PDX 2026-513 (71) T2.01.pdf
PDF 411 KB Posted
- Solicitation number
- 145968
- Issued by
- Multnomah County, Oregon
About this file
This is an architectural floor plan drawing for the Portland International Airport's Customs and Border Protection Improvements - Phase 2 project, prepared by DBC Architecture Inc. and submitted to the City of Portland, Oregon. The drawing depicts the deplaning level sector 01 technology infrastructure layout at a scale of 1/8" = 1'-0" and details the installation of low-voltage technology systems within the CBP processing area, including nine booth stations (Booths 1-10) and various office, holding, and support spaces. The project specifications require the provision of new Cat6A cable installations within existing Walker duct systems, junction boxes on access areas, new 180-degree and 360-degree ceiling-mounted CCTV cameras connected to existing infrastructure in room D1605, new data jacks in 2-channel power poles, and 1.5" conduit extensions from restroom ceiling access hatches to existing cable trays. The drawing is dated September 8, 2026, and includes three additive alternate configurations for system installation flexibility. The document is digitally signed by Benjamin Earl Perry, a licensed professional engineer in Oregon with credentials expiring December 31, 2026.
The drawing does not contain pricing information, contract terms, set-asides, incumbent contractor details, or funding source specifications. The document serves as a technical reference guide for contractors and the Port of Portland during the permitting and construction phases, with coordination requirements mandated between the contractor and Port IT personnel for final camera field-of-view installations and exact placement locations of low-voltage equipment prior to rough-in work.
View the file
Other files
Show 40 more
Latest 50 of 88 listed here. See the rest on GovTribe.
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
D1660
JAND1655
CORR.
D14920
EQUIP
D1650
ELEV
D1658
BREAK
D1656
LOCKERS
D1657
LOCKERS
D1664
WOMENS
D1666
MENS
D1654
MECH
D1652
STAIRS
D1706
OFFICE
D1646
ESC
D1680
OFFICE
D1675
ISOLATION
D1679
EQUIPMENT
D1672
MENS
D1670
WOMENS
D1687
HOLD
D1686
HOLD
D1683
OFFICE
D1663
OFFICE
D1662
CORR
D1674
HEALTH
D1678
SUPERVISOR
D1676
TOILET
D1700
SECOND CHECK
D1702
INTERVIEW
D1704
INTERVIEW
D1605
OFFICE
D14573
OFFICE
D1671
CORR
D1600
IMMIGRATION
D1653
STAIRS
D1682
CORR
J
J
J
J
J
J
J
J
J
J
J
01.A 01.B
02.A 02.B
03.A 03.B
04.A 04.B
05.A 05.B
06.A 06.B
07.A 07.B
08.A 08.B
09.A 09.B
10.A 10.B
13.A 13.B
14.A 14.B
15.A 15.B
16.A 16.B
17.A 17.B
18.A 18.B
11.A 11.B
J
D1-614 24.A
(N)
D1-615 25.A
(N)
D1-617 27.A
(N)
D1-616 26.A
(N)
12.A 12.B 12.C 12.D
J
D50 D49 D48 D47 D46
DE
DD
DC
DB
DA
9/8/2026
C
AN
Y O
U S
EE
T
H E
AI
R
PL
AN
ES
T H
E
AD
JA
C
EN
T
SA
M
PL
ES
S H
O W
T H
R
EE
D
IF
FE
R
EN
T
LE
VE
LS
O
F
SH
AD
IN
G
SE
TT
IN
G
S
FO
R V
IE
W
IN
G
A N
D P
R
IN
TI
N
G D
R
AW
IN
G
C O
N
TE
N T
AR
E
O
PT
IM
IZ
ED
W
H
EN
AL
L
TH
R
EE
P
LA
N
ES
A
R E
VI
SI
BL
E.
T H
IS
G
U
ID
AN
C
E
IS
P R
O
VI
D
ED
F O
R R
EF
ER
EN
C
E O
N
LY
PRINTED:
lig ht da rk gr ay bl ac k
DESIGN NUMBER PROJECT NUMBER
2"
G R
AP
H
IC
S
C
AL
E
- F
O R
R
EF
ER
EN
C E
O N
LY
gr ay
1:42:32 PM ECLOSE g:\projects\339 - dbc architecture inc\3392601 - pdx cbp improvements\design\(2) drawings\current\pdx cbp improvements\sheets\t2.01 deplaning level - sector 01 - floor plan - technology.dwg
DISC. SHT. NO.
DRAWING SCALE IS REDUCED 50% WHEN SHEET SIZE IS 11" x 17"
DESIGN BY
DRAWN BY
CHECKED BY
DATE
SHEET NO.
SUBMITTED BY
DRAWING NO.
