PDX 2026-513 (57) E2.11.pdf

PDF 534 KB Posted

Attached to
Portland International Airport Customs and Border Protection Improvements - Phase 2
Solicitation number
145968
Issued by
Multnomah County, Oregon

About this file

This is an electrical design drawing for the Portland International Airport Customs and Border Protection Improvements - Phase 2 project in Oregon. The document is a reflected ceiling plan for the deplaning level, Sector 01, showing the lighting plan and electrical layout at a scale of 1/8" = 1'-0". The drawing details the locations of existing and new light fixtures across multiple rooms and corridors, including immigration processing areas, offices, interview rooms, mechanical spaces, restrooms, lockers, elevators, and equipment rooms distributed across levels L2 and L3. The plan indicates connections to existing lighting branch circuits from panels 2D1D, 2D1B, 4D1B, E4D1B, and E2D1B, with specific instructions for rewiring fixtures to new room light switches and maintaining existing lighting controls. The drawing was prepared by DBC Architecture Inc. in September 2026 and is part of design phase documentation submitted for permit review.

The drawing includes general notes requiring the contractor to trace existing lighting branch circuits for verification and provide red-line markups on contractor as-built drawings. Key notes specify that existing light fixtures should remain on existing lighting branch circuits with rewired connections to new room light switches, and that new light fixtures should connect to the existing lighting branch circuits that previously served demolished fixtures while maintaining existing lighting controls. This electrical plan represents Additive Alternate #2 and is one component of a comprehensive improvement project at Portland International Airport's customs and border protection facility, with continued coordination referenced on subsequent drawing sheet E2.12.

View the file

Other files

File Type Posted
PDX 2026-513 (08) A1.01.pdf PDF
PDX 2026-513 (75) G0.01.pdf PDF
PDX 2026-513 (12) A1.12.pdf PDF
PDX 2026-513 (42) M5.01.pdf PDF
PDX 2026-513 (50) E1.12.pdf PDF
PDX 2026-513 (28) A9.02.pdf PDF
PDX 2026-513 (60) E8.01.pdf PDF
PDX 2026-513 (20) A5.01.pdf PDF
PDX 2026-513 (25) A8.02.pdf PDF
PDX 2026-513 (77) G2.02.pdf PDF
PDX 2026-513 (35) M0.02.pdf PDF
PDX 2026-513 (79) G9.01.pdf PDF
PDX 2026-513 (03) GI2.00.pdf PDF
PDX 2026-513 (13) A1.13.pdf PDF
PDX 2026-513 (29) A9.03.pdf PDF
PDX 2026-513 (56) E2.05.pdf PDF
PDX 2026-513 (69) T1.02.pdf PDF
PDX 2026-513 (43) M5.02.pdf PDF
PDX 2026-513 (37) M1.02.pdf PDF
PDX 2026-513 (58) E2.12.pdf PDF
PDX 2026-513 (10) A1.03.pdf PDF
PDX 2026-513 (14) A2.01.pdf PDF
PDX 2026-513 (66) E8.07.pdf PDF
PDX 2026-513 (31) S0.02.pdf PDF
PDX 2026-513 (85) G9.15.pdf PDF
PDX 2026-513 (83) G9.13.pdf PDF
PDX 2026-513 (78) G2.03.pdf PDF
PDX 2026-513 (45) E0.02.pdf PDF
PDX 2026-513 (68) T1.01.pdf PDF
Substitution Request Form.pdf PDF
PDX 2026-513 (15) A2.02.pdf PDF
PDX 2026-513 (61) E8.02.pdf PDF
PDX 2026-513 (70) T1.03.pdf PDF
PDX 2026-513 (72) T2.02.pdf PDF
PDX 2026-513 (19) A2.13.pdf PDF
PDX 2026-513 (04) GI3.00.pdf PDF
PDX 2026-513 (51) E1.13.pdf PDF
PDX 2026-513 (82) G9.12.pdf PDF
PDX 2026-513 (33) S2.01.pdf PDF
PDX 2026-513 (46) E0.03.pdf PDF
PDX 2026-513 (17) A2.11.pdf PDF
PDX 2026-513 (62) E8.03.pdf PDF
PDX 2026-513 (81) G9.11.pdf PDF
PDX 2026-513 (39) M2.01.pdf PDF
PDX 2026-513 (22) A5.03.pdf PDF
PDX 2026-513 (44) E0.01.pdf PDF
PDX 2026-513 (49) E1.11.pdf PDF
PDX 2026-513 (05) GI3.01.pdf PDF
PDX 2026-513 (09) A1.02.pdf PDF
Getting the most out of your Port of Portland Vendor Profile.docx DOCX document
Show 40 more

Latest 50 of 88 listed here. See the rest on GovTribe.

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

D1660

JAND1655

CORR.

