PDX 2026-513 (30) S0.01.pdf
PDF 392 KB Posted
- Solicitation number
- 145968
- Issued by
- Multnomah County, Oregon
About this file
This is a structural design drawing for the Portland International Airport Customs and Border Protection Improvements - Phase 2 project, prepared by T.M. Rippey Consulting Engineers for the Port of Portland in Oregon. The project involves seismic anchorage improvements for non-structural components, including two suspended signs at Portland International Airport (PDX). The drawings were created in September 2026 and include general notes and abbreviations for structural specifications. The design follows the 2024 International Building Code as amended by the 2025 Oregon Structural Specialty Code, with specific design criteria including live loads of 100 PSF, ground snow loads of 10 PSF, and seismic design category D with a seismic importance factor of 1.25. The contractor is required to field-verify all existing conditions and dimensions prior to construction start and notify the Port, Architect, and Engineer of any discrepancies identified during site assessment.
The scope of work is limited to seismic anchorage of non-structural components only. Shop drawings must be submitted to the Port prior to fabrication for all structural items, including metal strut framing, with any modifications subject to Port and Engineer review and acceptance. Concrete and CMU accessories must comply with specified standards, such as Hilti Kwik Hus-Ez concrete screw anchors or port-approved equivalents. The contractor bears responsibility for structural stability of both new and existing structures during construction. Design calculations and shop drawings for items designed by others must be sealed and signed by a structural engineer registered in Oregon and submitted prior to fabrication. Non-structural deferred submittals for architectural, mechanical, sprinkler, and fire alarm systems shall follow the program outlined in architectural drawings. The documents are for exclusive use on this project only, and T.M. Rippey Consulting Engineers assumes no liability for use outside the project scope or modifications made without express written consent.
View the file
Other files
Show 40 more
Latest 50 of 88 listed here. See the rest on GovTribe.
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
8/26/2026
C
AN
Y O
U S
EE
T
H E
AI
R
PL
AN
ES
T H
E
AD
JA
C
EN
T
SA
M
PL
ES
S H
O W
T H
R
EE
D
IF
FE
R
EN
T
LE
VE
LS
O
F
SH
AD
IN
G
SE
TT
IN
G
S
FO
R V
IE
W
IN
G
A N
D P
R
IN
TI
N
G D
R
AW
IN
G
C O
N
TE
N T
AR
E
O
PT
IM
IZ
ED
W
H
EN
AL
L
TH
R
EE
P
LA
N
ES
A
R E
VI
SI
BL
E.
T H
IS
G
U
ID
AN
C
E
IS
P R
O
VI
D
ED
F O
R R
EF
ER
EN
C
E O
N
LY
PRINTED:
lig ht da rk gr ay bl ac k
DESIGN NUMBER PROJECT NUMBER
2"
G R
AP
H
IC
S
C
AL
E
- F
O R
R
EF
ER
EN
C E
O N
LY
gr ay
THE AREA BELOW IS TO BE LEFT BLANK - FOR
USE BY CITY FOR PERMIT REVIEW STAMP ONLY-
11:15:40 AM JCAVANAGH p:\2026 projects\26105 - dbc - pop cbp improvements\structural\cad\r-floor_plan.dwg
DISC. SHT. NO.
DRAWING SCALE IS REDUCED 50% WHEN SHEET SIZE IS 11" x 17"
DESIGN BY
DRAWN BY
CHECKED BY
DATE
SHEET NO.
SUBMITTED BY
DRAWING NO.
TYPE:
1/
4" 1/
2" 1"
1/
4" 1/
2" 1"
DATE BY REVISION APPDATE BY REVISION APP ##
IF ELECTRONIC SIGNATURE IS BROKEN OR MISSING - THIS IS NOT A LEGAL DRAWING
CONSULTING ENGINEERS
T.M. RIPPEY
7650 SW Beveland, Suite 100 Tigard, Oregon 97223 Phone: (503) 443-3900
Fax: (503) 443-3700PROJECT #26105
PORTLAND INTERNATIONAL AIRPORT
CUSTOMS AND BORDER PROTECTION IMPROVEMENTS PHASE 2
GENERAL NOTES AND ABBREVIATIONS - STRUCTURAL
JAY OSTLUND
R. TURNBAUGH
J. CAVANAGH
R. TURNBAUGH
SEPTEMBER 2026
30 CD
PDX 2026-513 S0.012005D042 103146
AND &
CENTERLINE ℄
DEGREES °
FEET '
INCHES ''
A
ABANDONED ABAND.
