This document is Amendment 0004 to a Design-Bid-Build federal solicitation for the USCG Offshore Patrol Cutters (OPC) Homeport Pier at Naval Station Newport, Newport, Rhode Island. The amendment extends the proposal due date from June 9, 2026 to June 15, 2026 at 2:00 PM EDT and provides updated drawings, specifications, attachments, and responses to pre-proposal inquiries (PPIs). The contract is issued by NAVFACSYSCOM Mid-Atlantic (CODE N40085) and administered by the same office. Key additions include updated Attachment K (prevailing wage determination WD RI20260001 dated May 18, 2026), Attachment U (Pier 1 Extension 1968 historical drawings), and Attachment V (Amendment 004 Drawings showing revisions to utility plans, demolition plans, framing plans, pile cap details, and manhole details). The amendment clarifies that no additional PPIs will be accepted after this amendment.

The document provides comprehensive responses to 216 pre-proposal inquiries addressing technical specifications, drawings, material requirements, construction methods, environmental permits, and evaluation criteria. Notable clarifications include confirmation that the existing pier is 1,580 feet long (extended in 1968), pile driving specifications and tolerances, use of precast versus cast-in-place concrete elements, utility separation requirements applying only to landside installations, acceptance of previously completed Past Performance Questionnaires, and provisions for handling asbestos-containing materials. The prevailing wage determination covers Rhode Island counties (Bristol, Kent, Newport, Providence, and Washington) with rates for various construction trades effective through different dates in 2025 and 2026. The amendment addresses design questions, material specifications, permit requirements, and contractor means and methods to enable accurate cost estimates and competitive bidding.

View the file

Other files

File Type Posted
USCG OPC Pier Amendment 0008 Drawings.pdf PDF
Amendment 0007 SPC USCG OPC Pier Appendix D (With Placeholders).pdf PDF
Updated Attachment H - USCG OPC Pier Price Proposal Form REV 5.docx DOCX document
Appendix A - Telecom Room Photos.pdf PDF
Amendment 0006 USCG OPC.pdf PDF
Attachment Z - Pier 1 - Amendment 006 Drawings.pdf PDF
Updated Attachment H - UCCG OPC Pier Price Proposal Form REV 4.docx DOCX document
24.168 NOAA OMAO Bulkhead Pile Driving Summary Table 08.13.24 to 08.15.24.pdf PDF
24.168 NOAA OMAO Bulkhead Pile Driving Summary Table 07.22.24 to 07.26.24.pdf PDF
24.168 NOAA OMAO Bulkhead Pile Driving Summary Table 07.01.24 - 07.02.24.pdf PDF
24.168 NOAA OMAO Bulkhead Pile Driving Summary Table 08.26.24 to 08.30.24 (1).pdf PDF
24.168 NOAA OMAO Bulkhead Pile Driving Summary Table 08.26.24 to 08.30.24.pdf PDF
24.168 NOAA OMAO Bulkhead Pile Driving Summary Table 07.11.24.pdf PDF
24.168 NOAA OMAO Prime Pier Pile Driving Summary Report.pdf PDF
Pier Pile Plan.pdf PDF
SUB-0123 Interim PDA and Test Pile Logs - Trestle Piles 10B 14B.pdf PDF
Amendment 0005 USCG OPC.pdf PDF
Attachment W - Pier 1 - Amendment 005 Drawings.pdf PDF
Attachment Y - Appendix A Record drawing 11836 125 Submarine Cable Relocation.pdf PDF
24.168 NOAA OMAO Bulkhead Pile Driving Summary Table 08.07.24 to 08.08.24.pdf PDF
24.168 NOAA OMAO Bulkhead Pile Driving Summary Table 08.20.24 to 08.23.24 (1).pdf PDF
Bulkhead Pile Plan.pdf PDF
24.168 NOAA OMAO Bulkhead Pile Driving Summary Table 08.20.24 to 08.23.24.pdf PDF
24.168 NOAA OMAO Bulkhead Pile Driving Summary Table 09.03.24 to 09.06.24.pdf PDF
NOAA OMAO Survey Reports 100 Percent Pre-Final Submittal 04072022.pdf PDF
SUB-0105 Trestle Piles 4C 6B - PDA and Test Pile Logs.pdf PDF
Trestle Summary.pdf PDF
SUB-0TBD Interim PDA and Test Pile Logs For Trestle Pile 17B.pdf PDF
Updated Attachment K - WD RI20260001 05-18-2026.pdf PDF
Amendment 0003 USCG OPC.pdf PDF
Attachment E - Historical Small Business Utilization.docx DOCX document
Attachment T - REF(m) Existing Pier 1 Drawings 1 of 2.pdf PDF
Updated Attachment H - UCCG OPC Pier Price Proposal Form REV 2.docx DOCX document
Attachment Q - Spc 100 Final Specs Appendix D - (With Placeholders).pdf PDF
Updated Attachment G - Individual SB Subcontracting Plan.docx DOCX document
Amendment 0002 USCG OPC.pdf PDF
Updated Attachment H - UCCG OPC Pier Price Proposal Form REV 1.pdf PDF
Attachment M - 01 45 35_Schedule_of_Special_Inspections.pdf PDF
Attachment N - 01 45 35_Statement_of_Special_Inspections.xlsx XLSX spreadsheet
Amendment 0001 USCG OPC.pdf PDF
Updated Attachment F - SB Participation Commitment Document.pdf PDF
Attachment A - Pre Proposal Inquiry Log.xlsx XLSX spreadsheet
Attachment C - Construction Experience Project Data Sheet.pdf PDF
Attachment F - SB Participation Commitment Document.pdf PDF
Attachment G - Individual SB Subcontrating Plan.pdf PDF
Attachment K - WD RI20260001 01-30-2026.pdf PDF
Solicitation - N4008526R0001.pdf PDF
Attachment D - Past Performance Questionnaire.pdf PDF
Attachment H - UCCG OPC Pier Price Proposal Form.pdf PDF
1826479dwg01of05_GEN-CIV.pdf PDF
Show 40 more

50 files listed here. See the rest on GovTribe.

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

R

11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS

The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offers is extended. is not extended.

Offers must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended, by one of the following methods:

(a) By completing items 8 and 15, and returning copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted;

or (c) By separate letter or electronic communication which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by letter or electronic communication, provided each letter or electronic communication makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.

12. ACCOUNTING AND APPROPRIATION DATA (If required)

13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS.

IT MODIFIES THE CONTRACT/ORDER NUMBER AS DESCRIBED IN ITEM 14.

CHECK ONE A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE CONTRACT ORDER

NUMBER IN ITEM 10A.

B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation data, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(b).

C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:

D. OTHER (Specify type of modification and authority)

E. IMPORTANT: Contractor is not is required to sign this document and return copies to the issuing office.

14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)

Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.

15A. NAME AND TITLE OF SIGNER (Type or print) 16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)

15B. CONTRACTOR/OFFEROR

(Signature of person authorized to sign)

15C. DATE SIGNED 16B. UNITED STATES OF AMERICA

(Signature of Contracting Officer)

16C. DATE SIGNED

Previous edition unusable STANDARD FORM 30 (REV. 11/2016) Prescribed by GSA FAR (48 CFR) 53.243

AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT 1. CONTRACT ID CODE PAGE OF PAGES

2. AMENDMENT/MODIFICATION NUMBER 3. EFFECTIVE DATE 4. REQUISITION/PURCHASE REQUISITION NUMBER 5. PROJECT NUMBER (If applicable)

6. ISSUED BY CODE 7. ADMINISTERED BY (If other than Item 6) CODE

8. NAME AND ADDRESS OF CONTRACTOR (Number, street, county, State and ZIP Code) (X) 9A. AMENDMENT OF SOLICITATION NUMBER

9B. DATED (SEE ITEM 11)

10A. MODIFICATION OF CONTRACT/ORDER NUMBE

10B. DATED (SEE ITEM 13)

CODE FACILITY CODE

SECTION SF 30 BLOCK 14 CONTINUATION PAGE

SUMMARY OF CHANGES

Block 14 (Description of Amendment/Modification): Solicitation NO: N4008526R0001, Design-Bid-Build, USCG Offshore Patrol Cutters (OPC) Homeport Pier, Naval Station Newport, Newport RI

SEE SF 30 BLOCK 14 CONTINUATION PAGE.

ALL CORRESPONDENCE REGARDING THIS SOLICITATION SHALL BE DIRECTED VIA EMAIL TO KRISTY GERREK AT KRISTY.L.

GERREK.CIV@US.NAVY.MIL.

This amendment is issued to incorporate the following:

1. Extend the proposal due date from 09 JUNE 2026 TO 15 JUNE 2026 NLT 2:00 P.M. EDT.

2. Provide continuation sheet for drawings and specifications (Enclosed)

3. Provide Updated Attachment K - WD RI20260001 05-18-2026 (Enclosed)

4. Provide Attachment U - Appendix A - Pier 1 Extension 1968 (Attached separately)

5. Provide Attachment V - Pier 1 - Amendment 004 Drawings (Attached separately)

6. Provide PPI Responses (Enclosed)

Section 00 00 00 - Procurement and Contracting Requirements

The following changes have been made:

INFORMATION FROM TO

Response Due Date 09 Jun 2026 15 Jun 2026

Section 00 73 00 - Supplementary Conditions

The following attachments were added:

Amendment 0004 Continuation Page

N4008526R00010004

SECTION SF30 BLOCK 14 CONTINUATION PAGE

SUMMARY OF CHANGES

The following have been added by full text:

AMENDMENT 0004

This amendment is issued to incorporate the following:

1. Extend the proposal due date from 09 JUNE 2026 TO 15 JUNE 2026 NLT 2:00 P.M. EDT.

2. Provide continuation sheet for drawings and specifications (Enclosed)

3. Provide Updated Attachment K - WD RI20260001 05-18-2026 (Enclosed)

4. Provide Attachment U - Appendix A - Pier 1 Extension 1968 (Attached separately)

5. Provide Attachment V - Pier 1 - Amendment 004 Drawings (Attached separately)

6. Provide PPI Responses (Enclosed)

1. The proposal due date is extended from 09 JUNE 2026 TO 15 JUNE 2026 NLT 2:00 P.M. EDT.

**PLEASE NOTE THAT NO ADDITIONAL PPI’S WILL BE ACCEPTED.**

2. Continuation Sheet for Drawings and Specifications (Enclosed)

The following drawings are revised and incorporated into this amendment:

