PDX 2026-513 (71) T2.01.pdf

PDF 411 KB Posted

Attached to
Portland International Airport Customs and Border Protection Improvements - Phase 2
Solicitation number
145968
Issued by
Multnomah County, Oregon

About this file

This is an architectural floor plan drawing for the Portland International Airport's Customs and Border Protection Improvements - Phase 2 project, prepared by DBC Architecture Inc. and submitted to the City of Portland, Oregon. The drawing depicts the deplaning level sector 01 technology infrastructure layout at a scale of 1/8" = 1'-0" and details the installation of low-voltage technology systems within the CBP processing area, including nine booth stations (Booths 1-10) and various office, holding, and support spaces. The project specifications require the provision of new Cat6A cable installations within existing Walker duct systems, junction boxes on access areas, new 180-degree and 360-degree ceiling-mounted CCTV cameras connected to existing infrastructure in room D1605, new data jacks in 2-channel power poles, and 1.5" conduit extensions from restroom ceiling access hatches to existing cable trays. The drawing is dated September 8, 2026, and includes three additive alternate configurations for system installation flexibility. The document is digitally signed by Benjamin Earl Perry, a licensed professional engineer in Oregon with credentials expiring December 31, 2026.

The drawing does not contain pricing information, contract terms, set-asides, incumbent contractor details, or funding source specifications. The document serves as a technical reference guide for contractors and the Port of Portland during the permitting and construction phases, with coordination requirements mandated between the contractor and Port IT personnel for final camera field-of-view installations and exact placement locations of low-voltage equipment prior to rough-in work.

View the file

Other files

File Type Posted
PDX 2026-513 (08) A1.01.pdf PDF
PDX 2026-513 (75) G0.01.pdf PDF
PDX 2026-513 (12) A1.12.pdf PDF
PDX 2026-513 (42) M5.01.pdf PDF
PDX 2026-513 (50) E1.12.pdf PDF
PDX 2026-513 (28) A9.02.pdf PDF
PDX 2026-513 (60) E8.01.pdf PDF
PDX 2026-513 (20) A5.01.pdf PDF
PDX 2026-513 (25) A8.02.pdf PDF
PDX 2026-513 (77) G2.02.pdf PDF
PDX 2026-513 (35) M0.02.pdf PDF
PDX 2026-513 (79) G9.01.pdf PDF
PDX 2026-513 (03) GI2.00.pdf PDF
PDX 2026-513 (13) A1.13.pdf PDF
PDX 2026-513 (29) A9.03.pdf PDF
PDX 2026-513 (56) E2.05.pdf PDF
PDX 2026-513 (69) T1.02.pdf PDF
PDX 2026-513 (43) M5.02.pdf PDF
PDX 2026-513 (37) M1.02.pdf PDF
PDX 2026-513 (58) E2.12.pdf PDF
PDX 2026-513 (10) A1.03.pdf PDF
PDX 2026-513 (14) A2.01.pdf PDF
PDX 2026-513 (66) E8.07.pdf PDF
PDX 2026-513 (31) S0.02.pdf PDF
PDX 2026-513 (85) G9.15.pdf PDF
PDX 2026-513 (83) G9.13.pdf PDF
PDX 2026-513 (78) G2.03.pdf PDF
PDX 2026-513 (45) E0.02.pdf PDF
PDX 2026-513 (68) T1.01.pdf PDF
Substitution Request Form.pdf PDF
PDX 2026-513 (15) A2.02.pdf PDF
PDX 2026-513 (61) E8.02.pdf PDF
PDX 2026-513 (70) T1.03.pdf PDF
PDX 2026-513 (72) T2.02.pdf PDF
PDX 2026-513 (19) A2.13.pdf PDF
PDX 2026-513 (04) GI3.00.pdf PDF
PDX 2026-513 (51) E1.13.pdf PDF
PDX 2026-513 (82) G9.12.pdf PDF
PDX 2026-513 (33) S2.01.pdf PDF
PDX 2026-513 (46) E0.03.pdf PDF
PDX 2026-513 (17) A2.11.pdf PDF
PDX 2026-513 (62) E8.03.pdf PDF
PDX 2026-513 (81) G9.11.pdf PDF
PDX 2026-513 (39) M2.01.pdf PDF
PDX 2026-513 (22) A5.03.pdf PDF
PDX 2026-513 (44) E0.01.pdf PDF
PDX 2026-513 (49) E1.11.pdf PDF
PDX 2026-513 (05) GI3.01.pdf PDF
PDX 2026-513 (09) A1.02.pdf PDF
Getting the most out of your Port of Portland Vendor Profile.docx DOCX document
Show 40 more

Latest 50 of 88 listed here. See the rest on GovTribe.

