USCG OPC Pier Amendment 007 Drawings.pdf
PDF 45 MB Posted
- Attached to
- Design-Bid-Build, USCG Offshore Patrol Cutters (OPC) Homeport Pier, Naval Station Newport, Newport RI
- Solicitation number
- N4008526R0001
About this file
This file is a general site plan drawing for the USCG Offshore Patrol Cutters (OPC) Homeport Initiative Pier project located at Naval Station Newport in Newport, Rhode Island. The drawing, dated Amendment 007 (07/24/2026), depicts the overall site layout for Pier 1 construction and demolition activities at Coddington Cove. The plan identifies existing infrastructure including Buildings 394, 395, and 396, existing piers and bulkheads, stone breakwater, and a NOAA Ship and Support Facility. The project scope includes demolition of the existing Pier 1 (base bid) and construction of a new pier with a 423-foot diameter turning clear space and a 100-foot by 80-foot pier structure. Water level and structure elevations are referenced to NAVD88 datum, with the 100-year flood zone (VE) at 16.0 feet. The site contains an approximately 40,000-square-foot Coast Guard laydown area and an impacted eel grass bed totaling 705 square feet. Utility markings indicate unknown existing utilities in the construction fence area.
The drawing includes multiple revisions and amendments, with the current version prepared by the Department of the Navy Naval Facilities Engineering Systems Command Mid-Atlantic at Naval Station Norfolk, Virginia. The plan references hydrographic survey data obtained in December 2023 and January 2024, and sediment sampling conducted in Summer 2024. Coordinate data and ground control points (CG-1 through CG-16) are provided for survey reference. This drawing serves as the foundational site plan for the Design-Bid-Build procurement for the OPC Homeport Pier construction contract.
View the file
Other files
Show 40 more
50 files listed here. See the rest on GovTribe.
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
T
T
D
D
D
D
D
D
D
D
D
D
D D
ACU
CR
CR
CR
HH
HH
ACUACU
HH
HH
HH
HH
HH
HH
HH
CR ACU
HH
HH
M
M
HH
HH
HH
HH
HH
HH
ACU
CR
HH
HH
HH
HH
HH
M
CB TYPE CL
TF=14.19
INV OUT=12.52
DMH
TF=15.12
INV IN=12.52 12"HDPE(SW)
INV OUT=9.62 8"RCP(NE)
DMH
TF=15.07
INV IN=12.77
INV OUT=9.17
8"RCP(S)
CB TYPE CL
TF=14.21
INV OUT=12.77
SIZE?
MH
TF=12.68
FILLED W/DIRT
STEAM MH
TF=17.64
STEAM MH
TF=17.66
STEAM MH
TF=15.65
CONCRETE
PAD
CONCRETE
PAD
CONCRETE
STRUCTURE
CODDINGTON COVECODDINGTON COVE
CODDINGTON COVE CODDINGTON COVE
BITUMINOUS CURB
A N
D E
R S
E N
A V
E
PIER ACCESS RD
PIER ACCESS RD
BURMA RD
CODDINGTON COVE
CODDINGTON COVE
CODDINGTON COVE
CODDINGTON COVE
CODDINGTON COVE
AREA WITHIN CONSTRUCTION FENCE
UNDER CONSTRUCTION
IT IS UNKNOWN IF UTILITIES STILL EXIST IN
THIS AREA
s ta n te c ad d ed pe r c lie n ts no t es x;E x;E x;E x; D x; D x;
D x; D x; D x; D x; D x; D x; D
W x;T W x;T x;E x;T x; D x;T
FLOOD
EBB
FLOOD
EBB
W W
W W
W
W
W x; D x;E x;E x;E
FLOOD
EBB
FLOOD
EBB
FLOOD
EBB
FLOOD
EBB
FLOOD
EBB
FLOOD
EBB
FLOOD
EBB
x; D x;E x;T x;E x; D x;E
W x; Dx;D
UP
MECHANICAL COMPRESSED AIR
ENCLOSURE BID OPTION 3
EXIST S45N BULKHEAD
EXIST S366
BULKHEAD
423' DIA TURNING CLEAR SPACE EXIST STONE BREAKWATER
NOAA OAMA SHIP AND
SUPPORT FACILITY
(TO BE EXISTING)
PROVIDE PIER 1
LCU LIMIT
EXIST T-PIER
EXIST PIER 1 TO BE
DEMOLISHED (BASE BID)
100' - 0"+/-
5' - 0" 80' - 0"
CODDINGTON COVE
EEL GRASS AREA
AREA OF IMPACTED EEL
GRASS BED 705 SQ. FT.
FLOOD
EBB
BUILDING 396
BUILDING 395
BUILDING 394
EMH 4123E
NOAA SITE LIMITS, TYP
EXISTING PIER HAS
BEEN DISCONNECTED
FROM LANDSIDE
COAST GUARD
LAYDOWN AREA
APPROXIMATELY
40, 000 SF
340'± 20 0'
0'
B A
S E
B
ID
O P
T
IO
N
WATER LEVEL & STRUCTURE ELEVATIONS
100 YEAR FLOOD (ZONE VE) 16.0 FT
PIER 1 13.00 FT
EXIST PIER 1 9.36 FT
MHHW 1.86 FT
MHW 1.62 FT
NAVD88 0.00 FT (DATUM)
MLW -1.97 FT
MLLW -2.12 FT
SATISFACTORY TO DATE
APPROVED
ACTIVITY
FOR COMMANDER NAVFAC
SEAL
A/E INFO
A
B
C
D
1 2 3 4 5
1 2 3 4 5
A
B
C
D
SCALE:
CONSTR. CONTR. NO.
SHEET
NAVFAC DRAWING NO.
DES DRW CHK
OF
EPROJECT NO.:
D E
P A
R T
M E
N T
O F
T H
E N
A V
Y N
A V
A L
F A
C
IL
IT
IE
S E
N G
IN
E
E R
IN
G
S Y
S T
E M
S C
O M
M A
N D
DRAWFORM REVISION: 25 AUGUST 2020
PM/DM
BRANCH MANAGER
CHIEF ENG/ARCH
FIRE PROTECTION
N A
V A
L F
A C
IL
IT
IE
S
E N
G
IN
E E
R
IN
G S
Y S
T E
M S
C O
M M
A N
D
M
ID
-A
TL
A N
T
IC
N A
V A
L S
T A
T
IO
N
N O
R F
O L
K V
A
AS NOTED
S Y
M D
E S
C R
IP
T
IO
N
D A
T E
A P
P R
/2
/2
:1 :4
P
M
A u to d e s k D o c s /2
U
S C
G O
C R
H o m e p o rt
In iti a ti v e O
P C
P ie r_
/P
IE
R
U S
C G
-1
-S
.r v t
G-102
U S
C G
O C
R H
O M
E P
O R
T
IN
IT
IA
T
IV
E O
P C
P
IE
R
G E
N E
R A
L S
IT
E
P
LA
N
MN
12936575
CHG HBF
Frank Cole USCG MASI
MRI/CWJ
1826479
N E
W P
O R
T , R
I N
A V
A L
S T
A T
IO
N
N E
W P
O R
T
JWJ
NEK
HPN
C I
C O
R E
H
A M
P T
O N
R O
A D
S
G -1
06 FEB 2026
PLAN
NORTH
SCALE: 1" = 100'
GENERAL SITE PLAN
1" = 100' 0 100' 400'200'
A
M E
N D
M E
N T
/2
3/
V
M G
A
M E
N D
M E
N T
/2
4/
V
M G
10 10
40 40
W
-15 -20
CG-4
CG-2
CG-1
CG-3
CG-5
CG-6
CG-7
CG-8
CG-9CG-10
CG-11
CG-12
CG-13
CG-14
CG-15
CG-16
N= 161615.96' E= 378778.08'
N= 161706.33' E= 378929.33'
N= 161741.25' E= 378848.96'
N= 161840.91' E= 378942.46'
N= 161432.66' E= 378462.96'
N= 161453.44' E= 378537.95'
N= 161437.60' E= 378501.75'
N= 161450.10' E= 378497.79'
N= 161679.56' E= 378629.44'
N= 161699.74' E= 378701.71' N= 161682.62' E= 378668.59'
N= 161698.37' E= 378663.96'
N= 162207.39' E= 378506.47'
N= 162214.87' E= 378554.34'
N= 162229.27' E= 378589.83' N= 162223.80' E= 378547.98'
N= 162235.69' E= 378075.98'
N= 162236.89' E= 378095.70'
N= 162246.63' E= 378117.05'N= 162248.09'
E= 378093.87'
N= 162595.33' E= 378705.20'
N= 162602.22' E= 378963.65'
N= 162612.75' E= 378990.75'
N= 162612.01' E= 378870.27'
N= 162527.29' E= 378498.43'
N= 162536.84' E= 378544.40'
N= 162552.73' E= 378578.04'N= 162546.33'
E= 378536.21'
N= 161865.78' E= 377835.54'
N= 161864.62' E= 377851.74'
N= 161870.96' E= 377865.92' N= 161872.64' E= 377849.36'
N= 162724.37' E= 378642.45'
N= 162741.12' E= 378652.89'
N= 162742.56' E= 378744.75'
N= 162765.81' E= 378728.26'
CN101
KPG ASM PJK
PLAN
NORTH
GENERAL SHEET NOTES:
1. ELEVATIONS SHOWN ON THE DREDGING PLAN ARE REFERENCED TO NAVD88.
CONTOURS ARE SHOWN AT 1-FT INTERVALS.
2. ALL SOUNDINGS WERE OBTAINED FROM HYDROGRAPHIC SURVEY
CONDUCTED IN DECEMBER 2023 AND JANUARY 2024.
3. 7 OF 32 SEDIMENT SAMPLES COLLECTED FROM PROJECT AREA IN SUMMER 2024
WERE FOUND TO HAVE TRACE AMOUNTS (<1% OF FIBROUS MATERIALS ANALYZED)
OF ASBESTOS. ONE SEDIMENT SAMPLE, OUTSIDE OF THE DREDGE FOOTPRINT, WAS
FOUND TO HAVE CHRYSOTILE ASBESTOS AT 2% OF FIBROUS MATERIALS ANALYZED.
APPROPRIATE HANDLING AND DISPOSAL OF ASBESTOS CONTAINING SEDIMENTS
MUST BE FOLLOWED DURING THE DREDGING OPERATIONS. SEE APPENDIX F OF
PROJECT SPECIFICATIONS FOR SEDIMENT CHEMISTRY REPORT.
4. DREDGING OPERATIONS MUST NOT OCCUR WITHIN 20-FT OF THE FACE OF EXISTING
BULKHEAD.
5. DREDGING ACTIVITIES MUST OCCUR WITHIN OU19 AND ARE SUBJECT TO LAND USE
CONTROLS AND OTHER REPORTING REQUIREMENTS. CONFIRM WITH CONTRACTING
OFFICER ON ACCEPTABLE DISPOSAL METHODS, APPROVALS, NOTIFICATIONS,
WORKER SAFETY, AND OTHER REQUIREMENTS FOR MANAGEMENT OF DREDGED
MATERIALS. DREDGED SEDIMENTS ARE TO BE DISPOSED OFF-SITE AT A PERMITTED
RCRA D FACILITY AT A MINIMUM.
6. TOTAL DREDGE AREA FOR MINIMUM DREDGE DEPTH = ± 47,325 SF.
7. ASLFS DETERMINED FROM SUMMER 2025 ARCHAEOLOGICAL SURVEYS. DREDGING,
SPUDDING, OR ANCHORING OF PROJECT BARGES OR VESSELS PROHIBITED IN
THESE AREAS.
D
EP
AR
TM
EN
T
O F
TH
E
N
AV
Y
A
B
C
D
1 2 3 4 5
1 2 3 4 5
A
B
C
D
SCALE:
CONSTR. CONTR. NO.
SHEET
NAVFAC DRAWING NO.
