Amendment 0004 USCG OPC.pdf
PDF 871 KB Posted
- Attached to
- Design-Bid-Build, USCG Offshore Patrol Cutters (OPC) Homeport Pier, Naval Station Newport, Newport RI
- Solicitation number
- N4008526R0001
About this file
This document is Amendment 0004 to a Design-Bid-Build federal solicitation for the USCG Offshore Patrol Cutters (OPC) Homeport Pier at Naval Station Newport, Newport, Rhode Island. The amendment extends the proposal due date from June 9, 2026 to June 15, 2026 at 2:00 PM EDT and provides updated drawings, specifications, attachments, and responses to pre-proposal inquiries (PPIs). The contract is issued by NAVFACSYSCOM Mid-Atlantic (CODE N40085) and administered by the same office. Key additions include updated Attachment K (prevailing wage determination WD RI20260001 dated May 18, 2026), Attachment U (Pier 1 Extension 1968 historical drawings), and Attachment V (Amendment 004 Drawings showing revisions to utility plans, demolition plans, framing plans, pile cap details, and manhole details). The amendment clarifies that no additional PPIs will be accepted after this amendment.
The document provides comprehensive responses to 216 pre-proposal inquiries addressing technical specifications, drawings, material requirements, construction methods, environmental permits, and evaluation criteria. Notable clarifications include confirmation that the existing pier is 1,580 feet long (extended in 1968), pile driving specifications and tolerances, use of precast versus cast-in-place concrete elements, utility separation requirements applying only to landside installations, acceptance of previously completed Past Performance Questionnaires, and provisions for handling asbestos-containing materials. The prevailing wage determination covers Rhode Island counties (Bristol, Kent, Newport, Providence, and Washington) with rates for various construction trades effective through different dates in 2025 and 2026. The amendment addresses design questions, material specifications, permit requirements, and contractor means and methods to enable accurate cost estimates and competitive bidding.
View the file
Other files
Show 40 more
50 files listed here. See the rest on GovTribe.
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
R
11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS
The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offers is extended. is not extended.
Offers must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended, by one of the following methods:
(a) By completing items 8 and 15, and returning copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted;
or (c) By separate letter or electronic communication which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by letter or electronic communication, provided each letter or electronic communication makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.
12. ACCOUNTING AND APPROPRIATION DATA (If required)
13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS.
IT MODIFIES THE CONTRACT/ORDER NUMBER AS DESCRIBED IN ITEM 14.
CHECK ONE A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE CONTRACT ORDER
NUMBER IN ITEM 10A.
B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation data, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(b).
C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:
D. OTHER (Specify type of modification and authority)
E. IMPORTANT: Contractor is not is required to sign this document and return copies to the issuing office.
14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)
Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.
15A. NAME AND TITLE OF SIGNER (Type or print) 16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)
15B. CONTRACTOR/OFFEROR
(Signature of person authorized to sign)
15C. DATE SIGNED 16B. UNITED STATES OF AMERICA
(Signature of Contracting Officer)
16C. DATE SIGNED
Previous edition unusable STANDARD FORM 30 (REV. 11/2016) Prescribed by GSA FAR (48 CFR) 53.243
AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT 1. CONTRACT ID CODE PAGE OF PAGES
2. AMENDMENT/MODIFICATION NUMBER 3. EFFECTIVE DATE 4. REQUISITION/PURCHASE REQUISITION NUMBER 5. PROJECT NUMBER (If applicable)
6. ISSUED BY CODE 7. ADMINISTERED BY (If other than Item 6) CODE
8. NAME AND ADDRESS OF CONTRACTOR (Number, street, county, State and ZIP Code) (X) 9A. AMENDMENT OF SOLICITATION NUMBER
9B. DATED (SEE ITEM 11)
10A. MODIFICATION OF CONTRACT/ORDER NUMBE
10B. DATED (SEE ITEM 13)
CODE FACILITY CODE
SECTION SF 30 BLOCK 14 CONTINUATION PAGE
SUMMARY OF CHANGES
Block 14 (Description of Amendment/Modification): Solicitation NO: N4008526R0001, Design-Bid-Build, USCG Offshore Patrol Cutters (OPC) Homeport Pier, Naval Station Newport, Newport RI
SEE SF 30 BLOCK 14 CONTINUATION PAGE.
ALL CORRESPONDENCE REGARDING THIS SOLICITATION SHALL BE DIRECTED VIA EMAIL TO KRISTY GERREK AT KRISTY.L.
GERREK.CIV@US.NAVY.MIL.
This amendment is issued to incorporate the following:
1. Extend the proposal due date from 09 JUNE 2026 TO 15 JUNE 2026 NLT 2:00 P.M. EDT.
2. Provide continuation sheet for drawings and specifications (Enclosed)
3. Provide Updated Attachment K - WD RI20260001 05-18-2026 (Enclosed)
4. Provide Attachment U - Appendix A - Pier 1 Extension 1968 (Attached separately)
5. Provide Attachment V - Pier 1 - Amendment 004 Drawings (Attached separately)
6. Provide PPI Responses (Enclosed)
Section 00 00 00 - Procurement and Contracting Requirements
The following changes have been made:
INFORMATION FROM TO
Response Due Date 09 Jun 2026 15 Jun 2026
Section 00 73 00 - Supplementary Conditions
The following attachments were added:
Amendment 0004 Continuation Page
N4008526R00010004
SECTION SF30 BLOCK 14 CONTINUATION PAGE
SUMMARY OF CHANGES
The following have been added by full text:
AMENDMENT 0004
This amendment is issued to incorporate the following:
1. Extend the proposal due date from 09 JUNE 2026 TO 15 JUNE 2026 NLT 2:00 P.M. EDT.
2. Provide continuation sheet for drawings and specifications (Enclosed)
3. Provide Updated Attachment K - WD RI20260001 05-18-2026 (Enclosed)
4. Provide Attachment U - Appendix A - Pier 1 Extension 1968 (Attached separately)
5. Provide Attachment V - Pier 1 - Amendment 004 Drawings (Attached separately)
6. Provide PPI Responses (Enclosed)
1. The proposal due date is extended from 09 JUNE 2026 TO 15 JUNE 2026 NLT 2:00 P.M. EDT.
**PLEASE NOTE THAT NO ADDITIONAL PPI’S WILL BE ACCEPTED.**
2. Continuation Sheet for Drawings and Specifications (Enclosed)
The following drawings are revised and incorporated into this amendment:
DWG
NO
NAVFAC
NO
CHANGE
NO
TITLE
C-102 12936608 004 UTILITY PLAN - PIER 1 LANDSIDE (BASE BID)
C-202 12936611 004 UTILITY PROFILES - SHEET 2 OF 2 (BASE BID)
C-505 12936616 004 SITE DETAILS - SHEET 4 OF 6
SD001 12936624 004 STRUCTURAL DEMOLITION NOTES (BASE BID)
SD101 12936625 004 OVERALL STRUCTURAL DEMOLITION PLAN (BASE BID)
SD102 12936626 004 PIER 1 DEMOLITION PLAN
S-110 12936646 004 FRAMING PLAN - SHEET 1 OF 7
S-111 12936647 004 FRAMING PLAN - SHEET 2 OF 7
S-112 12936648 004 FRAMING PLAN - SHEET 3 OF 7
S-113 12936649 004 FRAMING PLAN - SHEET 4 OF 7
S-114 12936650 004 FRAMING PLAN - SHEET 5 OF 7
S-115 12936651 004 FRAMING PLAN - SHEET 6 OF 7
S-504 12936701 004 CONCRETE PILE CAP DETAILS - SHEET 1 OF 3
S-517 12936732 004 PRECAST MANHOLE DETAILS
ADD the following changes to the drawings in the INDEX OF DRAWINGS under the corresponding discipline and drawing number. These drawings accompany this Amendment:
On NAVFAC Dwg. No. 12936608 (C-102)
CHANGE C-102 UTILITY PLAN - PIER 1 LANDSIDE (BASE BID) as follows:
REVISE Keynote 15 callout to Keynote 17 callout on plan.
REVISE Keynote 15 callout to Keynote 26 callout on plan.
REVISE Keynote 26 “80 LF OF 8” PVC PERFORATED UNDERDRAIN. INVERT = 3.5.”
On NAVFAC Dwg. No. 12936608 (C-202)
CHANGE C-202 UTILITY PROFILES - SHEET 2 OF 2 (BASE BID) as follows:
REVISE Detail B1, from a tee size of 10”x 8” to a tee size of 10”x6”
On NAVFAC Dwg. No. 12936608 (C-505)
CHANGE C-505 SITE DETAILS - SHEET 4 OF 6 as follows:
REVISE Detail A1, leader callout added to extend geomembrane, bioretention areas and elevations.
REVISE Detail A3, leader callout added to extend geomembrane, and bioretention planting soil.
On NAVFAC Dwg. No. 12936624 (SD001)
CHANGE SD001 STRUCTURAL DEMOLITION NOTES (BASE BID) as follows:
REVISE PCB / MERCURY NOTES. “LIGHTS” was removed and “FIXTURES” was used in place.
Fixture locations are now called out by location of buildings.
On NAVFAC Dwg. No. 12936625 (SD101)
CHANGE SD101 OVERALL STRUCTURAL DEMOLITION PLAN (BASE BID) as follows:
REVISE over all pier length dimension from 1,567’+/- to 1,580’-8” +/-, and model missing bent at expansion joint at bent 36.
ADD bent count at every 10 bents, and at last bent 159.
On NAVFAC Dwg. No. 12936626 (SD102)
CHANGE SD102 PIER 1 DEMOLITION PLAN as follows:
REVISE overall pier length dimension from 1,567’+/- to 1,580’-8” +/-, missing bent at expansion joint at bent 36.
On NAVFAC Dwg. No. 12936646 (S-110)
CHANGE S-110 FRAMING PLAN - SHEET 1 OF 7 as follows:
ADD outside dimensions to electrical manhole.