DWG

NO

NAVFAC

NO

CHANGE

NO

TITLE

C-102 12936608 004 UTILITY PLAN - PIER 1 LANDSIDE (BASE BID)

C-202 12936611 004 UTILITY PROFILES - SHEET 2 OF 2 (BASE BID)

C-505 12936616 004 SITE DETAILS - SHEET 4 OF 6

SD001 12936624 004 STRUCTURAL DEMOLITION NOTES (BASE BID)

SD101 12936625 004 OVERALL STRUCTURAL DEMOLITION PLAN (BASE BID)

SD102 12936626 004 PIER 1 DEMOLITION PLAN

S-110 12936646 004 FRAMING PLAN - SHEET 1 OF 7

S-111 12936647 004 FRAMING PLAN - SHEET 2 OF 7

S-112 12936648 004 FRAMING PLAN - SHEET 3 OF 7

S-113 12936649 004 FRAMING PLAN - SHEET 4 OF 7

S-114 12936650 004 FRAMING PLAN - SHEET 5 OF 7

S-115 12936651 004 FRAMING PLAN - SHEET 6 OF 7

S-504 12936701 004 CONCRETE PILE CAP DETAILS - SHEET 1 OF 3

S-517 12936732 004 PRECAST MANHOLE DETAILS

ADD the following changes to the drawings in the INDEX OF DRAWINGS under the corresponding discipline and drawing number. These drawings accompany this Amendment:

On NAVFAC Dwg. No. 12936608 (C-102)

CHANGE C-102 UTILITY PLAN - PIER 1 LANDSIDE (BASE BID) as follows:

REVISE Keynote 15 callout to Keynote 17 callout on plan.

REVISE Keynote 15 callout to Keynote 26 callout on plan.

REVISE Keynote 26 “80 LF OF 8” PVC PERFORATED UNDERDRAIN. INVERT = 3.5.”

On NAVFAC Dwg. No. 12936608 (C-202)

CHANGE C-202 UTILITY PROFILES - SHEET 2 OF 2 (BASE BID) as follows:

REVISE Detail B1, from a tee size of 10”x 8” to a tee size of 10”x6”

On NAVFAC Dwg. No. 12936608 (C-505)

CHANGE C-505 SITE DETAILS - SHEET 4 OF 6 as follows:

REVISE Detail A1, leader callout added to extend geomembrane, bioretention areas and elevations.

REVISE Detail A3, leader callout added to extend geomembrane, and bioretention planting soil.

On NAVFAC Dwg. No. 12936624 (SD001)

CHANGE SD001 STRUCTURAL DEMOLITION NOTES (BASE BID) as follows:

REVISE PCB / MERCURY NOTES. “LIGHTS” was removed and “FIXTURES” was used in place.

Fixture locations are now called out by location of buildings.

On NAVFAC Dwg. No. 12936625 (SD101)

CHANGE SD101 OVERALL STRUCTURAL DEMOLITION PLAN (BASE BID) as follows:

REVISE over all pier length dimension from 1,567’+/- to 1,580’-8” +/-, and model missing bent at expansion joint at bent 36.

ADD bent count at every 10 bents, and at last bent 159.

On NAVFAC Dwg. No. 12936626 (SD102)

CHANGE SD102 PIER 1 DEMOLITION PLAN as follows:

REVISE overall pier length dimension from 1,567’+/- to 1,580’-8” +/-, missing bent at expansion joint at bent 36.

On NAVFAC Dwg. No. 12936646 (S-110)

CHANGE S-110 FRAMING PLAN - SHEET 1 OF 7 as follows:

ADD outside dimensions to electrical manhole.

On NAVFAC Dwg. No. 12936647 (S-111)

CHANGE S-111 FRAMING PLAN - SHEET 2 OF 7 as follows:

ADD outside dimensions to electrical manholes.

On NAVFAC Dwg. No. 12936648 (S-112)

CHANGE S-112 FRAMING PLAN - SHEET 3 OF 7 as follows:

On NAVFAC Dwg. No. 12936649 (S-113)

CHANGE S-113 FRAMING PLAN - SHEET 4 OF 7 as follows:

On NAVFAC Dwg. No. 12936650 (S-114)

CHANGE S-114 FRAMING PLAN - SHEET 5 OF 7 as follows:

ADD the outside dimensions to electrical manholes and include 8-inch dimension for separation wall.

On NAVFAC Dwg. No. 12936651 (S-115)

CHANGE S-115 FRAMING PLAN - SHEET 6 OF 7 as follows:

ADD the outside dimensions to electrical manholes and include 8-inch dimension for separation wall.

On NAVFAC Dwg. No. 12936701 (S-504)

CHANGE S-504 CONCRETE PILE CAP DETAILS - SHEET 1 OF 3 as follows:

ADD Detail C1 of “TYPICAL BEAM ELEVATION”.

On NAVFAC Dwg. No. 12936732 (S-517)

CHANGE S-517 PRECAST MANHOLE DETAILS as follows:

ADD Section A4 “LATERAL SECTION THROUGH PRECAST MANHOLE WITH PARTITION

WALL”.

