PDX 2026-513 (27) A9.01.pdf
PDF 341 KB Posted
- Solicitation number
- 145968
- Issued by
- Multnomah County, Oregon
About this file
This is a Finish Legend document for the Portland International Airport Customs and Border Protection Improvements - Phase 2 project in Oregon. The document provides detailed specifications for all interior and exterior finish materials required for the renovation, including flooring, wall bases, paint, coatings, ceiling tiles, wall coverings, and corner guards. The specifications cover multiple finish types across various areas of the facility, including public circulation areas, office spaces, passport control booths, and exterior door elements. Each finish specification includes the CSI division number, finish code designation, material manufacturer, product series or type, color selection, size dimensions, and location notes. Materials specified include plastic laminate wainscoting by Pionite, suspended ceiling tiles by Armstrong, rubber wall bases by Johnsonite and Flexco, vinyl and luxury vinyl tile flooring by Tarkett and J&J Industries, resilient flooring by Eco Surfaces, and paint and high-performance coatings by Sherwin Williams. Transition strips by Johnsonite are specified for various floor material transitions, and stainless steel corner guards are included for protective edging in high-traffic areas.
The document was prepared in September 2026 and represents the design phase specifications for finish materials and installation standards. No pricing information, contract terms, set-asides, or procurement-related details are included in this finish legend document. The specifications establish the standard for quality and appearance across the renovation project and serve as reference materials for contractors and subcontractors involved in material selection and installation.
View the file
Other files
Show 40 more
Latest 50 of 88 listed here. See the rest on GovTribe.
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
FINISH LEGEND
SECTION FINISH DESCRIPTION MFR SERIES COLOR FINISH SIZE NOTES / REMARKS / LOCATIONS
064000 PL-01 PLASTIC LAMINATE PIONITE PIONITE HP898 BEIGE GRANITE TEXTURED N/A TYPICAL WAINSCOTING IN PUBLIC AREAS 095100 ACT-01 ANGLED TEGULAR WITH 15/16" GRID ARMSTRONG 2767 CORTEGA SECOND LOOK WHITE N/A 2' x 4' NEW OFFICE CEILING 095100 ACT-02 ANGLED TEGULAR WITH 15/16" GRID ARMSTRONG 704 CORTEGA WHITE N/A 2' x 2' MODIFIED OFFICE CEILING 096513 RB-01 RUBBER WALL BASE JOHNSONITE 4" COVE WALL BASE 48 GREY WG SATIN 4" x 1/8" TYPICAL WALL BASE IN NEW OFFICE 096513 RB-02 RUBBER WALL BASE FLEXCO 4" COVE WALL BASE 020 NEUTRAIL N/A 4" x 1/8" TYPICAL WALL BASE IN OFFICE AREAS 096513 TS-01 CARPET TO VINYL FLOOR TILE JOHNSONITE CTA-XX-C MATCH ADJACENT BASE N/A VARIES 1/4" TO 1/8" MATERIAL 096513 TS-02 CARPET TO CONCRETE JOHNSONITE EG-XX-H MATCH ADJACENT BASE N/A VARIES 1/4" MATERIAL TO FLOOR 096513 TS-03 VINYL FLOOR TILE TO CONCRETE JOHNSONITE SSR-XX-B MATCH ADJACENT BASE N/A VARIES 1/8" MATERIAL TO FLOOR 096513 TS-04 VINYL FLOOR TILE TO VINYL FLOOR