This is a comprehensive set of construction contract drawings for the USCG OCR Homeport Initiative OPC Pier 1 project located at Naval Station Newport, Rhode Island. The project involves the design and construction of a new pier structure with supporting infrastructure, including demolition of existing facilities, dredging, bulkhead construction, and utility systems installation.

The structural work includes installation of 36-inch diameter concrete-filled steel pipe piles (400-ton compression capacity), reinforced concrete pile caps and decking, precast concrete planks, and steel framing. The project specifies marine-grade concrete (5,000 PSI minimum), galvanized reinforcing steel per ASTM A767 Grade 60, and hot-dip galvanized structural steel. Foundation design accommodates dynamic pile analysis (PDA) testing for verification. Civil work encompasses site demolition, utility relocation, dredging to specified elevations (approximately -14 to -40 feet), bulkhead repair with steel sheet piling (PZ35), and erosion control measures. Mechanical systems include compressed air, fresh water (10-inch main with reduced pressure backflow preventers), and sanitary sewer force mains with dual pump systems. The fresh water system includes heated enclosures for freeze protection and remote monitoring. Electrical infrastructure provides shore power connections, lighting control via astronomical timers, line insulation monitoring, and heat trace systems for piping (277-volt circuits with 24 circuits totaling approximately 34,000 watts). The contract requires compliance with UFC standards, AISC specifications, ACI 318 concrete standards, and USCG mooring requirements. Project coordination emphasizes field verification of existing conditions, utility interface management, and protection of existing infrastructure including 1954-era concrete deadmen and tie rods.

View the file

Other files

File Type Posted
USCG OPC Pier Amendment 0008 Drawings.pdf PDF
Amendment 0007 SPC USCG OPC Pier Appendix D (With Placeholders).pdf PDF
Updated Attachment H - USCG OPC Pier Price Proposal Form REV 5.docx DOCX document
Appendix A - Telecom Room Photos.pdf PDF
Amendment 0006 USCG OPC.pdf PDF
Attachment Z - Pier 1 - Amendment 006 Drawings.pdf PDF
Updated Attachment H - UCCG OPC Pier Price Proposal Form REV 4.docx DOCX document
24.168 NOAA OMAO Bulkhead Pile Driving Summary Table 08.13.24 to 08.15.24.pdf PDF
24.168 NOAA OMAO Bulkhead Pile Driving Summary Table 07.22.24 to 07.26.24.pdf PDF
24.168 NOAA OMAO Bulkhead Pile Driving Summary Table 07.01.24 - 07.02.24.pdf PDF
24.168 NOAA OMAO Bulkhead Pile Driving Summary Table 08.26.24 to 08.30.24 (1).pdf PDF
24.168 NOAA OMAO Bulkhead Pile Driving Summary Table 08.26.24 to 08.30.24.pdf PDF
24.168 NOAA OMAO Bulkhead Pile Driving Summary Table 07.11.24.pdf PDF
24.168 NOAA OMAO Prime Pier Pile Driving Summary Report.pdf PDF
Pier Pile Plan.pdf PDF
SUB-0123 Interim PDA and Test Pile Logs - Trestle Piles 10B 14B.pdf PDF
Amendment 0005 USCG OPC.pdf PDF
Attachment Y - Appendix A Record drawing 11836 125 Submarine Cable Relocation.pdf PDF
24.168 NOAA OMAO Bulkhead Pile Driving Summary Table 08.07.24 to 08.08.24.pdf PDF
24.168 NOAA OMAO Bulkhead Pile Driving Summary Table 08.20.24 to 08.23.24 (1).pdf PDF
Bulkhead Pile Plan.pdf PDF
24.168 NOAA OMAO Bulkhead Pile Driving Summary Table 08.20.24 to 08.23.24.pdf PDF
24.168 NOAA OMAO Bulkhead Pile Driving Summary Table 09.03.24 to 09.06.24.pdf PDF
NOAA OMAO Survey Reports 100 Percent Pre-Final Submittal 04072022.pdf PDF
SUB-0105 Trestle Piles 4C 6B - PDA and Test Pile Logs.pdf PDF
Trestle Summary.pdf PDF
SUB-0TBD Interim PDA and Test Pile Logs For Trestle Pile 17B.pdf PDF
Updated Attachment K - WD RI20260001 05-18-2026.pdf PDF
Amendment 0003 USCG OPC.pdf PDF
Attachment E - Historical Small Business Utilization.docx DOCX document
Attachment T - REF(m) Existing Pier 1 Drawings 1 of 2.pdf PDF
Updated Attachment H - UCCG OPC Pier Price Proposal Form REV 2.docx DOCX document
Attachment Q - Spc 100 Final Specs Appendix D - (With Placeholders).pdf PDF
Updated Attachment G - Individual SB Subcontracting Plan.docx DOCX document
Amendment 0002 USCG OPC.pdf PDF
Updated Attachment H - UCCG OPC Pier Price Proposal Form REV 1.pdf PDF
Attachment M - 01 45 35_Schedule_of_Special_Inspections.pdf PDF
Attachment N - 01 45 35_Statement_of_Special_Inspections.xlsx XLSX spreadsheet
Amendment 0001 USCG OPC.pdf PDF
Updated Attachment F - SB Participation Commitment Document.pdf PDF
Attachment A - Pre Proposal Inquiry Log.xlsx XLSX spreadsheet
Attachment C - Construction Experience Project Data Sheet.pdf PDF
Attachment F - SB Participation Commitment Document.pdf PDF
Attachment G - Individual SB Subcontrating Plan.pdf PDF
Attachment K - WD RI20260001 01-30-2026.pdf PDF
Solicitation - N4008526R0001.pdf PDF
Attachment D - Past Performance Questionnaire.pdf PDF
Attachment H - UCCG OPC Pier Price Proposal Form.pdf PDF
1826479dwg01of05_GEN-CIV.pdf PDF
Attachment E - Historical Small Business Utilization.pdf PDF
Show 40 more

50 files listed here. See the rest on GovTribe.

