24.168 NOAA OMAO Bulkhead Pile Driving Summary Table 08.26.24 to 08.30.24.pdf

PDF 656 KB Posted

Attached to
Design-Bid-Build, USCG Offshore Patrol Cutters (OPC) Homeport Pier, Naval Station Newport, Newport RI
Solicitation number
N4008526R0001
Issued by

About this file

This document is a Pile Driving Summary and associated Pile Driving Logs prepared by Geosciences Testing and Research, Inc. (GTR) for the NOAA OMAO project at Newport, Rhode Island Naval Station, with Skanska as the contractor and Coastal Marine as the contractor representative.

The summary documents the driving of 20 bulkhead piles (BH4, BH3, BH2, S19-S23) conducted between August 26-30, 2024. The piles consist of steel 18-inch O.D. with 0.5-inch wall open-ended pipe and NZ26 sheet piles, each 60-47 feet in length. All piles were driven using a single-acting diesel hammer (ICE D-50) with a rated energy of 33.5 bhp and 11,355 lbs ram weight at 52 bpm maximum speed. The driving data shows pile depths ranging from 46-60 feet for bulkhead piles and 42-47 feet for sheet piles, with cut-off elevations between 40.50-53.50 feet. Blow counts for the final foot of driving ranged from 8-11 blows per foot across all piles. The detailed pile driving logs for individual piles (BH2, S10-S23) include strike-by-strike blow count records, driven depths, tip and top elevations, and end-of-drive stroke measurements. All elevations are referenced to NAVD88 datum, and stroke measurements at end-of-drive ranged from 8-12 feet depending on soil resistance encountered during driving operations.

View the file

Other files

File Type Posted
USCG OPC Pier Amendment 0009 Drawings.pdf PDF
2026-0816-HAI-USCG Homeport OPC Pier-Geotech Engineering Report Rev 2.pdf PDF
Amendment 0009 USCG OPC.pdf PDF
Updated Attachment H - USCG OPC Pier Price Proposal Form REV 5.docx DOCX document
Amendment 0008 USCG OPC.pdf PDF
Amendment 0007 SPC USCG OPC Pier Appendix D (With Placeholders).pdf PDF
Updated Attachment H - USCG OPC Pier Price Proposal Form REV 6.docx DOCX document
USCG OPC Pier Amendment 0008 Drawings.pdf PDF
USCG OPC Pier Amendment 007 Drawings.pdf PDF
Amendment 0007 USCG OPC.pdf PDF
Attachment Z - Pier 1 - Amendment 006 Drawings.pdf PDF
Appendix A - Telecom Room Photos.pdf PDF
Updated Attachment H - UCCG OPC Pier Price Proposal Form REV 4.docx DOCX document
Amendment 0006 USCG OPC.pdf PDF
24.168 NOAA OMAO Prime Pier Pile Driving Summary Report.pdf PDF
Pier Pile Plan.pdf PDF
24.168 NOAA OMAO Bulkhead Pile Driving Summary Table 08.26.24 to 08.30.24 (1).pdf PDF
24.168 NOAA OMAO Bulkhead Pile Driving Summary Table 07.22.24 to 07.26.24.pdf PDF
24.168 NOAA OMAO Bulkhead Pile Driving Summary Table 07.15.24 to 07.19.24.pdf PDF
Attachment Y - Appendix A Record drawing 11836 125 Submarine Cable Relocation.pdf PDF
SUB-0123 Interim PDA and Test Pile Logs - Trestle Piles 10B 14B.pdf PDF
SUB-0TBD Interim PDA and Test Pile Logs For Trestle Pile 17B.pdf PDF
Updated Attachment H - UCCG OPC Pier Price Proposal Form REV 3.docx DOCX document
SUB-0105 Trestle Piles 4C 6B - PDA and Test Pile Logs.pdf PDF
24.168 NOAA OMAO Bulkhead Pile Driving Summary Table 08.20.24 to 08.23.24.pdf PDF
24.107 NOAA OMAO Ship & Support Facility Relocation Newport RI - PDA Report - Pier Bent 19.pdf PDF
24.168 NOAA OMAO Bulkhead Pile Driving Summary Table 06.25.24 to 06.27.24.pdf PDF
24.168 NOAA OMAO Bulkhead Pile Driving Summary Table 07.31.24 to 08.01.24.pdf PDF
SUB-0284 PDA49B_A.pdf PDF
SUB-0262 Interim PDA Test Pile Logs for Pier Piles - Bent 35 B - A.pdf PDF
24.168 NOAA OMAO Bulkhead Pile Driving Summary Table 08.07.24 to 08.08.24.pdf PDF
Trestle Summary.pdf PDF
24.168 NOAA OMAO Bulkhead Pile Driving Summary Table 08.20.24 to 08.23.24 (1).pdf PDF
24.168 NOAA OMAO Bulkhead Pile Driving Summary Table 07.01.24 - 07.02.24.pdf PDF
Bulkhead Pile Plan.pdf PDF
24.168 NOAA OMAO Bulkhead Pile Driving Summary Table 09.03.24 to 09.06.24.pdf PDF
24.168 NOAA OMAO Bulkhead Pile Driving Summary Table 08.13.24 to 08.15.24.pdf PDF
Attachment W - Pier 1 - Amendment 005 Drawings.pdf PDF
24.168 NOAA OMAO Bulkhead Pile Driving Summary Table 07.11.24.pdf PDF
24.107 NOAA OMAO Ship Support Facility Relocation Newport RI - PDA Report - Pier Bent 25 and 27.pdf PDF
NOAA OMAO Survey Reports 100 Percent Pre-Final Submittal 04072022.pdf PDF
Amendment 0005 USCG OPC.pdf PDF
Attachment X - Appendix A Record Drawing 12819 135 Submarine Cable.pdf PDF
Attachment U - Appendix A - Pier 1 Extension 1968.pdf PDF
Attachment V - Pier 1 - Amendment 004 Drawings.pdf PDF
Updated Attachment K - WD RI20260001 05-18-2026.pdf PDF
Amendment 0004 USCG OPC.pdf PDF
Attachment T - REF(m) Existing Pier 1 Drawings 1 of 2.pdf PDF
Attachment C - Construction Experience Project Data Sheet.docx DOCX document
Attachment E - Historical Small Business Utilization.docx DOCX document
Show 40 more