N
AV
AL
F
AC
IL
IT
IE
S
EN
G
IN
EE
R
IN
G
S
YS
TE
M
S C
O M
M
AN
D
DES DRW
SY
M
D
ES
C R
IP
TI
O N
D
AT
E
AP
PR
DRAWFORM REVISION: 25 AUGUST 2020
CHK
OF
EPROJECT NO.:
PM/DM
BRANCH MANAGER
CHIEF ENG/ARCH
FIRE PROTECTION
NA
VA
L
FA
CI
LI
TI
ES
E
NG
IN
EE
RI
NG
S
YS
TE
M
S
CO
M M
AN
D
- M
ID
-A
TL
AN
TI
C
CI
C
OR
E
- H
AM
PT
ON
R
OA
DS
NA
VA
L S
TA
TI
ON
NO
RF
OL
K, V
A
NA
VA
L
ST
AT
IO
N
NE
W
PO
RT
NE
W
PO
RT
, R
I
US
CG
O
CR
H O
M
EP
O
RT
IN
IT
IA
TI
VE
O
PC
P
IE
R
MRI/CWJ
JWJ
HPN
1826479
NEK
Approved by Frank Cole USGC MASI
06 FEB 2026
LEGEND:
1" = 80'SCALE:
OVERALL DREDGING PLAN 1' = 80'
80' 0' 80' 160'
B1
CN302
B1
CN301
CG-X
DREDGE VOLUME SUMMARY
SITE DREDGE VOLUME (CY)
DREDGE TO MIN. DEPTH EL. -23 MLLW 7,560 CY
2' OVER-DREDGE DEPTH EL. -25 MLLW 3,815 CY
TOTAL 11,375 CY
MARGIN 06A
MARGIN 06B
MARGIN 06C
MARGIN 02A
MARGIN 02B
MARGIN 02C
MARGIN 03A
MARGIN 04B
MARGIN 01A
MARGIN XX
B1 CN
-30 -35
-35
-35
-40
-40
-40
-40
-35 -35
-35
-35 -35
-35 -35
-40
-30 -30
-3
-4
-4
-4
-40
-4
-40
-40
-40 -40
-40
-40
-35
-35 -30
-25
-20 -35
-30
-25
-25
-30
-15
-30 -20 -15
-10
-20
-15
DREDGE TO
EL. -25.12 NAVD88
/ EL. -23 MLLW
PIER 1
S45S BULKHEAD
AREAS TO BE DREDGED
N= 162022.50' E= 378689.52'
N= 161989.35' E= 378771.35'
N= 162091.69' E= 378889.81'
N= 162015.28' E= 378910.81'
N= 162050.89' E= 378879.49'
N= 162172.26' E= 379151.67' N= 162082.72' E= 379180.38'
N= 162233.56' E= 379257.34'
N= 162210.82' E= 379287.85'
N= 162029.61' E= 379328.50'
N= 162017.94' E= 379309.99'
N= 162096.16' E= 379291.92'
SEDIMENT SAMPLING LOCATION
CONTROL POINTS FOR LIMITS OF DREDGE
ANCIENT SUBMERGED LANDFORM FEATURES (ASLF)
MARGIN AVOIDANCE AREA
POINT COORDINATES
OV
ER
AL
L D
RE
DG
IN
G
PL
AN
20' MIN.
12936599
EXISTING EEL GRASS BED
AM
EN
DM
EN
T
/26
/20
VM
G
BA
SE
B
ID
BI
D
OP
TI
ON
AM
EN
DM
EN
T
/29
/20
VM
G
+10.46
+10.68
10.58
X X X X X X X
X X X X X
X
XXXXXXXXXXXXXX
X
X X
X X
X X
X
X X X
X X X X X X X
X
X X
X
E
W
T
W
T
E
W
X X X X X X X
X
E
E
E
E
W
W
S
X X
X
X
X
X
X
N = 162242.53' E = 379423.17'
N = 162164.27' E = 379490.39'
N = 162121.59' E = 379501.69'
N = 161832.69' E = 379557.58'
N = 161667.30' E = 379610.02'
N = 162248.33' E = 379400.87'
N = 162186.77' E = 379417.66'
N = 162190.55' E = 379575.06'
N = 162212.23' E = 379591.76'
N = 162269.67' E = 379575.23'
N = 162280.95' E = 379511.53'
N = 162290.26' E = 379543.88'
N = 162271.06' E = 379514.39'
CD101
SI
TE
D
EM
OL
IT
IO
N
PL
AN
KPG ASM PJK
1" = 30'SCALE:
SITE DEMOLITION PLAN
PLAN
NORTH
1" = 30' 30' 0 30' 60'
DEMOLITION KEYNOTES:
D
EP
AR
TM
EN
T
O F
TH
E
N
AV
Y
A
B
C
D
1 2 3 4 5
1 2 3 4 5
A
B
C
D
SCALE:
CONSTR. CONTR. NO.
SHEET
NAVFAC DRAWING NO.
N
AV
AL
F
AC
IL
IT
IE
S
EN
G
IN
EE
R
IN
G
S
YS
TE
M
S C
O M
M
AN
D
DES DRW
SY
M
D
ES
C R
IP
TI
O N
D
AT
E
AP
PR
DRAWFORM REVISION: 25 AUGUST 2020
CHK
OF
EPROJECT NO.:
PM/DM
BRANCH MANAGER
L
FA
CI
LI
TI
ES
E
NG
IN
EE
RI
NG
S
YS
TE
M
S
CO
M M
AN
D
- M
ID
-A
TL
AN
TI
C
CI
C
OR
E
- H
AM
PT
ON
R
OA
DS
NA
VA
L S
TA
TI
ON
NO
RF
OL
K, V
A
NA
VA
L
ST
AT
IO
N
NE
W
PO
RT
NE
W
PO
RT
, R
I
US
CG
O
CR
H O
M
EP
O
RT
IN
IT
IA
TI
VE
O
PC
P
IE
R
MRI/CWJ
JWJ
Approved by Frank Cole USGC MASI
06 FEB 2026
1. REMOVE AND DISPOSE OF BITUMINOUS CONCRETE
PAVEMENT.
2. REMOVE AND DISPOSE OF BITUMINOUS CONCRETE
CURBING. TOTAL ± 960 LF.
3. REMOVE AND CAST ASIDE STONE BREAKWATER AT
BULKHEAD CROSSING. TO BE RESET AFTER BULKHEAD
CONSTRUCTION. SEE REFERENCE IMAGE 'C1' AND 'C2'.
4. 8" SAWCUT FOR PAVEMENT REMOVAL.
5. REMOVE AND DISPOSE OF CONCRETE PAVEMENT.
6. REMOVE AND DISPOSE OF TOPSOIL, LAWN, AMENDED SOIL,
AND LANDSCAPE PLANTINGS.
7. REMOVE AND DISPOSE CONCRETE MONOLITHIC BLOCKS,
CHAINS, WIRE ROPE, TIMBER DEBRIS, VEGETATION, ETC
AS REQUIRED FOR BULKHEAD. SEE REFERENCE IMAGE 'B'
AND 'C2'.
8. REMOVE AND DISPOSE OF CONCRETE PADS. SEE
REFERENCE IMAGE 'A1' AND 'A2'.
9. PROTECT AND MAINTAIN MONITORING WELL.
10. LIMIT OF FULL DISTURBANCE.
11. SEDIMENTATION CONTROL SYSTEM AT CATCH BASIN /
DRAIN, TYP.
12. REMOVE AND DISPOSE OF GRAVEL SURFACE AS
REQUIRED. SEE REFERENCE IMAGE 'B'.
13. CONCRETE WASHOUT AREA. LOCATION TO BE
DETERMINED AND ADJUSTED AS REQUIRED TO PERMIT
CONSTRUCTION OPERATIONS.
14. MATERIAL STOCKPILE AREA. PROVIDE SEDIMENTATION
CONTROL SYSTEM AROUND STOCKPILE AREA.
15. REMOVE AND DISPOSE VEGETATION, GRAVEL SURFACE
RIPRAP, CONCRETE BLOCKS, CHAINS, WIRE ROPE, TIMBER
DEBRIS AS NECESSARY TO INSTALL STORM DRAINAGE
AND BULKHEAD.
16. SEDIMENTATION CONTROL SYSTEM AT TOE OF SLOPE.
17. REMOVE FENCE FABRIC AS REQUIRED FOR NEW UTILITY
TRENCHING. REPLACE FABRIC ONCE UTILITY HAS BEEN
INSTALLED AND TRENCH HAS BEEN BACKFILLED, TYP.
18. EXISTING FENCING TO REMAIN, TYP.
19. REMOVE VEGETATION OVERGROWTH. SEE REFERENCE
IMAGE 'A2', 'B', AND 'C2'.
EXISTING PIER 1
FOR PIER DEMOLITION, SEE
STRUCTURAL DEMOLITION
DRAWINGS
EXISTING MANHOLES
TO REMAIN
EXISTING MANHOLES
TO REMAIN
100-YR FLOODPLAIN
ELEV. 14.0
A PORTION OF THE EXIST. PIER 1 AND EXIST. BULKHEAD
S366 NEAR THE LANDWARD END OF THE PIER WAS
DEMOLISHED TO FACILITATE CONSTRUCTION OF
BULKHEAD S366 UNDER A SEPARATE CONTRACT.
GENERAL SHEET NOTES:
1. REFER DRAWINGS C-001 AND ##### FOR ADDITIONAL
LEGEND, ABBREVIATIONS, AND GENERAL NOTES.
2. SEE WORK KEYNOTES FOR SPECIFIC ITEMS INCLUDED AS
BID OPTIONS. ALL WORK NOT IDENTIFIED AS BID OPTIONS
MUST BE CONSIDERED PART OF THE BASE BID.
NOAA PROPERTY
LINE
REFERENCE IMAGES:
IMAGE 'A1'
CONCRETE PADS
IMAGE 'B'
TIMBER DEBRIS AND
GRAVEL SURFACE
IMAGE 'C1'
STONE BREAKWATER
TOPSOIL, LAWN, AND LANDSCAPE
PLANTINGS REMOVAL
BITUMINOUS CONCRETE PAVEMENT
REMOVAL
BITUMINOUS CURB REMOVAL
GRAVEL SURFACE REMOVAL
CONCRETE PAD / SURFACE / PAVEMENT
REMOVAL
LEGEND:
IMAGE 'A2'
CONCRETE PADS
IMAGE 'C2'
STONE BREAKWATER
VEGETATION, GRAVEL SURFACE,
RIPRAP, CONCRETE BLOCKS, CHAINS,
WIRE ROPE, TIMBER DEBRIS REMOVAL
12936605
BREAKWATER
REMOVE AND DISPOSE OF
EXISTING BITMINOUS CONCRETE
REMNANTS WITHIN THIS AREA
AM
EN
DM
EN
T
/26
/20
VM
G
AM
EN
DM
EN
T
/29
/20
VM
G
+10.46
+10.68
10.58100-YR FLOODPLAIN
EL 14.0
100-YR FLOODPLAINEL 14.0
X X X X X X X
X X X X X
X
XXXXXXXXXXXXXX
X
X X
X X
X X
X
X X X
X X X
X
X X
X
E
W
T
T
E
X X X X X X X
X
E
E
E
E
W
N = 162258.24' E = 379554.06'
N = 162215.20' E = 379586.23'
N = 162121.59' E = 379501.69'
N = 161832.69' E = 379557.58'
N = 161655.93' E = 379577.85'
N = 161625.63' E = 379462.80'
N = 162051.59' E = 379378.07'
N = 162128.47' E = 379355.94'
LIMIT OF BITUMINOUS
CONCRETE CURBING
N = 162248.33' E = 379400.87'
N = 162204.18' E = 379412.41'
N = 162034.87' E = 379418.98'
N = 162002.42' E = 379434.59'
N = 162002.14' E = 379385.27'
N = 162037.05' E = 379375.22'
BEGIN C PIER 1
N = 162084.18' E = 379346.68'
C-101
SI
TE
P
LA
N
KPG ASM PJK
PLAN
NORTH
1" = 30' 30' 0 30' 60'
GENERAL SHEET NOTES:
D
EP
AR
TM
EN
T
O F
TH
E
N
AV
Y
A
B
C
D
1 2 3 4 5
1 2 3 4 5
A
B
C
D
SCALE:
CONSTR. CONTR. NO.