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

SATISFACTORY TO DATE

APPROVED

ACTIVITY

FOR COMMANDER NAVFAC

SEAL

A/E INFO

A

B

C

D

1 2 3 4 5

1 2 3 4 5

A

B

C

D

SCALE:

CONSTR. CONTR. NO.

SHEET

NAVFAC DRAWING NO.

DES DRW CHK

OF

EPROJECT NO.:

D E

P A

R T

M E

N T

O F

T H

E N

A V

Y N

A V

A L

F A

C

IL

IT

IE

S E

N G

IN

E

E R

IN

G

S Y

S T

E M

S C

O M

M A

N D

DRAWFORM REVISION: 25 AUGUST 2020

PM/DM

BRANCH MANAGER

CHIEF ENG/ARCH

FIRE PROTECTION

N A

V A

L F

A C

IL

IT

IE

S

E N

G

IN

E E

R

IN

G S

Y S

T E

M S

C O

M M

A N

D

M

ID

-A T

LA

N

T

IC

N A

V A

L S

T A

T

IO

N

N O

R F

O L K

V

A

AS NOTED

S Y

M D

E S

C R

IP

T

IO

N

D A

T E

A P

P R

/2

/2

:5 :3

A

M

A u to d e s k D o c s /2

U

S C

G O

C R

H o m e p o rt

In it ia ti v e O

P C

P ie r_

/P

IE

R

U S

C G

-1 -S

.r v t

G-002

U S

C G

O C

R H

O M

E P

O R

T

IN

IT

IA

T

IV

E O

P C

P

IE

R

IN

D

E X

O F

D R

A W

IN

G

S

S H

E E

T

O F

MN

12936571

CHG HBF

Frank Cole USCG MASI

MRI/CWJ

1826479

N E

W P

O R

T, R

I N

A V

A L

S T

A T

IO

N

N E

W P

O R

T

JWJ

NEK

HPN

C I

C O

R E

H

A M

P T

O N

R O

A D

S

G -0

06 FEB 2026

GENERAL SHEET INDEX

SHEET NO.

NAVFAC DWG. NO. SHEET TITLENO. SHEET

1 G-001 12936570 TITLE SHEET

2 G-002 12936571 INDEX OF DRAWINGS - SHEET 1 OF 2

3 G-003 12936572 INDEX OF DRAWINGS - SHEET 2 OF 2

4 G-004 12936573 GENERAL ABBREVIATIONS

5 G-101 12936574 OVERVIEW EXISTING SITE CONTROLS

6 G-102 12936575 GENERAL SITE PLAN

7 G-103 12936576 GENERAL ARRANGEMENT PLAN

8 G-104 12936577 GENERAL ARRANGEMENT SECTION

9 G-105 12936578 CONTRACTOR ACCESS ROUTE PLAN

10 G-106 12936579 MOORING ARRANGEMENT PLAN

11 G-107 12936580 BATHYMETRIC SURVEY PLAN

LIST OF SHEETS

GEOTECHNICAL SHEET INDEX

SHEET NO.

NAVFAC DWG. NO. SHEET TITLENO. SHEET

23 B-101 12936592 ESTIMATED TOP OF WEATHERED ROCK CONTOUR PLAN

24 B-601 12936593 SOIL BORING LOGS - SHEET 1 OF 6

25 B-602 12936594 SOIL BORING LOGS - SHEET 2 OF 6

26 B-603 12936595 SOIL BORING LOGS - SHEET 3 OF 6

27 B-604 12936596 SOIL BORING LOGS - SHEET 4 OF 6

28 B-605 12936597 SOIL BORING LOGS - SHEET 5 OF 6

29 B-606 12936598 SOIL BORING LOGS - SHEET 6 OF 6

STRUCTURAL SHEET INDEX

SHEET NO.