TILE JOHNSONITE CTA-XX-N MATCH ADJACENT BASE N/A VARIES FLUSH - DISPARATE MATERIAL 096519 LVT-01 LUXURY VINYL FLOOR TILE TARKETT TANDUS CENTIVA EVENT SERIES HERITAGE PLANK #3352 HARVEST OAK STANDARD EMBOSS 6" x 36" x 1/8" MIN. 20 MIL WEAR LAYER 096566 RF-01 RESILIENT ANTI-FATIGUE FLOORING ECO SURFACES ECOFIT PLUS BEDROCK #806 N/A 4' WIDE ROLL FLOORING IN PASSPORT CONTROL BOOTHS 096800 CPT-01 PORT STANDARD FIELD CARPET J&J INDUSTRIES FLIGHT CUSTOM #C0427 STYLE J07E 12' WIDE ROLL TYPICAL PDX FIELD CARPET FOR MAIN CIRCULATION IN PUBLIC AREAS 096800 CPT-03 PORT STANDARD BORDER CARPET J&J INDUSTRIES FLIGHT CUSTOM #C0782 STYLE J15X 12' WIDE ROLL TYPICAL PDX BORDER CARPET IN PUBLIC AREAS 099100 PT-01 PAINT SHERWIN WILLIAMS PROMAR 200 ZERO VOC MATCH EXISTING SATIN N/A TYPICAL OFFICE WHITE WALLS 099100 PT-02 PAINT SHERWIN WILLIAMS PROMAR 200 ZERO VOC MATCH EXISTING SEMI-GLOSS N/A TYPICAL OFFICE DOORS AND FRAMES 099100 PT-03 PAINT SHERWIN WILLIAMS PROMAR 200 ZERO VOC MATCH EXISTING FLAT N/A TYPICAL GYPSUM BOARD CEILINGS AND SOFFITS TO MATCH EXISTING 099600 HPC-01 HIGH PERFORMANCE COATING SHERWIN WILLIAMS INDUSTRIAL ACRYLIC ENAMEL MATCH EXISTING SATIN N/A TYPICAL PUBLIC AREA WALLS ABOVE LAMINATE WAINSCOTING 099600 HPC-02 HIGH PERFORMANCE COATING SHERWIN WILLIAMS INDUSTRIAL ACRYLIC ENAMEL MATCH EXISTING SEMI-GLOSS N/A TYPICAL PUBLIC AREA DOORS AND FRAMES 099600 HPC-03 HIGH PERFORMANCE COATING SHERWIN WILLIAMS INDUSTRIAL ACRYLIC ENAMEL PORT BLUE SEMI-GLOSS N/A TYPICAL EXTERIOR SIDE OF EXTERIOR DOORS 099600 HPC-04 HIGH PERFORMANCE COATING SHERWIN WILLIAMS INDUSTRIAL ACRYLIC ENAMEL PORT BLACK SEMI-GLOSS N/A TYPICAL EXTERIOR SIDE OF EXTERIOR FRAMES 102600 SS-01 STAINLESS STEEL CORNER GUARD N/A 18 GAUGE 304 STAINLESS STEEL NO. 4 BRUSHED 48" TALL, 3" WINGS MOUNT ABOVE STAINLESS STEEL BASE
SCALE:
FINISH LEGEND
N.T.S.1
9/4/2026 lig ht da rk gr ay bl ac k
DESIGN NUMBER PROJECT NUMBER
2"
G R
AP
H
IC
S
C
AL
E-
FO
R R
EF
ER
EN
C
E O
N
LY
gr ay
4:42:54 PM x:\pdx cbp 2026\d-drawings\00 current\a9.01.dwg DRAWING SCALE IS REDUCED 50% WHEN SHEET SIZE IS 11" x 17"
DESIGNED BY
DRAWN BY
CHECKED BY
DATE
SHEET NO.
SUBMITTED BY
DRAWING NO.
1/ 4"
1/
2" 1"
BY REVISIONS APP
IF ELECTRONIC SIGNATURE IS BROKEN OR MISSING - THIS IS NOT A LEGAL DRAWING
NO.DATE BY REVISIONS APPNO.
TYPE:
DISC. SHT. NO.
C
AN
Y O
U S
EE
T
H E
AI
R
PL
AN
ES
T H
E
AD
JA
C
EN
T
SA
M
PL
ES
S H
O W
T H
R
EE
D
IF
FE
R
EN
T
LE
VE
LS
O
F
SH
AD
IN
G
SE
TT
IN
G
S
FO
R V
IE
W
IN
G
A N
D P
R
IN
TI
N
G D
R
AW
IN
G
C O
N
TE
N T
AR
E
O
PT
IM
IZ
ED
W
H
EN
A
LL
T H
R
EE
P
LA
N
ES
A R
E
VI
SI
BL
E.
T
H
IS
G U
ID
AN
C E
IS
P
R O
VI
D
ED
F
O R
R
EF
ER
EN
C E
O N
LY
D R
AW
IN
G S
C
AL
E
IS
R E
D U
C E
D
0% W
H
EN
S H
EE
T
SI
ZE
IS
1" x
7"
DATE
PORTLAND INTERNATIONAL AIRPORT
CUSTOMS AND BORDER PROTECTION IMPROVEMENTS - PHASE 2
FINISH LEGEND
JAY OSTLUND
D. CALEM
A. LASKEY
D. CALEM
SEPTEMBER 2026
27 CD
PDX 2026-513 A9.012025D042 103146
| Sheets and Views |
| A9.01 |
| 2026-09-04T16:53:53-0700 | |
| Dave Calem |
File details come from the government source that posted it. Updated .