SHEET
NAVFAC DRAWING NO.
N
AV
AL
F
AC
IL
IT
IE
S
EN
G
IN
EE
R
IN
G
S
YS
TE
M
S C
O M
M
AN
D
DES DRW
SY
M
D
ES
C R
IP
TI
O N
D
AT
E
AP
PR
DRAWFORM REVISION: 25 AUGUST 2020
CHK
OF
EPROJECT NO.:
PM/DM
BRANCH MANAGER
L
FA
CI
LI
TI
ES
E
NG
IN
EE
RI
NG
S
YS
TE
M
S
CO
M M
AN
D
- M
ID
-A
TL
AN
TI
C
CI
C
OR
E
- H
AM
PT
ON
R
OA
DS
NA
VA
L S
TA
TI
ON
NO
RF
OL
K, V
A
NA
VA
L
ST
AT
IO
N
NE
W
PO
RT
NE
W
PO
RT
, R
I
US
CG
O
CR
H O
M
EP
O
RT
IN
IT
IA
TI
VE
O
PC
P
IE
R
MRI/CWJ
JWJ
Approved by Frank Cole USGC MASI
06 FEB 2026
1. BITUMINOUS CONCRETE PAVEMENT. SEE DETAIL C1 / C-502.
BID ALTERNATE: CONCRETE PAVEMENT. SEE DETAIL D4 / C-503.
2. LIMITS OF BITUMINOUS CONCRETE PAVEMENT.
(SAWCUT AND SEAL JOINT, MATCH EXISTING PAVEMENT FLUSH).
3. BITUMINOUS CONCRETE CURBING (TOTAL = 545 LF).
4. MEET EXISTING CONCRETE PAVEMENT FLUSH.
5. SET MONITORING WELL FLUSH WITH GRADE. REMOVE
BOLLARDS. SEE DETAIL A2 / C-503.
6. 30-FOOT OPENING IN BITUMINOUS CONCRETE CURBING FOR
STORMWATER RUNOFF LEAKOFF.
7. FILTER STONE DIAPHRAGM.
8. 4" MULCH LAYER.
9. CONCRETE FILLED STEEL GUARD POST (TYP.). BID OPTION 3 AT
LOW PRESSURE COMPRESSED AIR LOCATION.
10. CONCRETE PAD FOR DUMPSTERS (36' X 15'). SEE DETAIL D3 /
C-503.
11. CONCRETE WHEEL STOP (TYP.). SEE DETAIL D4 / C-502.
12. CONCRETE CURBING (120 LF).
13. BITUMINOUS CONCRETE CURBING (197 LF).
14. VE ZONE LIMITS, TYP.
15. PROVIDE ACCESSIBLE PARKING SIGN AND POST.
16. ACCESSIBLE PARKING SPACE. PROVIDE ACCESSIBLE PARKING
SYMBOL PAVEMENT MARKING.
17. PROVIDE 1.5" LIP ALONG TRAVEL WAY TO MAINTAIN PIER
ACCESS ROAD GUTTER.
18. 6" LOAM AND SEED ALL DISTURBED AREAS NOT SCHEDULED
FOR OTHER IMPROVEMENTS (TYP.).
19. BIORETENTION PLANTER. SEE DETAIL A1 / C-505 AND SHEET
C-506.
20. 4" WIDE WHITE PAVEMENT MARKING FOR ALL LAYDOWN AREA
STRIPING (TYP.)
21. LIMITS OF BITUMINOUS CONCRETE PAVEMENT. MEET
APPROACH SLAB FLUSH. REFER TO STRUCTURAL DRAWINGS.
22. PERMANENT TRENCH REPAIR - CONCRETE PAVEMENT. (FOR
SANITARY PIPE INSTALLATION.)
23. 15KV SWITCHGEAR STRUCTURE. SEE DRAWING E-502 FOR
DETAILS.
24. PERMANENT TRENCH REPAIR IN LAWN AND TOPSOIL.
25. LIMITS OF FULL DISTURBANCE.
26. STEEL BEAM GUIDERAIL. REFER RIDOT STANDARD HIGHWAY
DETAIL 34.1.0 - 34.3.0
1. DISTURBED AREAS WITHIN THE SITE MUST BE RECAPPED WITH APPROVED
ENGINEERED CONTROLS (I.E. 6 INCHES OF A CLEAN SOIL ENCAPSULATION AND
COVER SYSTEM, 2 INCHES OF ASPHALT, OR CONCRETE) IN ACCORDANCE WITH
THE EPA RECORD OF DECISION FOR SITE 19 - ON-SHORE DERECKTOR
SHIPYARD OPERABLE UNIT 12, SEPTEMBER 2014, AND IN ACCORDANCE WITH
CONTRACT DOCUMENTS
2. SEE ELECTRICAL SITE WORK SHEETS E-108, E-109, E-110, AND E-111 FOR SITE
IMPROVEMENTS OUTSIDE THE WORK LIMITS DETAILED ON C-101 AND C-102.
3. SEE SHEET C-506 FOR BIORETENTION AREA PLANTING SCHEDULES.
4. SEE SHEET C-001 AND ##### FOR LEGEND ABBREVIATIONS, AND GENERAL
NOTES.
5. SEE WORK KEYNOTES FOR SPECIFIC ITEMS INCLUDED AS BID OPTIONS. ALL
WORK NOT IDENTIFIED AS BID OPTIONS MUST BE CONSIDERED PART OF THE
BASE BID.
WORK KEYNOTES:
9'-0"
20'-0"
12'-0"
35'-0"
10'-0"
'-0
23'-0"±
100-YR FLOODPLAIN
ZONE AE ELEV. 14.0
BOAT TRAILER PARKING (12)
CRANE PARKING
REFER TO STRUCTURE DRAWINGS FOR
APPROACH SLAB AND PIER DETAILS
PIER 1
LIMIT OF BITUMINOUS
CONCRETE CURBING
LIMIT OF BITUMINOUS
CONCRETE CURBING
BIORETENTION AREA NO. 1 BIORETENTION AREA NO. 2
5 12
NOAA PROPERTY
LINE
C PIER 1L
L
VEHICLE PARKING (8)
1" = 30'SCALE:
SITE PLAN
LIMIT OF CONCRETE
CURBING
27. STEEL BEAM GUIDERAIL TERMINAL END SECTION. REFER RIDOT
STANDARD HIGHWAY DETAIL 34.3.1
28. CONCRETE PAD FOR REDUCED PRESSURE ZONE BACKFLOW
PREVENTER. CONFIRM SIZE WITH FINAL APPROVED HEATED
ENCLOSURE.
29. REFER SHEET S-404 FOR TYPICAL BULKHEAD SECTION (BASE
BID).
30. ELECTRICAL MANHOLE. REFER ELECTRICAL DRAWINGS FOR
DETAILS.
31. PERMANENT TRENCH REPAIR IN BITUMINOUS CONCRETE
PAVEMENT.
32. RESET EXISTING CHAIN LINK FENCE TO ACCOMMODATE GRADE
ADJUSTMENTS ALONG CONCRETE CURBING.
33. CONCRETE EQUIPMENT PAD (2' X 6') . SEE DETAIL D3/C-503.
LIMIT OF BITUMINOUS
CONCRETE CURBING
SEE DRAWING C-506 FOR ENLARGEMENT
DETAILS FOR PLANTINGS
SEE DRAWING C-506 FOR ENLARGEMENT
DETAILS FOR PLANTINGS
LIMIT OF CONCRETE
CURBING
12936607
SEE GENERAL SHEET NOTE 2
SEE GENERAL
SHEET NOTE 2
AM
EN
DM
EN
T
/23
/20
VM
G
AM
EN
DM
EN
T
/26
/20
VM
G
BID OPTION AT
COMPRESSED
AIR ENCLOSURE
AM
EN
DM
EN
T
/29
/20
VM
G
LOW PRESSURE COMPRESSED AIR
(BID OPTION 3)
Cx
Cx
Cx
Cx
Cx
+10.46
+10.68
10.58
C x
Cx
G G
G
G G G G G G G G G G G G G G G G G G
G
G
G G G G G
G
12"Ø C.I.
12"Ø
DD
D
DD
D
D
D
D
D
X X X X X X X
X X X X X
X
XXXXXXXXXXXXXX
X
X X
X X
X X
X
X X X
X X X X X X X
X
X X
X
E
W
T
T
E
X X X X X X X
X
E
E
E
E
W W
W
W W W W W W W W
W
W
S
W W
W
10 9 8 7 6
SD
SS
SS
SS SS
SS SS SS SS SS SS SS
D
D
D
SD
SD
D
SD
SS
SS
D
D
SD
W
W
W
W
C-102
UT
ILI
TY
P
LA
N
- P
IE
R 1 L
AN
DS
ID
E
KPG ASM PJK
PLAN
NORTH
1" = 30' 30' 0 30' 60'
D
EP
AR
TM
EN
T
O F
TH
E
N
AV
Y
A
B
C
D
1 2 3 4 5
1 2 3 4 5
A
B
C
D
SCALE:
CONSTR. CONTR. NO.
SHEET
NAVFAC DRAWING NO.
N
AV
AL
F
AC
IL
IT
IE
S
EN
G
IN
EE
R
IN
G
S
YS
TE
M
S C
O M
M
AN
D
DES DRW
SY
M
D
ES
C R
IP
TI
O N
D
AT
E
AP
PR
DRAWFORM REVISION: 25 AUGUST 2020
CHK
OF
EPROJECT NO.:
PM/DM
BRANCH MANAGER
L
FA
CI
LI
TI
ES
E
NG
IN
EE
RI
NG
S
YS
TE
M
S
CO
M M
AN
D
- M
ID
-A
TL
AN
TI
C
CI
C
OR
E
- H
AM
PT
ON
R
OA
DS
NA
VA
L S
TA
TI
ON
NO
RF
OL
K, V
A
NA
VA
L
ST
AT
IO
N
NE
W
PO
RT
NE
W
PO
RT
, R
I
US
CG
O
CR
H O
M
EP
O
RT
IN
IT
IA
TI
VE
O
PC
P
IE
R
MRI/CWJ
JWJ
Approved by Frank Cole USGC MASI
06 FEB 2026
1. LIMITS OF BITUMINOUS CONCRETE PAVEMENT.
2. 10" Ø DUCTILE IRON WATER PIPE.
3. REDUCED PRESSURE BACKFLOW PREVENTER WITH HEATED
ENCLOSURE. SEE DRAWING M-402 FOR DETAILS.
4. 6" Ø DUCTILE IRON WATER PIPE.
5. CONNECT 10" WATER SERVICE TO EXISTING 12" MAIN USING
12"X10" TAPPING SLEEVE.
6. 10" GATE VALVE, (TYP)
7. 4" Ø DUCTILE IRON SANITARY SEWER FORCE MAIN (SSFM).
8. SANITARY SEWER PUMP STATION ASSEMBLY. SEE SHEET
C-504.
9. 41 LF OF 15" RCP.
10. 4" Ø DUCTILE IRON SANITARY SEWER FORCE MAIN (SSFM).
11. COMPRESSED AIR ENCLOSURE. SEE DRAWING M-401 FOR
DETAILS (BID OTPION 3).
12. 3" DIA. STAINLESS STEEL COMPRESSED AIR LINE (BID
OPTION).
13. 44 LF OF 15" RCP.
