This is an electrical floor plan drawing for the Portland International Airport Customs and Border Protection Improvements - Phase 2 project in Oregon. The drawing depicts the Deplaning Level - Sector 02 and details the electrical systems, conduit routing, panel connections, and junction boxes required for the customs and border protection facility improvements. The plan identifies multiple office spaces, laboratory areas, search areas, restrooms, baggage claim areas, and other operational spaces within the sector, with electrical specifications including conduit sizes (ranging from 0.75" to 1.0"), panel connections to unit 2D1D-44DA, and connections to panels 2D2A and existing circuits. Key notes specify requirements for poke-throughs to the enplaning level, junction box installation, conduit routing with coordination requirements, and terminal unit connections. The drawing was designed by M. Henning, drawn by E. Close, checked by B. Perry, and dated September 2026, with a revision date of September 8, 2026.

The drawing includes technical specifications for contractors performing electrical installation work, including requirements to coordinate exact locations with architectural drawings and the Port authority, conduct X-ray scanning of floors prior to coring, and disconnect and reconnect existing terminal units to specified circuits. The document is prepared at a scale of 1/8" = 1'-0" and includes a key plan for spatial reference. This plan serves as a construction document for electrical contractors bidding on or executing work related to the Phase 2 customs and border protection improvements at Portland International Airport.

View the file

Other files

File Type Posted
PDX 2026-513 (08) A1.01.pdf PDF
PDX 2026-513 (75) G0.01.pdf PDF
PDX 2026-513 (12) A1.12.pdf PDF
PDX 2026-513 (42) M5.01.pdf PDF
PDX 2026-513 (50) E1.12.pdf PDF
PDX 2026-513 (28) A9.02.pdf PDF
PDX 2026-513 (60) E8.01.pdf PDF
PDX 2026-513 (20) A5.01.pdf PDF
PDX 2026-513 (25) A8.02.pdf PDF
PDX 2026-513 (77) G2.02.pdf PDF
PDX 2026-513 (35) M0.02.pdf PDF
PDX 2026-513 (79) G9.01.pdf PDF
PDX 2026-513 (03) GI2.00.pdf PDF
PDX 2026-513 (13) A1.13.pdf PDF
PDX 2026-513 (29) A9.03.pdf PDF
PDX 2026-513 (56) E2.05.pdf PDF
PDX 2026-513 (69) T1.02.pdf PDF
PDX 2026-513 (43) M5.02.pdf PDF
PDX 2026-513 (37) M1.02.pdf PDF
PDX 2026-513 (58) E2.12.pdf PDF
PDX 2026-513 (10) A1.03.pdf PDF
PDX 2026-513 (14) A2.01.pdf PDF
PDX 2026-513 (66) E8.07.pdf PDF
PDX 2026-513 (31) S0.02.pdf PDF
PDX 2026-513 (85) G9.15.pdf PDF
PDX 2026-513 (83) G9.13.pdf PDF
PDX 2026-513 (78) G2.03.pdf PDF
PDX 2026-513 (45) E0.02.pdf PDF
PDX 2026-513 (68) T1.01.pdf PDF
Substitution Request Form.pdf PDF
PDX 2026-513 (15) A2.02.pdf PDF
PDX 2026-513 (61) E8.02.pdf PDF
PDX 2026-513 (70) T1.03.pdf PDF
PDX 2026-513 (72) T2.02.pdf PDF
PDX 2026-513 (19) A2.13.pdf PDF
PDX 2026-513 (04) GI3.00.pdf PDF
PDX 2026-513 (51) E1.13.pdf PDF
PDX 2026-513 (82) G9.12.pdf PDF
PDX 2026-513 (33) S2.01.pdf PDF
PDX 2026-513 (46) E0.03.pdf PDF
PDX 2026-513 (17) A2.11.pdf PDF
PDX 2026-513 (62) E8.03.pdf PDF
PDX 2026-513 (81) G9.11.pdf PDF
PDX 2026-513 (39) M2.01.pdf PDF
PDX 2026-513 (22) A5.03.pdf PDF
PDX 2026-513 (44) E0.01.pdf PDF
PDX 2026-513 (49) E1.11.pdf PDF
PDX 2026-513 (05) GI3.01.pdf PDF
PDX 2026-513 (09) A1.02.pdf PDF
Getting the most out of your Port of Portland Vendor Profile.docx DOCX document
Show 40 more

Latest 50 of 88 listed here. See the rest on GovTribe.