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

D1660

JAND1655

CORR.

D14920

EQUIP

D1650

ELEV

D1658

BREAK

D1656

LOCKERS

D1657

LOCKERS

D1664

WOMENS

D1666

MENS

D1654

MECH

D1652

STAIRS

D1706

OFFICE

D1646

ESC

D1680

OFFICE

D1675

ISOLATION

D1679

EQUIPMENT

D1672

MENS

D1670

WOMENS

D1687

HOLD

D1686

HOLD

D1683

OFFICE

D1663

OFFICE

D1662

CORR

D1674

HEALTH

D1678

SUPERVISOR

D1676

TOILET

D1700

SECOND CHECK

D1702

INTERVIEW

D1704

INTERVIEW

D1605

OFFICE

D14573

OFFICE

D1671

CORR

D1600

IMMIGRATION

D1653

STAIRS

D1682

CORR

J

J

J

J

J

J

J

J

J

J

J

01.A 01.B

02.A 02.B

03.A 03.B

04.A 04.B

05.A 05.B

06.A 06.B

07.A 07.B

08.A 08.B

09.A 09.B

10.A 10.B

13.A 13.B

14.A 14.B

15.A 15.B

16.A 16.B

17.A 17.B

18.A 18.B

11.A 11.B

J

D1-614 24.A

(N)

D1-615 25.A

(N)

D1-617 27.A

(N)

D1-616 26.A

(N)

12.A 12.B 12.C 12.D

J

D50 D49 D48 D47 D46

DE

DD

DC

DB

DA

9/8/2026

C

AN

Y O

U S

EE

T

H E

AI

R

PL

AN

ES

T H

E

AD

JA

C

EN

T

SA

M

PL

ES

S H

O W

T H

R

EE

D

IF

FE

R

EN

T

LE

VE

LS

O

F

SH

AD

IN

G

SE

TT

IN

G

S

FO

R V

IE

W

IN

G

A N

D P

R

IN

TI

N

G D

R

AW

IN

G

C O

N

TE

N T

AR

E

O

PT

IM

IZ

ED

W

H

EN

AL

L

TH

R

EE

P

LA

N

ES

A

R E

VI

SI

BL

E.

T H

IS

G

U

ID

AN

C

E

IS

P R

O

VI

D

ED

F O

R R

EF

ER

EN

C

E O

N

LY

PRINTED:

lig ht da rk gr ay bl ac k

DESIGN NUMBER PROJECT NUMBER

2"

G R

AP

H

IC

S

C

AL

E

- F

O R

R

EF

ER

EN

C E

O N

LY

gr ay

1:42:32 PM ECLOSE g:\projects\339 - dbc architecture inc\3392601 - pdx cbp improvements\design\(2) drawings\current\pdx cbp improvements\sheets\t2.01 deplaning level - sector 01 - floor plan - technology.dwg

DISC. SHT. NO.

DRAWING SCALE IS REDUCED 50% WHEN SHEET SIZE IS 11" x 17"

DESIGN BY

DRAWN BY

CHECKED BY

DATE

SHEET NO.

SUBMITTED BY

DRAWING NO.

TYPE:

1/

4" 1/

2" 1"

1/

4" 1/

2" 1"

DATE BY REVISION APPDATE BY REVISION APP ##

IF ELECTRONIC SIGNATURE IS BROKEN OR MISSING - THIS IS NOT A LEGAL DRAWING

KEY PLAN

SCALE: N.T.S.

