PDX 2026-513 (52) E2.01.pdf

PDF 484 KB Posted

Attached to
Portland International Airport Customs and Border Protection Improvements - Phase 2
Solicitation number
145968
Issued by
Multnomah County, Oregon

About this file

This is an electrical floor plan drawing for the Portland International Airport Customs and Border Protection Improvements - Phase 2 project in Oregon. The drawing, designated as sheet E2.01, depicts the deplaning level sector 01 electrical layout at a scale of 1/8" = 1'-0" and was prepared by DBC Architecture Inc. The plan illustrates the installation of electrical infrastructure including multiple electrical panels (2D1D, 2D1B, 4D1B, and E4D1B), junction boxes, duplex receptacles, power poles, conduit systems, and related electrical components required to support customs and border protection operations in the deplaning area. The drawing includes detailed key notes specifying nine primary installation requirements, such as providing junction boxes with flexible metal conduit, mounting duplex receptacles to casework, installing power poles with receptacles, coordinating poke-thru locations with architectural drawings, and modifying existing Walker duct systems to extend power and data capabilities to new booth installations. The design incorporates existing infrastructure elements, including a 3-channel Walker duct system, which requires modification through saw cutting and extension to accommodate new electrical service routes. X-ray inspection of the existing floor slab is required prior to any saw cutting operations to ensure safety and prevent damage to hidden structural elements.

The drawing was prepared under design number 2025D042 with project number PDX 2026-513 and was dated September 2026. The document identifies three additive alternate packages associated with the project scope. The drawing was digitally signed by Benjamin E. Perry, a licensed professional engineer in Oregon (License #102, expiring 12-31-2026), and reviewed by M. Henning and E. Close. The plan includes coordination requirements with the Port of Portland for exact placement of receptacles, poke-thru locations, and conduit terminations prior to rough-in installation. Conductor sizing specifications mandate a minimum #10AWG conductor size for all circuits within the Walker duct system to comply with derating requirements, ensuring proper electrical capacity and safety compliance throughout the installation.

View the file

Other files

File Type Posted
PDX 2026-513 (08) A1.01.pdf PDF
PDX 2026-513 (75) G0.01.pdf PDF
PDX 2026-513 (12) A1.12.pdf PDF
PDX 2026-513 (42) M5.01.pdf PDF
PDX 2026-513 (50) E1.12.pdf PDF
PDX 2026-513 (28) A9.02.pdf PDF
PDX 2026-513 (60) E8.01.pdf PDF
PDX 2026-513 (20) A5.01.pdf PDF
PDX 2026-513 (25) A8.02.pdf PDF
PDX 2026-513 (77) G2.02.pdf PDF
PDX 2026-513 (35) M0.02.pdf PDF
PDX 2026-513 (79) G9.01.pdf PDF
PDX 2026-513 (03) GI2.00.pdf PDF
PDX 2026-513 (13) A1.13.pdf PDF
PDX 2026-513 (29) A9.03.pdf PDF
PDX 2026-513 (56) E2.05.pdf PDF
PDX 2026-513 (69) T1.02.pdf PDF
PDX 2026-513 (43) M5.02.pdf PDF
PDX 2026-513 (37) M1.02.pdf PDF
PDX 2026-513 (58) E2.12.pdf PDF
PDX 2026-513 (10) A1.03.pdf PDF
PDX 2026-513 (14) A2.01.pdf PDF
PDX 2026-513 (66) E8.07.pdf PDF
PDX 2026-513 (31) S0.02.pdf PDF
PDX 2026-513 (85) G9.15.pdf PDF
PDX 2026-513 (83) G9.13.pdf PDF
PDX 2026-513 (78) G2.03.pdf PDF
PDX 2026-513 (45) E0.02.pdf PDF
PDX 2026-513 (68) T1.01.pdf PDF
Substitution Request Form.pdf PDF
PDX 2026-513 (15) A2.02.pdf PDF
PDX 2026-513 (61) E8.02.pdf PDF
PDX 2026-513 (70) T1.03.pdf PDF
PDX 2026-513 (72) T2.02.pdf PDF
PDX 2026-513 (19) A2.13.pdf PDF
PDX 2026-513 (04) GI3.00.pdf PDF
PDX 2026-513 (51) E1.13.pdf PDF
PDX 2026-513 (82) G9.12.pdf PDF
PDX 2026-513 (33) S2.01.pdf PDF
PDX 2026-513 (46) E0.03.pdf PDF
PDX 2026-513 (17) A2.11.pdf PDF
PDX 2026-513 (62) E8.03.pdf PDF
PDX 2026-513 (81) G9.11.pdf PDF
PDX 2026-513 (39) M2.01.pdf PDF
PDX 2026-513 (22) A5.03.pdf PDF
PDX 2026-513 (44) E0.01.pdf PDF
PDX 2026-513 (49) E1.11.pdf PDF
PDX 2026-513 (05) GI3.01.pdf PDF
PDX 2026-513 (09) A1.02.pdf PDF
Getting the most out of your Port of Portland Vendor Profile.docx DOCX document
Show 40 more