On NAVFAC Dwg. No. 12936647 (S-111)
CHANGE S-111 FRAMING PLAN - SHEET 2 OF 7 as follows:
ADD outside dimensions to electrical manholes.
On NAVFAC Dwg. No. 12936648 (S-112)
CHANGE S-112 FRAMING PLAN - SHEET 3 OF 7 as follows:
On NAVFAC Dwg. No. 12936649 (S-113)
CHANGE S-113 FRAMING PLAN - SHEET 4 OF 7 as follows:
On NAVFAC Dwg. No. 12936650 (S-114)
CHANGE S-114 FRAMING PLAN - SHEET 5 OF 7 as follows:
ADD the outside dimensions to electrical manholes and include 8-inch dimension for separation wall.
On NAVFAC Dwg. No. 12936651 (S-115)
CHANGE S-115 FRAMING PLAN - SHEET 6 OF 7 as follows:
ADD the outside dimensions to electrical manholes and include 8-inch dimension for separation wall.
On NAVFAC Dwg. No. 12936701 (S-504)
CHANGE S-504 CONCRETE PILE CAP DETAILS - SHEET 1 OF 3 as follows:
ADD Detail C1 of “TYPICAL BEAM ELEVATION”.
On NAVFAC Dwg. No. 12936732 (S-517)
CHANGE S-517 PRECAST MANHOLE DETAILS as follows:
ADD Section A4 “LATERAL SECTION THROUGH PRECAST MANHOLE WITH PARTITION
WALL”.
3. Updated Attachment K - WD RI20260001 05-18-2026 is provided with this amendment.
"General Decision Number: RI20260001 05/18/2026
State: Rhode Island
Construction Types: Building, Heavy and Highway
Counties: Rhode Island Counties of
Bristol, Kent, Newport, Providence and
Washington
Includes Marine Construction Projects
Modification Number Publication Date
2 01/30/2026
3 05/18/2026
ASBE0006-006 09/01/2024
Rates Fringes
HAZARDOUS MATERIAL HANDLER (INCLUDES PREPARATION,
WETTING, STRIPPING, REMOVAL SCRAPPING, VACUUMING,
BAGGING & DISPOSING OF ALL INSULATION MATERIALS,
WHETHER THEY CONTAIN ASBESTOS OR NOT, FROM
MECHANICAL SYSTEMS).................................$ 49.91 36.63
ASBE0006-008 09/01/2024
ASBESTOS WORKER/INSULATOR (INCLUDES APPLICATION OF
ALL INSULATING MATERIALS, PROTECTIVE COVERINGS,
COATINGS & FINISHES TO ALL TYPES OF MECHANICAL
SYSTEMS)............................................$ 49.91 36.63
BOIL0029-001 01/01/2025
BOILERMAKER.........................................$ 50.62 28.82
BRRI0003-001 06/01/2022
BRICKLAYER, STONEMASON, POINTER, CAULKER & CLEANER..$ 46.86 29.14
BRRI0003-002 09/01/2022
MARBLE SETTER, TERRAZZO WORKER & TILE SETTER........$ 46.54 30.34
BRRI0003-003 09/01/2022
MARBLE, TILE & TERRAZZO FINISHER....................$ 38.78 29.61
CARP0330-001 01/01/2023
PILEDRIVER FOOTNOTES: WHEN NOT DIVING OR
TENDING THE DIVER, THE DIVER AND DIVER TENDER SHALL
RECEIVE THE PILEDRIVER RATE. DIVER TENDERS SHALL
RECEIVE $1.00 PER HOUR ABOVE THE PILE DRIVER RATE
WHEN TENDING THE DIVER. WORK ON FREE-STANDING
STACKS, CONCRETE SILOS & PUBLIC UTILITY ELECTRICAL
POWER HOUSES, WHICH ARE OVER 35 FT. IN HEIGHT WHEN
CONSTRUCTED: $.50 PER HOUR ADDITIONAL. WORK ON
EXTERIOR CONCRETE SHEAR WALL GANG FORMS, 45 FT. OR
MORE ABOVE GROUND ELEVATION OR ON SETBACK: $.50 PER
HOUR ADDITIONAL. THE DESIGNATED PILEDRIVER,
KNOWN AS THE ""MONKEY"": $1.00 PER HOUR ADDITIONAL....$ 41.53 29.35
WELDER FOOTNOTES: WHEN NOT DIVING OR TENDING
THE DIVER, THE DIVER AND DIVER TENDER SHALL RECEIVE
THE PILEDRIVER RATE. DIVER TENDERS SHALL RECEIVE
$1.00 PER HOUR ABOVE THE PILE DRIVER RATE WHEN
TENDING THE DIVER. WORK ON FREE-STANDING STACKS,
CONCRETE SILOS & PUBLIC UTILITY ELECTRICAL POWER
HOUSES, WHICH ARE OVER 35 FT. IN HEIGHT WHEN
CONSTRUCTED: $.50 PER HOUR ADDITIONAL. WORK ON
EXTERIOR CONCRETE SHEAR WALL GANG FORMS, 45 FT. OR
MORE ABOVE GROUND ELEVATION OR ON SETBACK: $.50 PER
HOUR ADDITIONAL. THE DESIGNATED PILEDRIVER,
KNOWN AS THE ""MONKEY"": $1.00 PER HOUR ADDITIONAL....$ 48.68 30.50
DIVER TENDER FOOTNOTES: WHEN NOT DIVING OR
TENDING THE DIVER, THE DIVER AND DIVER TENDER SHALL
RECEIVE THE PILEDRIVER RATE. DIVER TENDERS SHALL
RECEIVE $1.00 PER HOUR ABOVE THE PILE DRIVER RATE
WHEN TENDING THE DIVER. WORK ON FREE-STANDING
STACKS, CONCRETE SILOS & PUBLIC UTILITY ELECTRICAL
POWER HOUSES, WHICH ARE OVER 35 FT. IN HEIGHT WHEN
CONSTRUCTED: $.50 PER HOUR ADDITIONAL. WORK ON
EXTERIOR CONCRETE SHEAR WALL GANG FORMS, 45 FT. OR
MORE ABOVE GROUND ELEVATION OR ON SETBACK: $.50 PER
HOUR ADDITIONAL. THE DESIGNATED PILEDRIVER,
KNOWN AS THE ""MONKEY"": $1.00 PER HOUR ADDITIONAL....$ 48.68 30.50
DIVER FOOTNOTES: WHEN NOT DIVING OR TENDING
THE DIVER, THE DIVER AND DIVER TENDER SHALL RECEIVE
THE PILEDRIVER RATE. DIVER TENDERS SHALL RECEIVE
$1.00 PER HOUR ABOVE THE PILE DRIVER RATE WHEN
TENDING THE DIVER. WORK ON FREE-STANDING STACKS,
CONCRETE SILOS & PUBLIC UTILITY ELECTRICAL POWER
HOUSES, WHICH ARE OVER 35 FT. IN HEIGHT WHEN
CONSTRUCTED: $.50 PER HOUR ADDITIONAL. WORK ON
EXTERIOR CONCRETE SHEAR WALL GANG FORMS, 45 FT. OR
MORE ABOVE GROUND ELEVATION OR ON SETBACK: $.50 PER
HOUR ADDITIONAL. THE DESIGNATED PILEDRIVER,
KNOWN AS THE ""MONKEY"": $1.00 PER HOUR ADDITIONAL....$ 60.83 30.50
CARPENTER: INCLUDES SOFT FLOOR LAYER................$ 47.88 30.50
CARP0330-001 06/02/2025
PILEDRIVER FOOTNOTES: WHEN NOT DIVING OR
TENDING THE DIVER, THE DIVER AND DIVER TENDER SHALL
RECEIVE THE PILEDRIVER RATE. DIVER TENDERS SHALL
RECEIVE $1.00 PER HOUR ABOVE THE PILE DRIVER RATE
WHEN TENDING THE DIVER. WORK ON FREE-STANDING
STACKS, CONCRETE SILOS & PUBLIC UTILITY ELECTRICAL
POWER HOUSES, WHICH ARE OVER 35 FT. IN HEIGHT WHEN
CONSTRUCTED: $.50 PER HOUR ADDITIONAL. WORK ON
EXTERIOR CONCRETE SHEAR WALL GANG FORMS, 45 FT. OR
MORE ABOVE GROUND ELEVATION OR ON SETBACK: $.50 PER
HOUR ADDITIONAL. THE DESIGNATED PILEDRIVER,
KNOWN AS THE ""MONKEY"": $1.00 PER HOUR ADDITIONAL....$ 41.53 29.35
WELDER FOOTNOTES: WHEN NOT DIVING OR TENDING
THE DIVER, THE DIVER AND DIVER TENDER SHALL RECEIVE
THE PILEDRIVER RATE. DIVER TENDERS SHALL RECEIVE
$1.00 PER HOUR ABOVE THE PILE DRIVER RATE WHEN
TENDING THE DIVER. WORK ON FREE-STANDING STACKS,
CONCRETE SILOS & PUBLIC UTILITY ELECTRICAL POWER
HOUSES, WHICH ARE OVER 35 FT. IN HEIGHT WHEN
CONSTRUCTED: $.50 PER HOUR ADDITIONAL. WORK ON
EXTERIOR CONCRETE SHEAR WALL GANG FORMS, 45 FT. OR
MORE ABOVE GROUND ELEVATION OR ON SETBACK: $.50 PER
HOUR ADDITIONAL. THE DESIGNATED PILEDRIVER,
KNOWN AS THE ""MONKEY"": $1.00 PER HOUR ADDITIONAL....$ 48.68 30.50
DIVER TENDER FOOTNOTES: WHEN NOT DIVING OR
TENDING THE DIVER, THE DIVER AND DIVER TENDER SHALL
RECEIVE THE PILEDRIVER RATE. DIVER TENDERS SHALL
RECEIVE $1.00 PER HOUR ABOVE THE PILE DRIVER RATE
WHEN TENDING THE DIVER. WORK ON FREE-STANDING
STACKS, CONCRETE SILOS & PUBLIC UTILITY ELECTRICAL
POWER HOUSES, WHICH ARE OVER 35 FT. IN HEIGHT WHEN
CONSTRUCTED: $.50 PER HOUR ADDITIONAL. WORK ON
EXTERIOR CONCRETE SHEAR WALL GANG FORMS, 45 FT. OR
MORE ABOVE GROUND ELEVATION OR ON SETBACK: $.50 PER
HOUR ADDITIONAL. THE DESIGNATED PILEDRIVER,
KNOWN AS THE ""MONKEY"": $1.00 PER HOUR ADDITIONAL....$ 48.68 30.50
DIVER FOOTNOTES: WHEN NOT DIVING OR TENDING
THE DIVER, THE DIVER AND DIVER TENDER SHALL RECEIVE
THE PILEDRIVER RATE. DIVER TENDERS SHALL RECEIVE
$1.00 PER HOUR ABOVE THE PILE DRIVER RATE WHEN
TENDING THE DIVER. WORK ON FREE-STANDING STACKS,
CONCRETE SILOS & PUBLIC UTILITY ELECTRICAL POWER
HOUSES, WHICH ARE OVER 35 FT. IN HEIGHT WHEN
CONSTRUCTED: $.50 PER HOUR ADDITIONAL. WORK ON
EXTERIOR CONCRETE SHEAR WALL GANG FORMS, 45 FT. OR
MORE ABOVE GROUND ELEVATION OR ON SETBACK: $.50 PER
HOUR ADDITIONAL. THE DESIGNATED PILEDRIVER,
KNOWN AS THE ""MONKEY"": $1.00 PER HOUR ADDITIONAL....$ 60.83 30.50
CARPENTER: INCLUDES SOFT FLOOR LAYER................$ 47.88 30.50
CARP1121-002 04/21/2025
MILLWRIGHT..........................................$ 45.72 31.50
ELEC0099-002 06/01/2025
TELEDATA SYSTEM INSTALLER FOOTNOTES: WORK OF
A HAZARDOUS NATURE, OR WHERE THE WORK HEIGHT IS 30
FT. OR MORE FROM THE FLOOR, EXCEPT WHEN WORKING
OSHA-APPROVED LIFTS: 20% PER HOUR ADDITIONAL.