3. Updated Attachment K - WD RI20260001 05-18-2026 is provided with this amendment.

"General Decision Number: RI20260001 05/18/2026

State: Rhode Island

Construction Types: Building, Heavy and Highway

Counties: Rhode Island Counties of

Bristol, Kent, Newport, Providence and

Washington

Includes Marine Construction Projects

Modification Number Publication Date

2 01/30/2026

3 05/18/2026

ASBE0006-006 09/01/2024

Rates Fringes

HAZARDOUS MATERIAL HANDLER (INCLUDES PREPARATION,

WETTING, STRIPPING, REMOVAL SCRAPPING, VACUUMING,

BAGGING & DISPOSING OF ALL INSULATION MATERIALS,

WHETHER THEY CONTAIN ASBESTOS OR NOT, FROM

MECHANICAL SYSTEMS).................................$ 49.91 36.63

ASBE0006-008 09/01/2024

ASBESTOS WORKER/INSULATOR (INCLUDES APPLICATION OF

ALL INSULATING MATERIALS, PROTECTIVE COVERINGS,

COATINGS & FINISHES TO ALL TYPES OF MECHANICAL

SYSTEMS)............................................$ 49.91 36.63

BOIL0029-001 01/01/2025

BOILERMAKER.........................................$ 50.62 28.82

BRRI0003-001 06/01/2022

BRICKLAYER, STONEMASON, POINTER, CAULKER & CLEANER..$ 46.86 29.14

BRRI0003-002 09/01/2022

MARBLE SETTER, TERRAZZO WORKER & TILE SETTER........$ 46.54 30.34

BRRI0003-003 09/01/2022

MARBLE, TILE & TERRAZZO FINISHER....................$ 38.78 29.61

CARP0330-001 01/01/2023

PILEDRIVER FOOTNOTES: WHEN NOT DIVING OR

TENDING THE DIVER, THE DIVER AND DIVER TENDER SHALL

RECEIVE THE PILEDRIVER RATE. DIVER TENDERS SHALL

RECEIVE $1.00 PER HOUR ABOVE THE PILE DRIVER RATE

WHEN TENDING THE DIVER. WORK ON FREE-STANDING

STACKS, CONCRETE SILOS & PUBLIC UTILITY ELECTRICAL

POWER HOUSES, WHICH ARE OVER 35 FT. IN HEIGHT WHEN

CONSTRUCTED: $.50 PER HOUR ADDITIONAL. WORK ON

EXTERIOR CONCRETE SHEAR WALL GANG FORMS, 45 FT. OR

MORE ABOVE GROUND ELEVATION OR ON SETBACK: $.50 PER

HOUR ADDITIONAL. THE DESIGNATED PILEDRIVER,

KNOWN AS THE ""MONKEY"": $1.00 PER HOUR ADDITIONAL....$ 41.53 29.35

WELDER FOOTNOTES: WHEN NOT DIVING OR TENDING

THE DIVER, THE DIVER AND DIVER TENDER SHALL RECEIVE

THE PILEDRIVER RATE. DIVER TENDERS SHALL RECEIVE

$1.00 PER HOUR ABOVE THE PILE DRIVER RATE WHEN

TENDING THE DIVER. WORK ON FREE-STANDING STACKS,

CONCRETE SILOS & PUBLIC UTILITY ELECTRICAL POWER

HOUSES, WHICH ARE OVER 35 FT. IN HEIGHT WHEN

CONSTRUCTED: $.50 PER HOUR ADDITIONAL. WORK ON

EXTERIOR CONCRETE SHEAR WALL GANG FORMS, 45 FT. OR

MORE ABOVE GROUND ELEVATION OR ON SETBACK: $.50 PER

HOUR ADDITIONAL. THE DESIGNATED PILEDRIVER,

KNOWN AS THE ""MONKEY"": $1.00 PER HOUR ADDITIONAL....$ 48.68 30.50

DIVER TENDER FOOTNOTES: WHEN NOT DIVING OR

TENDING THE DIVER, THE DIVER AND DIVER TENDER SHALL

RECEIVE THE PILEDRIVER RATE. DIVER TENDERS SHALL

RECEIVE $1.00 PER HOUR ABOVE THE PILE DRIVER RATE

WHEN TENDING THE DIVER. WORK ON FREE-STANDING

STACKS, CONCRETE SILOS & PUBLIC UTILITY ELECTRICAL

POWER HOUSES, WHICH ARE OVER 35 FT. IN HEIGHT WHEN

CONSTRUCTED: $.50 PER HOUR ADDITIONAL. WORK ON

EXTERIOR CONCRETE SHEAR WALL GANG FORMS, 45 FT. OR

MORE ABOVE GROUND ELEVATION OR ON SETBACK: $.50 PER

HOUR ADDITIONAL. THE DESIGNATED PILEDRIVER,

KNOWN AS THE ""MONKEY"": $1.00 PER HOUR ADDITIONAL....$ 48.68 30.50

DIVER FOOTNOTES: WHEN NOT DIVING OR TENDING

THE DIVER, THE DIVER AND DIVER TENDER SHALL RECEIVE

THE PILEDRIVER RATE. DIVER TENDERS SHALL RECEIVE

$1.00 PER HOUR ABOVE THE PILE DRIVER RATE WHEN

TENDING THE DIVER. WORK ON FREE-STANDING STACKS,

CONCRETE SILOS & PUBLIC UTILITY ELECTRICAL POWER

HOUSES, WHICH ARE OVER 35 FT. IN HEIGHT WHEN

CONSTRUCTED: $.50 PER HOUR ADDITIONAL. WORK ON

EXTERIOR CONCRETE SHEAR WALL GANG FORMS, 45 FT. OR

MORE ABOVE GROUND ELEVATION OR ON SETBACK: $.50 PER

HOUR ADDITIONAL. THE DESIGNATED PILEDRIVER,

KNOWN AS THE ""MONKEY"": $1.00 PER HOUR ADDITIONAL....$ 60.83 30.50

CARPENTER: INCLUDES SOFT FLOOR LAYER................$ 47.88 30.50

CARP0330-001 06/02/2025

PILEDRIVER FOOTNOTES: WHEN NOT DIVING OR

TENDING THE DIVER, THE DIVER AND DIVER TENDER SHALL

RECEIVE THE PILEDRIVER RATE. DIVER TENDERS SHALL

RECEIVE $1.00 PER HOUR ABOVE THE PILE DRIVER RATE

WHEN TENDING THE DIVER. WORK ON FREE-STANDING

STACKS, CONCRETE SILOS & PUBLIC UTILITY ELECTRICAL

POWER HOUSES, WHICH ARE OVER 35 FT. IN HEIGHT WHEN

CONSTRUCTED: $.50 PER HOUR ADDITIONAL. WORK ON

EXTERIOR CONCRETE SHEAR WALL GANG FORMS, 45 FT. OR

MORE ABOVE GROUND ELEVATION OR ON SETBACK: $.50 PER

HOUR ADDITIONAL. THE DESIGNATED PILEDRIVER,

KNOWN AS THE ""MONKEY"": $1.00 PER HOUR ADDITIONAL....$ 41.53 29.35

WELDER FOOTNOTES: WHEN NOT DIVING OR TENDING

THE DIVER, THE DIVER AND DIVER TENDER SHALL RECEIVE

THE PILEDRIVER RATE. DIVER TENDERS SHALL RECEIVE

$1.00 PER HOUR ABOVE THE PILE DRIVER RATE WHEN

TENDING THE DIVER. WORK ON FREE-STANDING STACKS,

CONCRETE SILOS & PUBLIC UTILITY ELECTRICAL POWER

HOUSES, WHICH ARE OVER 35 FT. IN HEIGHT WHEN

CONSTRUCTED: $.50 PER HOUR ADDITIONAL. WORK ON

EXTERIOR CONCRETE SHEAR WALL GANG FORMS, 45 FT. OR

MORE ABOVE GROUND ELEVATION OR ON SETBACK: $.50 PER

HOUR ADDITIONAL. THE DESIGNATED PILEDRIVER,

KNOWN AS THE ""MONKEY"": $1.00 PER HOUR ADDITIONAL....$ 48.68 30.50

DIVER TENDER FOOTNOTES: WHEN NOT DIVING OR

TENDING THE DIVER, THE DIVER AND DIVER TENDER SHALL

RECEIVE THE PILEDRIVER RATE. DIVER TENDERS SHALL

RECEIVE $1.00 PER HOUR ABOVE THE PILE DRIVER RATE

WHEN TENDING THE DIVER. WORK ON FREE-STANDING

STACKS, CONCRETE SILOS & PUBLIC UTILITY ELECTRICAL

POWER HOUSES, WHICH ARE OVER 35 FT. IN HEIGHT WHEN

CONSTRUCTED: $.50 PER HOUR ADDITIONAL. WORK ON

EXTERIOR CONCRETE SHEAR WALL GANG FORMS, 45 FT. OR

MORE ABOVE GROUND ELEVATION OR ON SETBACK: $.50 PER

HOUR ADDITIONAL. THE DESIGNATED PILEDRIVER,

KNOWN AS THE ""MONKEY"": $1.00 PER HOUR ADDITIONAL....$ 48.68 30.50

DIVER FOOTNOTES: WHEN NOT DIVING OR TENDING

THE DIVER, THE DIVER AND DIVER TENDER SHALL RECEIVE

THE PILEDRIVER RATE. DIVER TENDERS SHALL RECEIVE

$1.00 PER HOUR ABOVE THE PILE DRIVER RATE WHEN

TENDING THE DIVER. WORK ON FREE-STANDING STACKS,

CONCRETE SILOS & PUBLIC UTILITY ELECTRICAL POWER

HOUSES, WHICH ARE OVER 35 FT. IN HEIGHT WHEN

CONSTRUCTED: $.50 PER HOUR ADDITIONAL. WORK ON

EXTERIOR CONCRETE SHEAR WALL GANG FORMS, 45 FT. OR

MORE ABOVE GROUND ELEVATION OR ON SETBACK: $.50 PER

HOUR ADDITIONAL. THE DESIGNATED PILEDRIVER,

KNOWN AS THE ""MONKEY"": $1.00 PER HOUR ADDITIONAL....$ 60.83 30.50

CARPENTER: INCLUDES SOFT FLOOR LAYER................$ 47.88 30.50

CARP1121-002 04/21/2025

MILLWRIGHT..........................................$ 45.72 31.50

ELEC0099-002 06/01/2025

TELEDATA SYSTEM INSTALLER FOOTNOTES: WORK OF

A HAZARDOUS NATURE, OR WHERE THE WORK HEIGHT IS 30

FT. OR MORE FROM THE FLOOR, EXCEPT WHEN WORKING

OSHA-APPROVED LIFTS: 20% PER HOUR ADDITIONAL.

WORK IN TUNNELS BELOW GROUND LEVEL IN COMBINED

SEWER OUTFALL: 20% PER HOUR ADDITIONAL..............$ 42.09 19.71

ELECTRICIAN FOOTNOTES: WORK OF A HAZARDOUS

NATURE, OR WHERE THE WORK HEIGHT IS 30 FT. OR MORE

FROM THE FLOOR, EXCEPT WHEN WORKING OSHA-APPROVED

LIFTS: 20% PER HOUR ADDITIONAL. WORK IN TUNNELS

BELOW GROUND LEVEL IN COMBINED SEWER OUTFALL: 20%

PER HOUR ADDITIONAL.................................$ 56.11 24.74

ELEV0039-001 01/01/2025

ELEVATOR MECHANIC FOOTNOTES: A. PAID HOLIDAYS:

NEW YEARS DAY; MEMORIAL DAY; INDEPENDENCE DAY;

LABOR DAY; VETERANS' DAY; THANKSGIVING DAY; THE

FRIDAY AFTER THANKSGIVING DAY; AND CHRISTMAS DAY.

B. EMPLOYER CONTRIBUTES 8% BASIC HOURLY RATE FOR

5 YEARS OR MORE OF SERVICE OF 6% BASIC HOURLY RATE

FOR 6 MONTHS TO 5 YEARS OF SERVICE AS VACATION PAY

CREDIT..............................................$ 64.52 38.44

ENGI0057-001 12/01/2025

POWER EQUIPMENT OPERATOR: POWER PLANTS, SEWER

TREATMENT PLANTS, PUMPING STATIONS, TUNNELS,

CAISSONS, PIERS, DOCKS, BRIDGES, WIND TURBINES,

SUBTERRANEAN & OTHER MARINE AND HEAVY CONSTRUCTION

WORK: GROUP 9 BOAT & TUG OPERATOR.

A. BOOM LENGTHS, INCLUDING JIBS: 150 FEET

AND OVER + $ 2.00 180 FEET AND OVER + $ 3.00 210

FEET AND OVER + $ 4.00 240 FEET AND OVER + $ 5.00

270 FEET AND OVER + $ 7.00 300 FEET AND OVER + $

8.00 350 FEET AND OVER + $ 9.00 400 FEET AND OVER

+ $10.00 A. PAID HOLIDAYS: NEW YEAR'S DAY,

PRESIDENT'S DAY, MEMORIAL DAY, JULY FOURTH, VICTORY

DAY, LABOR DAY, COLUMBUS DAY, VETERANS DAY,

THANKSGIVING DAY, CHRISTMAS DAY. A: ANY EMPLOYEE

WHO WORKS 3 DAYS IN THE WEEK IN WHICH A HOLIDAY

FALLS SHALL BE PAID FOR THE HOLIDAY. A. FOOTNOTES:

HAZMAT WORK: $2.00 PER HOUR ADDITIONAL.

TUNNEL/SHAFT WORK: $5.00 PER HOUR ADDITIONAL........$ 48.92 29.95

POWER EQUIPMENT OPERATOR: POWER PLANTS, SEWER

TREATMENT PLANTS, PUMPING STATIONS, TUNNELS,

CAISSONS, PIERS, DOCKS, BRIDGES, WIND TURBINES,

SUBTERRANEAN & OTHER MARINE AND HEAVY CONSTRUCTION

WORK: GROUP 8 HEATER, CONCRETE MIXER, STONE

CRUSHER, WELDING MACHINE, GENERATOR AND LIGHT

PLANT, GAS AND ELECTRIC DRIVEN PUMP AND AIR

COMPRESSOR.

A. BOOM

LENGTHS, INCLUDING JIBS: 150 FEET AND OVER + $

2.00 180 FEET AND OVER + $ 3.00 210 FEET AND OVER

+ $ 4.00 240 FEET AND OVER + $ 5.00 270 FEET AND

OVER + $ 7.00 300 FEET AND OVER + $ 8.00 350 FEET

AND OVER + $ 9.00 400 FEET AND OVER + $10.00 A.

PAID HOLIDAYS: NEW YEAR'S DAY, PRESIDENT'S DAY,

MEMORIAL DAY, JULY FOURTH, VICTORY DAY, LABOR DAY,

COLUMBUS DAY, VETERANS DAY, THANKSGIVING DAY,

CHRISTMAS DAY. A: ANY EMPLOYEE WHO WORKS 3 DAYS IN

THE WEEK IN WHICH A HOLIDAY FALLS SHALL BE PAID FOR

THE HOLIDAY. A. FOOTNOTES: HAZMAT WORK: $2.00 PER

HOUR ADDITIONAL. TUNNEL/SHAFT WORK: $5.00 PER HOUR

ADDITIONAL..........................................$ 45.00 29.95

POWER EQUIPMENT OPERATOR: POWER PLANTS, SEWER

TREATMENT PLANTS, PUMPING STATIONS, TUNNELS,

CAISSONS, PIERS, DOCKS, BRIDGES, WIND TURBINES,

WORK: GROUP 7 UTILITY ENGINEERS AND SIGNAL PERSONS

A.

