This is an architectural drawing index sheet for the Portland International Airport Customs and Border Protection Improvements - Phase 2 project in Oregon. The document serves as a comprehensive guide to the construction documentation prepared for the airport renovation initiative. The project encompasses detailed architectural, mechanical, electrical, structural, technology, and signage drawings organized by discipline and building sector. The drawing set includes demolition plans, floor plans, reflected ceiling plans, enlarged details, equipment schedules, panel schedules, finish legends, and interior elevations across three designated sectors at the deplaning and enplaning levels of the terminal facility. The index contains 85 total sheets organized into seven categories: general information sheets, architectural sheets, structural sheets, mechanical sheets, electrical sheets, technology sheets, and graphics sheets for signage. The drawings are dated September 2026 and were designed by Jay Ostlund, drawn by D. Calem, and checked by A. Laskey, indicating this represents the Construction Documents phase of the project.
The document provides no information regarding pricing terms, contract award dates, bidding procedures, set-asides, incumbent contractors, funding sources, or other contractual terms and conditions. As an index sheet, this file serves solely to catalog and organize the technical drawing components of the construction documentation package for the Customs and Border Protection improvements at Portland International Airport.
View the file
Other files
Show 40 more
Latest 50 of 88 listed here. See the rest on GovTribe.
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
ARCHITECTURAL SHEETS
SHEET NUMBER DESCRIPTION
6 A0.01 ABBREVIATIONS, SYMBOLS, AND NOTES
7 A0.11 DEPLANING LEVEL - KEY PLAN
8 A1.01 DEPLANING LEVEL - SECTOR 01 - DEMOLITION PLAN
9 A1.02 DEPLANING LEVEL - SECTOR 02 - DEMOLITION PLAN
10 A1.03 DEPLANING LEVEL - SECTOR 03 - DEMOLITION PLAN
11 A1.11 DEPLANING LEVEL - SECTOR 01 - DEMOLITION REFLECTED CEILING PLAN
12 A1.12 DEPLANING LEVEL - SECTOR 02 - DEMOLITION REFLECTED CEILING PLAN
13 A1.13 DEPLANING LEVEL - SECTOR 03 - DEMOLITION REFLECTED CEILING PLAN
14 A2.01 DEPLANING LEVEL - SECTOR 01 - FLOOR PLAN
15 A2.02 DEPLANING LEVEL - SECTOR 02 - FLOOR PLAN
16 A2.03 DEPLANING LEVEL - SECTOR 03 - FLOOR PLAN
17 A2.11 DEPLANING LEVEL - SECTOR 01 - REFLECTED CEILING PLAN
18 A2.12 DEPLANING LEVEL - SECTOR 02 - REFLECTED CEILING PLAN
19 A2.13 DEPLANING LEVEL - SECTOR 03 - REFLECTED CEILING PLAN
20 A5.01 ENLARGED FLOOR PLANS 1
21 A5.02 ENLARGED FLOOR PLANS 2
22 A5.03 ENLARGED FLOOR PLANS 3
23 A7.01 INTERIOR ELEVATIONS
24 A8.01 INTERIOR DETAILS 1
25 A8.02 INTERIOR DETAILS 2