14. 36 LF OF 15" PVC SDR 35.
15. 77 LF OF 8" PVC PERFORATED UNDERDRAIN.
16. 78 LF OF 15" PVC SDR 35.
17. 57 LF OF 8" PVC PERFORATED UNDERDRAIN.
18. RESET MANHOLE AND PROVIDE RIDOT STANDARD DETAIL
6.4.1, ROUND AREA FRAME AND GRATE.
TF = 9.80
19. RESET MANHOLE AND PROVIDE RIDOT STANDARD DETAIL
6.4.1, ROUND AREA FRAME AND GRATE.
TF = 9.90
20. EXISTISTING STORM DRAINAGE OUTLET REMAIN. PROTECT IN
PLACE.
21. RESET MANHOLES, TF = MATCH EXIST, PROVIDE RIDOT
STANDARD DETAIL 6.4.1, ROUND AREA FRAME AND GRATE.
22. RESET HYDRODYNAMIC SEPARATOR MANHOLE. TF = 9.30
23. RESET HYDRODYNAMIC SEPARATOR MANHOLE. TF = 9.20
24. 15" RCP INVERT OUT = 1.60.
25. EXISTING BASIN TO BE USED AS HIGH LEVEL BIORETENTION
SYSTEM OVERFLOW. CORE FOR 8" PVC UNDERDRAIN, INV =
5.0.
26. 80 LF OF 8" PVC PERFORATED UNDERDRAIN. INVERT = 3.5.
27. 15KV SWITCHGEAR STRUCTURE. SEE DRAWING E-502 FOR
DETAILS.
28. CONNECT 4"Ø DUCTILE IRON SSFM TO EXISTING MANHOLE.
29. SET STONE DIAPHRAGM FLUSH WITH ROADWAY FOR ENTIRE
LENGTH OF BIORETENTION AREA.
30. FIRE HYDRANT.
31. RESET EXISTING ELECTRICAL / TELECOM MANHOLE COVERS
FLUSH TO GRADE.
32. SEE DRAWING M-107 FOR CONTINUATION OF PIPE TOWARDS
THE PIER.
33. 3" Ø GRAVITY SANITARY PIPE.
34. ELECTRICAL MANHOLE, SEE ELECTRICAL DRAWINGS FOR
DETAILS, TYP.
35. DRAINAGE MANHOLE DMH 1.
36. DRAINAGE MANHOLE DMH 2.
37. ROUND CATCH BASIN CB 1 (RIDOT STANDARD DETAIL 6.4.0,
ROUND FRAME AND GRATE AND 4.4.0 ROUND CATCH BASIN).
38. ROUND CATCH BASIN CB 2 (RIDOT STANDARD DETAIL 6.4.0,
ROUND FRAME AND GRATE AND 4.4.0 ROUND CATCH BASIN).
39. 10" x 6" DUCTILE IRON TEE. PROVIDE 6" GATE VALVE FOR
FIRE HYDRANT SERVICE LINE.
40. ELECTRICAL DUCT BANK, SEE ELECTRICAL DRAWINGS FOR
ADDITIONAL ROUTING AND DETAILS, TYP.
41. AIR RELEASE MANHOLE. TF = 10.00
42. CONCRETE EQUIPMENT PAD (2' X 6') . SEE DETAIL D3/C-503.
WORK KEYNOTES: GENERAL SHEET NOTES:
DRAINAGE STRUCTURES
STRUCTURE ID NORTHING EASTING RIM INVERTS
DMH 1 161790.47' 379463.95' 9.50 2.00 (E,W), 2.27 (SE)
DMH 2 161772.25' 379499.99' 9.10 2.67 (SE, NE, NW)
CB 1 (4-FT DIAM.) 161729.92 379571.50 7.75 3.5 (N,S,NW)
CB 2 (4-FT DIAM.) 161803.24 379536.82 7.75 4.0 (S)
PIER 1
100-YR FLOODPLAIN
ZONE AE ELEV. 14.0
10.0
10.0
10.010.0 10.0
9.90
10.0
1. DISTURBED AREAS WITHIN THE SITE MUST BE RECAPPED WITH
APPROVED ENGINEERED CONTROLS (I.E. 6 INCHES OF A CLEAN SOIL
ENCAPSULATION AND COVER SYSTEM, 2 INCHES OF ASPHALT, OR
CONCRETE) IN ACCORDANCE WITH THE EPA RECORD OF DECISION
FOR SITE 19 - ON-SHORE DERECKTOR SHIPYARD OPERABLE UNIT 12,
SEPTEMBER 2014, AND IN ACCORDANCE WITH CONTRACT
DOCUMENTS.
2. SEE ELECTRICAL SITE WORK SHEETS E-108, E-109, E-110, AND E-111
FOR SITE IMPROVEMENTS OUTSIDE THE WORK LIMITS DETAILED ON
C-101 AND C-102.
3. SEE WORK KEYNOTES FOR SPECIFIC ITEMS INCLUDED AS BID
OPTIONS. ALL WORK NOT IDENTIFIED AS BID OPTIONS MUST BE
CONSIDERED PART OF THE BASE BID.
5.
NOAA PROPERTY
LINE
C PIER 1L
BEGIN C PIER 1
N = 162084.18' E = 379346.68'
L
0+00.00
0+83.09
1+22.66
1+68.80
3+67.73
20.5 20.5
20.5 20.5
1" = 30'SCALE:
UTILITY PLAN - PIER 1 LANDSIDE
EXIST. EEL GRASS BED
12936608
SEE GENERAL SHEET NOTE 2
SEE GENERAL
SHEET NOTE 2
EXISTING SHEET
PILING (TYP.)
10.1
10.1
AM
EN
DM
EN
T
/23
/20
VM
G
AM
EN
DM
EN
T
/15
/20
VM
G
AM
EN
DM
EN
T
/01
/20
VM
G
AM
EN
DM
EN
T
/29
/20
VM
1. FIELD VERIFY ALL DIMENSIONS, LOCATIONS AND ELEVATIONS SHOWN ON CONTRACT DRAWINGS FOR EXISTING STRUCTURES. ALL DISCREPANCIES MUST BE BROUGHT TO THE ATTENTION OF THE
CONTRACTING OFFICER BEFORE PROCEEDING WITH THE WORK.
2. THE SIZES AND LOCATIONS OF EQUIPMENT PADS AND PEDESTALS, AS WELL AS EQUIPMENT-
RELATED FLOOR AND WALL OPENINGS, ARE DEPENDENT ON THE ACTUAL EQUIPMENT
FURNISHED. VERIFY AND COORDINATE ALL SUCH ITEMS. DIMENSIONS INDICATED ON THESE
DRAWINGS MUST NOT BE ALTERED WITHOUT APPROVAL OF THE CONTRACTING OFFICER.
STRUCTURAL DRAWINGS MAY NOT SHOW ALL EQUIPMENT PADS AND OTHER EQUIPMENT
SUPPORTS REQUIRED. REFER TO CIVIL, MECHANICAL AND ELECTRICAL DRAWINGS.
3. FOR NOTES PERTAINING TO INDIVIDUAL STRUCTURES, SEE DRAWINGS FOR THOSE STRUCTURES.
4. COORDINATE ALL ACTIVITIES, INCLUDING THOSE OF SUBCONTRACTORS, WITH THE
GOVERNMENT'S ACTIVITIES.
5. FIELD VERIFY ALL DIMENSIONS, ELEVATIONS, LOCATIONS AND DIMENSIONS OF UTILITIES AND
INTERFACE TO EXISTING PIER PRIOR TO DEMOLITION, MATERIAL FABRICATION AND FIELD
CONSTRUCTION.
6. COORDINATE CONCRETE PLACEMENT WITH MECHANICAL, ELECTRICAL AND FIRE PROTECTION.
STRUCTURAL GENERAL NOTES
STRUCTURAL CONCRETE NOTES
1. PROVIDE CONCRETE AS FOLLOWS:
A. PIER STRUCTURE (INCLUDING MANHOLES) - MARINE CONCRETE WITH A MINIMUM
COMPRESSIVE STRENGTH OF 5,000 PSI AT 28 DAYS. ALL OTHER STRUCTURES TO BE NORMAL
CONCRETE WITH MINIMUM COMPRESSIVE STRENGTH OF 5,000 PSI AT 28 DAYS.
2. DETAIL AND CONSTRUCT REINFORCED CONCRETE IN ACCORDANCE WITH AMERICAN CONCRETE
INSTITUTE ACI SPEC-301-20, "SPECIFICATION FOR STRUCTURAL CONCRETE".
3. DETAIL REINFORCING STEEL IN ACCORDANCE WITH AMERICAN CONCRETE INSTITUTE ACI 315R-18, "GUIDE TO PRESENTING REINFORCING STEEL DESIGN DETAILS," AND ACI SP-66, "ACI DETAILING
MANUAL".
4. PROVIDE REINFORCEMENT CONFORMING TO ASTM A767, GRADE 60. GALVANIZED REINFORCING
STEEL MUST BE USED, UNLESS NOTED OTHERWISE.
5. UNLESS NOTED OTHERWISE ON THE DRAWINGS, THE CONCRETE COVER FOR REINFORCEMENT
MUST BE AS FOLLOWS:
A. BOTTOM BARS IN FOOTINGS AND IN SLABS ON EARTH OR GRAVEL: 3".
B. BEAMS, SLABS, COLUMNS AND WALLS, EXPOSED TO GROUND, WEATHER MOISTURE, AND
MARINE ENVIRONMENT, AFTER REMOVAL OF FORMS: 3".
7. SUBMIT REINFORCING STEEL DETAILS (SHOP DRAWINGS) AND RECEIVE APPROVAL FROM THE
CONTRACTING OFFICER BEFORE PROCEEDING WITH FABRICATION.
8. CHAMFER ALL EXPOSED CONCRETE EDGES 3/4", UNLESS NOTED OTHERWISE.
9. POUR CONCRETE SLABS AND WALLS BETWEEN INDICATED JOINTS, ALLOWING A MINIMUM
ELAPSED PERIOD OF 3 DAYS BETWEEN ADJACENT POURS.
10. PROVIDE JOINTS AS DETAILED AND SPECIFIED. NO ADDITIONAL JOINTS MUST BE USED NOR ANY
OMITTED EXCEPT BY WRITTEN AUTHORIZATION FROM THE CONTRACTING OFFICER. APPROVED
ADDITIONAL JOINTS MUST NOT RESULT IN ADDITIONAL EXPENSE TO THE GOVERNMENT.
11. PROVIDE SWELLABLE WATERSTOPS AS SHOWN ON THE DRAWINGS. WHERE NOT SHOWN,
CONTINUOUS PVC WATERSTOPS MUST BE USED.
12. SIZE AND LOCATE ANCHOR BOLTS AND EQUIPMENT PADS OR PEDESTALS TO SUIT EQUIPMENT
FURNISHED.
13. REVIEW ALL DRAWINGS FROM OTHER DISCIPLINES AND COORDINATE ALL OPENINGS AND
EMBEDDED ITEMS, SUCH AS SLEEVES, ANCHORS, CONDUITS, ETC., WHICH WILL BE
INCORPORATED INTO CONCRETE WORK.
14. ROUGHEN SURFACE OF ALL HORIZONTAL CONSTRUCTION JOINTS IN BEAMS AND PILE CAPS TO
APPROXIMATELY 1/4" FULL AMPLITUDE UNLESS NOTED OTHERWISE.
15. PROVIDE WELDED WIRE FABRIC CONFORMING TO ASTM A185. ALL WELDED WIRE FABRIC MUST
BE GALVANIZED AND IN CONFORMANCE WITH ASTM A106.
16. FOR REINFORCEMENT TO REMAIN WITHIN DEMOLITION LIMIT REMOVE AND DISPOSE ALL
CONCRETE FROM REINFORCING. PER ACI 301, WHEN CONCRETE IS PLACED, ALL REINFORCEMENT
MUST BE FREE OF MATERIALS DELETERIOUS TO BOND.