BOOM LENGTHS, INCLUDING JIBS: 150 FEET AND OVER +

$ 2.00 180 FEET AND OVER + $ 3.00 210 FEET AND

OVER + $ 4.00 240 FEET AND OVER + $ 5.00 270 FEET

AND OVER + $ 7.00 300 FEET AND OVER + $ 8.00 350

FEET AND OVER + $ 9.00 400 FEET AND OVER + $10.00

A. PAID HOLIDAYS: NEW YEAR'S DAY, PRESIDENT'S DAY,

MEMORIAL DAY, JULY FOURTH, VICTORY DAY, LABOR DAY,

COLUMBUS DAY, VETERANS DAY, THANKSGIVING DAY,

CHRISTMAS DAY. A: ANY EMPLOYEE WHO WORKS 3 DAYS IN

THE WEEK IN WHICH A HOLIDAY FALLS SHALL BE PAID FOR

THE HOLIDAY. A. FOOTNOTES: HAZMAT WORK: $2.00 PER

HOUR ADDITIONAL. TUNNEL/SHAFT WORK: $5.00 PER HOUR

ADDITIONAL..........................................$ 33.15 29.95

POWER EQUIPMENT OPERATOR: POWER PLANTS, SEWER

TREATMENT PLANTS, PUMPING STATIONS, TUNNELS,

CAISSONS, PIERS, DOCKS, BRIDGES, WIND TURBINES,

WORK: GROUP 6 WELL-POINT INSTALLATION CREW.

A. BOOM LENGTHS, INCLUDING JIBS: 150 FEET AND

OVER + $ 2.00 180 FEET AND OVER + $ 3.00 210 FEET

AND OVER + $ 4.00 240 FEET AND OVER + $ 5.00 270

FEET AND OVER + $ 7.00 300 FEET AND OVER + $ 8.00

350 FEET AND OVER + $ 9.00 400 FEET AND OVER +

$10.00 A. PAID HOLIDAYS: NEW YEAR'S DAY,

PRESIDENT'S DAY, MEMORIAL DAY, JULY FOURTH, VICTORY

DAY, LABOR DAY, COLUMBUS DAY, VETERANS DAY,

THANKSGIVING DAY, CHRISTMAS DAY. A: ANY EMPLOYEE

WHO WORKS 3 DAYS IN THE WEEK IN WHICH A HOLIDAY

FALLS SHALL BE PAID FOR THE HOLIDAY. A. FOOTNOTES:

HAZMAT WORK: $2.00 PER HOUR ADDITIONAL.

TUNNEL/SHAFT WORK: $5.00 PER HOUR ADDITIONAL........$ 39.15 29.95

POWER EQUIPMENT OPERATOR: POWER PLANTS, SEWER

TREATMENT PLANTS, PUMPING STATIONS, TUNNELS,

CAISSONS, PIERS, DOCKS, BRIDGES, WIND TURBINES,

SUBTERRANEAN & OTHER MARINE AND HEAVY CONSTRUCTION

WORK: GROUP 5 BULLDOZER, BOBCATS, SKID STEER

LOADER, TRACTOR, SCRAPER, COMBINATION LOADER

BACKHOE, ROLLER, FRONT END LOADER (LESS THAN 3

YDS.), STREET AND MOBILE-POWERED SWEEPER (3-YD.

CAPACITY), 8-FT. SWEEPER MINIMUM 65 HP).

A. BOOM LENGTHS, INCLUDING JIBS: 150

FEET AND OVER + $ 2.00 180 FEET AND OVER + $ 3.00

210 FEET AND OVER + $ 4.00 240 FEET AND OVER + $

5.00 270 FEET AND OVER + $ 7.00 300 FEET AND OVER

+ $ 8.00 350 FEET AND OVER + $ 9.00 400 FEET AND

OVER + $10.00 A. PAID HOLIDAYS: NEW YEAR'S DAY,

PRESIDENT'S DAY, MEMORIAL DAY, JULY FOURTH, VICTORY

DAY, LABOR DAY, COLUMBUS DAY, VETERANS DAY,

THANKSGIVING DAY, CHRISTMAS DAY. A: ANY EMPLOYEE

WHO WORKS 3 DAYS IN THE WEEK IN WHICH A HOLIDAY

FALLS SHALL BE PAID FOR THE HOLIDAY. A. FOOTNOTES:

HAZMAT WORK: $2.00 PER HOUR ADDITIONAL.

TUNNEL/SHAFT WORK: $5.00 PER HOUR ADDITIONAL........$ 48.35 29.95

POWER EQUIPMENT OPERATOR: POWER PLANTS, SEWER

TREATMENT PLANTS, PUMPING STATIONS, TUNNELS,

CAISSONS, PIERS, DOCKS, BRIDGES, WIND TURBINES,

WORK: GROUP 4 OILER ON CRAWLER BACKHOE.

A. BOOM LENGTHS, INCLUDING JIBS: 150 FEET AND OVER

+ $ 2.00 180 FEET AND OVER + $ 3.00 210 FEET AND

OVER + $ 4.00 240 FEET AND OVER + $ 5.00 270 FEET

AND OVER + $ 7.00 300 FEET AND OVER + $ 8.00 350

FEET AND OVER + $ 9.00 400 FEET AND OVER + $10.00

A. PAID HOLIDAYS: NEW YEAR'S DAY, PRESIDENT'S DAY,

MEMORIAL DAY, JULY FOURTH, VICTORY DAY, LABOR DAY,

COLUMBUS DAY, VETERANS DAY, THANKSGIVING DAY,

CHRISTMAS DAY. A: ANY EMPLOYEE WHO WORKS 3 DAYS IN

THE WEEK IN WHICH A HOLIDAY FALLS SHALL BE PAID FOR

THE HOLIDAY. A. FOOTNOTES: HAZMAT WORK: $2.00 PER

HOUR ADDITIONAL. TUNNEL/SHAFT WORK: $5.00 PER HOUR

ADDITIONAL..........................................$ 42.07 29.95

POWER EQUIPMENT OPERATOR: POWER PLANTS, SEWER

TREATMENT PLANTS, PUMPING STATIONS, TUNNELS,

CAISSONS, PIERS, DOCKS, BRIDGES, WIND TURBINES,

WORK: GROUP 3 OILERS ON CRANES.

A. BOOM LENGTHS, INCLUDING JIBS: 150

FEET AND OVER + $ 2.00 180 FEET AND OVER + $ 3.00

210 FEET AND OVER + $ 4.00 240 FEET AND OVER + $

5.00 270 FEET AND OVER + $ 7.00 300 FEET AND OVER

+ $ 8.00 350 FEET AND OVER + $ 9.00 400 FEET AND

OVER + $10.00 A. PAID HOLIDAYS: NEW YEAR'S DAY,

PRESIDENT'S DAY, MEMORIAL DAY, JULY FOURTH, VICTORY

DAY, LABOR DAY, COLUMBUS DAY, VETERANS DAY,

THANKSGIVING DAY, CHRISTMAS DAY. A: ANY EMPLOYEE

WHO WORKS 3 DAYS IN THE WEEK IN WHICH A HOLIDAY

FALLS SHALL BE PAID FOR THE HOLIDAY. A. FOOTNOTES:

HAZMAT WORK: $2.00 PER HOUR ADDITIONAL.

TUNNEL/SHAFT WORK: $5.00 PER HOUR ADDITIONAL........$ 44.92 29.95

POWER EQUIPMENT OPERATOR: POWER PLANTS, SEWER

TREATMENT PLANTS, PUMPING STATIONS, TUNNELS,

CAISSONS, PIERS, DOCKS, BRIDGES, WIND TURBINES,

SUBTERRANEAN & OTHER MARINE AND HEAVY CONSTRUCTION

WORK: GROUP 2 DIGGING MACHINE, ROSS CARRIER,

LOCOMOTIVE, HOIST, ELEVATOR, BIDWELL-TYPE MACHINE,

SHOT & WATER BLASTING MACHINE, PAVER, SPREADER,

GRADERS, FRONT END LOADER (3 YDS. AND OVER),

VIBRATORY HAMMER & VACUUM TRUCK, ROADHEADERS,

FORKLIFTS, ECONOMOBILE TYPE EQUIPMENT, TUNNEL

BORING MACHINES, CONCRETE PUMP AND ON SITE CONCRETE

PLANTS.

A. BOOM LENGTHS, INCLUDING

JIBS: 150 FEET AND OVER + $ 2.00 180 FEET AND

OVER + $ 3.00 210 FEET AND OVER + $ 4.00 240 FEET

AND OVER + $ 5.00 270 FEET AND OVER + $ 7.00 300

FEET AND OVER + $ 8.00 350 FEET AND OVER + $ 9.00

400 FEET AND OVER + $10.00 A. PAID HOLIDAYS: NEW

YEAR'S DAY, PRESIDENT'S DAY, MEMORIAL DAY, JULY

FOURTH, VICTORY DAY, LABOR DAY, COLUMBUS DAY,

VETERANS DAY, THANKSGIVING DAY, CHRISTMAS DAY. A:

ANY EMPLOYEE WHO WORKS 3 DAYS IN THE WEEK IN WHICH

A HOLIDAY FALLS SHALL BE PAID FOR THE HOLIDAY. A.

FOOTNOTES: HAZMAT WORK: $2.00 PER HOUR ADDITIONAL.

TUNNEL/SHAFT WORK: $5.00 PER HOUR ADDITIONAL.......$ 49.30 29.95

POWER EQUIPMENT OPERATOR: POWER PLANTS, SEWER

TREATMENT PLANTS, PUMPING STATIONS, TUNNELS,

CAISSONS, PIERS, DOCKS, BRIDGES, WIND TURBINES,

SUBTERRANEAN & OTHER MARINE AND HEAVY CONSTRUCTION

WORK: GROUP 1 CRANES, LIGHTERS, BOOM TRUCKS AND

DERRICKS

A. BOOM LENGTHS,

INCLUDING JIBS: 150 FEET AND OVER + $ 2.00 180

FEET AND OVER + $ 3.00 210 FEET AND OVER + $ 4.00

240 FEET AND OVER + $ 5.00 270 FEET AND OVER + $

7.00 300 FEET AND OVER + $ 8.00 350 FEET AND OVER

+ $ 9.00 400 FEET AND OVER + $10.00 A. PAID

HOLIDAYS: NEW YEAR'S DAY, PRESIDENT'S DAY,

MEMORIAL DAY, JULY FOURTH, VICTORY DAY, LABOR DAY,

COLUMBUS DAY, VETERANS DAY, THANKSGIVING DAY,

CHRISTMAS DAY. A: ANY EMPLOYEE WHO WORKS 3 DAYS IN

THE WEEK IN WHICH A HOLIDAY FALLS SHALL BE PAID FOR

THE HOLIDAY. A. FOOTNOTES: HAZMAT WORK: $2.00 PER

HOUR ADDITIONAL. TUNNEL/SHAFT WORK: $5.00 PER HOUR

ADDITIONAL..........................................$ 51.30 29.95

ENGI0057-003 12/01/2025

POWER EQUIPMENT OPERATOR: BUILDING CONSTRUCTION:

GROUP 8 HEATER, CONCRETE MIXER, STONE CRUSHER,

WELDING MACHINE, GENERATOR FOR LIGHT PLANT, GAS AND

ELECTRIC DRIVEN PUMP & AIR COMPRESSOR

A. BOOM LENTHS, INCLUDING JIBS: 150 FT. AND OVER:

+ $ 2.00 180 FT. AND OVER: + $ 3.00 210 FT. AND

OVER: + $ 4.00 240 FT. AND OVER: + $ 5.00 270 FT.