TYPE:
1/
4" 1/
2" 1"
1/
4" 1/
2" 1"
DATE BY REVISION APPDATE BY REVISION APP ##
IF ELECTRONIC SIGNATURE IS BROKEN OR MISSING - THIS IS NOT A LEGAL DRAWING
KEY PLAN
SCALE: N.T.S.
N
THE AREA BELOW IS TO BE LEFT BLANK - FOR
USE BY CITY FOR PERMIT REVIEW STAMP ONLY-
Salem 503-584-1576 www.landisconsulting.com
PORTLAND INTERNATIONAL AIRPORT
CUSTOMS AND BORDER PROTECTION IMPROVEMENTS - PHASE 2
PDX 2026-5132025D042 103146
M. HENNING
E. CLOSE
B. PERRY
SEPTEMBER 2026
JAY OSTLUND
CD
PDERETSI
GER LA
NOI
SSEFOR
OREGON
86683
NIG
N
E R
EE
8 , 2
M A Y
PERRY
B
EN
JAMI N
E.
EXPIRES: 12-31-2026
Digitally Signed
DEPLANING LEVEL - SECTOR 01 - FLOOR PLAN - TECHNOLOGY
T2.01
N
SCALE:
DEPLANING LEVEL - SECTOR 01 - FLOOR PLAN - TECHNOLOGY
1/8" = 1'-0"1
SCALE: IN FEET
0' 4' 8' 16' 24'
#KEY NOTE(S) :
1. PROVIDE JUNCTION BOX ON ACCESS AREA TO LOW
VOLTAGE COMPARTMENT IN EXISTING 3-CHANNEL
WALKER DUCT. PROVIDE FLEXIBLE METAL CONDUIT
AND CAT6 CABLE AS SHOWN.
2. MOUNT LOW VOLTAGE BOX TO CASEWORK.
COORDINATE EXACT LOCATION WITH PORT PRIOR
TO ROUGH-IN.
3. PROVIDE NEW 180-DEGREE CCTV CAMERA
MOUNTED TO CEILING IN THE SAME LOCATIONS AS
EXISTING. CONNECT TO EXISTING CAT6A WHICH IS
CONNECTED TO IDF ROOM D1605. COORDINATE
FINAL, INSTALLED FIELD-OF-VIEWS WITH PORT IT.
4. PROVIDE NEW DATA JACKS AS SHOWN IN
2-CHANNEL POWER POLE.
5. PROVIDE NEW 360-DEGREE CAMERA MOUNTED TO
CEILING IN THE SAME LOCATION AS EXISTING.
PROVIDE NEW CAT6A CABLE AS SHOWN ON TELCOM
CABLE MATRIX. COORDINATE FINAL, INSTALLED
FIELD-OF-VIEWS WITH PORT IT.
6. PROVIDE NEW 1.5" CONDUIT FROM RESTROOM
CEILING ACCESS HATCH TO EXISTING CABLE TRAY
ABOVE CEILING. PROVIDE PULL STRING AND
CONDUIT BUSHINGS.
7. TERMINATE NEW CONDUIT ABOVE EXISTING
ACCESS HATCH IN CEILING OF EXISTING
RESTROOM. COORDINATE EXACT LOCATION OF
CONDUIT TERMINATION WITH PORT.
8. SEE SHEET E2.01 FOR EXTENSION OF NEW WALKER
DUCT.
9. PROVIDE NEW CAT6A CABLE AND CONNECT TO
EXISTING MONITOR. UTILIZE EXISTING PATHWAYS
TO CONNECT PATCH PANEL IN IDF ROOM D1642.
(E) RACK 1
(E) WALKER DUCT
2 1
2 1
2 1
2 1
C O
N
TI
N U
ED
O
N S
H
EE
T T2
.0
C O
N
TI
N U
ED
O
N S
H
EE
T T2
.0
4 4
4 4
4 4
GENERAL NOTE(S):
1. INTENT IS TO USE NEW CAT6A REDUCED DIAMETER
CABLE IN EXISTING WALKER DUCT TO CBP BOOTHS.
SEE SPECIFICATIONS FOR CABLE CALLOUT.
(E) CABLE TRAY
ADDITIVE ALTERNATE #2
ADDITIVE ALTERNATE #1
(E) RACK 3
(E) RACK 2
ADDITIVE ALTERNATE #3
BOOTH 1
BOOTH 2
BOOTH 3
BOOTH 4
BOOTH 5
BOOTH 6
BOOTH 7
BOOTH 8
BOOTH 9
BOOTH 10
| 2026-09-08T14:32:17-0700 | |
| Digitally Signed | |
| Benjamin Earl Perry |
File details come from the government source that posted it. Updated .