AIRPLANE FUEL AF
ASPHALT CONCRETE AC
C
CAST IRON PIPE CIP
CATCH BASIN CB
COMMUNICATIONS COMM
CONCENTRATE DEICING CDEI
CONCRETE CONC.
CONCRETE MASONRY UNIT CMU
CONCRETE SEWER PIPE CSP
CORRUGATED METAL PIPE CMP
D
DILUTE DEICING DDEI
DISTANCE DIST
DEICING DEI
DIAMETER DIA
DUCTILE IRON PIPE DIP
E
EACH EA
EAST E
EASTING E:
ELECTRICAL ELEC.
ELECTRICAL E
(UTILITY DESIGNATION)
ELEVATION ELEV.
EQUAL (EQUAL SPACING) EQ
EXISTING EXIST.
F
FEDERAL AVIATION FAA
ADMINISTRATION
FIBER OPTIC FO
G
GALVANIZED GALV.
H
HAND HOLE HH
HIGH DENSITY HDPE
POLYETHYLENE
HORIZONTAL HORIZ.
I
IDENTIFICATION ID
INSIDE DIAMETER I.D.
INVERT ELEVATION IE
K
KIPS K
KIPS PER SQUARE FOOT KSF
KIPS PER SQUARE INCH KSI
L
LEFT LT
M
MANHOLE MH
MANHOLE CATCH BASIN MH/CB
MAXIMUM MAX.
MISCELLANEOUS MISC.
N
NATURAL GAS G
(UTILITY DESIGNATION)
NOT IN CONTRACT N.I.C.
NORTH N
NORTHING N:
NORTHEAST NE
NORTHWEST NW
NOT TO SCALE N.T.S.
O
OFFSET OFF.
ORDINARY HIGH WATER OHW
OUTSIDE DIAMETER O.D.
OVERHEAD POWER OP
P
PAVEMENT PVMT.
PORTLAND INTERNATIONAL PDX
AIRPORT
PERFORATED PIPE PRF
POINT OF TANGENCY PT
POINT OF VERTICAL PVI
INTERSECTION
POINT OF CURVATURE PC
POINT OF INTERSECTION PI
POLYVINYL CHLORIDE PIPE PVC
PORTLAND CEMENT PCC
CONCRETE
PROFESSIONAL ENGINEER P.E.
R
RADIUS R
REMOVE REM.
RIGHT RT
RIGHT OF WAY R.O.W.
S
SANITARY SEWER SS
STORM SEWER STS
SOUTH S
SOUTHEAST SE
SOUTHWEST SW
SPACED SP.
STATION STA.
T
TEMPORARY TEMP.
TYPICAL TYP.
V
VERTICAL VERT.
W
WATER W
FIRE PROTECTION WATER WF
WEST W
ABBREVIATIONS
CODE REQUIREMENTS:
CONFORM TO THE 2024 INTERNATIONAL BUILDING CODE AS AMENDED BY THE 2025
OREGON STRUCTURAL SPECIALTY CODE, REFERENCED HEREAFTER AS IBC.
DESIGN CRITERIA:
DESIGN WAS BASED ON THE STRENGTH AND DEFLECTION CRITERIA OF THE IBC. IN
ADDITION TO THE DEAD LOADS, THE FOLLOWING LOADS WERE USED FOR DESIGN,
WITH LIVE LOADS REDUCED PER IBC:
LIVE LOAD: 100 PSF
GROUND SNOW LOAD Pg: 10 PSF FLAT-ROOF SNOW LOAD Pf: 25 PSF SNOW EXPOSURE FACTOR Ce: 1.0 SNOW IMPORTANCE FACTOR Is: 1.1 THERMAL FACTOR Ct: 1.0
SEISMIC IMPORTANCE FACTOR Ie: 1.25
SITE CLASS: F
SDS = 0.810
SEISMIC DESIGN CATEGORY: D
SEISMIC RISK CATEGORY: III
EXISTING CONDITIONS:
THE CONTRACTOR SHALL FIELD VERIFY ALL EXISTING CONDITIONS, DIMENSIONS AND
ELEVATIONS. THE CONTRACTOR SHALL NOTIFY THE PORT/ARCHITECT/ENGINEER OF
ANY DISCREPANCIES FROM CONDITIONS SHOWN ON THE DRAWINGS PRIOR TO THE
START OF THE WORK.