18. ALL REINFORCING STEEL MUST BE CONTINUOUS OR LAP SPLICED WITH LENGTH AS SHOWN
ON S-004 UNLESS NOTED OTHERWISE. ALL LAP SPLICES AT THE SAME LOCATION ARE REQUIRED
TO BE STAGGERED OUT 5'-0" FROM EACH OTHER AS MINIMUM FOR MORE THAN FIFTY PERCENT
(50%) OF TOTAL REINFORCEMENT AT THIS LOCATION.
19. PROVIDE WELDS OR MECHANICAL COUPLER TO ENSURE REINFORCEMENT CONTINUITY WHEN
REINFORCEMENT RETENTION IS NOT PRACTICAL OR INADVERTENT DAMAGE OCCURS TO EXISTING
REINFORCEMENT DURING CONSTRUCTION. REMOVAL AND RESTORATION (COLD-APPLIED) OF
REINFORCEMENT GALVANIZING ARE REQUIRED BEFORE AND AFTER WELDING.
20. PROVIDE HEADED REINFORCEMENT IN ACCORDANCE WITH ASTM A970, GRADE 60. HEADED
REINFORCEMENT TO BE GALVANIZED IN ACCORDANCE WITH ASTM A767.
STRUCTURAL STEEL NOTES
1. FABRICATE AND ERECT STRUCTURAL STEEL CONFORMING TO THE REQUIREMENTS OF
AMERICAN INSTITUTE OF STEEL CONSTRUCTION (AISC), "STEEL CONSTRUCTION MANUAL".
2. SUBMIT ERECTION PLANS AND SHOP DETAILS AND RECEIVE APPROVAL FROM THE
CONTRACTING OFFICER BEFORE PROCEEDING WITH FABRICATION.
3. PROVIDE STRUCTURAL STEEL WIDE-FLANGE SHAPES CONFORMING TO ASTM A992; H-PILES
CONFORMING TO ASTM A573 HSS MEMBERS CONFORMING TO ASTM A500; CHANNELS, PLATES,
AND ANGLES CONFORMING TO ASTM A36; AND THREADED RODS CONFORMING TO ASTM A36.
4. PROVIDE HOT-DIP GALVANIZED ANCHOR BOLTS CONFORMING TO ASTM F1554.
5. PROVIDE BOLTS CONFORMING TO ASTM A306, NUTS CONFORMING TO ASTM A563, AND
WASHERS CONFORMING TO ASTM F436. BOLTS, NUTS AND WASHERS ARE HOT-DIP GALVANIZED.
6. WELD IN COMPLIANCE WITH AMERICAN WELDING SOCIETY AWS D1.5 "BRIDGE WELDING CODE" FOR WELDS USED TO FABRICATE STEEL PIPE PILES, AND AWS D1.1, "STRUCTURAL WELDING CODE -
STEEL" FOR WELDS USED FOR ALL OTHER STEEL WORKS.
7. WELD ALL SHOP CONNECTIONS WITH CLASS E70XX ELECTRODES. PROVIDE FIELD
CONNECTIONS WITH HIGH STRENGTH BOLTED CONNECTIONS UNLESS NOTED OTHERWISE.
8. CONNECTIONS NOT INDICATED MUST BE DESIGNED BY THE FABRICATOR AND RECEIVE
APPROVAL FROM THE CONTRACTING OFFICER.
9. MILL BOTTOM OF ALL COLUMNS AND FINISH TOP OF ALL BASE PLATES IN ACCORDANCE WITH AISC
SPECIFICATIONS. WELD BASE PLATES TO BOTTOM OF COLUMNS.
10. ALL STRUCTURAL STEEL MUST BE HOT-DIP GALVANIZED, UNLESS NOTED OTHERWISE.
11. STRUCTURAL STEEL TO BE USED IN BULKHEAD IS EXCLUDED FROM THIS SECTION.
CODES AND STANDARDS
1. AMERICAN INSTITUTE OF STEEL CONSTRUCTION (AISC) "STEEL CONSTRUCTION MANUAL", SIXTEENTH EDITION, 2022.
2. AMERICAN INSTITUTE OF STEEL CONSTRUCTION (AISC), "SEISMIC DESIGN MANUAL", FOURTH EDITION, 2024.
3. AMERICAN INSTITUTE OF STEEL CONSTRUCTION (AISC), " SPECIFICATION FOR STRUCTURAL STAINLESS STEEL
BUILDINGS (ANSI/AISC 370-21)", 2021.
4. AMERICAN CONCRETE INSTITUTE ACI-318, "BUILDING CODE REQUIREMENTS FOR REINFORCED CONCRETE", 2019.
5. AMERICAN CONCRETE INSTITUTE ACI 301, "SPECIFICATIONS FOR CONCRETE CONSTRUCTION", 2020.
6. AMERICAN SOCIETY OF CIVIL ENGINEERS, "SEISMIC DESIGN OF PIERS AND WHARVES", ASCE/CORPI 61-14, 2014.
7. ALUMINUM ASSOCIATION, "ALUMINUM DESIGN MANUAL", 2020.
8. AMERICAN SOCIETY OF CIVIL ENGINEERS, ASCE 7, "MINIMUM DESIGN LOADS FOR BUILDING AND OTHER STRUCTURES", 2022.
9. AMERICAN ASSOCIATION OF STATE HIGHWAY AND TRANSPORTATION OFFICIALS (AASHTO), "LRFD BRIDGE DESIGN
SPECIFICATIONS", 9TH EDITION, 2024.
10. CALIFORNIA STATE LANDS COMMISSION MARINE FACILITIES DIVISION, "MARINE OIL TERMINAL ENGINEERING AND
MAINTENANCE STANDARDS", 2012.
11. FEMA 302, "NEHRP RECOMMENDED PROVISIONS FOR SEISMIC REGULATIONS FOR NEW BUILDINGS AND OTHER
STRUCTURES", 2020.
12. INTERNATIONAL BUILDING CODE (IBC), 2024.
13. UFC 1-200-01, "DoD BUILDING CODE" WITH CHANGE 3, 2024
14. UFC 4-151-10, "GENERAL CRITERIA FOR WATERFRONT CONSTRUCTION", WITH CHANGE 1, 2024.
15. UFC 4-152-01, "DESIGN: PIERS AND WHARVES", WITH CHANGE 1, 2024.
16. UFC 4-159-03, "MOORINGS", 2020.
17. UFC 3-301-01, "STRUCTURAL ENGINEERING", WITH CHANGE 3, 2025.
18. USCG CSTO, SILC-CSTO-36-11 31 21-02, CUTTER MOORINGS, JAN, 2025.
ALUMINUM STRUCTURAL NOTES
1. FABRICATE ALL STRUCTURAL ALUMINUM IN ACCORDANCE WITH THE SPECIFICATIONS OF THE ALUMINUM ASSOCIATION.
2. PROVIDE ALLOY 6061-T6 STRUCTURAL ALUMINUM.
3. COAT ALL ALUMINUM IN CONTACT WITH CONCRETE AND OTHER DISSIMILAR METALS WITH BITUMINOUS PAINT ON THE
CONTACT SURFACE.
4. USE STAINLESS STEEL CONNECTION BOLTS FOR CONNECTING ALUMINUM MEMBERS.
5. ALL EDGES AND OPENINGS IN GRATING MUST BE BANDED.
FOUNDATION NOTES - STEEL PIPE PILES
1. INSTALL STEEL PIPE PILES IN ACCORDANCE WITH THE PLANS AND SPECIFICATIONS. FOR ADDITIONAL STEEL PIPE PILE REQUIREMENTS, AS WELL AS REQUIREMENTS FOR THE PROJECT TEST PILE PROGRAM, REFER TO SPECIFICATION SECTION 31 62 16.13 “STEEL PIPE PILES.” NOTE THAT THE TEST PILE PROGRAM CONSISTS OF DYNAMIC PILE ANALYSIS (PDA) TESTS AT LOCATIONS AS INDICATED ON THE PILE PLANS. ALL PDA TEST LOCATIONS INDICATED ON THE PILE PLANS AND SCHEDULES MUST BE PERFORMED TO VERIFY PILE CAPACITIES AND DRIVABILITY. PDA TEST PILES MUST BE DRIVEN PRIOR TO DRIVING PRODUCTION PILES. LOCATION OF TEST PILES MAY BE ADJUSTED SLIGHTLY WITH CONTRACTING OFFICER APPROVAL.
DRIVE TEST PILES TO INDICATED TIP ELEVATION AND CAPACITY.
2. FOUNDATION TYPE AND LOCATIONS ARE SHOWN ON THE PILE PLANS (DRAWINGS S-103 THROUGH S-109).
3. UNLESS NOTED OTHERWISE, BENTS 1 THROUGH 43 AT PIER 1 MUST BE SUPPORTED BY 36"Ø X 3/4" WALL THICKNESS DRIVEN STEEL PIPE PILES. STEEL PIPE PILES MUST CONFORM TO THE REQUIREMENTS OF ASTM A252, GRADE 3 (MODIFIED TO 50 KSI MINIMUM YIELD STRENGTH). ALL DRIVEN STEEL PIPE PILES MUST BE EQUIPPED WITH AN OUTSIDE-FIT CAST STEEL DRIVING SHOE OR PILE POINT CONFORMING TO THE REQUIREMENTS OF ASTM A27, GRADE 90/60. FOR TYPICAL STEEL PIPE PILE DETAILS, SEE DRAWINGS S-502
AND S-503.
4. STEEL PIPE PILES MUST BE DRIVEN TO THE MINIMUM TIP ELEVATIONS AND ALLOWABLE BEARING CAPACITIES INDICATED ON THE PLANS, USING AN APPROVED HAMMER, WITH A CAPACITY AT LEAST EQUAL TO THE HAMMER MANUFACTURER'S RECOMMENDATIONS FOR THE TOTAL WEIGHT OF PILE AND THE
CHARACTER OF THE SUBSURFACE MATERIAL TO BE ENCOUNTERED.
5. PILE TIP ELEVATIONS ARE PROVIDED IN DRAWING S-601.
6. PILE SERVICE (ALLOWABLE) CAPACITIES:
6.1. 36” Ø CONCRETE-FILLED STEEL PIPE PILE CAPACITY…………….….285 TONS (COMPRESSION)
0 TONS (TENSION)
7. PILE FACTORED (ULTIMATE) CAPACITIES:
7.1. 36” Ø CONCRETE-FILLED STEEL PIPE PILE CAPACITY…………….…..641 TONS (COMPRESSION)
0 TONS (TENSION)
8. MINIMUM PILE TIP ELEVATION FOR LATERAL FIXITY FOR 36" PIPE PILES:
8.1 BENTS 1-25: PILE TIP ELEVATIONS PER PILE SCHEDULE (S-601)
8.2 BENTS 26-43: EL. -80
9. SPUDDING AND/OR JETTING OF STEEL PIPE PILES WILL NOT BE ALLOWED.
10. COORDINATE THE STEEL PIPE PILE DRIVING SCHEDULE SO AS NOT TO INTERFERE WITH OR BE
DETRIMENTAL TO ADJACENT CONCRETE PLACEMENT AND CURING OPERATIONS.
STAINLESS STEEL NOTES
1. ALL STAINLESS STEEL MATERIALS MUST CONFORM TO APPLICABLE ASTM STANDARDS AND MUST
BE SUITABLE FOR CONTINUOUS EXPOSURE TO MARINE AND COASTAL ENVIRONMENTS.
2. UNLESS NOTED OTHERWISE, ALL STAINLESS STEEL MUST BE TYPE 316L (UNS S31603).
3. STAINLESS STEEL MUST HAVE A PITTING RESISTANCE EQUIVALENT NUMBER NOT LESS THAN 32.
4. ALL FASTENERS, ANCHORS, BOLTS, NUTS, WASHERS, AND THREADED RODS MUST BE STAINLESS
STEEL OF THE SAME GRADE AS THE PARENT MATERIAL (316/316L MINIMUM).