26 A8.03 INTERIOR DETAILS 3
27 A9.01 FINISH LEGEND
28 A9.02 FINISH SCHEDULE
29 A9.03 DOOR SCHEDULE
GENERAL INFORMATION SHEETS
SHEET NUMBER DESCRIPTION
1 GI1.00 INDEX
2 GI1.01 CITY INFORMATION AND DIRECTIVES
3 GI2.00 SITE PLAN AND VICINITY MAP
4 GI3.00 CODE INFORMATION, WORK HOURS, AND PHASING
5 GI3.01 OCCUPANT LOAD AND LIFE SAFETY PLAN
MECHANICAL SHEETS
SHEET NUMBER DESCRIPTION
34 M0.01 SYMBOLS, LEGENDS, AND ABBREVIATIONS - MECHANICAL
35 M0.02 EQUIPMENT SCHEDULE - MECHANICAL
36 M1.01 DEPLANING LEVEL - SECTOR 01 - DEMOLITION PLAN - MECHANICAL
37 M1.02 DEPLANING LEVEL - SECTOR 02 - DEMOLITION PLAN - MECHANICAL
38 M1.03 DEPLANING LEVEL - SECTOR 03 - DEMOLITION PLAN - MECHANICAL
39 M2.01 DEPLANING LEVEL - SECTOR 01 - FLOOR PLAN - MECHANICAL
40 M2.02 DEPLANING LEVEL - SECTOR 02 - FLOOR PLAN - MECHANICAL
41 M2.03 DEPLANING LEVEL - SECTOR 03 - FLOOR PLAN - MECHANICAL
42 M5.01 DETAILS 1 - MECHANICAL
43 M5.02 DETAILS 2 - MECHANICAL
ELECTRICAL SHEETS
SHEET NUMBER DESCRIPTION
44 E0.01 SYMBOLS, LEGEND AND ABBREVIATIONS - ELECTRICAL
45 E0.02 SYMBOL LEGEND - ELECTRICAL
46 E0.03 MECHANICAL EQUIPMENT CONNECTION AND LIGHTING SCHEDULES - ELECTRICAL
47 E1.01 DEPLANING LEVEL - SECTOR 01 - DEMOLITION PLAN - ELECTRICAL
48 E1.03 DEPLANING LEVEL - SECTOR 03 - DEMOLITION PLAN - ELECTRICAL
49 E1.11 DEPLANING LEVEL - SECTOR 01 - DEMOLITION REFLECTED CEILING PLAN - ELECTRICAL 50 E1.12 DEPLANING LEVEL - SECTOR 02 - DEMOLITION REFLECTED CEILING PLAN - ELECTRICAL 51 E1.13 DEPLANING LEVEL - SECTOR 03 - DEMOLITION REFLECTED CEILING PLAN - ELECTRICAL
52 E2.01 DEPLANING LEVEL - SECTOR 01 - FLOOR PLAN - ELECTRICAL
53 E2.02 DEPLANING LEVEL - SECTOR 02 - FLOOR PLAN - ELECTRICAL
54 E2.03 DEPLANING LEVEL - SECTOR 03 - FLOOR PLAN - ELECTRICAL
55 E2.04 ENPLANING LEVEL - SECTOR 01 - FLOOR PLAN - ELECTRICAL
56 E2.05 ENPLANING LEVEL - SECTOR 02 - FLOOR PLAN - ELECTRICAL
57 E2.11 DEPLANING LEVEL - SECTOR 01 - REFLECTED CEILING PLAN - ELECTRICAL
58 E2.12 DEPLANING LEVEL - SECTOR 02 - REFLECTED CEILING PLAN - ELECTRICAL
59 E2.13 DEPLANING LEVEL - SECTOR 03 - REFLECTED CEILING PLAN - ELECTRICAL
60 E8.01 PANEL SCHEDULE - PANEL 2UP1D-44DA - ELECTRICAL
61 E8.02 PANEL SCHEDULE - PANEL 2D1C - ELECTRICAL
62 E8.03 PANEL SCHEDULE - PANEL 4D1A - ELECTRICAL
63 E8.04 PANEL SCHEDULE - PANEL E4D1A - ELECTRICAL
64 E8.05 PANEL SCHEDULE - PANEL 2D1B - ELECTRICAL
65 E8.06 PANEL SCHEDULE - PANEL 2D1D - ELECTRICAL
66 E8.07 PANEL SCHEDULE - PANEL 2D2A - ELECTRICAL
8/27/2026 lig ht da rk gr ay bl ac k
DESIGN NUMBER PROJECT NUMBER
2"
G R
AP
H
IC
S
C
AL
E-
FO
R R
EF
ER
EN
C
E O
N
LY
gr ay
11:53:15 AMx:\pdx cbp 2026\d-drawings\00 current\gi1.00.dwg DRAWING SCALE IS REDUCED 50% WHEN SHEET SIZE IS 11" x 17"
DESIGNED BY
DRAWN BY
CHECKED BY
DATE
SHEET NO.
SUBMITTED BY
DRAWING NO.