Latest 50 of 90 listed here. See the rest on GovTribe.

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

DATE:

PROJECT LOCATION:

CLIENT: CONTRACTOR:

GTR REP PILE INFO:

BH4 Not Vibed 26-Aug-24 12.25 60 55.50 10.25 -43.25 16.75 53.50 48 10 - 11 BH3 Not Vibed 27-Aug-24 12.25 60 55.50 10.25 -43.25 16.75 53.50 54 10 - 11 BH2 Not Vibed 27-Aug-24 12.25 60 55.50 10.25 -43.25 16.75 53.50 46 9.5 - 10.5 S19 Not Vibed 29-Aug-24 12.25 47 42.50 10.25 -30.25 16.75 40.50 34 8 - 9 S18 Not Vibed 29-Aug-24 12.25 47 42.50 10.25 -30.25 16.75 40.50 32 8 - 9 S17 Not Vibed 29-Aug-24 12.25 47 42.50 10.25 -30.25 16.75 40.50 32 8 - 9 S16 Not Vibed 29-Aug-24 12.25 47 42.50 10.25 -30.25 16.75 40.50 28 8 - 9 S15 Not Vibed 29-Aug-24 12.25 47 42.50 10.25 -30.25 16.75 40.50 34 8 - 9 S14 Not Vibed 29-Aug-24 12.25 47 42.50 10.25 -30.25 16.75 40.50 30 9 - 10 S13 Not Vibed 29-Aug-24 12.25 47 42.50 10.25 -30.25 16.75 40.50 32 8 - 9 S12 Not Vibed 29-Aug-24 12.25 47 42.50 10.25 -30.25 16.75 40.50 36 8 - 9 S11 Not Vibed 29-Aug-24 12.25 47 42.50 10.25 -30.25 16.75 40.50 32 9 - 10 S10 Not Vibed 29-Aug-24 12.25 47 42.50 10.25 -30.25 16.75 40.50 26 8 - 9 S23 Not Vibed 30-Aug-24 12.25 47 42.50 10.25 -30.25 16.75 40.50 34 8 - 9 S22 Not Vibed 30-Aug-24 12.25 47 42.50 10.25 -30.25 16.75 40.50 30 9 - 10 S21 Not Vibed 30-Aug-24 12.25 47 42.50 10.25 -30.25 16.75 40.50 32 9 - 10 S20 Not Vibed 30-Aug-24 12.25 47 42.50 10.25 -30.25 16.75 40.50 30 9 - 10 and NZ26 Sheet Piles

PILE

NO.

DRIVEN

DEPTH

(feet)

TIP

ELEVATION

(feet)

TOP

ELEVATION

(feet)

PILE

LENGTH

(feet)

EOD

STROKE

(feet)

WORKING

GRADE

(feet)

FINAL DRIVE

DATE

VIBRATION

DRIVE DATE

CUT-OFF

LENGTH

GTR JOB # 24.168

GEOSCIENCES TESTING AND RESEARCH, INC.

55 Middlesex Street, Suite 225, North Chelmsford, MA, Phone: (978) 251-9395 Fax: (978) 251-9396

COMMENTS

PILE DRIVING SUMMARY

J. Roth Steel 18-inch O.D. X 0.5-inch wall open-ended Pipe

Newport RI Naval Station Coastal Marine

NOAA OMAO

Skanska

30-Aug-24

CUT-OFF

ELEVATION

(feet)

BLOW

COUNT

FINAL FOOT

BULKHEAD PILES

File details come from the government source that posted it. Updated .