5. WELDING MUST BE PERFORMED IN ACCORDANCE WITH AWS D1.6. WELDERS MUST BE QUALIFIED
FOR STAINLESS STEEL WELDING.
6. FILLER METALS MUST BE LOW-CARBON, CORROSION-RESISTANT GRADES COMPATIBLE WITH BASE
METAL: ER316L/E316L FOR 316/316L BASE METAL.
7. NO CARBON STEEL OR DISSIMILAR FILLER METALS ARE PERMITTED.
8. ALL WELDING, GRINDING, CUTTING, AND FABRICATION TOOLS MUST BE DEDICATED STAINLESS
STEEL TOOLS ONLY AND MUST NOT BE PREVIOUSLY USED ON CARBON STEEL.
9. STAINLESS STEEL MUST BE PROTECTED FROM CONTACT WITH CARBON STEEL DURING
FABRICATION, STORAGE, AND INSTALLATION TO PREVENT IRON CONTAMINATION AND SURFACE
CORROSION.
10. ALL WELDS AND HEAT-AFFECTED ZONES MUST BE PICKLED AND PASSIVATED AFTER FABRICATION
IN ACCORDANCE WITH ASTM A380 AND ASTM A967.
11. MECHANICAL CLEANING ALONE (WIRE BRUSHING OR GRINDING) IS NOT SUFFICIENT; CHEMICAL
PASSIVATION IS MANDATORY FOR ALL MARINE-EXPOSED STAINLESS STEEL.
12. ALL FREE IRON MUST BE REMOVED FROM STAINLESS STEEL SURFACES PRIOR TO INSTALLATION.
13. SURFACE FINISH MUST BE:
13.1 MINIMUM NO. 2B FINISH FOR PLATES AND SHEETS.
13.2 SMOOTH MILL FINISH FOR BARS AND SHAPES.
13.3 NO ROUGH OR CREVICE-FORMING FINISHES PERMITTED IN SPLASH OR TIDAL ZONES.
14. STAINLESS STEEL MUST NOT BE IN DIRECT CONTACT WITH DISSIMILAR METALS (CARBON STEEL, ALUMINUM, COPPER ALLOYS) UNLESS ELECTRICALLY ISOLATED USING NEOPRENE, PTFE, HDPE, OR
EQUIVALENT NON-CONDUCTIVE MATERIALS.
15. STAINLESS STEEL MUST NOT BE PAINTED OR COATED UNLESS SPECIFICALLY SHOWN ON THE
DRAWINGS.
16. CHLORIDE-CONTAINING CLEANERS, BLEACH, OR ACIDIC CHEMICALS MUST NOT BE USED FOR
CLEANING STAINLESS STEEL.
17. ALL STAINLESS STEEL MUST BE DELIVERED WITH PROTECTIVE WRAPPING AND STORED OFF THE
GROUND, COVERED, AND PROTECTED FROM SALT SPRAY PRIOR TO INSTALLATION.
18. ANY DAMAGED, SCRATCHED, HEAT-TINTED, OR CONTAMINATED SURFACES MUST BE RE-GROUND, PICKLED, AND PASSIVATED PRIOR TO ACCEPTANCE.
19. SUBSTITUTIONS SUCH AS 2205 DUPLEX OR SUPER-AUSTENITIC STAINLESS STEELS (SUCH AS 904L, 254 SMO) MUST REQUIRE CONTRACTING OFFICER APPROVAL.
21. FINAL ACCEPTANCE MUST BE SUBJECT TO VISUAL INSPECTION FOR SURFACE CONTAMINATION, PITTING, RUST STAINING, OR FABRICATION DEFECTS.
SATISFACTORY TO DATE
APPROVED
ACTIVITY
FOR COMMANDER NAVFAC
SEAL
A/E INFO
A
B
C
D
1 2 3 4 5
1 2 3 4 5
A
B
C
D
SCALE:
CONSTR. CONTR. NO.
SHEET
NAVFAC DRAWING NO.
DES DRW CHK
OF
EPROJECT NO.:
D E
P A
R T
M E
N T
O F
T H
E N
A V
Y N
A V
A L
F A
C
IL
IT
IE
S E
N G
IN
E
E R
IN
G
S Y
S T
E M
S C
O M
M A
N D
DRAWFORM REVISION: 25 AUGUST 2020
PM/DM
BRANCH MANAGER
CHIEF ENG/ARCH
FIRE PROTECTION
N A
V A
L
FA
C
IL
IT
IE
S E
N G
IN
E
E R
IN
G
S Y
S
TE
M S
C O
M M
A N
D
M
ID
-A
TL
A N
TI
C
N A
V A
L S
T A
T
IO
N
N O
R F
O L K
V
A
AS NOTED
S Y
M D
E S
C R
IP
T
IO
N
D A
T E
A P
P R
/2
/2
:1 :5
P
M
A u to d e s k D o c s /2
U
S C
G O
C R
H o m e p o rt
In iti a tiv e O
P C
P ie r_
/P
IE
R
U S
C G
-1 -S
.r v t
S-002
U S
C G
O C
R H
O M
E P
O R
T
IN
IT
IA
TI
V
E O
P C
P
IE
R
S
TR
U C
TU
R
A L
G E
N E
R A
L N
O
TE
S
S H
E E
T
O F
MJF
12936620
JZ AEP
Frank Cole USCG MASI
MRI/CWJ
1826479
N E
W P
O R
T, R
I N
A V
A L
S T
A T
IO
N
N E
W P
O R
T
JWJ
NEK
HPN
C I
C O
R E
H
A M
P T
O N
R O
A D
S
S -0
06 FEB 2026
A
M E
N D
M E
N T
/0
1/
V
M G
A
M E
N D
M E
N T
/1
5/
V
M G
A
M E
N D
M E
N T
/2
4/
V
M G
FOUNDATION NOTES - FENDER PILES
1. FENDER PILE TIP ELEVATION IS LOCATED AT ON DRAWING S-602.
2. FENDER PILES SERVICE (ALLOWABLE) CAPACITY: 5.6 TONS (COMPRESSION), 0 TONS (TENSION)
3. FENDER PILES FACTORED (ULTIMATE) CAPACITY: 12.5 TONS (COMPRESSION), 0 TONS (TENSION)
4. MINIMUM PILE TIP FOR LATERAL FIXITY FOR FENDER PILES:
4.1 BENT 6-22 : PILE TIP ELEVATIONS PER PILE SCHEDULE (S-602)
4.2 BENT 6-43: EL. -61
5. THE CONTRACTOR SHALL ANTICIPATE REQUIRING TO PRE-DRILL FENDER PILES
BETWEEN BENT 6 AND 22.
1. FLOATING TURBIDITY CURTAIN MUST BE UTILIZED AT ALL PILE DRIVING, PILE EXTRACTION, DRILLING, AND DREDGING ACTIVITIES. DREDGING ACTIVITIES WILL BE LIMITED TO THE TIME OF
YEAR PERIOD AS DICTATED IN PROJECT PERMITS. TURBIDITY MONITORING IS REQUIRED
DURING PILE DRIVING, PILE EXTRACTION, AND DRILLING ACTIVITIES OUTSIDE OF THE
DREDGING TIME OF YEAR PERIOD.
2. THE FOLLOWING MITIGATION MEASURES MUST BE IMPLEMENTED DURING ALL PILE DRIVING, PILE EXTRACTION, AND DRILLING ACTIVITIES TO MINIMIZE MARINE MAMMAL EXPOSURE TO
LEVEL A INJURIOUS NOISE LEVELS GENERATED AND TO REDUCE TO THE LOWEST EXTENT
PRACTICABLE EXPOSURE TO LEVEL B NOISE LEVELS. FOR ADDITIONAL ENVIRONMENTAL
REQUIREMENTS ASSOCIATED WITH THIS WORK, REFER TO SPECIFICATION SECTION 01 35 40.00
25 “MARINE MAMMAL PROTECTION.”
3. TIME RESTRICTION: IN-WATER CONSTRUCTION AND DEMOLITION WORK WILL OCCUR ONLY
DURING DAYLIGHT HOURS.
4. ESTABLISHMENT OF MONITORING AND SHUTDOWN ZONES:
4.1. FOR ALL RELEVANT IN-WATER CONSTRUCTION AND DEMOLITION ACTIVITIES, DESIGNATE
A LEVEL A ACOUSTIC HARASSMENT MONITORING ZONE, A LEVEL B BEHAVIORAL
HARASSMENT MONITORING ZONE, AND PHYSICAL INJURY SHUTDOWN ZONE, WITH
RADIAL DISTANCES AS IDENTIFIED IN SPECIFICATION SECTION 01 35 40.00 25 “MARINE
MAMMAL PROTECTION.”
4.2. DURING ALL IN-WATER CONSTRUCTION AND DEMOLITION ACTIVITIES, A 33-FT PHYSICAL
SHUTDOWN ZONE AROUND EACH ACTIVE PILE WILL BE IMPLEMENTED TO PROTECT
ANIMALS FROM PHYSICAL INJURY. FOR SOME SOUND-GENERATING ACTIVITIES, THE
POTENTIAL FOR LEVEL A HARASSMENT BY ACOUSTIC INJURY IS LESS THAN 33 FT. FOR
THESE ACTIVITIES, THE 33-FT PHYSICAL INJURY SHUTDOWN ZONE AUTOMATICALLY
REDUCES THE POTENTIAL FOR LEVEL A ACOUSTIC HARASSMENT. THE MAXIMUM
DISTANCES FOR LEVEL A AND LEVEL B HARASSMENT FOR HARBOR SEALS AND GRAY
SEALS FROM PROJECT-RELATED ACTIVITIES ARE PROVIDED IN SPECIFICATION SECTION
01 35 40.00 25 “MARINE MAMMAL PROTECTION” (NOTE THAT THE MAXIMUM DISTANCE MAY
BE REACHED IN ONLY ONE DIRECTION, DEPENDING ON THE SHAPE OF THE ZONE OF
INTEREST AND INTERSECTING LANDMASSES).
4.3. PILE DRIVING MUST ONLY TAKE PLACE WHEN THE 33-FT PHYSICAL INJURY SHUTDOWN
AND LEVEL A ACOUSTIC HARASSMENT ZONES ARE VISIBLE AND CAN BE ADEQUATELY
MONITORED. IF CONDITIONS PREVENT THE VISUAL DETECTION OF MARINE MAMMALS,
ACTIVITIES WITH THE POTENTIAL TO RESULT IN LEVEL A HARASSMENT MUST NOT BE
INITIATED. IF SUCH CONDITIONS ARISE AFTER THE ACTIVITY HAS BEGUN, PILE DRIVING
OR PILE EXTRACTION ACTIVITIES MUST BE HALTED IF THE 33-FT SHUTDOWN ZONE IS NOT
VISIBLE.
5. SHUTDOWN MEASURES:
5.1. THREE PROTECTED SPECIES OBSERVERS (PSO) WILL BE DEPLOYED TO MONITOR FOR
SEALS. ONE PSO MUST BE LOCATED ON LAND AND TWO MUST BE LOCATED IN A BOAT
TO MONITOR OFFSHORE LOCATIONS. FOR THOSE MONITORING AREAS THAT ARE LARGE,
VESSEL-BASED OBSERVERS WILL MOVE NORTH AND SOUTH (BACK AND FORTH) TO
CAPTURE ALL AREAS DURING IN-WATER PILE DRIVING, PILE EXTRACTION, AND DRILLING
ACTIVITIES.