Latest 50 of 88 listed here. See the rest on GovTribe.

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

D1660

JAND1655

CORR.

D14920

EQUIP

D1650

ELEV

D1658

BREAK

D1656

LOCKERS

D1657

LOCKERS

D1664

WOMENS

D1666

MENS

D1654

MECH

D1652

STAIRS

D1706

OFFICE

D1646

ESC

D1680

OFFICE

D1675

ISOLATION

D1679

EQUIPMENT

D1672

MENS

D1670

WOMENS

D1687

HOLD

D1686

HOLD

D1683

OFFICE

D1663

OFFICE

D1662

CORR

D1674

HEALTH

D1678

SUPERVISOR

D1676

TOILET

D1700

SECOND CHECK

D1702

INTERVIEW

D1704

INTERVIEW

D1605

OFFICE

D14573

OFFICE

D1671

CORR

D1600

IMMIGRATION

D1653

STAIRS

D1682

CORR

S

J

J

J

J

J

J

J

J

J

(E)

(E)

(E)

(E)

J

J

2D1B:19

2D1B:28

2D1B:30

2D1B:28

S

J

(E)

D50 D49 D48 D47 D46

DE

DD

DC

DB

DA

9/8/2026

C

AN

Y O

U S

EE

T

H E

AI

R

PL

AN

ES

T H

E

AD

JA

C

EN

T

SA

M

PL

ES

S H

O W

T H

R

EE

D

IF

FE

R

EN

T

LE

VE

LS

O

F

SH

AD

IN

G

SE

TT

IN

G

S

FO

R V

IE

W

IN

G

A N

D P

R

IN

TI

N

G D

R

AW

IN

G

C O

N

TE

N T

AR

E

O

PT

IM

IZ

ED

W

H

EN

AL

L

TH

R

EE

P

LA

N

ES

A

R E

VI

SI

BL

E.

T H

IS

G

U

ID

AN

C

E

IS

P R

O

VI

D

ED

F O

R R

EF

ER

EN

C

E O

N

LY

PRINTED:

lig ht da rk gr ay bl ac k

DESIGN NUMBER PROJECT NUMBER

2"

G R

AP

H

IC

S

C

AL

E

- F

O R

R

EF

ER

EN

C E

O N

LY

gr ay

1:38:12 PM ECLOSE g:\projects\339 - dbc architecture inc\3392601 - pdx cbp improvements\design\(2) drawings\current\pdx cbp improvements\sheets\e2.01 deplaning level - sector 01 - floor plan - electrical.dwg

DISC. SHT. NO.

DRAWING SCALE IS REDUCED 50% WHEN SHEET SIZE IS 11" x 17"

DESIGN BY

DRAWN BY

CHECKED BY

DATE

SHEET NO.

SUBMITTED BY

DRAWING NO.

TYPE:

1/

4" 1/

2" 1"

1/

4" 1/

2" 1"

DATE BY REVISION APPDATE BY REVISION APP ##

IF ELECTRONIC SIGNATURE IS BROKEN OR MISSING - THIS IS NOT A LEGAL DRAWING

KEY PLAN

SCALE: N.T.S.

N

THE AREA BELOW IS TO BE LEFT BLANK - FOR

USE BY CITY FOR PERMIT REVIEW STAMP ONLY-

Salem 503-584-1576 www.landisconsulting.com

PORTLAND INTERNATIONAL AIRPORT

CUSTOMS AND BORDER PROTECTION IMPROVEMENTS - PHASE 2

PDX 2026-5132025D042 103146

M. HENNING

E. CLOSE

B. PERRY

SEPTEMBER 2026

JAY OSTLUND

CD

PDERETSI

GER LA

NOI

SSEFOR

OREGON

86683

NIG

N

E R

EE

8 , 2

M A Y

PERRY

B

EN

JAMI N

E.