NAVFAC DWG. NO. SHEET TITLENO. SHEET

50 S-001 12936619 STRUCTURAL ABBREVIATION

51 S-002 12936620 STRUCTURAL GENERAL NOTES - SHEET 1 OF 2

52 S-003 12936621 STRUCTURAL GENERAL NOTES - SHEET 2 OF 2

53 S-004 12936622 STRUCTURAL DESIGN LOADS AND STANDARD DETAILS - SHEET 1 OF 2

54 S-005 12936623 STRUCTURAL DESIGN LOADS AND STANDARD DETAILS - SHEET 2 OF 2

55 SD001 12936624 STRUCTURAL DEMOLITION NOTES

56 SD101 12936625 OVERALL STRUCTURAL DEMOLITION PLAN

57 SD102 12936626 PIER 1 DEMOLITION PLAN

58 SD103 12936627 S45N BULKHEAD DEMOLITION PLAN

59 SD104 12936628 S45S BULKHEAD DEMOLITION PLAN

60 SD201 12936629 S45N BULKHEAD DEMOLITION ELEVATION

61 SD202 12936630 TEMPORARY SHEETING BULKHEAD ELEVATION

62 SD301 12936631 TYPICAL SECTION FOR PIER 1 DEMOLITION

63 SD302 12936632 TYPICAL SECTION FOR BULKHEAD DEMOLITION

64 SD303 12936633 SECTION OF DEMOLITION AT S45N BULKHEAD

65 SD501 12936634 MISCELLANEOUS DEMOLITION DETAILS

66 SD601 12936635 PIER 1 AND S45N BULKHEAD DEMOLITION PHOTOGRAPHS

67 SD602 12936636 S45N BULKHEAD DEMOLITION PHOTOGRAPHS

68 S-101 12936637 OVERALL BULKHEAD PLAN

69 S-102 12936638 GENERAL DECK PLAN

70 S-103 12936639 PILE PLAN - SHEET 1 OF 7

71 S-104 12936640 PILE PLAN - SHEET 2 OF 7

72 S-105 12936641 PILE PLAN - SHEET 3 OF 7

73 S-106 12936642 PILE PLAN - SHEET 4 OF 7

74 S-107 12936643 PILE PLAN - SHEET 5 OF 7

75 S-108 12936644 PILE PLAN - SHEET 6 OF 7

76 S-109 12936645 PILE PLAN - SHEET 7 OF 7

77 S-110 12936646 FRAMING PLAN - SHEET 1 OF 7

78 S-111 12936647 FRAMING PLAN - SHEET 2 OF 7

79 S-112 12936648 FRAMING PLAN - SHEET 3 OF 7

80 S-113 12936649 FRAMING PLAN - SHEET 4 OF 7

81 S-114 12936650 FRAMING PLAN - SHEET 5 OF 7

82 S-115 12936651 FRAMING PLAN - SHEET 6 OF 7

83 S-116 12936652 FRAMING PLAN - SHEET 7 OF 7

84 S-117 12936653 CONCRETE PLANKS PLAN - SHEET 1 OF 7

85 S-118 12936654 CONCRETE PLANKS PLAN - SHEET 2 OF 7

86 S-119 12936655 CONCRETE PLANKS PLAN - SHEET 3 OF 7

87 S-120 12936656 CONCRETE PLANKS PLAN - SHEET 4 OF 7

88 S-121 12936657 CONCRETE PLANKS PLAN - SHEET 5 OF 7

89 S-122 12936658 CONCRETE PLANKS PLAN - SHEET 6 OF 7

90 S-123 12936659 CONCRETE PLANKS PLAN - SHEET 7 OF 7

91 S-124 12936660 DECK PLAN - SHEET 1 OF 7

92 S-125 12936661 DECK PLAN - SHEET 2 OF 7

93 S-126 12936662 DECK PLAN - SHEET 3 OF 7

94 S-127 12936663 DECK PLAN - SHEET 4 OF 7

95 S-128 12936664 DECK PLAN - SHEET 5 OF 7

96 S-129 12936665 DECK PLAN - SHEET 6 OF 7

97 S-130 12936666 DECK PLAN - SHEET 7 OF 7

98 S-131 12936667 FENDER PILE PLAN - SHEET 1 OF 6

99 S-132 12936668 FENDER PILE PLAN - SHEET 2 OF 6

STRUCTURAL SHEET INDEX

SHEET NO.