N

THE AREA BELOW IS TO BE LEFT BLANK - FOR

USE BY CITY FOR PERMIT REVIEW STAMP ONLY-

Salem 503-584-1576 www.landisconsulting.com

PORTLAND INTERNATIONAL AIRPORT

CUSTOMS AND BORDER PROTECTION IMPROVEMENTS - PHASE 2

PDX 2026-5132025D042 103146

M. HENNING

E. CLOSE

B. PERRY

SEPTEMBER 2026

JAY OSTLUND

CD

PDERETSI

GER LA

NOI

SSEFOR

OREGON

86683

NIG

N

E R

EE

8 , 2

M A Y

PERRY

B

EN

JAMI N

E.

EXPIRES: 12-31-2026

Digitally Signed

DEPLANING LEVEL - SECTOR 01 - FLOOR PLAN - TECHNOLOGY

T2.01

N

SCALE:

DEPLANING LEVEL - SECTOR 01 - FLOOR PLAN - TECHNOLOGY

1/8" = 1'-0"1

SCALE: IN FEET

0' 4' 8' 16' 24'

#KEY NOTE(S) :

1. PROVIDE JUNCTION BOX ON ACCESS AREA TO LOW

VOLTAGE COMPARTMENT IN EXISTING 3-CHANNEL

WALKER DUCT. PROVIDE FLEXIBLE METAL CONDUIT

AND CAT6 CABLE AS SHOWN.

2. MOUNT LOW VOLTAGE BOX TO CASEWORK.

COORDINATE EXACT LOCATION WITH PORT PRIOR

TO ROUGH-IN.

3. PROVIDE NEW 180-DEGREE CCTV CAMERA

MOUNTED TO CEILING IN THE SAME LOCATIONS AS

EXISTING. CONNECT TO EXISTING CAT6A WHICH IS

CONNECTED TO IDF ROOM D1605. COORDINATE

FINAL, INSTALLED FIELD-OF-VIEWS WITH PORT IT.

4. PROVIDE NEW DATA JACKS AS SHOWN IN

2-CHANNEL POWER POLE.

5. PROVIDE NEW 360-DEGREE CAMERA MOUNTED TO

CEILING IN THE SAME LOCATION AS EXISTING.

PROVIDE NEW CAT6A CABLE AS SHOWN ON TELCOM

CABLE MATRIX. COORDINATE FINAL, INSTALLED

FIELD-OF-VIEWS WITH PORT IT.

6. PROVIDE NEW 1.5" CONDUIT FROM RESTROOM

CEILING ACCESS HATCH TO EXISTING CABLE TRAY

ABOVE CEILING. PROVIDE PULL STRING AND

CONDUIT BUSHINGS.

7. TERMINATE NEW CONDUIT ABOVE EXISTING

ACCESS HATCH IN CEILING OF EXISTING

RESTROOM. COORDINATE EXACT LOCATION OF

CONDUIT TERMINATION WITH PORT.

8. SEE SHEET E2.01 FOR EXTENSION OF NEW WALKER

DUCT.

9. PROVIDE NEW CAT6A CABLE AND CONNECT TO

EXISTING MONITOR. UTILIZE EXISTING PATHWAYS

TO CONNECT PATCH PANEL IN IDF ROOM D1642.

(E) RACK 1

(E) WALKER DUCT

2 1

2 1

2 1

2 1

C O

N

TI

N U

ED

O

N S

H

EE

T T2

.0

C O

N

TI

N U

ED

O

N S

H

EE

T T2

.0

4 4

4 4

4 4

GENERAL NOTE(S):

1. INTENT IS TO USE NEW CAT6A REDUCED DIAMETER

CABLE IN EXISTING WALKER DUCT TO CBP BOOTHS.

SEE SPECIFICATIONS FOR CABLE CALLOUT.

(E) CABLE TRAY

ADDITIVE ALTERNATE #2

ADDITIVE ALTERNATE #1

(E) RACK 3

(E) RACK 2

ADDITIVE ALTERNATE #3

BOOTH 1

BOOTH 2

BOOTH 3

BOOTH 4

BOOTH 5

BOOTH 6

BOOTH 7

BOOTH 8

BOOTH 9

BOOTH 10

2026-09-08T14:32:17-0700
Digitally Signed
Benjamin Earl Perry

File details come from the government source that posted it. Updated .