EXPIRES: 12-31-2026

Digitally Signed

DEPLANING LEVEL - SECTOR 01 - FLOOR PLAN - ELECTRICAL

E2.01

N

SCALE:

DEPLANING LEVEL - SECTOR 01 - FLOOR PLAN - ELECTRICAL

1/8" = 1'-0"1

SCALE: IN FEET

0' 4' 8' 16' 24'

(E) PANEL 2D1D

(E) PANEL 2D1B

(E) PANEL 4D1B

(E) PANEL E4D1B

(E) PANEL E2D1B

U2P1D-44DA:22

U2P1D-44DA:22

U2P1D-44DA:26

U2P1D-44DA:26

U2P1D-44DA:18

U2P1D-44DA:18

U2P1D-44DA:16

U2P1D-44DA:20

U2P1D-44DA:16

#KEY NOTE(S) :

1. PROVIDE JUNCTION BOX ON ACCESS AREA TO

POWER COMPARTMENT IN EXISTING 3-CHANNEL

WALKER DUCT. PROVIDE FLEXIBLE METAL

CONDUIT AND (3) #10AWG CONDUCTORS TO

DUPLEX RECEPTACLE SHOWN.

2. MOUNT DUPLEX RECEPTACLE TO CASEWORK.

COORDINATE EXACT LOCATION WITH PORT PRIOR

TO ROUGH-IN.

3. PROVIDE 2-CHANNEL POWER POLE WITH (2)

DUPLEX RECEPTACLES AS SHOWN.

4. PROVIDE POKE THRU INSTALLED ON ENPLANING

LEVEL. PROVIDE NEW CONDUIT AS SHOWN AND

CONNECT TO NEW POKE THRU. COORDINATE

EXACT LOCATION OF POKE THRU WITH

ARCHITECTURAL DRAWINGS.

5. PROVIDE 6" X 6" X 4" JUNCTION BOX MOUNTED TO

STRUCTURAL CEILING.

6. UTILIZE EXISTING CONDUIT FOR HOMERUN BACK

TO EXISTING PANEL U2P1D-44DA. PROVIDE NEW

(10) #10AWG AND (2) #10AWG GROUND

CONDUCTORS AND CONNECT COMPLETE.

7. PROVIDE 1.0" CONDUIT WITH PULL STRING FROM

EXISTING PANEL 2D1D FOR FUTURE PATRON

COUNTER. ROUTE CONDUIT ABOVE CEILING.

8. TERMINATE NEW CONDUIT ABOVE EXISTING

ACCESS HATCH IN CEILING OF EXISTING

RESTROOM. COORDINATE EXACT LOCATION OF

CONDUIT TERMINATION WITH PORT.

9. SAWCUT EXISTING CONDUIT AND PROVIDE NEW

3-CHANNEL WALKER DUCT AS SHOWN. MODIFY

END OF EXISTING WALKER DUCT TO ALLOW

CHANNEL CONTINUATION IN NEW WALKER DUCT.

INTENT IS TO EXTEND WALKER DUCT THE

REQUIRED DISTANCE TO FEED NEW BOOTH WITH

POWER AND DATA. X-RAY EXISTING FLOOR SLAB

PRIOR TO SAW CUTTING.

C O

N

TI

N U

ED

O

N S

H

EE

T E2

.0

C O

N

TI

N U

ED

O

N S

H

EE

T E2

.0

2D1B:12 2D1B:12

2D1B:12 2D1B:12

2D1B:12 2D1B:12

2D1B:32

2D1B:32

2D1B:32

2D1B:32

2D1B:32

2D1B:32

3 3

3 3

3 3

(E) 3-CHANNEL WALKERDUCT

(E) 3-CHANNEL

WALKERDUCT

(1) 0.75"C

(1) 0.75"C

(1) 0.75"C

NOTE:

1. PROVIDE #10AWG MINIMUM CONDUCTOR SIZE FOR

ALL CIRCUITS IN WALKER DUCT FOR DERATING.

U2P1D-44DA:30

8 8

7 7

U2P1D-44DA:20

ADDITIVE ALTERNATE #3

ADDITIVE ALTERNATE #2

ADDITIVE ALTERNATE #1

2026-09-08T14:32:23-0700
Digitally Signed
Benjamin Earl Perry

File details come from the government source that posted it. Updated .