NAVFAC DWG. NO. SHEET TITLENO. SHEET

100 S-133 12936669 FENDER PILE PLAN - SHEET 3 OF 6

101 S-134 12936670 FENDER PILE PLAN - SHEET 4 OF 6

102 S-135 12936671 FENDER PILE PLAN - SHEET 5 OF 6

103 S-136 12936672 FENDER PILE PLAN - SHEET 6 OF 6

104 S-137 12936673 DECK DRAINAGE PLAN - SHEET 1 OF 2

105 S-138 12936674 DECK DRAINAGE PLAN - SHEET 2 OF 2

106 S-201 12936675 PIER SOUTHERN ELEVATION - SHEET 1 OF 3

107 S-202 12936676 PIER SOUTHERN ELEVATION - SHEET 2 OF 3

108 S-203 12936677 PIER SOUTHERN ELEVATION - SHEET 3 OF 3

109 S-204 12936678 PIER NORTHERN ELEVATION - SHEET 1 OF 3

110 S-205 12936679 PIER NORTHERN ELEVATION - SHEET 2 OF 3

111 S-206 12936680 PIER NORTHERN ELEVATION - SHEET 3 OF 3

112 S-207 12936681 REPAIRED S45N BULKHEAD ELEVATION & PIER 1 SECTION

113 S-208 12936682 S45S BULKHEAD ELEVATION

114 S-301 12936683 PIER LONGITUDINAL SECTIONS - SHEET 1 OF 2

115 S-302 12936684 PIER LONGITUDINAL SECTIONS - SHEET 2 OF 2

116 S-303 12936685 PIER ABUTMENT & APPROACH SLAB LONGITUDINAL SECTION

117 S-304 12936686 LONGITUDINAL SECTIONS AT UTILITY TRENCH

118 S-305 12936687 LONGITUDINAL SECTION CROSS UTILITY TRENCH AT ABUTMENT

119 S-306 12936688 PIER ABUTMENT & UTILITY TRENCH TRANSVERSE SECTION

120 S-307 12936689 PIER TRANSVERSE SECTIONS - SHEET 1 OF 5

121 S-308 12936690 PIER TRANSVERSE SECTIONS - SHEET 2 OF 5

122 S-309 12936691 PIER TRANSVERSE SECTIONS - SHEET 3 OF 5

123 S-310 12936692 PIER TRANSVERSE SECTIONS - SHEET 4 OF 5

124 S-311 12936693 PIER TRANSVERSE SECTIONS - SHEET 5 OF 5

125 S-401 12936694 ABUTMENT & LANDSIDE FRAMING PART PLAN

126 S-402 12936695 OUTBOARD SUBSTATION PART PLAN

127 S-403 12936696 INBOARD SUBSTATION PART PLAN

128 S-404 12936697 S45S BULKHEAD PART PLAN & SECTION

129 S-501 12936698 TURBIDITY CURTAIN NOTES & DETAILS

130 S-502 12936699 PILE DETAILS - CONCRETE-FILLED STEEL PIPE PILES

131 S-503 12936700 PILE DETAILS - STEEL PILES

132 S-504 12936701 CONCRETE PILE CAP DETAILS - SHEET 1 OF 3

133 S-505 12936702 CONCRETE PILE CAP DETAILS - SHEET 2 OF 3

134 S-506 12936703 CONCRETE PILE CAP DETAILS - SHEET 3 OF 3

135 S-507 12936704 REINFORCED BOLLARD FOUNDATION DETAILS

136 S-508 12936705 REINFORCEMENT DETAILS FOR CONCRETE BLOCKOUT AT BENT 43 - SHEET 1 OF 2

137 S-509 12936706 REINFORCEMENT DETAILS FOR CONCRETE BLOCKOUT AT BENT 43 - SHEET 2 OF 2

138 S-510 12936707 CONCRETE DUCTBANK REINFORCEMENT DETAILS

139 S-511 12936708 REINFORCEMENT DETAILS

140 S-512 12936709 CONCRETE BEAM DETAILS

141 S-513 12936710 TYPICAL PIER DUCTBANK DETAILS

142 S-514 12936711 LANDSIDE PIPE PILES CONNECTION DETAILS

143 S-515 12936712 PRECAST CONCRETE PLANK DETAILS

144 S-516 12936713 CONDUITS AND FITTINGS AT EXPANSION JOINT

145 S-517 12936714 PRECAST MANHOLE DETAILS

146 S-518 12936715 UTILITY TRENCH COVER DETAILS

147 S-519 12936716 FENDER SYSTEM DETAILS - SHEET 1 OF 2

148 S-520 12936717 FENDER SYSTEM DETAILS - SHEET 2 OF 2

149 S-521 12936718 PIPE SUPPORT DETAILS

150 S-522 12936719 MISCELLANEOUS SECTIONS & DETAILS - SHEET 1 OF 2

151 S-523 12936720 MISCELLANEOUS SECTIONS & DETAILS - SHEET 2 OF 2

152 S-524 12936721 S45N BULKHEAD MODIFICATION DETAILS - SHEET 1 OF 2

153 S-525 12936722 S45N BULKHEAD MODIFICATION DETAILS - SHEET 2 OF 2

154 S-526 12936723 S45S BULKHEAD DETAILS - SHEET 1 OF 3

155 S-527 12936724 S45S BULKHEAD DETAILS - SHEET 2 OF 3

156 S-528 12936725 S45S BULKHEAD DETAILS - SHEET 3 OF 3

157 S-529 12936726 AIR COMPRESSOR FOUNDATION & STEEL FRAME PART PLAN

158 S-530 12936727 AIR COMPRESSOR DETAILS

159 S-531 12936728 AIR COMPRESSOR FOUNDATION DETAILS

160 S-532 12936729 AIR COMPRESSOR STAIRS ACCESS DETAILS - SHEET 1 OF 2

161 S-533 12936730 AIR COMPRESSOR STAIRS ACCESS DETAILS - SHEET 2 OF 2

162 S-534 12936731 15KV SWITCHGEAR STRUCTURE DETAILS

163 S-601 12936732 STEEL PILE SCHEDULE

164 S-602 12936733 FENDER PILE SCHEDULE - SHEET 1 OF 2

165 S-603 12936734 FENDER PILE SCHEDULE - SHEET 2 OF 2

DREDGE SHEET INDEX

SHEET NO.

NAVFAC DWG. NO. SHEET TITLENO. SHEET

30 CN101 12936599 OVERALL DREDGING PLAN

31 CN301 12936600 DREDGING SECTIONS - SHEET 1 OF 3

32 CN302 12936601 DREDGING SECTIONS - SHEET 2 OF 3

33 CN303 12936602 DREDGING SECTIONS - SHEET 3 OF 3

HAZARDOUS MATERIALS SHEET INDEX

SHEET NO.

NAVFAC DWG. NO. SHEET TITLENO. SHEET

12 H-101 12936581 HAZARDOUS MATERIALS NOTES & PLAN

CIVIL SHEET INDEX

SHEET NO.

NAVFAC DWG. NO. SHEET TITLENO. SHEET

34 C-001 12936603 CIVIL LEGEND, ABBREVIATIONS & GENERAL NOTES

35 C-002 12936604 GENERAL NOTES

35A C-003 ORIGINAL EXISTING CONDITIONS - SHEET 1 OF 3

35B C-004 ORIGINAL EXISTING CONDITIONS - SHEET 2 OF 3

35C C-005 ORIGINAL EXISTING CONDITIONS - SHEET 3 OF 3

35D C-006 EXISTING LANDSIDE STRUCTURAL CONDITIONS - SHEET 1 OF 2

35E C-007 EXISTING LANDSIDE STRUCTURAL CONDITIONS - SHEET 2 OF 2

36 CD101 12936605 SITE DEMOLITION PLAN

37 CD102 12936606 UTILITY DEMOLITION PLAN - PIER 1 LANDSIDE

38 C-101 12936607 SITE PLAN

39 C-102 12936608 UTILITY PLAN - PIER 1 LAND SIDE

40 C-103 12936609 COMPOSITE UTILITY LAYOUT PLAN - PIER 1 LANDSIDE

41 C-201 12936610 UTILITY PROFILES - SHEET 1 OF 2

42 C-202 12936611 UTILITY PROFILES - SHEET 2 OF 2

43 C-501 12936612 EROSION CONTROL NOTES & DETAILS

44 C-502 12936613 SITE DETAILS - SHEET 1 OF 6

45 C-503 12936614 SITE DETAILS - SHEET 2 OF 6

46 C-504 12936615 SITE DETAILS - SHEET 3 OF 6

47 C-505 12936616 SITE DETAILS - SHEET 4 OF 6

48 C-506 12936617 SITE DETAILS - SHEET 5 OF 6

49 C-507 12936618 SITE DETAILS - SHEET 6 OF 6

SURVEY SHEET INDEX

SHEET NO.

