PDX 2026-513 (54) E2.03.pdf
PDF 376 KB Posted
- Solicitation number
- 145968
- Issued by
- Multnomah County, Oregon
About this file
This is an electrical floor plan drawing for the Portland International Airport Customs and Border Protection Improvements - Phase 2 project in Oregon. The drawing, designated as Sheet E2.03, illustrates the deplaning level sector 03 electrical layout at a scale of 1/8" = 1'-0". The plan depicts electrical infrastructure including existing panels (E2D1A, E4D1A, 2D1A, 4D1A, 2D1C), fire alarm control panels (FACP-19, FACP-20-1), signage (CS3-01), and HVAC equipment connections (HAC-DE-101, HAC-DE-102). The drawing references multiple airport zones including corridors, elevators, stairs, equipment rooms, storage areas, bag screening facilities, and waiting areas. Key specifications include a 20-amp disconnect switch requirement for signage, coordination points for conductor and conduit routing, flexible conduit transition requirements for HVAC connections, and ceiling-mounted speaker strobe placement requirements with owner coordination prior to rough-in work.
The drawing was prepared by DBC Architecture Inc. under design number 2025D042, with Benjamin Earl Perry as the professional engineer of record licensed in Oregon (License No. 86683, expires 12-31-2026). The document was created on September 8, 2026, and is intended for permit review and construction coordination purposes. The plan references continuation of electrical details on Sheet E2.02 and requires coordination with the Port of Portland, the mechanical contractor, and signage consultant prior to rough-in installation. The drawing includes standard architectural notation with key notes addressing equipment connections and construction sequencing requirements specific to airport security and border protection facility operations.
View the file
Other files
Show 40 more
Latest 50 of 88 listed here. See the rest on GovTribe.
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
D1636
ESC
D1630
STAIRS
D1626
CORR
D1628
ELEV
D1620
ELEC
D1621
CORR
D1005
PASS THRU
D1632
EQUIP
D1691
STOR
D1623
BAG SCREENING
D1634
STOR
D1637
ELEC
D1635
MECH
D1601
CASHIER
D1618
STOR
D1639
WAITING
D1641
VESTIBULE
D1619
CORR
D1633
RECHECK
D1631
STAIRS
J
J
J J
S
S
D50 D49 D48 D47 D46
DE
DD
DC
DB
DA
9/8/2026
C
AN
Y O
U S
EE
T
H E
AI
R
PL
AN
ES
T H
E
AD
JA
C
EN
T
SA
M
PL
ES
S H
O W
T H
R
EE
D
IF
FE
R
EN
T
LE
VE
LS
O
F
SH
AD
IN
G
SE
TT
IN
G
S
FO
R V
IE
W
IN
G
A N
D P
R
IN
TI
N
G D
R
AW
IN
G
C O
N
TE
N T
AR
E
O
PT
IM
IZ
ED
W
H
EN
AL
L
TH
R
EE
P
LA
N
ES
A
R E
VI
SI
BL
E.
T H
IS
G
U
ID
AN
C
E
IS
P R
O
VI
D
ED
F O
R R
EF
ER
EN
C
E O
N
LY
PRINTED:
lig ht da rk gr ay bl ac k
DESIGN NUMBER PROJECT NUMBER
2"
G R
AP
H
IC
S
C
AL
E
- F
O R
R
EF
ER
EN
C E
O N
LY
gr ay
1:38:35 PM ECLOSE g:\projects\339 - dbc architecture inc\3392601 - pdx cbp improvements\design\(2) drawings\current\pdx cbp improvements\sheets\e2.03 deplaning level - sector 03 - floor plan - electrical.dwg
DISC. SHT. NO.
DRAWING SCALE IS REDUCED 50% WHEN SHEET SIZE IS 11" x 17"
DESIGN BY
DRAWN BY
CHECKED BY
DATE
SHEET NO.
SUBMITTED BY
DRAWING NO.
TYPE:
1/
4" 1/
2" 1"
1/
4" 1/
2" 1"
DATE BY REVISION APPDATE BY REVISION APP ##
IF ELECTRONIC SIGNATURE IS BROKEN OR MISSING - THIS IS NOT A LEGAL DRAWING
KEY PLAN
SCALE: N.T.S.
N
THE AREA BELOW IS TO BE LEFT BLANK - FOR
USE BY CITY FOR PERMIT REVIEW STAMP ONLY-
Salem 503-584-1576 www.landisconsulting.com
PORTLAND INTERNATIONAL AIRPORT
CUSTOMS AND BORDER PROTECTION IMPROVEMENTS - PHASE 2
PDX 2026-5132025D042 103146
M. HENNING
E. CLOSE
B. PERRY
SEPTEMBER 2026
JAY OSTLUND
CD
PDERETSI
GER LA
NOI
SSEFOR
OREGON
86683
NIG
N
E R
EE
8 , 2
M A Y
PERRY
B
EN
JAMI N
E.
EXPIRES: 12-31-2026
Digitally Signed
DEPLANING LEVEL - SECTOR 03 - FLOOR PLAN - ELECTRICAL
E2.03
N
SCALE: IN FEET
0' 4' 8' 16' 24'
SCALE:
DEPLANING LEVEL - SECTOR 03 - FLOOR PLAN - ELECTRICAL
1/8" = 1'-0"1
2D1C:16
#KEY NOTE(S) :
1. PROVIDE 20-AMP DISCONNECT SWITCH ON TOP
OF SIGN. COORDINATE WITH PORT AND SIGNAGE
DRAWINGS.
2. PROVIDE NEW CONDUCTORS AND CONDUIT TO
SIGN. COORDINATE EXACT LOCATION WITH
OWNER PRIOR TO ROUGH-IN.
3. TRANSITION FROM EMT CONDUIT TO FLEXIBLE
CONDUIT FOR CONNECTION TO HVAC EQUIPMENT.
COORDINATE WITH MECHANICAL CONTRACTOR
PRIOR TO ROUGH-IN.
4. CEILING MOUNT SPEAKER STROBE. COORDINATE
EXACT LOCATION WITH PORT PRIOR TO
ROUGH-IN.
(E) PANEL E2D1A
(E) PANEL E4D1A
(E) PANEL 2D1A
(E) PANEL 4D1A
(E) PANEL 2D1C
(E) FACP-19
(E) FACP-20-1
C O
N
TIN
U
ED
O N
SH
EET E2.02
C O
N
TIN
U
ED
O N
SH
EET E2.02
SIGN CS3-01
2D1C:18
SIGN CS3-01
HAC-DE-102
1 2
1 2
HAC-DE-1013
| 2026-09-08T14:32:26-0700 | |
| Digitally Signed | |
| Benjamin Earl Perry |
File details come from the government source that posted it. Updated .