WORK IN TUNNELS BELOW GROUND LEVEL IN COMBINED
SEWER OUTFALL: 20% PER HOUR ADDITIONAL..............$ 42.09 19.71
ELECTRICIAN FOOTNOTES: WORK OF A HAZARDOUS
NATURE, OR WHERE THE WORK HEIGHT IS 30 FT. OR MORE
FROM THE FLOOR, EXCEPT WHEN WORKING OSHA-APPROVED
LIFTS: 20% PER HOUR ADDITIONAL. WORK IN TUNNELS
BELOW GROUND LEVEL IN COMBINED SEWER OUTFALL: 20%
PER HOUR ADDITIONAL.................................$ 56.11 24.74
ELEV0039-001 01/01/2025
ELEVATOR MECHANIC FOOTNOTES: A. PAID HOLIDAYS:
NEW YEARS DAY; MEMORIAL DAY; INDEPENDENCE DAY;
LABOR DAY; VETERANS' DAY; THANKSGIVING DAY; THE
FRIDAY AFTER THANKSGIVING DAY; AND CHRISTMAS DAY.
B. EMPLOYER CONTRIBUTES 8% BASIC HOURLY RATE FOR
5 YEARS OR MORE OF SERVICE OF 6% BASIC HOURLY RATE
FOR 6 MONTHS TO 5 YEARS OF SERVICE AS VACATION PAY
CREDIT..............................................$ 64.52 38.44
ENGI0057-001 12/01/2025
POWER EQUIPMENT OPERATOR: POWER PLANTS, SEWER
TREATMENT PLANTS, PUMPING STATIONS, TUNNELS,
CAISSONS, PIERS, DOCKS, BRIDGES, WIND TURBINES,
SUBTERRANEAN & OTHER MARINE AND HEAVY CONSTRUCTION
WORK: GROUP 9 BOAT & TUG OPERATOR.
A. BOOM LENGTHS, INCLUDING JIBS: 150 FEET
AND OVER + $ 2.00 180 FEET AND OVER + $ 3.00 210
FEET AND OVER + $ 4.00 240 FEET AND OVER + $ 5.00
270 FEET AND OVER + $ 7.00 300 FEET AND OVER + $
8.00 350 FEET AND OVER + $ 9.00 400 FEET AND OVER
+ $10.00 A. PAID HOLIDAYS: NEW YEAR'S DAY,
PRESIDENT'S DAY, MEMORIAL DAY, JULY FOURTH, VICTORY
DAY, LABOR DAY, COLUMBUS DAY, VETERANS DAY,
THANKSGIVING DAY, CHRISTMAS DAY. A: ANY EMPLOYEE
WHO WORKS 3 DAYS IN THE WEEK IN WHICH A HOLIDAY
FALLS SHALL BE PAID FOR THE HOLIDAY. A. FOOTNOTES:
HAZMAT WORK: $2.00 PER HOUR ADDITIONAL.
TUNNEL/SHAFT WORK: $5.00 PER HOUR ADDITIONAL........$ 48.92 29.95
POWER EQUIPMENT OPERATOR: POWER PLANTS, SEWER
TREATMENT PLANTS, PUMPING STATIONS, TUNNELS,
CAISSONS, PIERS, DOCKS, BRIDGES, WIND TURBINES,
SUBTERRANEAN & OTHER MARINE AND HEAVY CONSTRUCTION
WORK: GROUP 8 HEATER, CONCRETE MIXER, STONE
CRUSHER, WELDING MACHINE, GENERATOR AND LIGHT
PLANT, GAS AND ELECTRIC DRIVEN PUMP AND AIR
COMPRESSOR.
A. BOOM
LENGTHS, INCLUDING JIBS: 150 FEET AND OVER + $
2.00 180 FEET AND OVER + $ 3.00 210 FEET AND OVER
+ $ 4.00 240 FEET AND OVER + $ 5.00 270 FEET AND
OVER + $ 7.00 300 FEET AND OVER + $ 8.00 350 FEET
AND OVER + $ 9.00 400 FEET AND OVER + $10.00 A.
PAID HOLIDAYS: NEW YEAR'S DAY, PRESIDENT'S DAY,
MEMORIAL DAY, JULY FOURTH, VICTORY DAY, LABOR DAY,
COLUMBUS DAY, VETERANS DAY, THANKSGIVING DAY,
CHRISTMAS DAY. A: ANY EMPLOYEE WHO WORKS 3 DAYS IN
THE WEEK IN WHICH A HOLIDAY FALLS SHALL BE PAID FOR
THE HOLIDAY. A. FOOTNOTES: HAZMAT WORK: $2.00 PER
HOUR ADDITIONAL. TUNNEL/SHAFT WORK: $5.00 PER HOUR
ADDITIONAL..........................................$ 45.00 29.95
POWER EQUIPMENT OPERATOR: POWER PLANTS, SEWER
TREATMENT PLANTS, PUMPING STATIONS, TUNNELS,
CAISSONS, PIERS, DOCKS, BRIDGES, WIND TURBINES,
WORK: GROUP 7 UTILITY ENGINEERS AND SIGNAL PERSONS
A.
BOOM LENGTHS, INCLUDING JIBS: 150 FEET AND OVER +
$ 2.00 180 FEET AND OVER + $ 3.00 210 FEET AND
OVER + $ 4.00 240 FEET AND OVER + $ 5.00 270 FEET
AND OVER + $ 7.00 300 FEET AND OVER + $ 8.00 350
FEET AND OVER + $ 9.00 400 FEET AND OVER + $10.00
A. PAID HOLIDAYS: NEW YEAR'S DAY, PRESIDENT'S DAY,
MEMORIAL DAY, JULY FOURTH, VICTORY DAY, LABOR DAY,
COLUMBUS DAY, VETERANS DAY, THANKSGIVING DAY,
CHRISTMAS DAY. A: ANY EMPLOYEE WHO WORKS 3 DAYS IN
THE WEEK IN WHICH A HOLIDAY FALLS SHALL BE PAID FOR
THE HOLIDAY. A. FOOTNOTES: HAZMAT WORK: $2.00 PER
HOUR ADDITIONAL. TUNNEL/SHAFT WORK: $5.00 PER HOUR
ADDITIONAL..........................................$ 33.15 29.95
POWER EQUIPMENT OPERATOR: POWER PLANTS, SEWER
TREATMENT PLANTS, PUMPING STATIONS, TUNNELS,
CAISSONS, PIERS, DOCKS, BRIDGES, WIND TURBINES,
WORK: GROUP 6 WELL-POINT INSTALLATION CREW.
A. BOOM LENGTHS, INCLUDING JIBS: 150 FEET AND
OVER + $ 2.00 180 FEET AND OVER + $ 3.00 210 FEET
AND OVER + $ 4.00 240 FEET AND OVER + $ 5.00 270
FEET AND OVER + $ 7.00 300 FEET AND OVER + $ 8.00
350 FEET AND OVER + $ 9.00 400 FEET AND OVER +
$10.00 A. PAID HOLIDAYS: NEW YEAR'S DAY,
PRESIDENT'S DAY, MEMORIAL DAY, JULY FOURTH, VICTORY
DAY, LABOR DAY, COLUMBUS DAY, VETERANS DAY,
THANKSGIVING DAY, CHRISTMAS DAY. A: ANY EMPLOYEE
WHO WORKS 3 DAYS IN THE WEEK IN WHICH A HOLIDAY
FALLS SHALL BE PAID FOR THE HOLIDAY. A. FOOTNOTES:
HAZMAT WORK: $2.00 PER HOUR ADDITIONAL.