NAVFAC DWG. NO. SHEET TITLENO. SHEET

13 V-001 12936582 CODDINGTON COVE EXISTING CONDITIONS OVERVIEW

14 V-101 12936583 EXISTING CONDITIONS - PIER 2 LANDSIDE

15 V-102 12936584 EXISTING CONDITIONS - PIER 1 LANDSIDE

16 V-103 12936585 EXISTING CONDITIONS - RETENTION POND

17 V-104 12936586 EXISTING CONDITIONS - NOAA BUILDING

18 V-105 12936587 EXISTING CONDITIONS - PIER 1 SHEET 1 OF 5

19 V-106 12936588 EXISTING CONDITIONS - PIER 1 SHEET 2 OF 5

20 V-107 12936589 EXISTING CONDITIONS - PIER 1 SHEET 3 OF 5

21 V-108 12936590 EXISTING CONDITIONS - PIER 1 SHEET 4 OF 5

22 V-109 12936591 EXISTING CONDITIONS - PIER 1 SHEET 5 OF 5

A

M E

N D

M E

N T

/2

/2

V M

G

A

M E

N D

M E

N T

/0

/2

V M

G

1. FIELD VERIFY ALL DIMENSIONS, LOCATIONS AND ELEVATIONS SHOWN ON CONTRACT DRAWINGS FOR EXISTING STRUCTURES. ALL DISCREPANCIES MUST BE BROUGHT TO THE ATTENTION OF THE

CONTRACTING OFFICER BEFORE PROCEEDING WITH THE WORK.

2. THE SIZES AND LOCATIONS OF EQUIPMENT PADS AND PEDESTALS, AS WELL AS EQUIPMENT-

RELATED FLOOR AND WALL OPENINGS, ARE DEPENDENT ON THE ACTUAL EQUIPMENT

FURNISHED. VERIFY AND COORDINATE ALL SUCH ITEMS. DIMENSIONS INDICATED ON THESE

DRAWINGS MUST NOT BE ALTERED WITHOUT APPROVAL OF THE CONTRACTING OFFICER.

STRUCTURAL DRAWINGS MAY NOT SHOW ALL EQUIPMENT PADS AND OTHER EQUIPMENT

SUPPORTS REQUIRED. REFER TO CIVIL, MECHANICAL AND ELECTRICAL DRAWINGS.

3. FOR NOTES PERTAINING TO INDIVIDUAL STRUCTURES, SEE DRAWINGS FOR THOSE STRUCTURES.

4. COORDINATE ALL ACTIVITIES, INCLUDING THOSE OF SUBCONTRACTORS, WITH THE

GOVERNMENT'S ACTIVITIES.

5. FIELD VERIFY ALL DIMENSIONS, ELEVATIONS, LOCATIONS AND DIMENSIONS OF UTILITIES AND

INTERFACE TO EXISTING PIER PRIOR TO DEMOLITION, MATERIAL FABRICATION AND FIELD

CONSTRUCTION.

6. COORDINATE CONCRETE PLACEMENT WITH MECHANICAL, ELECTRICAL AND FIRE PROTECTION.

STRUCTURAL GENERAL NOTES

STRUCTURAL CONCRETE NOTES

1. PROVIDE CONCRETE AS FOLLOWS:

A. PIER STRUCTURE (INCLUDING PILES AND MANHOLES) - MARINE CONCRETE WITH A MINIMUM

COMPRESSIVE STRENGTH OF 5,000 PSI AT 28 DAYS.

2. DETAIL AND CONSTRUCT REINFORCED CONCRETE IN ACCORDANCE WITH AMERICAN CONCRETE

INSTITUTE ACI SPEC-301-20, "SPECIFICATION FOR STRUCTURAL CONCRETE".

3. DETAIL REINFORCING STEEL IN ACCORDANCE WITH AMERICAN CONCRETE INSTITUTE ACI 315R-18, "GUIDE TO PRESENTING REINFORCING STEEL DESIGN DETAILS," AND ACI SP-66, "ACI DETAILING

MANUAL".

4. PROVIDE REINFORCEMENT CONFORMING TO ASTM A767, GRADE 60. GALVANIZED REINFORCING

STEEL MUST BE USED, UNLESS NOTED OTHERWISE.

5. UNLESS NOTED OTHERWISE ON THE DRAWINGS, THE CONCRETE COVER FOR REINFORCEMENT

MUST BE AS FOLLOWS:

A. BOTTOM BARS IN FOOTINGS AND IN SLABS ON EARTH OR GRAVEL: 3".

B. BEAMS, SLABS, COLUMNS AND WALLS, EXPOSED TO GROUND, WEATHER MOISTURE, AND

MARINE ENVIRONMENT, AFTER REMOVAL OF FORMS: 3".

7. SUBMIT REINFORCING STEEL DETAILS (SHOP DRAWINGS) AND RECEIVE APPROVAL FROM THE

CONTRACTING OFFICER BEFORE PROCEEDING WITH FABRICATION.

8. CHAMFER ALL EXPOSED CONCRETE EDGES 3/4", UNLESS NOTED OTHERWISE.

9. POUR CONCRETE SLABS AND WALLS BETWEEN INDICATED JOINTS, ALLOWING A MINIMUM

ELAPSED PERIOD OF 3 DAYS BETWEEN ADJACENT POURS.

10. PROVIDE JOINTS AS DETAILED AND SPECIFIED. NO ADDITIONAL JOINTS MUST BE USED NOR ANY

OMITTED EXCEPT BY WRITTEN AUTHORIZATION FROM THE CONTRACTING OFFICER. APPROVED

ADDITIONAL JOINTS MUST NOT RESULT IN ADDITIONAL EXPENSE TO THE GOVERNMENT.

11. PROVIDE SWELLABLE WATERSTOPS AS SHOWN ON THE DRAWINGS. WHERE NOT SHOWN,

CONTINUOUS PVC WATERSTOPS MUST BE USED.