D14920

EQUIP

D1650

ELEV

D1658

BREAK

D1656

LOCKERS

D1657

LOCKERS

D1664

WOMENS

D1666

MENS

D1654

MECH

D1652

STAIRS

D1706

OFFICE

D1646

ESC

D1680

OFFICE

D1675

ISOLATION

D1679

EQUIPMENT

D1672

MENS

D1670

WOMENS

D1687

HOLD

D1686

HOLD

D1683

OFFICE

D1663

OFFICE

D1662

CORR

D1674

HEALTH

D1678

SUPERVISOR

D1676

TOILET

D1700

SECOND CHECK

D1702

INTERVIEW

D1704

INTERVIEW

D1605

OFFICE

D14573

OFFICE

D1671

CORR

D1600

IMMIGRATION

D1653

STAIRS

D1682

CORR

(E)

(E)

(E)

(E)

L3 L3

L3 L3

L3 L3

L3 L3

L3 L3

L3 L3

L3 L3

L3 L3

L3 L3

L2 L2

L2 L2

L2 L2

L2 L2

4D1A:1 4D1A:1

E4D1A:3 4D1A:1

4D1A:14D1A:1

4D1A:14D1A:1

4D1A:1E4D1A:3

4D1A:14D1A:1

4D1A:1E4D1A:3

4D1A:14D1A:1

4D1A:1E4D1A:3

4D1A:14D1A:1

4D1A:14D1A:1

4D1A:1E4D1A:3

4D1A:14D1A:1

D50 D49 D48 D47 D46

DE

DD

DC

DB

DA

9/8/2026

C

AN

Y O

U S

EE

T

H E

AI

R

PL

AN

ES

T H

E

AD

JA

C

EN

T

SA

M

PL

ES

S H

O W

T H

R

EE

D

IF

FE

R

EN

T

LE

VE

LS

O

F

SH

AD

IN

G

SE

TT

IN

G

S

FO

R V

IE

W

IN

G

A N

D P

R

IN

TI

N

G D

R

AW

IN

G

C O

N

TE

N T

AR

E

O

PT

IM

IZ

ED

W

H

EN

AL

L

TH

R

EE

P

LA

N

ES

A

R E

VI

SI

BL

E.

T H

IS

G

U

ID

AN

C

E

IS

P R

O

VI

D

ED

F O

R R

EF

ER

EN

C

E O

N

LY

PRINTED:

lig ht da rk gr ay bl ac k

DESIGN NUMBER PROJECT NUMBER

2"

G R

AP

H

IC

S

C

AL

E

- F

O R

R

EF

ER

EN

C E

O N

LY

gr ay

1:39:10 PM ECLOSE g:\projects\339 - dbc architecture inc\3392601 - pdx cbp improvements\design\(2) drawings\current\pdx cbp improvements\sheets\e2.11 deplaning level - sector 01 - lighting plan - electrical.dwg

DISC. SHT. NO.

DRAWING SCALE IS REDUCED 50% WHEN SHEET SIZE IS 11" x 17"

DESIGN BY

DRAWN BY

CHECKED BY

DATE

SHEET NO.

SUBMITTED BY

DRAWING NO.

TYPE:

1/

4" 1/

2" 1"

1/

4" 1/

2" 1"

DATE BY REVISION APPDATE BY REVISION APP ##

IF ELECTRONIC SIGNATURE IS BROKEN OR MISSING - THIS IS NOT A LEGAL DRAWING

KEY PLAN

SCALE: N.T.S.

N

THE AREA BELOW IS TO BE LEFT BLANK - FOR

USE BY CITY FOR PERMIT REVIEW STAMP ONLY-

Salem 503-584-1576 www.landisconsulting.com

PORTLAND INTERNATIONAL AIRPORT

CUSTOMS AND BORDER PROTECTION IMPROVEMENTS - PHASE 2

PDX 2026-5132025D042 103146

M. HENNING

E. CLOSE

B. PERRY

SEPTEMBER 2026

JAY OSTLUND

CD

PDERETSI

GER LA

NOI

SSEFOR

OREGON

86683

NIG

N

E R

EE

8 , 2

M A Y

PERRY

B

EN

JAMI N

E.

EXPIRES: 12-31-2026

Digitally Signed

DEPLANING LEVEL - SECTOR 01 - REFLECTED CEILING

PLAN - ELECTRICAL

E2.11

N

SCALE:

DEPLANING LEVEL - SECTOR 01 - REFLECTED CEILING PLAN - ELECTRICAL

1/8" = 1'-0"1

SCALE: IN FEET

0' 4' 8' 16' 24'

#KEY NOTE(S) :

1. EXISTING LIGHT FIXTURE TO REMAIN ON

EXISTING LIGHTING BRANCH CIRCUIT. REWIRE

FIXTURES SHOWN TO NEW ROOM LIGHT SWITCH.

2. CONNECT NEW LIGHT FIXTURE TO THE EXISTING

LIGHTING BRANCH CIRCUIT THE DEMOLITION

FIXTURES WERE CONNECTED TO IN THIS AREA.

MAINTAIN EXISTING LIGHTING CONTROLS.

C O

N

TI

N U

ED

O

N S

H

EE

T E2

.1

C O

N

TI

N U

ED

O

N S

H

EE

T E2

.1

(E) PANEL 2D1D

(E) PANEL 2D1B

(E) PANEL 4D1B

(E) PANEL E4D1B

(E) PANEL E2D1B

2 2

2 2

2 2

2 2

2 2

2 2

2 2

2 2

2 2

GENERAL NOTE:

1. EXISTING LIGHTING BRANCH CIRCUITS ARE FROM

AS-BUILT DRAWINGS. CONTRACTOR TO TRACE

LIGHTING BRANCH CIRCUITS FOR VERIFICATION

AND PROVIDE RED LINE MARKUPS FOR THESE

CIRCUITS ON THE CONTRACTOR AS-BUILT

DRAWINGS.

ADDITIVE ALTERNATE #2

2026-09-08T14:34:21-0700
Digitally Signed
Benjamin Earl Perry

File details come from the government source that posted it. Updated .