulted concrete enclosure shall encase and protect both the primary steel tank and the secondary containment. The concrete encasement shall be 6” thick with a minimum design strength of 4000 psi. The concrete design shall include the following for long-term durability: air entrainment, water-reducing admixture, and steel reinforcement. Concrete placement shall be a visually verifiable monolithic (seamless) pour to ensure the absence of voids on all sides and beneath the steel tank.

The vault enclosure shall have concrete support legs of unitized monolithic construction raising the concrete enclosure a minimum of 3” above the ground to meet visual inspection requirements. A mid-level seam or other cold joint construction which could compromise the liquid tightness (secondary containment) and fire protection capability of the vault is not permitted.

2.4 Thermal Protection: The tank system construction shall include covering the outer surface of the primary steel tank with a minimum 1/4” inch of polystyrene foam panels and 6” thick reinforced concrete for thermal insulation to protect against temperature extremes.

2.5 Corrosion Protection: All steel outside the concrete encasement shall be anti-oxidant powder coated to inhibit corrosion and meet ASTM B117.

2.6 Ballistics Resistance: The tank system shall carry a listing under UL Ballistics Standard 752, Levels 5,6, and 8 (see table below), signifying bullet-resisting protection against penetration, passage of fragments of projectiles, or fragmentation of the vault enclosure to the extent that any protected material, including the secondary containment and primary tank are not damaged.

UL 752 Ratings Table

PROTECTION

LEVEL

# OF SHOTS DISTANCE GRAIN AMMUNITION

Level 5 1 15 150 7.62mm rifle lead core full metal copper jacket, military ball

Level 6 5 15 124 9.00mm full metal copper jacket with lead core

Level 8 5 15 150 7.62mm rifle lead core full metal copper jacket, military ball

The tank system shall have been tested and passed the requirements to meet the following Ratings for Bullet Resistant Materials at a National Institute of Justice (NIJ) approved laboratory accredited by the National Voluntary Laboratory Accreditation Program (NVLAP):

Additional Ratings Systems Table

RATING SYSTEM AND LEVEL # OF

SHOTS

GRAIN AMMUNITION

UL 752; Level 9 1 166 Armor piercing .30 caliber rifle steel core lead point filler full metal jacket

National Institute of Justice (NIJ);

Level 4 1 166 .30-06 armor piercing

State Department SD-STD-02.01;

SD-Rifle AP, .30, 30-06 3 165 (Part 1) .30-06 caliber M2AP

ASTM F-1233; .30-06 Armor Piercing Rifle 3 165 .30-06 M2 AP

2.7 High Explosive (HE) Blast Resistance: The tank system design shall have been subjected to a Blast Effects Analysis (BEA) assessing resistance and performance under the following blast threat scenarios per the FEMA 426 - Reference Manual to Mitigate Potential Terrorist Attacks Against Buildings:

Blast Resistance Table

BLAST SCENARIO WEIGHT OF EXPLOSIVE DEVICE STANDOFF DISTANCE

Man-Portable Improvised Explosive Device (MPIED) 50 pound 5 feet

Vehicle-Borne Improvised Explosive Device (VBIED) 500 pound 20 feet

Vapor Cloud Explosion (VCE) 10 psi NA

The BEA shall conclude that the tank system will resist the explosion loads and remain intact, without failure of the primary tank or movement of the tank exceeding 2”. Tank designs that do not protect the primary tank AND secondary containment by providing both Ballistics and Blast Effect resistance as specified in this Sections 2.6 and 2.7 will not be permitted.

2.8 Fire Resistance: The tank system shall be designed and tested to provide 2 hour fire protection for the primary tank as per UL 2085 2-hour furnace fire test and 2 hour simulated pool fire test. The average maximum rise in temperature of the primary tank during the test shall not exceed 260° F and the maximum temperature of any single point on the primary tank shall not exceed 400° F. No steel members shall penetrate the walls or floor of the concrete encasement to assure isolation from pool fire heat.

2.9 Leak Monitoring: A thru-tank leak detection monitoring tube terminating between the primary tank and the secondary containment shall be provided to monitor any leaks from the primary tank.

2.10 Spill/Overfill Containment: The tank system shall include a UL listed 7 gallon spill/overfill container manufactured as an integral part of the primary tank, surrounding the fill pipe, and protected by 2 hour fire rating of the enclosure. The spill/overfill container shall include a stick port and normally closed drain valve to release spilled product into the main tank. Exterior steel shall be anti-oxidant powder coated to inhibit rust. Overfill containment systems that are designed to release spilled product into the interstitial area will not be accepted.

2.11 Overfill Protection: Overfill protection shall be provided by the following methods: a) direct reading level gauge visible from fill pipe access; b) valve rated for pressurized delivery located within fill pipe to close automatically at 95% full level; and c) high level alarm.

2.12 Exterior Finish: The tank system exterior shall be a low maintenance architectural exterior concrete finish. Models with fiber clad or painted steel exterior tanks will not be accepted.

3.0 EXECUTION

3.1 Manufacturer will have a minimum of 10 years of experience in producing specified tank for commercial use and document at least 10 installations in satisfactory operation.

3.2 The tank system shall be installed in strict accordance with the manufacturer’s recommendations, industry standards, and applicable fire and environmental codes. All state and local permits shall be obtained prior to installation.

3.3 The tank system shall be handled, lifted, stored and installed in accordance with the manufacturer’s instructions on a reinforced concrete base slab designed to support the fully loaded tank. Protective bollards shall be installed where required by state and local codes. Tanks shall be marked on all sides with warning signs and product identification as required by applicable codes.

3.4 Electrical work shall be in accordance with applicable codes and shall be rated for hazardous area as required. Electric feed for dispensing pumps shall include an emergency shutoff switch located per code requirements.

3.5 The tank system shall be grounded in accordance with NFPA 780 and all electrical work shall be in accordance with applicable codes.

3.6 Any proposed equal alternatives to this specification must be submitted for review and approval prior to bid opening. If the proposed alternative is deemed to present a better solution, review expenses will be waived. If the proposed alternative is denied or deemed to be equal, all expenses incurred for such review are to be paid for by the bidder prior to submittal of bid.

For drawings or more information contact Oldcastle Precast at: www.convault.com Phone: (888) 965-3227