5.2. MONITORING MUST TAKE PLACE FROM 15 MINUTES PRIOR TO INITIATION OF PILE DRIVING
OR PILE EXTRACTION ACTIVITIES THROUGH 30 MINUTES POST-COMPLETION OF PILE
DRIVING OR PILE EXTRACTION ACTIVITIES. PILE DRIVING OR PILE EXTRACTION MAY
COMMENCE WHEN OBSERVERS HAVE DECLARED THE SHUTDOWN ZONE CLEAR OF
MARINE MAMMALS PRIOR TO INITIATION OF PILE INSTALLATION OR REMOVAL. IN THE
EVENT OF A DELAY OR SHUTDOWN OF ACTIVITY RESULTING FROM MARINE MAMMALS IN
THE SHUTDOWN ZONE, ANIMALS MUST BE ALLOWED TO REMAIN IN THE SHUTDOWN
ZONE AND THEIR BEHAVIOR MUST BE MONITORED AND DOCUMENTED. MONITORING
MUST OCCUR THROUGHOUT THE TIME REQUIRED TO DRIVE OR REMOVE A PILE. A
DETERMINATION THAT THE SHUTDOWN ZONE IS CLEAR MUST BE MADE DURING A
PERIOD OF GOOD VISIBILITY.
5.3. IF A MARINE MAMMAL APPROACHES OR ENTERS THE SHUTDOWN ZONE, OR IF A MARINE
MAMMAL OTHER THAN A HARBOR SEAL OR GRAY SEAL ENTERS THE LEVEL B
HARASSMENT ZONE, OR IF THE TAKE OF A MARINE MAMMAL SPECIES OR STOCK HAS
REACHED THE LIMITS INDICATED IN SPECIFICATION SECTION 01 35 40.00 25 “MARINE
MAMMAL PROTECTION” AND ENTERS THE LEVEL B HARASSMENT ZONE, ALL PILE DRIVING
OR PILE EXTRACTION ACTIVITIES AT THAT LOCATION MUST BE HALTED. IF NONE OF THE
TAKE NUMBERS HAVE BEEN EXCEEDED, PILE DRIVING OR PILE EXTRACTION MAY
COMMENCE OR RESUME WHEN EITHER THE ANIMAL HAS VOLUNTARILY LEFT THE
SHUTDOWN ZONE, AND BEEN VISUALLY CONFIRMED BEYOND THE SHUTDOWN ZONE, OR
15 MINUTES HAVE PASSED WITHOUT RE-DETECTION OF THE ANIMAL.
6. SOFT START (IMPACT PILE DRIVING ONLY):
6.1. AN INITIAL SET OF THREE STRIKES FROM THE IMPACT HAMMER AT A REDUCED ENERGY
LEVEL (40 PERCENT OF FULL POWER), SEPARATED BY A 1-MINUTE WAITING PERIOD,
THEN TWO SUBSEQUENT THREE STRIKE SETS WILL BE IMPLEMENTED. PILE DRIVING
MAY COMMENCE AT FULL POWER ON THE FOURTH STRIKE.
6.2. SOFT START IS REQUIRED FOR ANY IMPACT PILE DRIVING, INCLUDING AT THE BEGINNING
OF THE DAY, AND AT ANY TIME FOLLOWING CESSATION OF IMPACT PILE DRIVING OF 30
MINUTES OR LONGER.
FOUNDATION NOTES - ENVIRONMENTAL REQUIREMENTS
FOUNDATION NOTES AT-GRADE STRUCTURES
1. AT-GRADE FOUNDATIONS MUST BE DESIGNED AND CONSTRUCTED IN ACCORDANCE WITH APPLICABLE SECTIONS OF
THE RHODE ISLAND STATE BUILDING CODE, UNIFIED FACILITIES CRITERIA (UFC) AND RECOMMENDATIONS BELOW.
2. SPREAD FOOTINGS MUST BE FOUNDED ON UNDISTURBED GLACIOFLUVIAL DEPOSITS; OR, IF EXISTING FILL IS ENCOUNTERED AT THE DESIGN BEARING ELEVATION, ON GRANULAR FILL PLACED FOLLOWING REMOVAL OF THE EXISTING FILL TO THE TOP OF THE UNDISTURBED GLACIOFLUVIAL DEPOSITS. EXISTING FILL IS NOT SUITABLE FOR
FOUNDATION SUPPORT.
3. FOOTINGS MUST BE SIZED USING AN ALLOWABLE BEARING PRESSURE OF 3.0 KSF (CONTRACTOR TO VERIFY IN THE FIELD UPON INVESTIGATION). THE ALLOWABLE BEARING PRESSURE MAY BE INCREASED BY 1/3 FOR TRANSIENT
LOADING CONDITIONS.
4. FOR FOOTINGS LESS THAN 3 FT IN LEAST LATERAL DIM, DESIGN FOR AN ALLOWABLE BEARING PRESSURE IN KSF EQUAL
TO B, WHERE B EQUALS THE FOOTING WIDTH IN FEET.
5. MINIMUM FOOTING WIDTH IS 18”.
6. IF UNSUITABLE SOILS, SUCH AS EXISTING FILL, ARE ENCOUNTERED AT THE FOOTING BEARING ELEVATION, EITHER:
6.1. LOWER THE FOOTING TO THE SUITABLE BEARING MATERIAL, OR
6.2. MAINTAIN THE FOOTING AT THE DESIGN BEARING ELEVATION AND REPLACE UNSUITABLE MATERIALS WITHIN THE
ZONE OF INFLUENCE (ZOI) WITH GRANULAR FILL.
7. FOOTINGS MUST BEAR A MINIMUM OF 3.5 FT BELOW PROPOSED GRADES EXPOSED TO FREEZING TEMPERATURES FOR
FROST PROTECTION.
BULKHEAD MATERIALS:
1. STRUCTURAL STEEL:
A. STEEL SHEET PILING: ASTM A690, Fy = 50 KSI, HOT ROLLED.
B. WIDE FLANGE SHAPES, CHANNELS, ANGLE, PLATES, AND TEES: ASTM A36, Fy = 36 KSI.
C. TIE RODS: ASTM A615, Fy = 75 KSI.
D. BOLTS:
a. 3/4" DIA ASTM F3125 GRADE A325, UNLESS NOTED OTHERWISE.
b. FRAMING CONNECTIONS: SNUG TIGHT JOINTS WITH STANDARD HOLES, UNLESS NOTED OTHERWISE.
c. DIRECT TENSION INDICATOR WASHERS: ASTM F959.
d. HOLES MUST BE DRILLED OR REAMED. FLAME CUTTING OF HOLES IN PERMANENT STRUCTURE MUST NOT
BE ALLOWED.
F. WELDING: AWS D1.1 USING E70 ELECTRODE, WITH LOW HYDROGEN AS INDICATED ON PLANS.
2. STEEL WATERFRONT STRUCTURES COATING:
A. SHEET PILE, STEEL WALES, BULKHEAD CAP, MISCELLANEOUS STEEL:
a. COAT WITH EPOXY-POLYAMIDE SYSTEM.
b. SURFACE PREP AND COATING ON STEEL SHEET PILES MUST BE INSTALLED ON BOTH LAND SIDE AND WATER
SIDE TO MINIMUM DEPTH OF 5' BELOW THE PLANNED DREDGE DEPTH.
B. STEEL HARDWARE AND FASTENERS, THREADED TIE RODS:
a. THREADED TIE RODS MUST BE HOT DIP GALVANIZED PER ASTM A153 AND WRAPPED IN PETROLATUM TAPE.
b. ANY COATING DAMAGED DURING INSTALLATION MUST BE TOUCHED UP PRIOR TO BEING WRAPPED IN
PETROLATUM TAPE.
13.3.c. PROBE THE LIMITS OF THE OBSTRUCTION TO DETERMINE IF THE STEEL PIPE PILE CAN
BE PULLED, OFFSET ALONG THE LONGITUDINAL AXIS OF THE CAST-IN-PLACE
CONCRETE BEAM, AND RE-DRIVEN TO THE ESTIMATED PILE TIP ELEVATION AND
REQUIRED ULTIMATE VERTICAL CAPACITY. THE CONTRACTING OFFICER WILL UTILIZE
THE REQUIRED OFFSET INFORMATION TO DETERMINE IF THE BENT CAP, BEAM, AND
PILES CAN ACCOMMODATE RELOCATION TO AVOID THE OBSTRUCTION. NOTE THAT
THIS OPTION WILL REQUIRE MODIFICATIONS TO THE BEAM WIDTH IN ORDER TO FULLY
ENCAPSULATE THE 36"Ø STEEL PIPE PILE WITHIN THE BEAM WHILE MAINTAINING 6”
CLEAR FROM THE EDGE OF PILE TO EDGE OF BEAM. AT THE CONTRACTOR'S OPTION,
THE PILE ENCOUNTERING THE OBSTRUCTION MAY BE ABANDONED IN PLACE AND A
NEW STEEL PIPE PILE INSTALLED AT THE REQUIRED OFFSET LOCATION AT NO
ADDITIONAL COST TO THE GOVERNMENT.
13.3.d. PROBE THE LIMITS OF THE OBSTRUCTION TO DETERMINE IF THE STEEL PIPE PILE CAN
BE PULLED AND RE-DRIVEN AT A SLIGHT BATTER (NOT MORE THAN 1” PER FOOT) TO
AVOID THE OBSTRUCTION. PILES MUST BE BATTERED PERPENDICULAR TO THE
LONGITUDINAL AXIS OF THE BENT CAP AND RE-DRIVEN TO THE ESTIMATED PILE TIP
ELEVATION AND REQUIRED ULTIMATE VERTICAL CAPACITY.
13.3.e. USE A DTH HAMMER TO DRILL THROUGH THE OBSTRUCTION AND ATTEMPT TO RE-
DRIVE THE PILE THROUGH THE OBSTRUCTION TO THE ESTIMATED PILE TIP ELEVATION
AND REQUIRED ULTIMATE VERTICAL CAPACITY.
13.4. IF THE DRIVEN STEEL PIPE PILE ENCOUNTERS AN OBSTRUCTION ABOVE MINIMUM PILE TIP
ELEVATION FOR LATERAL FIXITY, POSSIBLE CONTRACTOR OPTIONS TO MITIGATE THE
OBSTRUCTION INCLUDE, BUT ARE NOT LIMITED TO:
13.4.a. IF THE OBSTRUCTION IS DETERMINED TO BE RELATIVELY CLOSE TO THE
APPROXIMATE MUDLINE ELEVATION, PULL THE PILE, ATTEMPT TO EXTRACT THE
OBSTRUCTION BY MEANS AND METHODS DETERMINED BY THE CONTRACTOR, AND RE-
DRIVE THE PILE TO THE ESTIMATED PILE TIP ELEVATION AND REQUIRED ULTIMATE
VERTICAL CAPACITY.
FOUNDATION NOTES - STEEL PIPE PILES CONT
11. EPOXY COAT ENTIRE STEEL PIPE PILES IN ACCORDANCE WITH SPECIFICATION SECTION 09 97 02
"PAINTING : HYDRAULIC STRUCTURES." INSTALL ANODES AS SHOWN ON DRAWING E-112.
12. FOR THE PURPOSE OF BIDDING, ANTICIPATE ENCOUNTERING OBSTRUCTIONS (52 TOTAL PILES) DURING DRIVING OF THE STEEL PIPE PILES FOR PIER 1. IF OBSTRUCTIONS ARE ENCOUNTERED DURING PILE
DRIVING:
12.1. NOTIFY THE CONTRACTING OFFICER IMMEDIATELY OF THE DEPTH AND APPARENT SIZE OF THE
OBSTRUCTION.
12.2. OBTAIN APPROVAL OF THE CONTRACTING OFFICER THAT THE CONTRACTOR HAS
ENCOUNTERED AN OBSTRUCTION.