AND OVER: + $ 7.00 300 FT. AND OVER: + $ 8.00 350

FT. AND OVER: + $ 9.00 400 FT. AND OVER: +

$10.00 A. PAID HOLIDAYS: NEW YEAR'S DAY,

PRESIDENT'S DAY, MEMORIAL DAY, JULY FOURTH, VICTORY

DAY, LABOR DAY, COLUMBUS DAY, VETERANS DAY,

THANKSGIVING DAY & CHRISTMAS DAY. A: ANY EMPLOYEE

WHO WORKS 3 DAYS IN THE WEEK IN WHICH A HOLIDAY

FALLS SHALL BE PAID FOR THE HOLIDAY.

A. FOOTNOTE: HAZMAT WORK: $2.00 PER HOUR

ADDITIONAL. TUNNEL/SHAFT WORK: $5.00 PER

HOUR ADDITIONAL.....................................$ 44.54 29.95

POWER EQUIPMENT OPERATOR: BUILDING CONSTRUCTION:

GROUP 7 WELL POINT INSTALLATION CREW

A. BOOM LENTHS,

INCLUDING JIBS: 150 FT. AND OVER: + $ 2.00 180

FT. AND OVER: + $ 3.00 210 FT. AND OVER: + $ 4.00

240 FT. AND OVER: + $ 5.00 270 FT. AND OVER: + $

7.00 300 FT. AND OVER: + $ 8.00 350 FT. AND OVER:

+ $ 9.00 400 FT. AND OVER: + $10.00 A.

PAID HOLIDAYS: NEW YEAR'S DAY, PRESIDENT'S DAY,

MEMORIAL DAY, JULY FOURTH, VICTORY DAY, LABOR DAY,

COLUMBUS DAY, VETERANS DAY, THANKSGIVING DAY &

CHRISTMAS DAY. A: ANY EMPLOYEE WHO WORKS 3 DAYS IN

THE WEEK IN WHICH A HOLIDAY FALLS SHALL BE PAID FOR

THE HOLIDAY. A. FOOTNOTE: HAZMAT

WORK: $2.00 PER HOUR ADDITIONAL.

TUNNEL/SHAFT WORK: $5.00 PER HOUR ADDITIONAL........$ 47.22 29.95

POWER EQUIPMENT OPERATOR: BUILDING CONSTRUCTION:

GROUP 6 BULLDOZER,SKID STEER LOADERS,BOBCATS,

TRACTOR, GRADER, SCRAPER,COMBINATION LOADER

BACKHOE, ROLLER, FRONT END LOADER (LESS THAN 3

YDS.), STREET AND MOBILE POWERED SWEEPER (3 YDS.

CAPACITY), 8-FT. SWEEPER (MINIMUM 65 HP)

OVER: + $ 4.00 240 FT. AND OVER: + $ 5.00 270 FT.

AND OVER: + $ 7.00 300 FT. AND OVER: + $ 8.00 350

FT. AND OVER: + $ 9.00 400 FT. AND OVER: +

$10.00 A. PAID HOLIDAYS: NEW YEAR'S DAY,

PRESIDENT'S DAY, MEMORIAL DAY, JULY FOURTH, VICTORY

DAY, LABOR DAY, COLUMBUS DAY, VETERANS DAY,

THANKSGIVING DAY & CHRISTMAS DAY. A: ANY EMPLOYEE

WHO WORKS 3 DAYS IN THE WEEK IN WHICH A HOLIDAY

FALLS SHALL BE PAID FOR THE HOLIDAY.

A. FOOTNOTE: HAZMAT WORK: $2.00 PER HOUR

ADDITIONAL. TUNNEL/SHAFT WORK: $5.00 PER

HOUR ADDITIONAL.....................................$ 47.65 29.95

GROUP 5 OILER ON CRAWLER BACKHOE

A. BOOM LENTHS, INCLUDING JIBS: 150 FT. AND

OVER: + $ 2.00 180 FT. AND OVER: + $ 3.00 210 FT.

AND OVER: + $ 4.00 240 FT. AND OVER: + $ 5.00 270

FT. AND OVER: + $ 7.00 300 FT. AND OVER: + $ 8.00

350 FT. AND OVER: + $ 9.00 400 FT. AND OVER: +

$10.00 A. PAID HOLIDAYS: NEW YEAR'S DAY,

PRESIDENT'S DAY, MEMORIAL DAY, JULY FOURTH, VICTORY

DAY, LABOR DAY, COLUMBUS DAY, VETERANS DAY,

THANKSGIVING DAY & CHRISTMAS DAY. A: ANY EMPLOYEE

WHO WORKS 3 DAYS IN THE WEEK IN WHICH A HOLIDAY

FALLS SHALL BE PAID FOR THE HOLIDAY.

A. FOOTNOTE: HAZMAT WORK: $2.00 PER HOUR

ADDITIONAL. TUNNEL/SHAFT WORK: $5.00 PER

HOUR ADDITIONAL.....................................$ 41.50 29.95

GROUP 4 FIREMAN & OILER ON CRANES

LENTHS, INCLUDING JIBS: 150 FT. AND OVER: + $ 2.00

180 FT. AND OVER: + $ 3.00 210 FT. AND OVER: + $

4.00 240 FT. AND OVER: + $ 5.00 270 FT. AND OVER:

+ $ 7.00 300 FT. AND OVER: + $ 8.00 350 FT. AND

OVER: + $ 9.00 400 FT. AND OVER: + $10.00

A. PAID HOLIDAYS: NEW YEAR'S DAY, PRESIDENT'S DAY,

MEMORIAL DAY, JULY FOURTH, VICTORY DAY, LABOR DAY,

COLUMBUS DAY, VETERANS DAY, THANKSGIVING DAY &

CHRISTMAS DAY. A: ANY EMPLOYEE WHO WORKS 3 DAYS IN

THE WEEK IN WHICH A HOLIDAY FALLS SHALL BE PAID FOR

THE HOLIDAY. A. FOOTNOTE: HAZMAT

WORK: $2.00 PER HOUR ADDITIONAL.

TUNNEL/SHAFT WORK: $5.00 PER HOUR ADDITIONAL........$ 44.35 29.95

POWER EQUIPMENT OPERATOR: BUILDING CONSTRUCTION:

GROUP 3 TELEHANDLER EQUIPMENT, FORKLIFT, CONCRETE

PUMP & ON-SITE CONCRETE PLANT

OVER: + $ 4.00 240 FT. AND OVER: + $ 5.00 270 FT.

AND OVER: + $ 7.00 300 FT. AND OVER: + $ 8.00 350

FT. AND OVER: + $ 9.00 400 FT. AND OVER: +

$10.00 A. PAID HOLIDAYS: NEW YEAR'S DAY,

PRESIDENT'S DAY, MEMORIAL DAY, JULY FOURTH, VICTORY

DAY, LABOR DAY, COLUMBUS DAY, VETERANS DAY,

THANKSGIVING DAY & CHRISTMAS DAY. A: ANY EMPLOYEE

WHO WORKS 3 DAYS IN THE WEEK IN WHICH A HOLIDAY

FALLS SHALL BE PAID FOR THE HOLIDAY.

A. FOOTNOTE: HAZMAT WORK: $2.00 PER HOUR

ADDITIONAL. TUNNEL/SHAFT WORK: $5.00 PER

HOUR ADDITIONAL.....................................$ 48.35 29.95

POWER EQUIPMENT OPERATOR: BUILDING CONSTRUCTION:

GROUP 2 DIGGING MACHINE, ROSS CARRIER, LOCOMOTIVE,

HOIST, ELEVATOR, BIDWELL-TYPE MACHINE, SHOT & WATER

BLASTING MACHINE, PAVER, SPREADER, FRONT END LOADER

(3 YDS. AND OVER), VIBRATORY HAMMER AND VACUUM

TRUCK

180 FT. AND OVER: + $ 3.00 210 FT. AND OVER: + $

4.00 240 FT. AND OVER: + $ 5.00 270 FT. AND OVER:

+ $ 7.00 300 FT. AND OVER: + $ 8.00 350 FT. AND

OVER: + $ 9.00 400 FT. AND OVER: + $10.00

A. PAID HOLIDAYS: NEW YEAR'S DAY, PRESIDENT'S DAY,

MEMORIAL DAY, JULY FOURTH, VICTORY DAY, LABOR DAY,

COLUMBUS DAY, VETERANS DAY, THANKSGIVING DAY &

CHRISTMAS DAY. A: ANY EMPLOYEE WHO WORKS 3 DAYS IN

THE WEEK IN WHICH A HOLIDAY FALLS SHALL BE PAID FOR

THE HOLIDAY. A. FOOTNOTE: HAZMAT

WORK: $2.00 PER HOUR ADDITIONAL.

TUNNEL/SHAFT WORK: $5.00 PER HOUR ADDITIONAL........$ 48.57 29.95

POWER EQUIPMENT OPERATOR: BUILDING CONSTRUCTION:

GROUP 1 CRANES, LIGHTERS, BOOM TRUCKS AND

DERRICKS.