12. SIZE AND LOCATE ANCHOR BOLTS AND EQUIPMENT PADS OR PEDESTALS TO SUIT EQUIPMENT

FURNISHED.

13. REVIEW ALL DRAWINGS FROM OTHER DISCIPLINES AND COORDINATE ALL OPENINGS AND

EMBEDDED ITEMS, SUCH AS SLEEVES, ANCHORS, CONDUITS, ETC., WHICH WILL BE

INCORPORATED INTO CONCRETE WORK.

14. ROUGHEN SURFACE OF ALL HORIZONTAL CONSTRUCTION JOINTS IN BEAMS AND PILE CAPS TO

APPROXIMATELY 1/4" FULL AMPLITUDE UNLESS NOTED OTHERWISE.

15. PROVIDE WELDED WIRE FABRIC CONFORMING TO ASTM A185. ALL WELDED WIRE FABRIC MUST

BE GALVANIZED AND IN CONFORMANCE WITH ASTM A106.

16. FOR REINFORCEMENT TO REMAIN WITHIN DEMOLITION LIMIT REMOVE AND DISPOSE ALL

CONCRETE FROM REINFORCING. PER ACI 301, WHEN CONCRETE IS PLACED, ALL REINFORCEMENT

MUST BE FREE OF MATERIALS DELETERIOUS TO BOND.

18. ALL REINFORCING STEEL MUST BE CONTINUOUS OR LAP SPLICED WITH LENGTH AS SHOWN

ON S-### UNLESS NOTED OTHERWISE. ALL LAP SPLICES AT THE SAME LOCATION ARE REQUIRED

TO BE STAGGERED OUT 5'-0" FROM EACH OTHER AS MINIMUM FOR MORE THAN FIFTY PERCENT

(50%) OF TOTAL REINFORCEMENT AT THIS LOCATION.

19. PROVIDE WELDS OR MECHANICAL COUPLER TO ENSURE REINFORCEMENT CONTINUITY WHEN

REINFORCEMENT RETENTION IS NOT PRACTICAL OR INADVERTENT DAMAGE OCCURS TO EXISTING

REINFORCEMENT DURING CONSTRUCTION. REMOVAL AND RESTORATION (COLD-APPLIED) OF

REINFORCEMENT GALVANIZING ARE REQUIRED BEFORE AND AFTER WELDING.

20. PROVIDE HEADED REINFORCEMENT IN ACCORDANCE WITH ASTM A970, GRADE 60. HEADED

REINFORCEMENT TO BE GALVANIZED IN ACCORDANCE WITH ASTM A767.

STRUCTURAL STEEL NOTES

1. FABRICATE AND ERECT STRUCTURAL STEEL CONFORMING TO THE REQUIREMENTS OF

AMERICAN INSTITUTE OF STEEL CONSTRUCTION (AISC), "STEEL CONSTRUCTION MANUAL".

2. SUBMIT ERECTION PLANS AND SHOP DETAILS AND RECEIVE APPROVAL FROM THE

CONTRACTING OFFICER BEFORE PROCEEDING WITH FABRICATION.

3. PROVIDE STRUCTURAL STEEL WIDE-FLANGE SHAPES CONFORMING TO ASTM A992; H-PILES

CONFORMING TO ASTM A573 HSS MEMBERS CONFORMING TO ASTM A500; CHANNELS, PLATES,

AND ANGLES CONFORMING TO ASTM A36; AND THREADED RODS CONFORMING TO ASTM A36.

4. PROVIDE HOT-DIP GALVANIZED ANCHOR BOLTS CONFORMING TO ASTM F1554.

5. PROVIDE BOLTS CONFORMING TO ASTM A306, NUTS CONFORMING TO ASTM A563, AND

WASHERS CONFORMING TO ASTM F436. BOLTS, NUTS AND WASHERS ARE HOT-DIP GALVANIZED.

6. WELD IN COMPLIANCE WITH AMERICAN WELDING SOCIETY AWS D1.5 "BRIDGE WELDING CODE" FOR WELDS USED TO FABRICATE STEEL PIPE PILES, AND AWS D1.1, "STRUCTURAL WELDING CODE -

STEEL" FOR WELDS USED FOR ALL OTHER STEEL WORKS.

7. WELD ALL SHOP CONNECTIONS WITH CLASS E70XX ELECTRODES. PROVIDE FIELD

CONNECTIONS WITH HIGH STRENGTH BOLTED CONNECTIONS UNLESS NOTED OTHERWISE.

8. CONNECTIONS NOT INDICATED MUST BE DESIGNED BY THE FABRICATOR AND RECEIVE

APPROVAL FROM THE CONTRACTING OFFICER.

9. MILL BOTTOM OF ALL COLUMNS AND FINISH TOP OF ALL BASE PLATES IN ACCORDANCE WITH AISC

SPECIFICATIONS. WELD BASE PLATES TO BOTTOM OF COLUMNS.

10. ALL STRUCTURAL STEEL MUST BE HOT-DIP GALVANIZED, UNLESS NOTED OTHERWISE.

11. STRUCTURAL STEEL TO BE USED IN BULKHEAD IS EXCLUDED FROM THIS SECTION.

CODES AND STANDARDS

1. AMERICAN INSTITUTE OF STEEL CONSTRUCTION (AISC) "STEEL CONSTRUCTION MANUAL", SIXTEENTH EDITION, 2022.

2. AMERICAN INSTITUTE OF STEEL CONSTRUCTION (AISC), "SEISMIC DESIGN MANUAL", FOURTH EDITION, 2024.

3. AMERICAN INSTITUTE OF STEEL CONSTRUCTION (AISC), " SPECIFICATION FOR STRUCTURAL STAINLESS STEEL

BUILDINGS (ANSI/AISC 370-21)", 2021.