TUNNEL/SHAFT WORK: $5.00 PER HOUR ADDITIONAL........$ 39.15 29.95
POWER EQUIPMENT OPERATOR: POWER PLANTS, SEWER
TREATMENT PLANTS, PUMPING STATIONS, TUNNELS,
CAISSONS, PIERS, DOCKS, BRIDGES, WIND TURBINES,
SUBTERRANEAN & OTHER MARINE AND HEAVY CONSTRUCTION
WORK: GROUP 5 BULLDOZER, BOBCATS, SKID STEER
LOADER, TRACTOR, SCRAPER, COMBINATION LOADER
BACKHOE, ROLLER, FRONT END LOADER (LESS THAN 3
YDS.), STREET AND MOBILE-POWERED SWEEPER (3-YD.
CAPACITY), 8-FT. SWEEPER MINIMUM 65 HP).
A. BOOM LENGTHS, INCLUDING JIBS: 150
FEET AND OVER + $ 2.00 180 FEET AND OVER + $ 3.00
210 FEET AND OVER + $ 4.00 240 FEET AND OVER + $
5.00 270 FEET AND OVER + $ 7.00 300 FEET AND OVER
+ $ 8.00 350 FEET AND OVER + $ 9.00 400 FEET AND
OVER + $10.00 A. PAID HOLIDAYS: NEW YEAR'S DAY,
PRESIDENT'S DAY, MEMORIAL DAY, JULY FOURTH, VICTORY
DAY, LABOR DAY, COLUMBUS DAY, VETERANS DAY,
THANKSGIVING DAY, CHRISTMAS DAY. A: ANY EMPLOYEE
WHO WORKS 3 DAYS IN THE WEEK IN WHICH A HOLIDAY
FALLS SHALL BE PAID FOR THE HOLIDAY. A. FOOTNOTES:
HAZMAT WORK: $2.00 PER HOUR ADDITIONAL.
TUNNEL/SHAFT WORK: $5.00 PER HOUR ADDITIONAL........$ 48.35 29.95
POWER EQUIPMENT OPERATOR: POWER PLANTS, SEWER
TREATMENT PLANTS, PUMPING STATIONS, TUNNELS,
CAISSONS, PIERS, DOCKS, BRIDGES, WIND TURBINES,
WORK: GROUP 4 OILER ON CRAWLER BACKHOE.
A. BOOM LENGTHS, INCLUDING JIBS: 150 FEET AND OVER
+ $ 2.00 180 FEET AND OVER + $ 3.00 210 FEET AND
OVER + $ 4.00 240 FEET AND OVER + $ 5.00 270 FEET
AND OVER + $ 7.00 300 FEET AND OVER + $ 8.00 350
FEET AND OVER + $ 9.00 400 FEET AND OVER + $10.00
A. PAID HOLIDAYS: NEW YEAR'S DAY, PRESIDENT'S DAY,
MEMORIAL DAY, JULY FOURTH, VICTORY DAY, LABOR DAY,
COLUMBUS DAY, VETERANS DAY, THANKSGIVING DAY,
CHRISTMAS DAY. A: ANY EMPLOYEE WHO WORKS 3 DAYS IN
THE WEEK IN WHICH A HOLIDAY FALLS SHALL BE PAID FOR
THE HOLIDAY. A. FOOTNOTES: HAZMAT WORK: $2.00 PER
HOUR ADDITIONAL. TUNNEL/SHAFT WORK: $5.00 PER HOUR
ADDITIONAL..........................................$ 42.07 29.95
POWER EQUIPMENT OPERATOR: POWER PLANTS, SEWER
TREATMENT PLANTS, PUMPING STATIONS, TUNNELS,
CAISSONS, PIERS, DOCKS, BRIDGES, WIND TURBINES,
WORK: GROUP 3 OILERS ON CRANES.
A. BOOM LENGTHS, INCLUDING JIBS: 150
FEET AND OVER + $ 2.00 180 FEET AND OVER + $ 3.00
210 FEET AND OVER + $ 4.00 240 FEET AND OVER + $
5.00 270 FEET AND OVER + $ 7.00 300 FEET AND OVER
+ $ 8.00 350 FEET AND OVER + $ 9.00 400 FEET AND
OVER + $10.00 A. PAID HOLIDAYS: NEW YEAR'S DAY,
PRESIDENT'S DAY, MEMORIAL DAY, JULY FOURTH, VICTORY
DAY, LABOR DAY, COLUMBUS DAY, VETERANS DAY,
THANKSGIVING DAY, CHRISTMAS DAY. A: ANY EMPLOYEE
WHO WORKS 3 DAYS IN THE WEEK IN WHICH A HOLIDAY
FALLS SHALL BE PAID FOR THE HOLIDAY. A. FOOTNOTES:
HAZMAT WORK: $2.00 PER HOUR ADDITIONAL.
TUNNEL/SHAFT WORK: $5.00 PER HOUR ADDITIONAL........$ 44.92 29.95
POWER EQUIPMENT OPERATOR: POWER PLANTS, SEWER
TREATMENT PLANTS, PUMPING STATIONS, TUNNELS,
CAISSONS, PIERS, DOCKS, BRIDGES, WIND TURBINES,
SUBTERRANEAN & OTHER MARINE AND HEAVY CONSTRUCTION
WORK: GROUP 2 DIGGING MACHINE, ROSS CARRIER,
LOCOMOTIVE, HOIST, ELEVATOR, BIDWELL-TYPE MACHINE,
SHOT & WATER BLASTING MACHINE, PAVER, SPREADER,
GRADERS, FRONT END LOADER (3 YDS. AND OVER),
VIBRATORY HAMMER & VACUUM TRUCK, ROADHEADERS,
FORKLIFTS, ECONOMOBILE TYPE EQUIPMENT, TUNNEL
BORING MACHINES, CONCRETE PUMP AND ON SITE CONCRETE
PLANTS.
A. BOOM LENGTHS, INCLUDING
JIBS: 150 FEET AND OVER + $ 2.00 180 FEET AND
OVER + $ 3.00 210 FEET AND OVER + $ 4.00 240 FEET
AND OVER + $ 5.00 270 FEET AND OVER + $ 7.00 300
FEET AND OVER + $ 8.00 350 FEET AND OVER + $ 9.00
400 FEET AND OVER + $10.00 A. PAID HOLIDAYS: NEW
YEAR'S DAY, PRESIDENT'S DAY, MEMORIAL DAY, JULY
FOURTH, VICTORY DAY, LABOR DAY, COLUMBUS DAY,
VETERANS DAY, THANKSGIVING DAY, CHRISTMAS DAY. A:
ANY EMPLOYEE WHO WORKS 3 DAYS IN THE WEEK IN WHICH
A HOLIDAY FALLS SHALL BE PAID FOR THE HOLIDAY. A.
FOOTNOTES: HAZMAT WORK: $2.00 PER HOUR ADDITIONAL.
TUNNEL/SHAFT WORK: $5.00 PER HOUR ADDITIONAL.......$ 49.30 29.95
POWER EQUIPMENT OPERATOR: POWER PLANTS, SEWER
TREATMENT PLANTS, PUMPING STATIONS, TUNNELS,
CAISSONS, PIERS, DOCKS, BRIDGES, WIND TURBINES,
SUBTERRANEAN & OTHER MARINE AND HEAVY CONSTRUCTION
WORK: GROUP 1 CRANES, LIGHTERS, BOOM TRUCKS AND
DERRICKS
A. BOOM LENGTHS,
INCLUDING JIBS: 150 FEET AND OVER + $ 2.00 180
FEET AND OVER + $ 3.00 210 FEET AND OVER + $ 4.00
240 FEET AND OVER + $ 5.00 270 FEET AND OVER + $
7.00 300 FEET AND OVER + $ 8.00 350 FEET AND OVER
+ $ 9.00 400 FEET AND OVER + $10.00 A. PAID
HOLIDAYS: NEW YEAR'S DAY, PRESIDENT'S DAY,
MEMORIAL DAY, JULY FOURTH, VICTORY DAY, LABOR DAY,
COLUMBUS DAY, VETERANS DAY, THANKSGIVING DAY,
CHRISTMAS DAY. A: ANY EMPLOYEE WHO WORKS 3 DAYS IN
THE WEEK IN WHICH A HOLIDAY FALLS SHALL BE PAID FOR
THE HOLIDAY. A. FOOTNOTES: HAZMAT WORK: $2.00 PER
HOUR ADDITIONAL. TUNNEL/SHAFT WORK: $5.00 PER HOUR
ADDITIONAL..........................................$ 51.30 29.95
ENGI0057-003 12/01/2025
POWER EQUIPMENT OPERATOR: BUILDING CONSTRUCTION:
GROUP 8 HEATER, CONCRETE MIXER, STONE CRUSHER,
WELDING MACHINE, GENERATOR FOR LIGHT PLANT, GAS AND
ELECTRIC DRIVEN PUMP & AIR COMPRESSOR
A. BOOM LENTHS, INCLUDING JIBS: 150 FT. AND OVER:
+ $ 2.00 180 FT. AND OVER: + $ 3.00 210 FT. AND
OVER: + $ 4.00 240 FT. AND OVER: + $ 5.00 270 FT.
AND OVER: + $ 7.00 300 FT. AND OVER: + $ 8.00 350
FT. AND OVER: + $ 9.00 400 FT. AND OVER: +
$10.00 A. PAID HOLIDAYS: NEW YEAR'S DAY,
PRESIDENT'S DAY, MEMORIAL DAY, JULY FOURTH, VICTORY
DAY, LABOR DAY, COLUMBUS DAY, VETERANS DAY,
THANKSGIVING DAY & CHRISTMAS DAY. A: ANY EMPLOYEE
WHO WORKS 3 DAYS IN THE WEEK IN WHICH A HOLIDAY
FALLS SHALL BE PAID FOR THE HOLIDAY.