TEMPORARY CONDITIONS:
THE CONTRACTOR SHALL BE RESPONSIBLE FOR STRUCTURAL STABILITY OF THE NEW
AND EXISTING STRUCTURES AND WALLS DURING CONSTRUCTION. THE STRUCTURE
SHOWN ON THE DRAWINGS HAS BEEN DESIGNED FOR STABILITY UNDER THE FINAL
CONFIGURATION ONLY.
SUBMITTALS:
SHOP DRAWINGS SHALL BE SUBMITTED TO THE PORT PRIOR TO FABRICATION AND
CONSTRUCTION REGARDING ALL STRUCTURAL ITEMS, INCLUDING THE FOLLOWING:
1. METAL STRUT FRAMING.
IF THE SHOP DRAWINGS DIFFER FROM, OR ADD TO THE DESIGN OF THE STRUCTURAL
DRAWINGS, THEY SHALL BE CLEARLY IDENTIFIED. ANY CHANGES TO THE
STRUCTURAL DRAWINGS SHALL BE SUBMITTED TO THE PORT AND ARE SUBJECT TO
REVIEW AND ACCEPTANCE BY THE ENGINEER.
DESIGN DRAWINGS, SHOP DRAWINGS, AND CALCULATIONS FOR THE DESIGN AND
FABRICATION OF ITEMS THAT ARE DESIGNED BY OTHERS SHALL BEAR THE SEAL AND
SIGNATURE OF A STRUCTURAL ENGINEER REGISTERED IN THE STATE WHERE THE
PROJECT IS BEING PERFORMED, AND SHALL BE SUBMITTED TO THE PORT PRIOR TO
FABRICATION. DESIGN SHALL BE BASED ON THE REQUIREMENTS OF THE IBC.
NON-STRUCTURAL DEFERRED SUBMITTALS SUCH AS ARCHITECTURAL, MECHANICAL,
SPRINKLER, AND FIRE ALARMS SHALL BE PER THE PROGRAM OUTLINED ON THE
ARCHITECTURAL DRAWINGS.
CONCRETE AND CMU ACCESSORIES:
CONCRETE SCREW ANCHORS SHALL BE ''HILTI KWIK HUS-EZ'' (OR PORT/ENGINEER
APPROVED EQUIVALENT) INSTALLED PER MANUFACTURER'S GUIDELINES AND
CURRENT ESR REPORT.
UNISTRUT:
TYPICAL INSTALLATION AND ATTACHMENTS PER MANUFACTURER'S
RECOMMENDATIONS.
ACCEPTABLE STRUT VARIANTS INCLUDE 'KO', 'HS', 'H3', 'WT', 'T', AND 'SL' SERIES.
QUALITY ASSURANCE PROGRAM:
SEE SECTION 1705 THRU 1707 AMENDED BY OREGON.
USE OF DOCUMENTS:
USE OF THESE DOCUMENTS IS LIMITED EXCLUSIVELY TO THIS PROJECT. TM RIPPEY
CONSULTING ENGINEERS SHALL NOT BE LIABLE OR RESPONSIBLE FOR USE OF THESE
DOCUMENTS OUTSIDE OF THIS PROJECT, OR FOR MODIFICATION TO THESE
DOCUMENTS MADE BY OTHERS, WITHOUT THE EXPRESS WRITTEN CONSENT OF TM
RIPPEY CONSULTING ENGINEERS.
SCOPE OF WORK:
TM RIPPEY CONSULTING ENGINEER'S SCOPE OF WORK IS LIMITED TO SEISMIC
ANCHORAGE OF THE NON-STRUCTURAL COMPONENTS ONLY INCLUDING TWO
SUSPENDED SIGNS.
GENERAL STRUCTURAL NOTES:
| Sheets and Views |
| S0.01 |
| 503-443-3900 | |
| 2026-08-28T13:04:24-0700 | |
| Tigard, Or | |
| Ralph Turnbaugh | |
| I have reviewed this document |
File details come from the government source that posted it. Updated .