180 FT. AND OVER: + $ 3.00 210 FT. AND OVER: + $

4.00 240 FT. AND OVER: + $ 5.00 270 FT. AND OVER:

+ $ 7.00 300 FT. AND OVER: + $ 8.00 350 FT. AND

OVER: + $ 9.00 400 FT. AND OVER: + $10.00

A. PAID HOLIDAYS: NEW YEAR'S DAY, PRESIDENT'S DAY,

MEMORIAL DAY, JULY FOURTH, VICTORY DAY, LABOR DAY,

COLUMBUS DAY, VETERANS DAY, THANKSGIVING DAY &

CHRISTMAS DAY. A: ANY EMPLOYEE WHO WORKS 3 DAYS IN

THE WEEK IN WHICH A HOLIDAY FALLS SHALL BE PAID FOR

THE HOLIDAY. A. FOOTNOTE: HAZMAT

WORK: $2.00 PER HOUR ADDITIONAL.

TUNNEL/SHAFT WORK: $5.00 PER HOUR ADDITIONAL........$ 50.57 29.95

ENGI0057-005 12/01/2025

POWER EQUIPMENT OPERATOR: HIGHWAY CONSTRUCTION

PROJECTS; WATER AND SEWERLINE PROJECTS WHICH ARE

INCIDENTAL TO HIGHWAY CONSTRUCTION PROJECTS; AND

BRIDGE PROJECTS THAT DO NOT SPAN WATER: GROUP 8 GAS

AND ELECTRIC DRIVE HEATERS, CONCRETE MIXERS, LIGHT

PLANTS, WELDING MACHINES, PUMPS AND COMPRESSORS

A. FOOTNOTE: A. ANY

EMPLOYEE WHO WORKS THREE DAYS IN THE WEEK IN WHICH

A HOLIDAY FALLS SHALL BE PAID FOR THE HOLIDAY. B.

PAID HOLIDAYS: NEW YEAR'S DAY, PRESIDENT'S DAY,

MEMORIAL DAY, JULY FOURTH, VICTORY DAY, LABOR DAY,

COLUMBUS DAY, VETERANS DAY, THANKSGIVING DAY &

CHRISTMAS DAY.......................................$ 38.70 29.95

POWER EQUIPMENT OPERATOR: HIGHWAY CONSTRUCTION

PROJECTS; WATER AND SEWERLINE PROJECTS WHICH ARE

INCIDENTAL TO HIGHWAY CONSTRUCTION PROJECTS; AND

BRIDGE PROJECTS THAT DO NOT SPAN WATER: GROUP 7

COMBINATION LOADER / BACKHOES, FRONT-END LOADERS

(LESS THAN 3 YDS.), FORKLIFT, BULLDOZERS, SCRAPERS,

BOATS, ROLLERS, SKID STEER LOADERS (REGARDLESS OF

ATTACHMENTS), STREET SWEEPERS, MECHANICS, WELDERS,

OPERATORS IN MATERIALS YARDS, SHOPS AND GARAGES

A HOLIDAY FALLS SHALL BE PAID FOR THE HOLIDAY. B.

PAID HOLIDAYS: NEW YEAR'S DAY, PRESIDENT'S DAY,

MEMORIAL DAY, JULY FOURTH, VICTORY DAY, LABOR DAY,

COLUMBUS DAY, VETERANS DAY, THANKSGIVING DAY &

CHRISTMAS DAY.......................................$ 43.43 29.95

POWER EQUIPMENT OPERATOR: HIGHWAY CONSTRUCTION

PROJECTS; WATER AND SEWERLINE PROJECTS WHICH ARE

INCIDENTAL TO HIGHWAY CONSTRUCTION PROJECTS; AND

BRIDGE PROJECTS THAT DO NOT SPAN WATER: GROUP 6

OILERS ON CRANES AND DECKHANDS

A HOLIDAY FALLS SHALL BE PAID FOR THE HOLIDAY. B.

PAID HOLIDAYS: NEW YEAR'S DAY, PRESIDENT'S DAY,

MEMORIAL DAY, JULY FOURTH, VICTORY DAY, LABOR DAY,

COLUMBUS DAY, VETERANS DAY, THANKSGIVING DAY &

CHRISTMAS DAY.......................................$ 39.73 29.95

POWER EQUIPMENT OPERATOR: HIGHWAY CONSTRUCTION

PROJECTS; WATER AND SEWERLINE PROJECTS WHICH ARE

INCIDENTAL TO HIGHWAY CONSTRUCTION PROJECTS; AND

BRIDGE PROJECTS THAT DO NOT SPAN WATER: GROUP 5

SIGNAL PERSONS

A.