A. FOOTNOTE: HAZMAT WORK: $2.00 PER HOUR
ADDITIONAL. TUNNEL/SHAFT WORK: $5.00 PER
HOUR ADDITIONAL.....................................$ 44.54 29.95
POWER EQUIPMENT OPERATOR: BUILDING CONSTRUCTION:
GROUP 7 WELL POINT INSTALLATION CREW
A. BOOM LENTHS,
INCLUDING JIBS: 150 FT. AND OVER: + $ 2.00 180
FT. AND OVER: + $ 3.00 210 FT. AND OVER: + $ 4.00
240 FT. AND OVER: + $ 5.00 270 FT. AND OVER: + $
7.00 300 FT. AND OVER: + $ 8.00 350 FT. AND OVER:
+ $ 9.00 400 FT. AND OVER: + $10.00 A.
PAID HOLIDAYS: NEW YEAR'S DAY, PRESIDENT'S DAY,
MEMORIAL DAY, JULY FOURTH, VICTORY DAY, LABOR DAY,
COLUMBUS DAY, VETERANS DAY, THANKSGIVING DAY &
CHRISTMAS DAY. A: ANY EMPLOYEE WHO WORKS 3 DAYS IN
THE WEEK IN WHICH A HOLIDAY FALLS SHALL BE PAID FOR
THE HOLIDAY. A. FOOTNOTE: HAZMAT
WORK: $2.00 PER HOUR ADDITIONAL.
TUNNEL/SHAFT WORK: $5.00 PER HOUR ADDITIONAL........$ 47.22 29.95
POWER EQUIPMENT OPERATOR: BUILDING CONSTRUCTION:
GROUP 6 BULLDOZER,SKID STEER LOADERS,BOBCATS,
TRACTOR, GRADER, SCRAPER,COMBINATION LOADER
BACKHOE, ROLLER, FRONT END LOADER (LESS THAN 3
YDS.), STREET AND MOBILE POWERED SWEEPER (3 YDS.
CAPACITY), 8-FT. SWEEPER (MINIMUM 65 HP)
OVER: + $ 4.00 240 FT. AND OVER: + $ 5.00 270 FT.
AND OVER: + $ 7.00 300 FT. AND OVER: + $ 8.00 350
FT. AND OVER: + $ 9.00 400 FT. AND OVER: +
$10.00 A. PAID HOLIDAYS: NEW YEAR'S DAY,
PRESIDENT'S DAY, MEMORIAL DAY, JULY FOURTH, VICTORY
DAY, LABOR DAY, COLUMBUS DAY, VETERANS DAY,
THANKSGIVING DAY & CHRISTMAS DAY. A: ANY EMPLOYEE
WHO WORKS 3 DAYS IN THE WEEK IN WHICH A HOLIDAY
FALLS SHALL BE PAID FOR THE HOLIDAY.
A. FOOTNOTE: HAZMAT WORK: $2.00 PER HOUR
ADDITIONAL. TUNNEL/SHAFT WORK: $5.00 PER
HOUR ADDITIONAL.....................................$ 47.65 29.95
GROUP 5 OILER ON CRAWLER BACKHOE
A. BOOM LENTHS, INCLUDING JIBS: 150 FT. AND
OVER: + $ 2.00 180 FT. AND OVER: + $ 3.00 210 FT.
AND OVER: + $ 4.00 240 FT. AND OVER: + $ 5.00 270
FT. AND OVER: + $ 7.00 300 FT. AND OVER: + $ 8.00
350 FT. AND OVER: + $ 9.00 400 FT. AND OVER: +
$10.00 A. PAID HOLIDAYS: NEW YEAR'S DAY,
PRESIDENT'S DAY, MEMORIAL DAY, JULY FOURTH, VICTORY
DAY, LABOR DAY, COLUMBUS DAY, VETERANS DAY,
THANKSGIVING DAY & CHRISTMAS DAY. A: ANY EMPLOYEE
WHO WORKS 3 DAYS IN THE WEEK IN WHICH A HOLIDAY
FALLS SHALL BE PAID FOR THE HOLIDAY.
A. FOOTNOTE: HAZMAT WORK: $2.00 PER HOUR
ADDITIONAL. TUNNEL/SHAFT WORK: $5.00 PER
HOUR ADDITIONAL.....................................$ 41.50 29.95
GROUP 4 FIREMAN & OILER ON CRANES
LENTHS, INCLUDING JIBS: 150 FT. AND OVER: + $ 2.00
180 FT. AND OVER: + $ 3.00 210 FT. AND OVER: + $
4.00 240 FT. AND OVER: + $ 5.00 270 FT. AND OVER:
+ $ 7.00 300 FT. AND OVER: + $ 8.00 350 FT. AND
OVER: + $ 9.00 400 FT. AND OVER: + $10.00
A. PAID HOLIDAYS: NEW YEAR'S DAY, PRESIDENT'S DAY,
MEMORIAL DAY, JULY FOURTH, VICTORY DAY, LABOR DAY,
COLUMBUS DAY, VETERANS DAY, THANKSGIVING DAY &
CHRISTMAS DAY. A: ANY EMPLOYEE WHO WORKS 3 DAYS IN
THE WEEK IN WHICH A HOLIDAY FALLS SHALL BE PAID FOR
THE HOLIDAY. A. FOOTNOTE: HAZMAT
WORK: $2.00 PER HOUR ADDITIONAL.
TUNNEL/SHAFT WORK: $5.00 PER HOUR ADDITIONAL........$ 44.35 29.95
POWER EQUIPMENT OPERATOR: BUILDING CONSTRUCTION:
GROUP 3 TELEHANDLER EQUIPMENT, FORKLIFT, CONCRETE
PUMP & ON-SITE CONCRETE PLANT
OVER: + $ 4.00 240 FT. AND OVER: + $ 5.00 270 FT.
AND OVER: + $ 7.00 300 FT. AND OVER: + $ 8.00 350
FT. AND OVER: + $ 9.00 400 FT. AND OVER: +
$10.00 A. PAID HOLIDAYS: NEW YEAR'S DAY,
PRESIDENT'S DAY, MEMORIAL DAY, JULY FOURTH, VICTORY
DAY, LABOR DAY, COLUMBUS DAY, VETERANS DAY,
THANKSGIVING DAY & CHRISTMAS DAY. A: ANY EMPLOYEE
WHO WORKS 3 DAYS IN THE WEEK IN WHICH A HOLIDAY
FALLS SHALL BE PAID FOR THE HOLIDAY.
A. FOOTNOTE: HAZMAT WORK: $2.00 PER HOUR
ADDITIONAL. TUNNEL/SHAFT WORK: $5.00 PER
HOUR ADDITIONAL.....................................$ 48.35 29.95
POWER EQUIPMENT OPERATOR: BUILDING CONSTRUCTION:
GROUP 2 DIGGING MACHINE, ROSS CARRIER, LOCOMOTIVE,
HOIST, ELEVATOR, BIDWELL-TYPE MACHINE, SHOT & WATER
BLASTING MACHINE, PAVER, SPREADER, FRONT END LOADER
(3 YDS. AND OVER), VIBRATORY HAMMER AND VACUUM
TRUCK
180 FT. AND OVER: + $ 3.00 210 FT. AND OVER: + $
4.00 240 FT. AND OVER: + $ 5.00 270 FT. AND OVER:
+ $ 7.00 300 FT. AND OVER: + $ 8.00 350 FT. AND
OVER: + $ 9.00 400 FT. AND OVER: + $10.00
A. PAID HOLIDAYS: NEW YEAR'S DAY, PRESIDENT'S DAY,
MEMORIAL DAY, JULY FOURTH, VICTORY DAY, LABOR DAY,
COLUMBUS DAY, VETERANS DAY, THANKSGIVING DAY &
CHRISTMAS DAY. A: ANY EMPLOYEE WHO WORKS 3 DAYS IN
THE WEEK IN WHICH A HOLIDAY FALLS SHALL BE PAID FOR
THE HOLIDAY. A. FOOTNOTE: HAZMAT
WORK: $2.00 PER HOUR ADDITIONAL.
TUNNEL/SHAFT WORK: $5.00 PER HOUR ADDITIONAL........$ 48.57 29.95
POWER EQUIPMENT OPERATOR: BUILDING CONSTRUCTION:
GROUP 1 CRANES, LIGHTERS, BOOM TRUCKS AND
DERRICKS.
180 FT. AND OVER: + $ 3.00 210 FT. AND OVER: + $
4.00 240 FT. AND OVER: + $ 5.00 270 FT. AND OVER:
+ $ 7.00 300 FT. AND OVER: + $ 8.00 350 FT. AND
OVER: + $ 9.00 400 FT. AND OVER: + $10.00
A. PAID HOLIDAYS: NEW YEAR'S DAY, PRESIDENT'S DAY,
MEMORIAL DAY, JULY FOURTH, VICTORY DAY, LABOR DAY,
COLUMBUS DAY, VETERANS DAY, THANKSGIVING DAY &
CHRISTMAS DAY. A: ANY EMPLOYEE WHO WORKS 3 DAYS IN
THE WEEK IN WHICH A HOLIDAY FALLS SHALL BE PAID FOR
THE HOLIDAY. A. FOOTNOTE: HAZMAT
WORK: $2.00 PER HOUR ADDITIONAL.
TUNNEL/SHAFT WORK: $5.00 PER HOUR ADDITIONAL........$ 50.57 29.95
ENGI0057-005 12/01/2025
POWER EQUIPMENT OPERATOR: HIGHWAY CONSTRUCTION
PROJECTS; WATER AND SEWERLINE PROJECTS WHICH ARE
INCIDENTAL TO HIGHWAY CONSTRUCTION PROJECTS; AND
BRIDGE PROJECTS THAT DO NOT SPAN WATER: GROUP 8 GAS
AND ELECTRIC DRIVE HEATERS, CONCRETE MIXERS, LIGHT
PLANTS, WELDING MACHINES, PUMPS AND COMPRESSORS
A. FOOTNOTE: A. ANY
EMPLOYEE WHO WORKS THREE DAYS IN THE WEEK IN WHICH
A HOLIDAY FALLS SHALL BE PAID FOR THE HOLIDAY. B.
