PDX 2026-513 (54) E2.03.pdf

PDF 376 KB Posted

Attached to
Portland International Airport Customs and Border Protection Improvements - Phase 2
Solicitation number
145968
Issued by
Multnomah County, Oregon

About this file

This is an electrical floor plan drawing for the Portland International Airport Customs and Border Protection Improvements - Phase 2 project in Oregon. The drawing, designated as Sheet E2.03, illustrates the deplaning level sector 03 electrical layout at a scale of 1/8" = 1'-0". The plan depicts electrical infrastructure including existing panels (E2D1A, E4D1A, 2D1A, 4D1A, 2D1C), fire alarm control panels (FACP-19, FACP-20-1), signage (CS3-01), and HVAC equipment connections (HAC-DE-101, HAC-DE-102). The drawing references multiple airport zones including corridors, elevators, stairs, equipment rooms, storage areas, bag screening facilities, and waiting areas. Key specifications include a 20-amp disconnect switch requirement for signage, coordination points for conductor and conduit routing, flexible conduit transition requirements for HVAC connections, and ceiling-mounted speaker strobe placement requirements with owner coordination prior to rough-in work.

The drawing was prepared by DBC Architecture Inc. under design number 2025D042, with Benjamin Earl Perry as the professional engineer of record licensed in Oregon (License No. 86683, expires 12-31-2026). The document was created on September 8, 2026, and is intended for permit review and construction coordination purposes. The plan references continuation of electrical details on Sheet E2.02 and requires coordination with the Port of Portland, the mechanical contractor, and signage consultant prior to rough-in installation. The drawing includes standard architectural notation with key notes addressing equipment connections and construction sequencing requirements specific to airport security and border protection facility operations.

View the file

Other files

File Type Posted
PDX 2026-513 (08) A1.01.pdf PDF
PDX 2026-513 (75) G0.01.pdf PDF
PDX 2026-513 (12) A1.12.pdf PDF
PDX 2026-513 (42) M5.01.pdf PDF
PDX 2026-513 (50) E1.12.pdf PDF
PDX 2026-513 (28) A9.02.pdf PDF
PDX 2026-513 (60) E8.01.pdf PDF
PDX 2026-513 (20) A5.01.pdf PDF
PDX 2026-513 (25) A8.02.pdf PDF
PDX 2026-513 (77) G2.02.pdf PDF
PDX 2026-513 (35) M0.02.pdf PDF
PDX 2026-513 (79) G9.01.pdf PDF
PDX 2026-513 (03) GI2.00.pdf PDF
PDX 2026-513 (13) A1.13.pdf PDF
PDX 2026-513 (29) A9.03.pdf PDF
PDX 2026-513 (56) E2.05.pdf PDF
PDX 2026-513 (69) T1.02.pdf PDF
PDX 2026-513 (43) M5.02.pdf PDF
PDX 2026-513 (37) M1.02.pdf PDF
PDX 2026-513 (58) E2.12.pdf PDF
PDX 2026-513 (10) A1.03.pdf PDF
PDX 2026-513 (14) A2.01.pdf PDF
PDX 2026-513 (66) E8.07.pdf PDF
PDX 2026-513 (31) S0.02.pdf PDF
PDX 2026-513 (85) G9.15.pdf PDF
PDX 2026-513 (83) G9.13.pdf PDF
PDX 2026-513 (78) G2.03.pdf PDF
PDX 2026-513 (45) E0.02.pdf PDF
PDX 2026-513 (68) T1.01.pdf PDF
Substitution Request Form.pdf PDF
PDX 2026-513 (15) A2.02.pdf PDF
PDX 2026-513 (61) E8.02.pdf PDF
PDX 2026-513 (70) T1.03.pdf PDF
PDX 2026-513 (72) T2.02.pdf PDF
PDX 2026-513 (19) A2.13.pdf PDF
PDX 2026-513 (04) GI3.00.pdf PDF
PDX 2026-513 (51) E1.13.pdf PDF
PDX 2026-513 (82) G9.12.pdf PDF
PDX 2026-513 (33) S2.01.pdf PDF
PDX 2026-513 (46) E0.03.pdf PDF
PDX 2026-513 (17) A2.11.pdf PDF
PDX 2026-513 (62) E8.03.pdf PDF
PDX 2026-513 (81) G9.11.pdf PDF
PDX 2026-513 (39) M2.01.pdf PDF
PDX 2026-513 (22) A5.03.pdf PDF
PDX 2026-513 (44) E0.01.pdf PDF
PDX 2026-513 (49) E1.11.pdf PDF
PDX 2026-513 (05) GI3.01.pdf PDF
PDX 2026-513 (09) A1.02.pdf PDF
Getting the most out of your Port of Portland Vendor Profile.docx DOCX document
Show 40 more

Latest 50 of 88 listed here. See the rest on GovTribe.

