CAMP NELSON NATIONAL CEMETERY, KY 833CM3030 – CORRECT FCA DEFICIENCIES
Solicitation number
36C78626R0058
Issued by

About this file

This document is a Liquidated Damages Formulation for a construction contract at Camp Nelson National Cemetery (833-030) to correct FCA deficiencies. The estimated daily liquidated damages total $1,375.00 per calendar day of delay, calculated based on civilian rates effective January 1, 2026. The daily amount comprises costs for an NCA Contracting Officer (GS-13) at $75 for 1 hour, a Design & Construction Service Project Manager (GS-14) at $100 for 1 hour, and a Government-Retained Inspector (GSA) at $150 for 8 hours. The contractor is obligated to pay this amount for each calendar day required to complete construction work past the scheduled completion date. The liquidated damages formulation is compensatory in nature and established in accordance with Federal Acquisition Regulation 36.206, though the Government retains the right to pursue actual damages that are distinguishable and separate from the liquidated damages amount if the contractor fails to complete work within the specified timeframe.

View the file

Other files

File Type Posted
S06_36C78626R0058 Amend. 0003.pdf PDF
S02 Amendement 36C78626R0058 0002.pdf PDF
S02 amendment 2.pdf PDF
S02 Fire Alarm Panel.pdf PDF
S02 12 from 833CM3030_CNNC FCA Corrections_CONS_BD DRAWINGS_VOL 1_addendum01.pdf PDF
S02 Amendment 36C78626R0058 0001.pdf PDF
P07 Jessamine Camp Nelson Building.pdf PDF
S02_Price Proposal Breakdown.docx DOCX document
S02_Attachment - Past Performance Questionnaire.docx DOCX document
P07 Jessamine Camp Nelson Highway.pdf PDF
S02_Attachment - DOL Payroll Form.pdf PDF
S02 833CM3030_CNNC FCA Corrections_CONS_BD SPECIFICATIONS.pdf PDF
S02 08 from 833CM3030_CNNC FCA Corrections_CONS_BD DRAWINGS_VOL 1_05212026 1.pdf PDF
S02 10 from 833CM3030_CNNC FCA Corrections_CONS_BD DRAWINGS_VOL 1_05212026 1.pdf PDF
S02 04 from 833CM3030_CNNC FCA Corrections_CONS_BD DRAWINGS_VOL 1_05212026 1 (1).pdf PDF
S02_Attachment - Standard Form 1413.pdf PDF
S02 02 from 833CM3030_CNNC FCA Corrections_CONS_BD DRAWINGS_VOL 1_05212026 1.pdf PDF
S02 07 from 833CM3030_CNNC FCA Corrections_CONS_BD DRAWINGS_VOL 1_05212026 1.pdf PDF
S02 03 from 833CM3030_CNNC FCA Corrections_CONS_BD DRAWINGS_VOL 1_05212026 1.pdf PDF
S02 06 from 833CM3030_CNNC FCA Corrections_CONS_BD DRAWINGS_VOL 1_05212026 1.pdf PDF
P07 Jessamine Camp Nelson Heavy.pdf PDF
S02_Attachment - Davis-Bacon Act Poster.pdf PDF
S09 09 from 833CM3030_CNNC FCA Corrections_CONS_BD DRAWINGS_VOL 1_05212026 1.pdf PDF
S02 11 from 833CM3030_CNNC FCA Corrections_CONS_BD DRAWINGS_VOL 2_05212026 1.pdf PDF
S02 Camp Nelson Sol 36C78626R0058 draft 9-14-2026.pdf PDF
S02 05 from 833CM3030_CNNC FCA Corrections_CONS_BD DRAWINGS_VOL 1_05212026 1.pdf PDF
S02 01 from 833CM3030_CNNC FCA Corrections_CONS_BD DRAWINGS_VOL 1_05212026 1.pdf PDF
S02_Attachment - Project Sample Template.docx DOCX document
Show all 28

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

LIQUIDATED DAMAGES FORMULATION

Camp Nelson National Cemetery 833-030, Correct FCA Deficiencies

1. Estimated liquidated damages for NCA Contracting, Design & Construction Service (DCS), and Government-Retained Inspector are as follows. Civilian rates based on General Schedule Locality Pay Tables effective 01 Jan 2026.

Classification Grade Rate Hours Total NCA Contracting Officer GS-13 $75 1 $75 Legal Officer NA NA NA NA DCS Project Manager GS-14 $100 1 $100 Govt Retained Inspector GSA $150 8 $1200 Total Daily LD Amount $1,375.00

2. The Contractor shall pay liquidated damages to the Government in the amount of $1,375.00 for each calendar day of delay until the work is completed or accepted. Numbers derived from historical trends associated with time required to perform additional contract administration. The purpose of Liquidated Damages is compensatory only. The Government retains the right to seek actual damages so far as they are distinguishable and separate due to Contractor not completing the work within the time specified in the contract.

3. Liquidated Damages as detailed above are in accordance with Federal Acquisition Regulation

36.206 and will be assessed for each calendar day required to complete the construction work on this project past the scheduled completion date.