PAID HOLIDAYS: NEW YEAR'S DAY, PRESIDENT'S DAY,
MEMORIAL DAY, JULY FOURTH, VICTORY DAY, LABOR DAY,
COLUMBUS DAY, VETERANS DAY, THANKSGIVING DAY &
CHRISTMAS DAY.......................................$ 38.70 29.95
POWER EQUIPMENT OPERATOR: HIGHWAY CONSTRUCTION
PROJECTS; WATER AND SEWERLINE PROJECTS WHICH ARE
INCIDENTAL TO HIGHWAY CONSTRUCTION PROJECTS; AND
BRIDGE PROJECTS THAT DO NOT SPAN WATER: GROUP 7
COMBINATION LOADER / BACKHOES, FRONT-END LOADERS
(LESS THAN 3 YDS.), FORKLIFT, BULLDOZERS, SCRAPERS,
BOATS, ROLLERS, SKID STEER LOADERS (REGARDLESS OF
ATTACHMENTS), STREET SWEEPERS, MECHANICS, WELDERS,
OPERATORS IN MATERIALS YARDS, SHOPS AND GARAGES
A HOLIDAY FALLS SHALL BE PAID FOR THE HOLIDAY. B.
PAID HOLIDAYS: NEW YEAR'S DAY, PRESIDENT'S DAY,
MEMORIAL DAY, JULY FOURTH, VICTORY DAY, LABOR DAY,
COLUMBUS DAY, VETERANS DAY, THANKSGIVING DAY &
CHRISTMAS DAY.......................................$ 43.43 29.95
POWER EQUIPMENT OPERATOR: HIGHWAY CONSTRUCTION
PROJECTS; WATER AND SEWERLINE PROJECTS WHICH ARE
INCIDENTAL TO HIGHWAY CONSTRUCTION PROJECTS; AND
BRIDGE PROJECTS THAT DO NOT SPAN WATER: GROUP 6
OILERS ON CRANES AND DECKHANDS
A HOLIDAY FALLS SHALL BE PAID FOR THE HOLIDAY. B.
PAID HOLIDAYS: NEW YEAR'S DAY, PRESIDENT'S DAY,
MEMORIAL DAY, JULY FOURTH, VICTORY DAY, LABOR DAY,
COLUMBUS DAY, VETERANS DAY, THANKSGIVING DAY &
CHRISTMAS DAY.......................................$ 39.73 29.95
POWER EQUIPMENT OPERATOR: HIGHWAY CONSTRUCTION
PROJECTS; WATER AND SEWERLINE PROJECTS WHICH ARE
INCIDENTAL TO HIGHWAY CONSTRUCTION PROJECTS; AND
BRIDGE PROJECTS THAT DO NOT SPAN WATER: GROUP 5
SIGNAL PERSONS
A.
FOOTNOTE: A. ANY EMPLOYEE WHO WORKS THREE DAYS IN
THE WEEK IN WHICH A HOLIDAY FALLS SHALL BE PAID FOR
THE HOLIDAY. B. PAID HOLIDAYS: NEW YEAR'S DAY,
PRESIDENT'S DAY, MEMORIAL DAY, JULY FOURTH, VICTORY
DAY, LABOR DAY, COLUMBUS DAY, VETERANS DAY,
THANKSGIVING DAY & CHRISTMAS DAY....................$ 33.15 29.95
POWER EQUIPMENT OPERATOR: HIGHWAY CONSTRUCTION
PROJECTS; WATER AND SEWERLINE PROJECTS WHICH ARE
INCIDENTAL TO HIGHWAY CONSTRUCTION PROJECTS; AND
BRIDGE PROJECTS THAT DO NOT SPAN WATER: GROUP 4
UTILITY ENGINEERS
A. FOOTNOTE:
A. ANY EMPLOYEE WHO WORKS THREE DAYS IN THE WEEK IN
WHICH A HOLIDAY FALLS SHALL BE PAID FOR THE
HOLIDAY. B. PAID HOLIDAYS: NEW YEAR'S DAY,
PRESIDENT'S DAY, MEMORIAL DAY, JULY FOURTH, VICTORY
DAY, LABOR DAY, COLUMBUS DAY, VETERANS DAY,
THANKSGIVING DAY & CHRISTMAS DAY....................$ 25.75 29.95
POWER EQUIPMENT OPERATOR: HIGHWAY CONSTRUCTION
PROJECTS; WATER AND SEWERLINE PROJECTS WHICH ARE
INCIDENTAL TO HIGHWAY CONSTRUCTION PROJECTS; AND
BRIDGE PROJECTS THAT DO NOT SPAN WATER: GROUP 3
WELLPOINT INSTALLATION AND DRILL/BORING MACHINE
ASSISTANTS
A. FOOTNOTE: A. ANY EMPLOYEE WHO WORKS THREE
DAYS IN THE WEEK IN WHICH A HOLIDAY FALLS SHALL BE
PAID FOR THE HOLIDAY. B. PAID HOLIDAYS: NEW YEAR'S
DAY, PRESIDENT'S DAY, MEMORIAL DAY, JULY FOURTH,
VICTORY DAY, LABOR DAY, COLUMBUS DAY, VETERANS DAY,
THANKSGIVING DAY & CHRISTMAS DAY....................$ 39.15 29.95
POWER EQUIPMENT OPERATOR: HIGHWAY CONSTRUCTION
PROJECTS; WATER AND SEWERLINE PROJECTS WHICH ARE
INCIDENTAL TO HIGHWAY CONSTRUCTION PROJECTS; AND
BRIDGE PROJECTS THAT DO NOT SPAN WATER: GROUP 2
DIGGING MACHINES, EXCAVATORS, LOCOMOTIVES, JOHN
HENRY'S, DIRECTIONAL DRILLING MACHINES, COLD
PLANERS, RECLAIMERS, PAVERS, SPREADERS, GRADERS,
FRONT-END LOADERS (3YDS & OVER), VACUUM TRUCK,
DRILL/BORING MACHINE OPERATORS, VERMEER SAW, WATER
BLASTER, HYDRAULIC-DEMOLITION ROBOT, ROSS CARRIERS,
CONCRETE PUMP OPERATORS, ASPHALT/MATERIAL TRANSFER
MACHINES, ROTATING TELEHANDLERS, SPMT TYPE
EQUIPMENT
A. FOOTNOTE: A.
ANY EMPLOYEE WHO WORKS THREE DAYS IN THE WEEK IN
WHICH A HOLIDAY FALLS SHALL BE PAID FOR THE
HOLIDAY. B. PAID HOLIDAYS: NEW YEAR'S DAY,
PRESIDENT'S DAY, MEMORIAL DAY, JULY FOURTH, VICTORY
DAY, LABOR DAY, COLUMBUS DAY, VETERANS DAY,
THANKSGIVING DAY & CHRISTMAS DAY....................$ 44.45 29.95
POWER EQUIPMENT OPERATOR: HIGHWAY CONSTRUCTION
PROJECTS; WATER AND SEWERLINE PROJECTS WHICH ARE
INCIDENTAL TO HIGHWAY CONSTRUCTION PROJECTS; AND
BRIDGE PROJECTS THAT DO NOT SPAN WATER: GROUP 1
CRANES, PILE DRIVERS, LIGHTERS, BOOM TRUCKS,
HOISTS, DERRICKS
A. FOOTNOTE: A. ANY EMPLOYEE WHO WORKS THREE
DAYS IN THE WEEK IN WHICH A HOLIDAY FALLS SHALL BE
PAID FOR THE HOLIDAY. B. PAID HOLIDAYS: NEW YEAR'S
DAY, PRESIDENT'S DAY, MEMORIAL DAY, JULY FOURTH,
VICTORY DAY, LABOR DAY, COLUMBUS DAY, VETERANS DAY,
THANKSGIVING DAY & CHRISTMAS DAY....................$ 46.45 29.95
IRON0037-001 09/16/2025
IRONWORKER..........................................$ 43.03 33.53
LABO0271-001 12/03/2023
LABORER GROUP 5 (BUILDING CONSTRUCTION).............$ 39.00 26.90
LABORER GROUP 4 (BUILDING CONSTRUCTION).............$ 37.00 26.90
LABORER GROUP 3 (BUILDING CONSTRUCTION).............$ 37.00 26.90
LABORER GROUP 2 (BUILDING CONSTRUCTION).............$ 37.00 26.90
LABORER GROUP 1 (BUILDING CONSTRUCTION).............$ 37.00 26.90
LABO0271-002 11/27/2022
LABORER TEST BORING LABORER.........................$ 41.95 24.15
LABORER TEST BORING DRILLER.........................$ 41.95 24.15
LABORER OPEN AIR CAISSON, UNDERPINNING WORK AND
BORING CREW TOP MAN & LABORER...................$ 35.60 24.15
LABORER OPEN AIR CAISSON, UNDERPINNING WORK AND
BORING CREW BOTTOM MAN..............................$ 41.50 24.15
LABORER FREE AIR GROUP 3............................$ 42.45 24.15
LABORER FREE AIR GROUP 2............................$ 45.00 24.15
LABORER FREE AIR GROUP 1............................$ 46.00 24.15
LABORER COMPRESSED AIR GROUP 3......................$ 42.45 24.15
LABORER COMPRESSED AIR GROUP 2......................$ 52.93 24.15
LABORER COMPRESSED AIR GROUP 1......................$ 55.40 24.15
PAIN0011-005 06/01/2025
PAINTER (SPRAY, SAND & WATER BLASTING)..............$ 42.57 26.60
PAINTER (EPOXY, TANKS, TOWERS, SWING STAGE &
STRUCTURAL STEEL)...................................$ 41.57 26.60
PAINTER (BRUSH AND ROLLER)..........................$ 39.57 26.60
PAIN0011-006 06/01/2024
GLAZIER FOOTNOTES: SWING STAGE: $1.00 PER
HOUR ADDITIONAL. PAID HOLIDAYS: LABOR DAY &
CHRISTMAS DAY.......................................$ 41.63 26.15
PAIN0011-011 06/01/2024
PAINTER (BRIDGE WORK)...............................$ 57.85 26.40
PAIN0035-008 06/01/2011
SIGN PAINTER........................................$ 24.79 13.72
PLAS0040-001 01/01/2025
CEMENT MASON/CONCRETE FINISHER (BUILDING
CONSTRUCTION) FOOTNOTE: CEMENT MASON: WORK ON
FREE SWINGING SCAFFOLDS UNDER 3 PLANKS WIDTH AND
WHICH IS 20 OR MORE FEET ABOVE GROUND AND ANY
OFFSET STRUCTURE: $.30 PER HOUR ADDITIONAL..........$ 44.75 29.10
PLAS0040-002 01/01/2025
CEMENT MASON/CONCRETE FINISHER (HEAVY AND HIGHWAY
CONSTRUCTION).......................................$ 44.75 29.10
PLAS0040-003 01/01/2025
PLASTERER...........................................$ 45.52 29.43
PLUM0051-002 08/25/2025
PLUMBERS AND PIPEFITTERS............................$ 54.34 34.50
ROOF0033-004 12/01/2025
ROOFER..............................................$ 47.49 31.44
SFRI0669-001 04/01/2025
SPRINKLER FITTER....................................$ 53.76 33.44
SHEE0017-002 06/01/2025
SHEET METAL WORKER..................................$ 44.42 41.94
TEAM0251-001 05/01/2025
TRUCK DRIVER: HEAVY AND HIGHWAY CONSTRUCTION: GROUP
5 FOUR- AND FIVE-AXLE EQUIPMENT
FOOTNOTES:
A. PAID HOLIDAYS: NEW YEAR'S DAY, MEMORIAL DAY,
INDEPENDENCE DAY, LABOR DAY, THANKSGIVING DAY AND
CHRISTMAS DAY, PLUS PRESIDENTS' DAY, COLUMBUS DAY,
VETERAN'S DAY & V-J DAY, PROVIDING THE EMPLOYEE HAS
WORKED AT LEAST ONE DAY IN THE CALENDAR WEEK IN
WHICH THE HOLIDAY FALLS. B. EMPLOYEE WHO HAS
BEEN ON THE PAYROLL FOR 1 YEAR OR MORE BUT LESS
THAN 5 YEARS AND HAS WORKED 150 DAYS DURING THE
LAST YEAR OF EMPLOYMENT SHALL RECEIVE 1 WEEK'S PAID
VACATION; 5 TO 10 YEARS - 2 WEEKS' PAID VACATION;