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

D1636

ESC

D1630

STAIRS

D1626

CORR

D1628

ELEV

D1620

ELEC

D1621

CORR

D1005

PASS THRU

D1632

EQUIP

D1691

STOR

D1623

BAG SCREENING

D1634

STOR

D1637

ELEC

D1635

MECH

D1601

CASHIER

D1618

STOR

D1639

WAITING

D1641

VESTIBULE

D1619

CORR

D1633

RECHECK

D1631

STAIRS

J

J

J J

S

S

D50 D49 D48 D47 D46

DE

DD

DC

DB

DA

9/8/2026

C

AN

Y O

U S

EE

T

H E

AI

R

PL

AN

ES

T H

E

AD

JA

C

EN

T

SA

M

PL

ES

S H

O W

T H

R

EE

D

IF

FE

R

EN

T

LE

VE

LS

O

F

SH

AD

IN

G

SE

TT

IN

G

S

FO

R V

IE

W

IN

G

A N

D P

R

IN

TI

N

G D

R

AW

IN

G

C O

N

TE

N T

AR

E

O

PT

IM

IZ

ED

W

H

EN

AL

L

TH

R

EE

P

LA

N

ES

A

R E

VI

SI

BL

E.

T H

IS

G

U

ID

AN

C

E

IS

P R

O

VI

D

ED

F O

R R

EF

ER

EN

C

E O

N

LY

PRINTED:

lig ht da rk gr ay bl ac k

DESIGN NUMBER PROJECT NUMBER

2"

G R

AP

H

IC

S

C

AL

E

- F

O R

R

EF

ER

EN

C E

O N

LY

gr ay

1:38:35 PM ECLOSE g:\projects\339 - dbc architecture inc\3392601 - pdx cbp improvements\design\(2) drawings\current\pdx cbp improvements\sheets\e2.03 deplaning level - sector 03 - floor plan - electrical.dwg

DISC. SHT. NO.

DRAWING SCALE IS REDUCED 50% WHEN SHEET SIZE IS 11" x 17"

DESIGN BY

DRAWN BY

CHECKED BY

DATE

SHEET NO.

SUBMITTED BY

DRAWING NO.

TYPE:

1/

4" 1/

2" 1"

1/

4" 1/

2" 1"

DATE BY REVISION APPDATE BY REVISION APP ##

IF ELECTRONIC SIGNATURE IS BROKEN OR MISSING - THIS IS NOT A LEGAL DRAWING

KEY PLAN

SCALE: N.T.S.

N

THE AREA BELOW IS TO BE LEFT BLANK - FOR

USE BY CITY FOR PERMIT REVIEW STAMP ONLY-

Salem 503-584-1576 www.landisconsulting.com

PORTLAND INTERNATIONAL AIRPORT

CUSTOMS AND BORDER PROTECTION IMPROVEMENTS - PHASE 2

PDX 2026-5132025D042 103146

M. HENNING

E. CLOSE

B. PERRY

SEPTEMBER 2026

JAY OSTLUND

CD

PDERETSI

GER LA

NOI

SSEFOR

OREGON

86683

NIG

N

E R

EE

8 , 2

M A Y

PERRY

B

EN

JAMI N

E.

EXPIRES: 12-31-2026

Digitally Signed

DEPLANING LEVEL - SECTOR 03 - FLOOR PLAN - ELECTRICAL

E2.03

N

SCALE: IN FEET

0' 4' 8' 16' 24'

SCALE:

DEPLANING LEVEL - SECTOR 03 - FLOOR PLAN - ELECTRICAL

1/8" = 1'-0"1

2D1C:16

#KEY NOTE(S) :

1. PROVIDE 20-AMP DISCONNECT SWITCH ON TOP

OF SIGN. COORDINATE WITH PORT AND SIGNAGE

DRAWINGS.

2. PROVIDE NEW CONDUCTORS AND CONDUIT TO

SIGN. COORDINATE EXACT LOCATION WITH

OWNER PRIOR TO ROUGH-IN.

3. TRANSITION FROM EMT CONDUIT TO FLEXIBLE

CONDUIT FOR CONNECTION TO HVAC EQUIPMENT.

COORDINATE WITH MECHANICAL CONTRACTOR

PRIOR TO ROUGH-IN.

4. CEILING MOUNT SPEAKER STROBE. COORDINATE

EXACT LOCATION WITH PORT PRIOR TO

ROUGH-IN.

(E) PANEL E2D1A

(E) PANEL E4D1A

(E) PANEL 2D1A

(E) PANEL 4D1A

(E) PANEL 2D1C

(E) FACP-19

(E) FACP-20-1

C O

N

TIN

U

ED

O N

SH

EET E2.02

C O

N

TIN

U

ED

O N

SH

EET E2.02

SIGN CS3-01

2D1C:18

SIGN CS3-01

HAC-DE-102

1 2

1 2

HAC-DE-1013

2026-09-08T14:32:26-0700
Digitally Signed
Benjamin Earl Perry

File details come from the government source that posted it. Updated .