1/ 4"
1/
2" 1"
BY REVISIONS APP
IF ELECTRONIC SIGNATURE IS BROKEN OR MISSING - THIS IS NOT A LEGAL DRAWING
NO.DATE BY REVISIONS APPNO.
TYPE:
DISC. SHT. NO.
C
AN
Y O
U S
EE
T
H E
AI
R
PL
AN
ES
T H
E
AD
JA
C
EN
T
SA
M
PL
ES
S H
O W
T H
R
EE
D
IF
FE
R
EN
T
LE
VE
LS
O
F
SH
AD
IN
G
SE
TT
IN
G
S
FO
R V
IE
W
IN
G
A N
D P
R
IN
TI
N
G D
R
AW
IN
G
C O
N
TE
N T
AR
E
O
PT
IM
IZ
ED
W
H
EN
A
LL
T H
R
EE
P
LA
N
ES
A R
E
VI
SI
BL
E.
T
H
IS
G U
ID
AN
C E
IS
P
R O
VI
D
ED
F
O R
R
EF
ER
EN
C E
O N
LY
D R
AW
IN
G S
C
AL
E
IS
R E
D U
C E
D
0% W
H
EN
S H
EE
T
SI
ZE
IS
1" x
7"
DATE
PORTLAND INTERNATIONAL AIRPORT
CUSTOMS AND BORDER PROTECTION IMPROVEMENTS - PHASE 2
INDEX
JAY OSTLUND
D. CALEM
A. LASKEY
D. CALEM
SEPTEMBER 2026
1 CD
PDX 2026-513 GI1.002025D042 103146
STRUCTURAL SHEETS
SHEET NUMBER DESCRIPTION
30 S0.01 GENERAL NOTES AND ABBREVIATIONS - STRUCTURAL
31 S0.02 SPECIAL INSPECTION PROGRAM - STRUCTURAL
32 S1.01 DEPLANING LEVEL - SECTOR 03 - FLOOR PLAN - STRUCTURAL
33 S2.01 DETAILS - STRUCTURAL
TECHNOLOGY SHEETS
SHEET NUMBER DESCRIPTION
67 T0.01 SYMBOLS, LEGENDS, AND ABBREVIATIONS - TECHNOLOGY
68 T1.01 DEPLANING LEVEL - SECTOR 01 - DEMOLITION PLAN - TECHNOLOGY
69 T1.02 DEPLANING LEVEL - SECTOR 02 - DEMOLITION PLAN - TECHNOLOGY
70 T1.03 DEPLANING LEVEL - SECTOR 03 - DEMOLITION PLAN - TECHNOLOGY
71 T2.01 DEPLANING LEVEL - SECTOR 01 - FLOOR PLAN - TECHNOLOGY
72 T2.02 DEPLANING LEVEL - SECTOR 02 - FLOOR PLAN - TECHNOLOGY
73 T2.03 DEPLANING LEVEL - SECTOR 03 - FLOOR PLAN - TECHNOLOGY
74 T4.01 CABLE MATRIX - TECHNOLOGY
GRAPHICS SHEETS
SHEET NUMBER DESCRIPTION
75 G0.01 MESSAGE SCHEDULE - SIGNAGE
76 G2.01 DEPLANING LEVEL - SECTOR 01 - FLOOR PLAN - SIGNAGE
77 G2.02 DEPLANING LEVEL - SECTOR 02 - FLOOR PLAN - SIGNAGE
78 G2.03 DEPLANING LEVEL - SECTOR 03 - FLOOR PLAN - SIGNAGE
79 G9.01 GRAPHICS STANDARDS - SIGNAGE
80 G9.10 SIGN FAMILY - SIGNAGE
81 G9.11 DETAILS 1 - SIGNAGE
82 G9.12 DETAILS 2 - SIGNAGE
83 G9.13 DETAILS 3 - SIGNAGE
84 G9.14 DETAILS 4 - SIGNAGE
85 G9.15 DETAILS 5 - SIGNAGE
| Sheets and Views |
| GI1.00 INDEX |
| 2026-08-27T14:36:10-0700 | |
| Dave Calem |
File details come from the government source that posted it. Updated .