10 OR MORE YEARS - 3 WEEK'S PAID VACATION. C.
EMPLOYEES ON THE SENIORITY LIST SHALL BE PAID A ONE
HUNDRED DOLLAR ($100.00) BONUS FOR EVERY FOUR
HUNDRED (400) HOURS WORKED, UP TO A MAXIMUM OF FIVE
HUNDRED DOLLARS ($500.00) ALL DRIVERS WORKING ON A
DEFINED HAZARD MATERIAL JOB SITE SHALL BE PAID A
PREMIUM OF $2.00 PER HOUR OVER APPLICABLE RATE.
........................................$ 32.21 34.51
10 TRACTOR TRAILER
FOOTNOTES: A. PAID HOLIDAYS: NEW YEAR'S DAY,
MEMORIAL DAY, INDEPENDENCE DAY, LABOR DAY,
THANKSGIVING DAY AND CHRISTMAS DAY, PLUS
PRESIDENTS' DAY, COLUMBUS DAY, VETERAN'S DAY & V-J
DAY, PROVIDING THE EMPLOYEE HAS WORKED AT LEAST ONE
DAY IN THE CALENDAR WEEK IN WHICH THE HOLIDAY
FALLS. B. EMPLOYEE WHO HAS BEEN ON THE PAYROLL
FOR 1 YEAR OR MORE BUT LESS THAN 5 YEARS AND HAS
WORKED 150 DAYS DURING THE LAST YEAR OF EMPLOYMENT
SHALL RECEIVE 1 WEEK'S PAID VACATION; 5 TO 10 YEARS
- 2 WEEKS' PAID VACATION; 10 OR MORE YEARS - 3
WEEK'S PAID VACATION. C. EMPLOYEES ON THE
SENIORITY LIST SHALL BE PAID A ONE HUNDRED DOLLAR
($100.00) BONUS FOR EVERY FOUR HUNDRED (400) HOURS
WORKED, UP TO A MAXIMUM OF FIVE HUNDRED DOLLARS
($500.00) ALL DRIVERS WORKING ON A DEFINED HAZARD
MATERIAL JOB SITE SHALL BE PAID A PREMIUM OF $2.00
PER HOUR OVER APPLICABLE RATE. .....$ 32.36 34.51
9 SPECIAL EARTH-MOVING EQUIPMENT, 35 TONS OR OVER
THANKSGIVING DAY AND CHRISTMAS DAY, PLUS
PRESIDENTS' DAY, COLUMBUS DAY, VETERAN'S DAY & V-J
DAY, PROVIDING THE EMPLOYEE HAS WORKED AT LEAST ONE
DAY IN THE CALENDAR WEEK IN WHICH THE HOLIDAY
FALLS. B. EMPLOYEE WHO HAS BEEN ON THE PAYROLL
FOR 1 YEAR OR MORE BUT LESS THAN 5 YEARS AND HAS
WORKED 150 DAYS DURING THE LAST YEAR OF EMPLOYMENT
SHALL RECEIVE 1 WEEK'S PAID VACATION; 5 TO 10 YEARS
- 2 WEEKS' PAID VACATION; 10 OR MORE YEARS - 3
WEEK'S PAID VACATION. C. EMPLOYEES ON THE
SENIORITY LIST SHALL BE PAID A ONE HUNDRED DOLLAR
($100.00) BONUS FOR EVERY FOUR HUNDRED (400) HOURS
WORKED, UP TO A MAXIMUM OF FIVE HUNDRED DOLLARS
($500.00) ALL DRIVERS WORKING ON A DEFINED HAZARD
MATERIAL JOB SITE SHALL BE PAID A PREMIUM OF $2.00
PER HOUR OVER APPLICABLE RATE. .....$ 32.56 34.51
8 SPECIAL EARTH-MOVING EQUIPMENT, UNDER 35 TONS
FOOTNOTES: A. PAID HOLIDAYS: NEW
YEAR'S DAY, MEMORIAL DAY, INDEPENDENCE DAY, LABOR
DAY, THANKSGIVING DAY AND CHRISTMAS DAY, PLUS
PRESIDENTS' DAY, COLUMBUS DAY, VETERAN'S DAY & V-J
DAY, PROVIDING THE EMPLOYEE HAS WORKED AT LEAST ONE
DAY IN THE CALENDAR WEEK IN WHICH THE HOLIDAY
FALLS. B. EMPLOYEE WHO HAS BEEN ON THE PAYROLL
FOR 1 YEAR OR MORE BUT LESS THAN 5 YEARS AND HAS
WORKED 150 DAYS DURING THE LAST YEAR OF EMPLOYMENT
SHALL RECEIVE 1 WEEK'S PAID VACATION; 5 TO 10 YEARS
- 2 WEEKS' PAID VACATION; 10 OR MORE YEARS - 3
WEEK'S PAID VACATION. C. EMPLOYEES ON THE
SENIORITY LIST SHALL BE PAID A ONE HUNDRED DOLLAR
($100.00) BONUS FOR EVERY FOUR HUNDRED (400) HOURS
WORKED, UP TO A MAXIMUM OF FIVE HUNDRED DOLLARS
($500.00) ALL DRIVERS WORKING ON A DEFINED HAZARD
MATERIAL JOB SITE SHALL BE PAID A PREMIUM OF $2.00
PER HOUR OVER APPLICABLE RATE. .....$ 32.31 34.51
TRUCK DRIVER: HEAVY AND HIGHWAY CONSTRUCTION: GROUP
7 TRAILERS WHEN USED ON A DOUBLE HOOK UP (PULLING
2 TRAILERS)
FOOTNOTES: A. PAID
HOLIDAYS: NEW YEAR'S DAY, MEMORIAL DAY,
INDEPENDENCE DAY, LABOR DAY, THANKSGIVING DAY AND
CHRISTMAS DAY, PLUS PRESIDENTS' DAY, COLUMBUS DAY,
VETERAN'S DAY & V-J DAY, PROVIDING THE EMPLOYEE HAS
WORKED AT LEAST ONE DAY IN THE CALENDAR WEEK IN
WHICH THE HOLIDAY FALLS. B. EMPLOYEE WHO HAS
BEEN ON THE PAYROLL FOR 1 YEAR OR MORE BUT LESS
THAN 5 YEARS AND HAS WORKED 150 DAYS DURING THE
LAST YEAR OF EMPLOYMENT SHALL RECEIVE 1 WEEK'S PAID
VACATION; 5 TO 10 YEARS - 2 WEEKS' PAID VACATION;
10 OR MORE YEARS - 3 WEEK'S PAID VACATION. C.
EMPLOYEES ON THE SENIORITY LIST SHALL BE PAID A ONE
HUNDRED DOLLAR ($100.00) BONUS FOR EVERY FOUR
HUNDRED (400) HOURS WORKED, UP TO A MAXIMUM OF FIVE
HUNDRED DOLLARS ($500.00) ALL DRIVERS WORKING ON A
DEFINED HAZARD MATERIAL JOB SITE SHALL BE PAID A
PREMIUM OF $2.00 PER HOUR OVER APPLICABLE RATE.