FOOTNOTE: A. ANY EMPLOYEE WHO WORKS THREE DAYS IN

THE WEEK IN WHICH A HOLIDAY FALLS SHALL BE PAID FOR

THE HOLIDAY. B. PAID HOLIDAYS: NEW YEAR'S DAY,

PRESIDENT'S DAY, MEMORIAL DAY, JULY FOURTH, VICTORY

DAY, LABOR DAY, COLUMBUS DAY, VETERANS DAY,

THANKSGIVING DAY & CHRISTMAS DAY....................$ 33.15 29.95

POWER EQUIPMENT OPERATOR: HIGHWAY CONSTRUCTION

PROJECTS; WATER AND SEWERLINE PROJECTS WHICH ARE

INCIDENTAL TO HIGHWAY CONSTRUCTION PROJECTS; AND

BRIDGE PROJECTS THAT DO NOT SPAN WATER: GROUP 4

UTILITY ENGINEERS

A. FOOTNOTE:

A. ANY EMPLOYEE WHO WORKS THREE DAYS IN THE WEEK IN

WHICH A HOLIDAY FALLS SHALL BE PAID FOR THE

HOLIDAY. B. PAID HOLIDAYS: NEW YEAR'S DAY,

PRESIDENT'S DAY, MEMORIAL DAY, JULY FOURTH, VICTORY

DAY, LABOR DAY, COLUMBUS DAY, VETERANS DAY,

THANKSGIVING DAY & CHRISTMAS DAY....................$ 25.75 29.95

POWER EQUIPMENT OPERATOR: HIGHWAY CONSTRUCTION

PROJECTS; WATER AND SEWERLINE PROJECTS WHICH ARE

INCIDENTAL TO HIGHWAY CONSTRUCTION PROJECTS; AND

BRIDGE PROJECTS THAT DO NOT SPAN WATER: GROUP 3

WELLPOINT INSTALLATION AND DRILL/BORING MACHINE

ASSISTANTS

A. FOOTNOTE: A. ANY EMPLOYEE WHO WORKS THREE

DAYS IN THE WEEK IN WHICH A HOLIDAY FALLS SHALL BE

PAID FOR THE HOLIDAY. B. PAID HOLIDAYS: NEW YEAR'S

DAY, PRESIDENT'S DAY, MEMORIAL DAY, JULY FOURTH,

VICTORY DAY, LABOR DAY, COLUMBUS DAY, VETERANS DAY,

THANKSGIVING DAY & CHRISTMAS DAY....................$ 39.15 29.95

POWER EQUIPMENT OPERATOR: HIGHWAY CONSTRUCTION

PROJECTS; WATER AND SEWERLINE PROJECTS WHICH ARE

INCIDENTAL TO HIGHWAY CONSTRUCTION PROJECTS; AND

BRIDGE PROJECTS THAT DO NOT SPAN WATER: GROUP 2

DIGGING MACHINES, EXCAVATORS, LOCOMOTIVES, JOHN

HENRY'S, DIRECTIONAL DRILLING MACHINES, COLD

PLANERS, RECLAIMERS, PAVERS, SPREADERS, GRADERS,

FRONT-END LOADERS (3YDS & OVER), VACUUM TRUCK,

DRILL/BORING MACHINE OPERATORS, VERMEER SAW, WATER

BLASTER, HYDRAULIC-DEMOLITION ROBOT, ROSS CARRIERS,

CONCRETE PUMP OPERATORS, ASPHALT/MATERIAL TRANSFER

MACHINES, ROTATING TELEHANDLERS, SPMT TYPE

EQUIPMENT

A. FOOTNOTE: A.

ANY EMPLOYEE WHO WORKS THREE DAYS IN THE WEEK IN

WHICH A HOLIDAY FALLS SHALL BE PAID FOR THE

HOLIDAY. B. PAID HOLIDAYS: NEW YEAR'S DAY,

PRESIDENT'S DAY, MEMORIAL DAY, JULY FOURTH, VICTORY

DAY, LABOR DAY, COLUMBUS DAY, VETERANS DAY,

THANKSGIVING DAY & CHRISTMAS DAY....................$ 44.45 29.95

POWER EQUIPMENT OPERATOR: HIGHWAY CONSTRUCTION

PROJECTS; WATER AND SEWERLINE PROJECTS WHICH ARE

INCIDENTAL TO HIGHWAY CONSTRUCTION PROJECTS; AND

BRIDGE PROJECTS THAT DO NOT SPAN WATER: GROUP 1

CRANES, PILE DRIVERS, LIGHTERS, BOOM TRUCKS,

HOISTS, DERRICKS

A. FOOTNOTE: A. ANY EMPLOYEE WHO WORKS THREE

DAYS IN THE WEEK IN WHICH A HOLIDAY FALLS SHALL BE

PAID FOR THE HOLIDAY. B. PAID HOLIDAYS: NEW YEAR'S

DAY, PRESIDENT'S DAY, MEMORIAL DAY, JULY FOURTH,

VICTORY DAY, LABOR DAY, COLUMBUS DAY, VETERANS DAY,

THANKSGIVING DAY & CHRISTMAS DAY....................$ 46.45 29.95

IRON0037-001 09/16/2025

IRONWORKER..........................................$ 43.03 33.53

LABO0271-001 12/03/2023

LABORER GROUP 5 (BUILDING CONSTRUCTION).............$ 39.00 26.90

LABORER GROUP 4 (BUILDING CONSTRUCTION).............$ 37.00 26.90

LABORER GROUP 3 (BUILDING CONSTRUCTION).............$ 37.00 26.90

LABORER GROUP 2 (BUILDING CONSTRUCTION).............$ 37.00 26.90

LABORER GROUP 1 (BUILDING CONSTRUCTION).............$ 37.00 26.90

LABO0271-002 11/27/2022

LABORER TEST BORING LABORER.........................$ 41.95 24.15

LABORER TEST BORING DRILLER.........................$ 41.95 24.15

LABORER OPEN AIR CAISSON, UNDERPINNING WORK AND

BORING CREW TOP MAN & LABORER...................$ 35.60 24.15

LABORER OPEN AIR CAISSON, UNDERPINNING WORK AND

BORING CREW BOTTOM MAN..............................$ 41.50 24.15

LABORER FREE AIR GROUP 3............................$ 42.45 24.15

LABORER FREE AIR GROUP 2............................$ 45.00 24.15

LABORER FREE AIR GROUP 1............................$ 46.00 24.15

LABORER COMPRESSED AIR GROUP 3......................$ 42.45 24.15

LABORER COMPRESSED AIR GROUP 2......................$ 52.93 24.15

LABORER COMPRESSED AIR GROUP 1......................$ 55.40 24.15

PAIN0011-005 06/01/2025

PAINTER (SPRAY, SAND & WATER BLASTING)..............$ 42.57 26.60

PAINTER (EPOXY, TANKS, TOWERS, SWING STAGE &

STRUCTURAL STEEL)...................................$ 41.57 26.60

PAINTER (BRUSH AND ROLLER)..........................$ 39.57 26.60

PAIN0011-006 06/01/2024

GLAZIER FOOTNOTES: SWING STAGE: $1.00 PER

HOUR ADDITIONAL. PAID HOLIDAYS: LABOR DAY &

CHRISTMAS DAY.......................................$ 41.63 26.15

PAIN0011-011 06/01/2024

PAINTER (BRIDGE WORK)...............................$ 57.85 26.40

PAIN0035-008 06/01/2011

SIGN PAINTER........................................$ 24.79 13.72

PLAS0040-001 01/01/2025

CEMENT MASON/CONCRETE FINISHER (BUILDING

CONSTRUCTION) FOOTNOTE: CEMENT MASON: WORK ON

FREE SWINGING SCAFFOLDS UNDER 3 PLANKS WIDTH AND

WHICH IS 20 OR MORE FEET ABOVE GROUND AND ANY

OFFSET STRUCTURE: $.30 PER HOUR ADDITIONAL..........$ 44.75 29.10

PLAS0040-002 01/01/2025

CEMENT MASON/CONCRETE FINISHER (HEAVY AND HIGHWAY

CONSTRUCTION).......................................$ 44.75 29.10

PLAS0040-003 01/01/2025

PLASTERER...........................................$ 45.52 29.43

PLUM0051-002 08/25/2025

PLUMBERS AND PIPEFITTERS............................$ 54.34 34.50

ROOF0033-004 12/01/2025

ROOFER..............................................$ 47.49 31.44

SFRI0669-001 04/01/2025

SPRINKLER FITTER....................................$ 53.76 33.44

SHEE0017-002 06/01/2025

SHEET METAL WORKER..................................$ 44.42 41.94

TEAM0251-001 05/01/2025

TRUCK DRIVER: HEAVY AND HIGHWAY CONSTRUCTION: GROUP

5 FOUR- AND FIVE-AXLE EQUIPMENT

FOOTNOTES:

A. PAID HOLIDAYS: NEW YEAR'S DAY, MEMORIAL DAY,

INDEPENDENCE DAY, LABOR DAY, THANKSGIVING DAY AND

CHRISTMAS DAY, PLUS PRESIDENTS' DAY, COLUMBUS DAY,

VETERAN'S DAY & V-J DAY, PROVIDING THE EMPLOYEE HAS

WORKED AT LEAST ONE DAY IN THE CALENDAR WEEK IN

WHICH THE HOLIDAY FALLS. B. EMPLOYEE WHO HAS

BEEN ON THE PAYROLL FOR 1 YEAR OR MORE BUT LESS

THAN 5 YEARS AND HAS WORKED 150 DAYS DURING THE

LAST YEAR OF EMPLOYMENT SHALL RECEIVE 1 WEEK'S PAID

VACATION; 5 TO 10 YEARS - 2 WEEKS' PAID VACATION;

10 OR MORE YEARS - 3 WEEK'S PAID VACATION. C.

EMPLOYEES ON THE SENIORITY LIST SHALL BE PAID A ONE

HUNDRED DOLLAR ($100.00) BONUS FOR EVERY FOUR

HUNDRED (400) HOURS WORKED, UP TO A MAXIMUM OF FIVE

HUNDRED DOLLARS ($500.00) ALL DRIVERS WORKING ON A

DEFINED HAZARD MATERIAL JOB SITE SHALL BE PAID A

PREMIUM OF $2.00 PER HOUR OVER APPLICABLE RATE.

........................................$ 32.21 34.51

10 TRACTOR TRAILER

FOOTNOTES: A. PAID HOLIDAYS: NEW YEAR'S DAY,

MEMORIAL DAY, INDEPENDENCE DAY, LABOR DAY,

THANKSGIVING DAY AND CHRISTMAS DAY, PLUS

PRESIDENTS' DAY, COLUMBUS DAY, VETERAN'S DAY & V-J

DAY, PROVIDING THE EMPLOYEE HAS WORKED AT LEAST ONE

DAY IN THE CALENDAR WEEK IN WHICH THE HOLIDAY

FALLS. B. EMPLOYEE WHO HAS BEEN ON THE PAYROLL

FOR 1 YEAR OR MORE BUT LESS THAN 5 YEARS AND HAS

WORKED 150 DAYS DURING THE LAST YEAR OF EMPLOYMENT

SHALL RECEIVE 1 WEEK'S PAID VACATION; 5 TO 10 YEARS

- 2 WEEKS' PAID VACATION; 10 OR MORE YEARS - 3

WEEK'S PAID VACATION. C. EMPLOYEES ON THE

SENIORITY LIST SHALL BE PAID A ONE HUNDRED DOLLAR

($100.00) BONUS FOR EVERY FOUR HUNDRED (400) HOURS

WORKED, UP TO A MAXIMUM OF FIVE HUNDRED DOLLARS

($500.00) ALL DRIVERS WORKING ON A DEFINED HAZARD

MATERIAL JOB SITE SHALL BE PAID A PREMIUM OF $2.00

PER HOUR OVER APPLICABLE RATE. .....$ 32.36 34.51

9 SPECIAL EARTH-MOVING EQUIPMENT, 35 TONS OR OVER

THANKSGIVING DAY AND CHRISTMAS DAY, PLUS

PRESIDENTS' DAY, COLUMBUS DAY, VETERAN'S DAY & V-J

DAY, PROVIDING THE EMPLOYEE HAS WORKED AT LEAST ONE

DAY IN THE CALENDAR WEEK IN WHICH THE HOLIDAY

FALLS. B. EMPLOYEE WHO HAS BEEN ON THE PAYROLL

FOR 1 YEAR OR MORE BUT LESS THAN 5 YEARS AND HAS

WORKED 150 DAYS DURING THE LAST YEAR OF EMPLOYMENT

SHALL RECEIVE 1 WEEK'S PAID VACATION; 5 TO 10 YEARS

- 2 WEEKS' PAID VACATION; 10 OR MORE YEARS - 3

WEEK'S PAID VACATION. C. EMPLOYEES ON THE

SENIORITY LIST SHALL BE PAID A ONE HUNDRED DOLLAR

($100.00) BONUS FOR EVERY FOUR HUNDRED (400) HOURS

WORKED, UP TO A MAXIMUM OF FIVE HUNDRED DOLLARS

($500.00) ALL DRIVERS WORKING ON A DEFINED HAZARD

MATERIAL JOB SITE SHALL BE PAID A PREMIUM OF $2.00

PER HOUR OVER APPLICABLE RATE. .....$ 32.56 34.51

8 SPECIAL EARTH-MOVING EQUIPMENT, UNDER 35 TONS

FOOTNOTES: A. PAID HOLIDAYS: NEW

YEAR'S DAY, MEMORIAL DAY, INDEPENDENCE DAY, LABOR

DAY, THANKSGIVING DAY AND CHRISTMAS DAY, PLUS

PRESIDENTS' DAY, COLUMBUS DAY, VETERAN'S DAY & V-J

DAY, PROVIDING THE EMPLOYEE HAS WORKED AT LEAST ONE

DAY IN THE CALENDAR WEEK IN WHICH THE HOLIDAY

FALLS. B. EMPLOYEE WHO HAS BEEN ON THE PAYROLL

FOR 1 YEAR OR MORE BUT LESS THAN 5 YEARS AND HAS

WORKED 150 DAYS DURING THE LAST YEAR OF EMPLOYMENT

SHALL RECEIVE 1 WEEK'S PAID VACATION; 5 TO 10 YEARS

- 2 WEEKS' PAID VACATION; 10 OR MORE YEARS - 3

WEEK'S PAID VACATION. C. EMPLOYEES ON THE

SENIORITY LIST SHALL BE PAID A ONE HUNDRED DOLLAR

($100.00) BONUS FOR EVERY FOUR HUNDRED (400) HOURS

WORKED, UP TO A MAXIMUM OF FIVE HUNDRED DOLLARS

($500.00) ALL DRIVERS WORKING ON A DEFINED HAZARD

MATERIAL JOB SITE SHALL BE PAID A PREMIUM OF $2.00

PER HOUR OVER APPLICABLE RATE. .....$ 32.31 34.51

TRUCK DRIVER: HEAVY AND HIGHWAY CONSTRUCTION: GROUP

7 TRAILERS WHEN USED ON A DOUBLE HOOK UP (PULLING

2 TRAILERS)

FOOTNOTES: A. PAID

HOLIDAYS: NEW YEAR'S DAY, MEMORIAL DAY,

INDEPENDENCE DAY, LABOR DAY, THANKSGIVING DAY AND

CHRISTMAS DAY, PLUS PRESIDENTS' DAY, COLUMBUS DAY,

VETERAN'S DAY & V-J DAY, PROVIDING THE EMPLOYEE HAS

WORKED AT LEAST ONE DAY IN THE CALENDAR WEEK IN

WHICH THE HOLIDAY FALLS. B. EMPLOYEE WHO HAS

BEEN ON THE PAYROLL FOR 1 YEAR OR MORE BUT LESS

THAN 5 YEARS AND HAS WORKED 150 DAYS DURING THE

LAST YEAR OF EMPLOYMENT SHALL RECEIVE 1 WEEK'S PAID

VACATION; 5 TO 10 YEARS - 2 WEEKS' PAID VACATION;

10 OR MORE YEARS - 3 WEEK'S PAID VACATION. C.

EMPLOYEES ON THE SENIORITY LIST SHALL BE PAID A ONE

HUNDRED DOLLAR ($100.00) BONUS FOR EVERY FOUR

HUNDRED (400) HOURS WORKED, UP TO A MAXIMUM OF FIVE

HUNDRED DOLLARS ($500.00) ALL DRIVERS WORKING ON A

DEFINED HAZARD MATERIAL JOB SITE SHALL BE PAID A

PREMIUM OF $2.00 PER HOUR OVER APPLICABLE RATE.