4. AMERICAN CONCRETE INSTITUTE ACI-318, "BUILDING CODE REQUIREMENTS FOR REINFORCED CONCRETE", 2019.

5. AMERICAN CONCRETE INSTITUTE ACI 301, "SPECIFICATIONS FOR CONCRETE CONSTRUCTION", 2020.

6. AMERICAN SOCIETY OF CIVIL ENGINEERS, "SEISMIC DESIGN OF PIERS AND WHARVES", ASCE/CORPI 61-14, 2014.

7. ALUMINUM ASSOCIATION, "ALUMINUM DESIGN MANUAL", 2020.

8. AMERICAN SOCIETY OF CIVIL ENGINEERS, ASCE 7, "MINIMUM DESIGN LOADS FOR BUILDING AND OTHER STRUCTURES", 2022.

9. AMERICAN ASSOCIATION OF STATE HIGHWAY AND TRANSPORTATION OFFICIALS (AASHTO), "LRFD BRIDGE DESIGN

SPECIFICATIONS", 9TH EDITION, 2024.

10. CALIFORNIA STATE LANDS COMMISSION MARINE FACILITIES DIVISION, "MARINE OIL TERMINAL ENGINEERING AND

MAINTENANCE STANDARDS", 2012.

11. FEMA 302, "NEHRP RECOMMENDED PROVISIONS FOR SEISMIC REGULATIONS FOR NEW BUILDINGS AND OTHER

STRUCTURES", 2020.

12. INTERNATIONAL BUILDING CODE (IBC), 2024.

13. UFC 1-200-01, "DoD BUILDING CODE" WITH CHANGE 3, 2024

14. UFC 4-151-10, "GENERAL CRITERIA FOR WATERFRONT CONSTRUCTION", WITH CHANGE 1, 2024.

15. UFC 4-152-01, "DESIGN: PIERS AND WHARVES", WITH CHANGE 1, 2024.

16. UFC 4-159-03, "MOORINGS", 2020.

17. UFC 3-301-01, "STRUCTURAL ENGINEERING", WITH CHANGE 3, 2025.

18. USCG CSTO, SILC-CSTO-36-11 31 21-02, CUTTER MOORINGS, JAN, 2025.

ALUMINUM STRUCTURAL NOTES

1. FABRICATE ALL STRUCTURAL ALUMINUM IN ACCORDANCE WITH THE SPECIFICATIONS OF THE ALUMINUM ASSOCIATION.

2. PROVIDE ALLOY 6061-T6 STRUCTURAL ALUMINUM.

3. COAT ALL ALUMINUM IN CONTACT WITH CONCRETE AND OTHER DISSIMILAR METALS WITH BITUMINOUS PAINT ON THE

CONTACT SURFACE.

4. USE STAINLESS STEEL CONNECTION BOLTS FOR CONNECTING ALUMINUM MEMBERS.

5. ALL EDGES AND OPENINGS IN GRATING MUST BE BANDED.

FOUNDATION NOTES - STEEL PIPE PILES

1. INSTALL STEEL PIPE PILES IN ACCORDANCE WITH THE PLANS AND SPECIFICATIONS. FOR ADDITIONAL STEEL PIPE PILE REQUIREMENTS, AS WELL AS REQUIREMENTS FOR THE PROJECT TEST PILE PROGRAM, REFER TO SPECIFICATION SECTION 31 62 16.13 “STEEL PIPE PILES.” NOTE THAT THE TEST PILE PROGRAM CONSISTS OF DYNAMIC PILE ANALYSIS (PDA) TESTS AT LOCATIONS AS INDICATED ON THE PILE PLANS. ALL PDA TEST LOCATIONS INDICATED ON THE PILE PLANS AND SCHEDULES MUST BE PERFORMED TO VERIFY PILE CAPACITIES AND DRIVABILITY. PDA TEST PILES MUST BE DRIVEN PRIOR TO DRIVING PRODUCTION PILES. LOCATION OF TEST PILES MAY BE ADJUSTED SLIGHTLY WITH CONTRACTING OFFICER APPROVAL.

DRIVE TEST PILES TO INDICATED TIP ELEVATION AND CAPACITY.

2. FOUNDATION TYPE AND LOCATIONS ARE SHOWN ON THE PILE PLANS (DRAWINGS S-103 THROUGH S-109).

3. UNLESS NOTED OTHERWISE, BENTS 1 THROUGH 43 AT PIER 1 MUST BE SUPPORTED BY 36"Ø X 7/8" WALL THICKNESS DRIVEN STEEL PIPE PILES. STEEL PIPE PILES MUST CONFORM TO THE REQUIREMENTS OF ASTM A252, GRADE 3 (MODIFIED TO 50 KSI MINIMUM YIELD STRENGTH). ALL DRIVEN STEEL PIPE PILES MUST BE EQUIPPED WITH AN OUTSIDE-FIT CAST STEEL DRIVING SHOE OR PILE POINT CONFORMING TO THE REQUIREMENTS OF ASTM A27, GRADE 90/60. FOR TYPICAL STEEL PIPE PILE DETAILS, SEE DRAWINGS S-502

AND S-503.

4. STEEL PIPE PILES MUST BE DRIVEN TO THE MINIMUM TIP ELEVATIONS AND ALLOWABLE BEARING CAPACITIES INDICATED ON THE PLANS, USING AN APPROVED HAMMER, WITH A CAPACITY AT LEAST EQUAL TO THE HAMMER MANUFACTURER'S RECOMMENDATIONS FOR THE TOTAL WEIGHT OF PILE AND THE

CHARACTER OF THE SUBSURFACE MATERIAL TO BE ENCOUNTERED.