........................................$ 32.81 34.51
6 LOW-BED OR BOOM TRAILER.
THANKSGIVING DAY AND CHRISTMAS DAY, PLUS
PRESIDENTS' DAY, COLUMBUS DAY, VETERAN'S DAY & V-J
DAY, PROVIDING THE EMPLOYEE HAS WORKED AT LEAST ONE
DAY IN THE CALENDAR WEEK IN WHICH THE HOLIDAY
FALLS. B. EMPLOYEE WHO HAS BEEN ON THE PAYROLL
FOR 1 YEAR OR MORE BUT LESS THAN 5 YEARS AND HAS
WORKED 150 DAYS DURING THE LAST YEAR OF EMPLOYMENT
SHALL RECEIVE 1 WEEK'S PAID VACATION; 5 TO 10 YEARS
- 2 WEEKS' PAID VACATION; 10 OR MORE YEARS - 3
WEEK'S PAID VACATION. C. EMPLOYEES ON THE
SENIORITY LIST SHALL BE PAID A ONE HUNDRED DOLLAR
($100.00) BONUS FOR EVERY FOUR HUNDRED (400) HOURS
WORKED, UP TO A MAXIMUM OF FIVE HUNDRED DOLLARS
($500.00) ALL DRIVERS WORKING ON A DEFINED HAZARD
MATERIAL JOB SITE SHALL BE PAID A PREMIUM OF $2.00
PER HOUR OVER APPLICABLE RATE. .....$ 32.61 34.51
4 THREE-AXLE DUMP TRUCK
THANKSGIVING DAY AND CHRISTMAS DAY, PLUS
PRESIDENTS' DAY, COLUMBUS DAY, VETERAN'S DAY & V-J
DAY, PROVIDING THE EMPLOYEE HAS WORKED AT LEAST ONE
DAY IN THE CALENDAR WEEK IN WHICH THE HOLIDAY
FALLS. B. EMPLOYEE WHO HAS BEEN ON THE PAYROLL
FOR 1 YEAR OR MORE BUT LESS THAN 5 YEARS AND HAS
WORKED 150 DAYS DURING THE LAST YEAR OF EMPLOYMENT
SHALL RECEIVE 1 WEEK'S PAID VACATION; 5 TO 10 YEARS
- 2 WEEKS' PAID VACATION; 10 OR MORE YEARS - 3
WEEK'S PAID VACATION. C. EMPLOYEES ON THE
SENIORITY LIST SHALL BE PAID A ONE HUNDRED DOLLAR
($100.00) BONUS FOR EVERY FOUR HUNDRED (400) HOURS
($500.00) ALL DRIVERS WORKING ON A DEFINED HAZARD
MATERIAL JOB SITE SHALL BE PAID A PREMIUM OF $2.00
PER HOUR OVER APPLICABLE RATE. .....$ 32.11 34.51
3 TWO-AXLE DUMP TRUCK
THANKSGIVING DAY AND CHRISTMAS DAY, PLUS
PRESIDENTS' DAY, COLUMBUS DAY, VETERAN'S DAY & V-J
DAY, PROVIDING THE EMPLOYEE HAS WORKED AT LEAST ONE
DAY IN THE CALENDAR WEEK IN WHICH THE HOLIDAY
FALLS. B. EMPLOYEE WHO HAS BEEN ON THE PAYROLL
FOR 1 YEAR OR MORE BUT LESS THAN 5 YEARS AND HAS
WORKED 150 DAYS DURING THE LAST YEAR OF EMPLOYMENT
SHALL RECEIVE 1 WEEK'S PAID VACATION; 5 TO 10 YEARS
- 2 WEEKS' PAID VACATION; 10 OR MORE YEARS - 3
WEEK'S PAID VACATION. C. EMPLOYEES ON THE
SENIORITY LIST SHALL BE PAID A ONE HUNDRED DOLLAR
($100.00) BONUS FOR EVERY FOUR HUNDRED (400) HOURS
WORKED, UP TO A MAXIMUM OF FIVE HUNDRED DOLLARS
($500.00) ALL DRIVERS WORKING ON A DEFINED HAZARD
MATERIAL JOB SITE SHALL BE PAID A PREMIUM OF $2.00
PER HOUR OVER APPLICABLE RATE. .....$ 32.06 34.51
2 TWO-AXLE ON LOW BEDS
THANKSGIVING DAY AND CHRISTMAS DAY, PLUS
PRESIDENTS' DAY, COLUMBUS DAY, VETERAN'S DAY & V-J
DAY, PROVIDING THE EMPLOYEE HAS WORKED AT LEAST ONE
DAY IN THE CALENDAR WEEK IN WHICH THE HOLIDAY
FALLS. B. EMPLOYEE WHO HAS BEEN ON THE PAYROLL
FOR 1 YEAR OR MORE BUT LESS THAN 5 YEARS AND HAS
WORKED 150 DAYS DURING THE LAST YEAR OF EMPLOYMENT
SHALL RECEIVE 1 WEEK'S PAID VACATION; 5 TO 10 YEARS
- 2 WEEKS' PAID VACATION; 10 OR MORE YEARS - 3
WEEK'S PAID VACATION. C. EMPLOYEES ON THE
SENIORITY LIST SHALL BE PAID A ONE HUNDRED DOLLAR
($100.00) BONUS FOR EVERY FOUR HUNDRED (400) HOURS
WORKED, UP TO A MAXIMUM OF FIVE HUNDRED DOLLARS
($500.00) ALL DRIVERS WORKING ON A DEFINED HAZARD
MATERIAL JOB SITE SHALL BE PAID A PREMIUM OF $2.00
PER HOUR OVER APPLICABLE RATE. .....$ 32.01 34.51
1 PICK-UP TRUCKS, STATION WAGONS, & PANEL TRUCKS
FOOTNOTES: A. PAID HOLIDAYS: NEW
YEAR'S DAY, MEMORIAL DAY, INDEPENDENCE DAY, LABOR
DAY, THANKSGIVING DAY AND CHRISTMAS DAY, PLUS
PRESIDENTS' DAY, COLUMBUS DAY, VETERAN'S DAY & V-J
DAY, PROVIDING THE EMPLOYEE HAS WORKED AT LEAST ONE
DAY IN THE CALENDAR WEEK IN WHICH THE HOLIDAY
FALLS. B. EMPLOYEE WHO HAS BEEN ON THE PAYROLL
FOR 1 YEAR OR MORE BUT LESS THAN 5 YEARS AND HAS
WORKED 150 DAYS DURING THE LAST YEAR OF EMPLOYMENT
SHALL RECEIVE 1 WEEK'S PAID VACATION; 5 TO 10 YEARS
- 2 WEEKS' PAID VACATION; 10 OR MORE YEARS - 3
WEEK'S PAID VACATION. C. EMPLOYEES ON THE
SENIORITY LIST SHALL BE PAID A ONE HUNDRED DOLLAR
($100.00) BONUS FOR EVERY FOUR HUNDRED (400) HOURS
($500.00) ALL DRIVERS WORKING ON A DEFINED HAZARD
MATERIAL JOB SITE SHALL BE PAID A PREMIUM OF $2.00
PER HOUR OVER APPLICABLE RATE. .....$ 31.86 34.51
WELDERS - Receive rate prescribed for craft performing operation to which welding is incidental.
Note: Executive Order (EO) 13706, Establishing Paid Sick Leave for Federal Contractors applies to all contracts subject to the
Davis-Bacon Act for which the contract is awarded (and any solicitation was issued) on or after January 1, 2017. If this contract is covered by the EO, the contractor must provide employees with 1 hour of paid sick leave for every 30 hours they work, up to 56 hours of paid sick leave each year.
Employees must be permitted to use paid sick leave for their own illness, injury or other health-related needs, including preventive care; to assist a family member (or person who is like family to the employee) who is ill, injured, or has other health-related needs, including preventive care; or for reasons resulting from, or to assist a family member (or person who is like family to the employee) who is a victim of, domestic violence, sexual assault, or stalking. Additional information on contractor requirements and worker protections under the EO is available at https://www.dol.gov/agencies/whd/government-contracts.
Note: Executive Order 13658 generally applies to contracts subject to the Davis-Bacon Act that were awarded on or between January 1, 2015 and January 29, 2022, and that have not been renewed or extended on or after January 30, 2022. Executive Order 13658 does not apply to contracts subject only to the Davis-Bacon Related Acts regardless of when they were awarded. If a contract is subject to
Executive Order 13658, the contractor must pay all covered workers at least $13.65 per hour (or the applicable wage rate listed on this wage determination, if it is higher) for all hours spent performing on the contract from May 11, 2026, through December 31, 2026. The applicable Executive Order minimum wage rate will be adjusted annually.
Additional information on contractor requirements and worker protections under Executive Order 13658 is available at www.dol.gov/whd/govcontracts.
Unlisted classifications needed for work not included within the scope of the classifications listed may be added after award only as provided in the labor standards contract clauses
(29CFR 5.5 (a) (1) (iii)).
The body of each wage determination lists the classifications and wage rates that have been found to be prevailing for the type(s) of construction and geographic area covered by the wage determination. The classifications are listed in alphabetical order under rate identifiers indicating whether the particular rate is a union rate (current union negotiated rate), a survey rate, a weighted union average rate, a state adopted rate, or a supplemental classification rate.
Union Rate Identifiers
A four-letter identifier beginning with characters other than
�SU�, �UAVG�, �SA�, or �SC� denotes that a union rate was prevailing for that classification in the survey. Example:
PLUM0198-005 07/01/2024. PLUM is an identifier of the union whose collectively bargained rate prevailed in the survey for this classification, which in this example would be Plumbers.
0198 indicates the local union number or district council number where applicable, i.e., Plumbers Local 0198. The next number, 005 in the example, is an internal number used in processing the wage determination. The date, 07/01/2024 in the example, is the effective date of the most current negotiated rate.
Union prevailing wage rates are updated to reflect all changes over time that are reported to WHD in the rates in the collective bargaining agreement (CBA) governing the classification.
Union Average Rate Identifiers
The UAVG identifier indicates that no single rate prevailed for those classifications, but that 100% of the data reported for the classifications reflected union rates. EXAMPLE:
UAVG-OH-0010 01/01/2024. UAVG indicates that the rate is a weighted union average rate. OH indicates the State of Ohio.
The next number, 0010 in the example, is an internal number used in producing the wage determination. The date, 01/01/2024 in the example, indicates the date the wage determination was updated to reflect the most current union average rate.
A UAVG rate will be updated once a year, usually in…