........................................$ 32.81 34.51

6 LOW-BED OR BOOM TRAILER.

THANKSGIVING DAY AND CHRISTMAS DAY, PLUS

PRESIDENTS' DAY, COLUMBUS DAY, VETERAN'S DAY & V-J

DAY, PROVIDING THE EMPLOYEE HAS WORKED AT LEAST ONE

DAY IN THE CALENDAR WEEK IN WHICH THE HOLIDAY

FALLS. B. EMPLOYEE WHO HAS BEEN ON THE PAYROLL

FOR 1 YEAR OR MORE BUT LESS THAN 5 YEARS AND HAS

WORKED 150 DAYS DURING THE LAST YEAR OF EMPLOYMENT

SHALL RECEIVE 1 WEEK'S PAID VACATION; 5 TO 10 YEARS

- 2 WEEKS' PAID VACATION; 10 OR MORE YEARS - 3

WEEK'S PAID VACATION. C. EMPLOYEES ON THE

SENIORITY LIST SHALL BE PAID A ONE HUNDRED DOLLAR

($100.00) BONUS FOR EVERY FOUR HUNDRED (400) HOURS

WORKED, UP TO A MAXIMUM OF FIVE HUNDRED DOLLARS

($500.00) ALL DRIVERS WORKING ON A DEFINED HAZARD

MATERIAL JOB SITE SHALL BE PAID A PREMIUM OF $2.00

PER HOUR OVER APPLICABLE RATE. .....$ 32.61 34.51

4 THREE-AXLE DUMP TRUCK

THANKSGIVING DAY AND CHRISTMAS DAY, PLUS

PRESIDENTS' DAY, COLUMBUS DAY, VETERAN'S DAY & V-J

DAY, PROVIDING THE EMPLOYEE HAS WORKED AT LEAST ONE

DAY IN THE CALENDAR WEEK IN WHICH THE HOLIDAY

FALLS. B. EMPLOYEE WHO HAS BEEN ON THE PAYROLL

FOR 1 YEAR OR MORE BUT LESS THAN 5 YEARS AND HAS

WORKED 150 DAYS DURING THE LAST YEAR OF EMPLOYMENT

SHALL RECEIVE 1 WEEK'S PAID VACATION; 5 TO 10 YEARS

- 2 WEEKS' PAID VACATION; 10 OR MORE YEARS - 3

WEEK'S PAID VACATION. C. EMPLOYEES ON THE

SENIORITY LIST SHALL BE PAID A ONE HUNDRED DOLLAR

($100.00) BONUS FOR EVERY FOUR HUNDRED (400) HOURS

($500.00) ALL DRIVERS WORKING ON A DEFINED HAZARD

MATERIAL JOB SITE SHALL BE PAID A PREMIUM OF $2.00

PER HOUR OVER APPLICABLE RATE. .....$ 32.11 34.51

3 TWO-AXLE DUMP TRUCK

THANKSGIVING DAY AND CHRISTMAS DAY, PLUS

PRESIDENTS' DAY, COLUMBUS DAY, VETERAN'S DAY & V-J

DAY, PROVIDING THE EMPLOYEE HAS WORKED AT LEAST ONE

DAY IN THE CALENDAR WEEK IN WHICH THE HOLIDAY

FALLS. B. EMPLOYEE WHO HAS BEEN ON THE PAYROLL

FOR 1 YEAR OR MORE BUT LESS THAN 5 YEARS AND HAS

WORKED 150 DAYS DURING THE LAST YEAR OF EMPLOYMENT

SHALL RECEIVE 1 WEEK'S PAID VACATION; 5 TO 10 YEARS

- 2 WEEKS' PAID VACATION; 10 OR MORE YEARS - 3

WEEK'S PAID VACATION. C. EMPLOYEES ON THE

SENIORITY LIST SHALL BE PAID A ONE HUNDRED DOLLAR

($100.00) BONUS FOR EVERY FOUR HUNDRED (400) HOURS

WORKED, UP TO A MAXIMUM OF FIVE HUNDRED DOLLARS

($500.00) ALL DRIVERS WORKING ON A DEFINED HAZARD

MATERIAL JOB SITE SHALL BE PAID A PREMIUM OF $2.00

PER HOUR OVER APPLICABLE RATE. .....$ 32.06 34.51

2 TWO-AXLE ON LOW BEDS

THANKSGIVING DAY AND CHRISTMAS DAY, PLUS

PRESIDENTS' DAY, COLUMBUS DAY, VETERAN'S DAY & V-J

DAY, PROVIDING THE EMPLOYEE HAS WORKED AT LEAST ONE

DAY IN THE CALENDAR WEEK IN WHICH THE HOLIDAY

FALLS. B. EMPLOYEE WHO HAS BEEN ON THE PAYROLL

FOR 1 YEAR OR MORE BUT LESS THAN 5 YEARS AND HAS

WORKED 150 DAYS DURING THE LAST YEAR OF EMPLOYMENT

SHALL RECEIVE 1 WEEK'S PAID VACATION; 5 TO 10 YEARS

- 2 WEEKS' PAID VACATION; 10 OR MORE YEARS - 3

WEEK'S PAID VACATION. C. EMPLOYEES ON THE

SENIORITY LIST SHALL BE PAID A ONE HUNDRED DOLLAR

($100.00) BONUS FOR EVERY FOUR HUNDRED (400) HOURS

WORKED, UP TO A MAXIMUM OF FIVE HUNDRED DOLLARS

($500.00) ALL DRIVERS WORKING ON A DEFINED HAZARD

MATERIAL JOB SITE SHALL BE PAID A PREMIUM OF $2.00

PER HOUR OVER APPLICABLE RATE. .....$ 32.01 34.51

1 PICK-UP TRUCKS, STATION WAGONS, & PANEL TRUCKS

FOOTNOTES: A. PAID HOLIDAYS: NEW

YEAR'S DAY, MEMORIAL DAY, INDEPENDENCE DAY, LABOR

DAY, THANKSGIVING DAY AND CHRISTMAS DAY, PLUS

PRESIDENTS' DAY, COLUMBUS DAY, VETERAN'S DAY & V-J

DAY, PROVIDING THE EMPLOYEE HAS WORKED AT LEAST ONE

DAY IN THE CALENDAR WEEK IN WHICH THE HOLIDAY

FALLS. B. EMPLOYEE WHO HAS BEEN ON THE PAYROLL

FOR 1 YEAR OR MORE BUT LESS THAN 5 YEARS AND HAS

WORKED 150 DAYS DURING THE LAST YEAR OF EMPLOYMENT

SHALL RECEIVE 1 WEEK'S PAID VACATION; 5 TO 10 YEARS

- 2 WEEKS' PAID VACATION; 10 OR MORE YEARS - 3

WEEK'S PAID VACATION. C. EMPLOYEES ON THE

SENIORITY LIST SHALL BE PAID A ONE HUNDRED DOLLAR

($100.00) BONUS FOR EVERY FOUR HUNDRED (400) HOURS

($500.00) ALL DRIVERS WORKING ON A DEFINED HAZARD

MATERIAL JOB SITE SHALL BE PAID A PREMIUM OF $2.00

PER HOUR OVER APPLICABLE RATE. .....$ 31.86 34.51

WELDERS - Receive rate prescribed for craft performing operation to which welding is incidental.

Note: Executive Order (EO) 13706, Establishing Paid Sick Leave for Federal Contractors applies to all contracts subject to the

Davis-Bacon Act for which the contract is awarded (and any solicitation was issued) on or after January 1, 2017. If this contract is covered by the EO, the contractor must provide employees with 1 hour of paid sick leave for every 30 hours they work, up to 56 hours of paid sick leave each year.

Employees must be permitted to use paid sick leave for their own illness, injury or other health-related needs, including preventive care; to assist a family member (or person who is like family to the employee) who is ill, injured, or has other health-related needs, including preventive care; or for reasons resulting from, or to assist a family member (or person who is like family to the employee) who is a victim of, domestic violence, sexual assault, or stalking. Additional information on contractor requirements and worker protections under the EO is available at https://www.dol.gov/agencies/whd/government-contracts.

Note: Executive Order 13658 generally applies to contracts subject to the Davis-Bacon Act that were awarded on or between January 1, 2015 and January 29, 2022, and that have not been renewed or extended on or after January 30, 2022. Executive Order 13658 does not apply to contracts subject only to the Davis-Bacon Related Acts regardless of when they were awarded. If a contract is subject to

Executive Order 13658, the contractor must pay all covered workers at least $13.65 per hour (or the applicable wage rate listed on this wage determination, if it is higher) for all hours spent performing on the contract from May 11, 2026, through December 31, 2026. The applicable Executive Order minimum wage rate will be adjusted annually.

Additional information on contractor requirements and worker protections under Executive Order 13658 is available at www.dol.gov/whd/govcontracts.

Unlisted classifications needed for work not included within the scope of the classifications listed may be added after award only as provided in the labor standards contract clauses

(29CFR 5.5 (a) (1) (iii)).

The body of each wage determination lists the classifications and wage rates that have been found to be prevailing for the type(s) of construction and geographic area covered by the wage determination. The classifications are listed in alphabetical order under rate identifiers indicating whether the particular rate is a union rate (current union negotiated rate), a survey rate, a weighted union average rate, a state adopted rate, or a supplemental classification rate.

Union Rate Identifiers

A four-letter identifier beginning with characters other than

�SU�, �UAVG�, �SA�, or �SC� denotes that a union rate was prevailing for that classification in the survey. Example:

PLUM0198-005 07/01/2024. PLUM is an identifier of the union whose collectively bargained rate prevailed in the survey for this classification, which in this example would be Plumbers.

0198 indicates the local union number or district council number where applicable, i.e., Plumbers Local 0198. The next number, 005 in the example, is an internal number used in processing the wage determination. The date, 07/01/2024 in the example, is the effective date of the most current negotiated rate.

Union prevailing wage rates are updated to reflect all changes over time that are reported to WHD in the rates in the collective bargaining agreement (CBA) governing the classification.

Union Average Rate Identifiers

The UAVG identifier indicates that no single rate prevailed for those classifications, but that 100% of the data reported for the classifications reflected union rates. EXAMPLE:

UAVG-OH-0010 01/01/2024. UAVG indicates that the rate is a weighted union average rate. OH indicates the State of Ohio.

The next number, 0010 in the example, is an internal number used in producing the wage determination. The date, 01/01/2024 in the example, indicates the date the wage determination was updated to reflect the most current union average rate.

A UAVG rate will be updated once a year, usually in…