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

D45 D44 D43 D42 D41 D40 D39

DE

DD

DC

DB

DA

D1706

OFFICE

D1708

LAB

D1709

SEARCH

D1710

KEN

D1636

ESC

D1638

STAIRS

D1614

MENS

D1616

WOMENS

D1613

SEARCH

D1615

SEARCHD1612

VESTIBULE

D1624

COMM

D1622

ELEC

D1601

CASHIER

D1707

CORR

D1603

BAGGAGE CLAIM

D1642

LAN

D1604

OFFICE

D1602

OFFICE

D1611

LOCKERS

D1610

OFFICE

D1608

SUPERVISOR

D1603

CUSTOMS

D1606

OFFICE

D14177

OFFICE

JJ

S

J

M

SCALE:

DEPLANING LEVEL - SECTOR 02 - FLOOR PLAN - ELECTRICAL

1/8" = 1'-0"1

9/8/2026

C

AN

Y O

U S

EE

T

H E

AI

R

PL

AN

ES

T H

E

AD

JA

C

EN

T

SA

M

PL

ES

S H

O W

T H

R

EE

D

IF

FE

R

EN

T

LE

VE

LS

O

F

SH

AD

IN

G

SE

TT

IN

G

S

FO

R V

IE

W

IN

G

A N

D P

R

IN

TI

N

G D

R

AW

IN

G

C O

N

TE

N T

AR

E

O

PT

IM

IZ

ED

W

H

EN

AL

L

TH

R

EE

P

LA

N

ES

A

R E

VI

SI

BL

E.

T H

IS

G

U

ID

AN

C

E

IS

P R

O

VI

D

ED

F O

R R

EF

ER

EN

C

E O

N

LY

PRINTED:

lig ht da rk gr ay bl ac k

DESIGN NUMBER PROJECT NUMBER

2"

G R

AP

H

IC

S

C

AL

E

- F

O R

R

EF

ER

EN

C E

O N

LY

gr ay

1:38:24 PM ECLOSE g:\projects\339 - dbc architecture inc\3392601 - pdx cbp improvements\design\(2) drawings\current\pdx cbp improvements\sheets\e2.02 deplaning level - sector 02 - floor plan - electrical.dwg

DISC. SHT. NO.

DRAWING SCALE IS REDUCED 50% WHEN SHEET SIZE IS 11" x 17"

DESIGN BY

DRAWN BY

CHECKED BY

DATE

SHEET NO.

SUBMITTED BY

DRAWING NO.

TYPE:

1/

4" 1/

2" 1"

1/

4" 1/

2" 1"

DATE BY REVISION APPDATE BY REVISION APP ##

IF ELECTRONIC SIGNATURE IS BROKEN OR MISSING - THIS IS NOT A LEGAL DRAWING

KEY PLAN

SCALE: N.T.S.

N

THE AREA BELOW IS TO BE LEFT BLANK - FOR

USE BY CITY FOR PERMIT REVIEW STAMP ONLY-

Salem 503-584-1576 www.landisconsulting.com

PORTLAND INTERNATIONAL AIRPORT

CUSTOMS AND BORDER PROTECTION IMPROVEMENTS - PHASE 2

PDX 2026-5132025D042 103146

M. HENNING

E. CLOSE

B. PERRY

SEPTEMBER 2026

JAY OSTLUND

CD

PDERETSI

GER LA

NOI

SSEFOR

OREGON

86683

NIG

N

E R

EE

8 , 2

M A Y

PERRY

B

EN

JAMI N

E.

EXPIRES: 12-31-2026

Digitally Signed

DEPLANING LEVEL - SECTOR 02 - FLOOR PLAN - ELECTRICAL

E2.02

N

SCALE: IN FEET

0' 4' 8' 16' 24'

2D1A:16

2D1A:15

2D1A:15

2D1A:15

(E)

(E)

(E)

(E)

(E) PANEL U2P1D-44DA

C O

N

TI

N U

ED

O

N S

H

EE

T E2

.0

C O

N

TI

N U

ED

O

N S

H

EE

T E2

.0

C O

N

TIN

U

ED

O N

SH

EET E2.01

C O

N

TIN

U

ED

O N

SH

EET E2.01

2D1B:32

2D1B:32

2D1B:34

2D1B:32

2D1B:34

#KEY NOTE(S) :

1. PROVIDE POKE THRU INSTALLED ON ENPLANING

LEVEL. PROVIDE NEW CONDUIT AS SHOWN AND

CONNECT TO NEW POKE THRU. COORDINATE

EXACT LOCATION OF POKE THRU WITH

ARCHITECTURAL DRAWINGS.

2. PROVIDE 6" X 6" X 4" JUNCTION BOX MOUNTED TO

STRUCTURAL CEILING.

3. PROVIDE CONDUIT UP TO ENPLANING LEVEL AND

TERMINATE IN PANEL 2D2A. PROVIDE 1" CORE AND

COORDINATE EXACT LOCATION WITH PORT.

CONTRACTOR TO X-RAY FLOOR PRIOR TO CORING.

4. DISCONNECT EXISTING TERMINAL UNIT FROM

EXISTING CIRCUIT. CONNECT NEW TERMINAL. UNIT

TO THE SAME EXISTING CIRCUIT AND CONNECT

COMPLETE.

(1) 1.0"C

(1) 0.75"C

(1) 0.75"C(1) 0.75"C

(1) 0.75"C

1 1

2 2

2D1B:34

4D1A:27

VVR-D-120

2026-09-08T14:32:32-0700
Digitally Signed
Benjamin Earl Perry

File details come from the government source that posted it. Updated .