13. FOLLOWING ARE SUGGESTED ALTERNATIVES FOR MITIGATING OBSTRUCTIONS ENCOUNTERED DURING DRIVING OF THE PIER 1 STEEL PIPE PILES. NOTE THAT THE CONTRACTOR MAY ALSO SUBMIT ALTERNATE METHODS FOR MITIGATING OBSTRUCTIONS FOR APPROVAL BY THE CONTRACTING OFFICER. PERSONNEL AND EQUIPMENT REQUIRED TO PERFORM ANY AND ALL OBSTRUCTION MITIGATION MEASURES MUST BE AVAILABLE TO BE ON-SITE WITHIN 72 HOURS OF ENCOUNTERING THE OBSTRUCTION. THE FOLLOWING
ITEMS ARE CONSIDERED AS PART OF CONTRACT AS DESCRIBED IN THE PRICE SCHEDULE:
13.1. IF THE DRIVEN STEEL PIPE PILE REACHES THE ESTIMATED PILE TIP ELEVATION SHOWN ON THE
PROJECT DRAWINGS WHILE ALSO ACHIEVING THE REQUIRED ULTIMATE VERTICAL CAPACITY,
THE PILE WOULD BE CONSIDERED ACCEPTABLE.
13.2. IF THE DRIVEN STEEL PIPE PILE ENCOUNTERS AN OBSTRUCTION BELOW MINIMUM PILE TIP
ELEVATION FOR LATERAL FIXITY, THE CONTRACTING OFFICER MUST BE NOTIFIED TO
DETERMINE IF THE OBSTRUCTION AND PILE TIP IS WITHIN DENSE DEPOSITS/WEATHERED ROCK.
ONCE THE TIP IS CONFIRMED TO BE DENSE DEPOSITS/WEATHERED ROCK IN GLACIAL
DEPOSITS BY THE CONTRACTING OFFICER, THE CONTRACTOR MUST PERFORM PDA TESTING
TO DETERMINE THE ULTIMATE VERTICAL CAPACITY OF THE PILE (USING A CAPWAP ANALYSIS)
AND IF THE PILE WAS DAMAGED DURING INSTALLATION. THE PDA REPORT AND CAPWAP
ANALYSIS MUST BE PROVIDED TO THE CONTRACTING OFFICER WITHIN 72 HOURS OF
CONFIRMATION FROM THE CONTRACTING OFFICER CONFIRMING THE OBSTRUCTION IS
WITHIN DENSE GLACIAL DEPOSITS. RESULTS OF THE CAPWAP ANALYSIS WILL BE COMPARED
VERSUS THE REQUIRED ULTIMATE VERTICAL CAPACITY OF THE SPECIFIC PILE ENCOUNTERING
THE OBSTRUCTION. IF IT IS DETERMINED THAT THE PILE WAS DAMAGED DURING
INSTALLATION, THE CONTRACTOR MUST REMOVE AND REPLACE THE PILE AT NO ADDITIONAL
COST TO THE GOVERNMENT. IF THE PILE HAS NOT BEEN DAMAGED, IS OF SUITABLE DEPTH,
AND HAS ACHIEVED THE REQUIRED ULTIMATE VERTICAL CAPACITY, THE PILE WOULD BE
CONSIDERED ACCEPTABLE.
13.3. IF THE DRIVEN STEEL PIPE PILE ENCOUNTERS AN OBSTRUCTION BELOW MINIMUM PILE TIP
ELEVATION FOR LATERAL FIXITY, BUT THE REQUIRED ULTIMATE VERTICAL CAPACITY IS NOT
ACHIEVED (AS DETERMINED THROUGH INITIAL PDA TESTING), POSSIBLE CONTRACTOR
OPTIONS TO MITIGATE THE OBSTRUCTION INCLUDE, BUT ARE NOT LIMITED TO:
13.3.a. RE-STRIKE THE PILE AND PERFORM FURTHER PDA TESTING (WITH CAPWAP ANALYSIS)
TO DETERMINE IF THE PILE IS ABLE TO ACHIEVE THE REQUIRED ULTIMATE VERTICAL
CAPACITY THROUGH SETUP OF THE UNDERLYING SOILS.
13.3.b. PERFORM FURTHER PDA TESTING (WITH CAPWAP ANALYSIS) TO DETERMINE THE
ULTIMATE VERTICAL CAPACITY OF BOTH THE PILE ENCOUNTERING AN OBSTRUCTION
AND THE TWO (2) ADJACENT PILES IN THE BENT CAP. THE CONTRACTING OFFICER
WILL UTILIZE THIS INFORMATION TO DETERMINE IF THE BENT CAP CAN STRUCTURALLY
ACCOMMODATE A LOWER CAPACITY PILE AT THE OBSTRUCTION LOCATION.
13.4.b. PROBE THE LIMITS OF THE OBSTRUCTION TO DETERMINE IF THE STEEL PIPE PILE CAN
BE PULLED, OFFSET ALONG THE LONGITUDINAL AXIS OF THE CAST-IN-PLACE
CONCRETE BEAM, AND RE-DRIVEN TO THE ESTIMATED PILE TIP ELEVATION AND
REQUIRED ULTIMATE VERTICAL CAPACITY. THE CONTRACTING OFFICER WILL UTILIZE
THE REQUIRED OFFSET INFORMATION TO DETERMINE IF THE BENT CAP, BEAM, AND
PILES CAN ACCOMMODATE RELOCATION TO AVOID THE OBSTRUCTION. NOTE THAT
THIS OPTION WILL REQUIRE MODIFICATIONS TO THE BEAM WIDTH IN ORDER TO FULLY
ENCAPSULATE THE 36"Ø STEEL PIPE PILE WITHIN THE BEAM WHILE MAINTAINING 6”
CLEAR FROM THE EDGE OF PILE TO EDGE OF BEAM. AT THE CONTRACTOR'S OPTION,
THE PILE ENCOUNTERING THE OBSTRUCTION MAY BE ABANDONED IN PLACE AND A
NEW STEEL PIPE PILE INSTALLED AT THE REQUIRED OFFSET LOCATION AT NO
ADDITIONAL COST TO THE GOVERNMENT.
13.4.c. PROBE THE LIMITS OF THE OBSTRUCTION TO DETERMINE IF THE STEEL PIPE PILE CAN
BE PULLED AND RE-DRIVEN AT A SLIGHT BATTER (NOT MORE THAN 1” PER FOOT) TO
AVOID THE OBSTRUCTION. PILES MUST BE BATTERED PERPENDICULAR TO THE
LONGITUDINAL AXIS OF THE BENT CAP AND RE-DRIVEN TO THE ESTIMATED PILE TIP
ELEVATION AND REQUIRED ULTIMATE VERTICAL CAPACITY.
13.4.d. USE A DTH HAMMER TO DRILL THROUGH THE OBSTRUCTION AND ATTEMPT TO RE-
DRIVE THE PILE THROUGH THE OBSTRUCTION TO THE ESTIMATED PILE TIP ELEVATION
AND REQUIRED ULTIMATE VERTICAL CAPACITY.
FOUNDATION NOTES - STEEL PIPE PILES CONT
SATISFACTORY TO DATE
APPROVED
ACTIVITY
FOR COMMANDER NAVFAC
SEAL
A/E INFO
A
B
C
D
1 2 3 4 5
1 2 3 4 5
A
B
C
D
SCALE:
CONSTR. CONTR. NO.
SHEET
NAVFAC DRAWING NO.
DES DRW CHK
OF
EPROJECT NO.:
D E
P A
R T
M E
N T
O F
T H
E N
A V
Y N
A V
A L
F A
C
IL
IT
IE
S E
N G
IN
E
E R
IN
G
S Y
S T
E M
S C
O M
M A
N D
DRAWFORM REVISION: 25 AUGUST 2020
PM/DM
BRANCH MANAGER
CHIEF ENG/ARCH
FIRE PROTECTION
N A
V A
L
FA
C
IL
IT
IE
S E
N G
IN
E
E R
IN
G
S Y
S
TE
M S
C O
M M
A N
D
M
ID
-A
TL
A N
TI
C
N A
V A
L S
T A
T
IO
N
N O
R F
O L K
V
A
AS NOTED
S Y
M D
E S
C R
IP
T
IO
N
D A
T E
A P
P R
/2
/2
:1 :5
P
M
A u to d e s k D o c s /2
U
S C
G O
C R
H o m e p o rt
In iti a tiv e O
P C
P ie r_
/P
IE
R
U S
C G
-1 -S
.r v t
S-003
U S
C G
O C
R H
O M
E P
O R
T
IN
IT
IA
TI
V
E O
P C
P
IE
R
S
TR
U C
TU
R
A L
G E
N E
R A
L N
O
TE
S
S H
E E
T
O F
MJF
12936621
JZ AEP
Frank Cole USCG MASI
MRI/CWJ
1826479
N E
W P
O R
T, R
I N
A V
A L
S T
A T
IO
N
N E
W P
O R
T
JWJ
NEK
HPN
C I
C O
R E
H
A M
P T
O N
R O
A D
S
S -0
06 FEB 2026
A
M E
N D
M E
N T
/1
5/
V
M G
A
M E
N D
M E
N T
/2
4/
V
M G
100-YR FLOODPLAIN
EL 14.0
x;E x
D x
D x
D
B3
SD303
RIP RAP REVETMENT
EXIST STONE BREAKWATER
LIMITS OF SUBMERGED AQUATIC
VEGETATION
A1
SD601
A4
SD601
A3
SD601
SHEET KEYNOTES:
1. DEMOLISH EXISTING STEEL BULKHEAD CAP CHANNEL.
2. CUT AND DISPOSE OF EXISTING PZ 35 STEEL SHEET PILE
DOWN TO ELEVATION 4.5.
3. REMOVE AND DISPOSE OF TIMBER DEBRIS, CHAIN, WIRE,
ROPE, AND ETC.
4. REMOVE STONE FILL AT EXISTING BREAKWATER. STONE TO BE
RESET AFTER CONSTRUCTION OF BULKHEAD S45.
5. DEMOLISH REINFORCED CONCRETE BUILDING DEBRIS (150
CY.), SEE PHOTO A4 ON DRAWING SD601 FOR ADDITIONAL
INFORMATION.
6. TEMPORARILY REMOVE STONE FILL WITHIN NEW BULKHEAD
DRIVING LINE TO BE RE-INSTALLED AFTER SHEETING
INSTALLATION, SEE PHOTO A4 ON DRAWING SD601 FOR
ADDITIONAL INFORMATION.
7. TEMPORARY SPUDDING OF CONSTRUCTION BARGES IN
IDENTIFIED EELGRASS BED IS ONLY PERMITTED FOR
CONSTRUCTION OF THE S45S BULKHEAD. CONTRACTOR IS
PROHIBITED FROM PLACING OR DUMPING ANY CONSTRUCTION
MATERIALS INTO THE EELGRASS BED OR USE OF THE AREA
FOR VESSEL/EQUIPMENT STORAGE OTHER THAN FOR THE
S45S BULKHEAD CONSTRUCTION.
LEGEND:
LIMITS OF DEMOLITION
KEY PLAN
SATISFACTORY TO DATE
APPROVED
ACTIVITY
FOR COMMANDER NAVFAC
SEAL
A/E INFO
A
B
C
D
1 2 3 4 5
1 2 3 4 5
A
B
C
D
SCALE:
CONSTR. CONTR. NO.
SHEET
NAVFAC DRAWING NO.
DES DRW CHK
OF
EPROJECT NO.:
D E
P A
R T
M E
N T
O F
T H
E N
A V
Y N
A V
A L
F A
C
IL
IT
IE
S E
N G
IN
E
E R
IN
G
S Y
S T
E M
S C
O M
M A
N D
DRAWFORM REVISION: 25 AUGUST 2020
PM/DM
BRANCH MANAGER
CHIEF ENG/ARCH
FIRE PROTECTION
N A
V A
L
FA
C
IL
IT
IE
S E
N G
IN
E
E R
IN
G
S Y
S
TE
M S
C O
M M
A N
D
M
ID
-A
TL
A N
T…
This is the start of the file's text. The full file is on GovTribe.