5. PILE TIP ELEVATIONS ARE PROVIDED IN DRAWING S-601.

6. PILE SERVICE (ALLOWABLE) CAPACITIES:

6.1. 36” Ø CONCRETE-FILLED STEEL PIPE PILE CAPACITY…………….….400 TONS (COMPRESSION)

0 TONS (TENSION)

7. PILE FACTORED (ULTIMATE) CAPACITIES:

7.1. 36” Ø CONCRETE-FILLED STEEL PIPE PILE CAPACITY…………….…..900 TONS (COMPRESSION)

0 TONS (TENSION)

8. SPUDDING AND/OR JETTING OF STEEL PIPE PILES WILL NOT BE ALLOWED.

9. COORDINATE THE STEEL PIPE PILE DRIVING SCHEDULE SO AS NOT TO INTERFERE WITH OR BE

DETRIMENTAL TO ADJACENT CONCRETE PLACEMENT AND CURING OPERATIONS.

S-004

STAINLESS STEEL NOTES

1. ALL STAINLESS STEEL MATERIALS MUST CONFORM TO APPLICABLE ASTM STANDARDS AND MUST

BE SUITABLE FOR CONTINUOUS EXPOSURE TO MARINE AND COASTAL ENVIRONMENTS.

2. UNLESS NOTED OTHERWISE, ALL STAINLESS STEEL MUST BE TYPE 316L (UNS S31603).

3. STAINLESS STEEL MUST HAVE A PITTING RESISTANCE EQUIVALENT NUMBER NOT LESS THAN 32.

4. ALL FASTENERS, ANCHORS, BOLTS, NUTS, WASHERS, AND THREADED RODS MUST BE STAINLESS

STEEL OF THE SAME GRADE AS THE PARENT MATERIAL (316/316L MINIMUM).

5. WELDING MUST BE PERFORMED IN ACCORDANCE WITH AWS D1.6. WELDERS MUST BE QUALIFIED

FOR STAINLESS STEEL WELDING.

6. FILLER METALS MUST BE LOW-CARBON, CORROSION-RESISTANT GRADES COMPATIBLE WITH BASE

METAL: ER316L/E316L FOR 316/316L BASE METAL.

7. NO CARBON STEEL OR DISSIMILAR FILLER METALS ARE PERMITTED.

8. ALL WELDING, GRINDING, CUTTING, AND FABRICATION TOOLS MUST BE DEDICATED STAINLESS

STEEL TOOLS ONLY AND MUST NOT BE PREVIOUSLY USED ON CARBON STEEL.

9. STAINLESS STEEL MUST BE PROTECTED FROM CONTACT WITH CARBON STEEL DURING

FABRICATION, STORAGE, AND INSTALLATION TO PREVENT IRON CONTAMINATION AND SURFACE

CORROSION.

10. ALL WELDS AND HEAT-AFFECTED ZONES MUST BE PICKLED AND PASSIVATED AFTER FABRICATION

IN ACCORDANCE WITH ASTM A380 AND ASTM A967.

11. MECHANICAL CLEANING ALONE (WIRE BRUSHING OR GRINDING) IS NOT SUFFICIENT; CHEMICAL

PASSIVATION IS MANDATORY FOR ALL MARINE-EXPOSED STAINLESS STEEL.

12. ALL FREE IRON MUST BE REMOVED FROM STAINLESS STEEL SURFACES PRIOR TO INSTALLATION.

13. SURFACE FINISH MUST BE:

13.1 MINIMUM NO. 2B FINISH FOR PLATES AND SHEETS.

13.2 SMOOTH MILL FINISH FOR BARS AND SHAPES.

13.3 NO ROUGH OR CREVICE-FORMING FINISHES PERMITTED IN SPLASH OR TIDAL ZONES.

14. STAINLESS STEEL MUST NOT BE IN DIRECT CONTACT WITH DISSIMILAR METALS (CARBON STEEL, ALUMINUM, COPPER ALLOYS) UNLESS ELECTRICALLY ISOLATED USING NEOPRENE, PTFE, HDPE, OR

EQUIVALENT NON-CONDUCTIVE MATERIALS.

15. STAINLESS STEEL MUST NOT BE PAINTED OR COATED UNLESS SPECIFICALLY SHOWN ON THE

DRAWINGS.

16. CHLORIDE-CONTAINING CLEANERS, BLEACH, OR ACIDIC CHEMICALS MUST NOT BE USED FOR

CLEANING STAINLESS STEEL.

17. ALL STAINLESS STEEL MUST BE DELIVERED WITH PROTECTIVE WRAPPING AND STORED OFF THE

GROUND, COVERED, AND PROTECTED FROM SALT SPRAY PRIOR TO INSTALLATION.

18. ANY DAMAGED, SCRATCHED, HEAT-TINTED, OR CONTAMINATED SURFACES MUST BE RE-GROUND, PICKLED, AND PASSIVATED PRIOR TO ACCEPTANCE.

19. SUBSTITUTIONS SUCH AS 2205 DUPLEX OR SUPER-AUSTENITIC STAINLESS STEELS (SUCH AS 904L, 254 SMO) MUST REQUIRE CONTRACTING OFFICER APPROVAL.

21. FINAL ACCEPTANCE MUST BE SUBJECT TO VISUAL INSPECTION FOR SURFACE CONTAMINATION, PITTING, RUST STAINING, OR FABRICATION DEFECTS.

SATISFACTORY TO DATE

APPROVED

ACTIVITY

FOR COMMANDER NAVFAC

SEAL

A/E INFO

A

B

C

D

1 2 3 4 5

1 2 3 4 5

A

B

C

D

SCALE:

CONSTR. CONTR. NO.

SHEET

NAVFAC DRAWING NO.

DES DRW CHK

OF

EPROJECT NO.:

D E

P A

R T

M E

N T

O F

T H

E N

A V

Y N

A V

A L

F A

C

IL

IT

IE

S E

N G

IN

E

E R

IN

G

S Y

S T

E M

S C

O M

M A

N D

DRAWFORM REVISION: 25 AUGUST 2020

PM/DM

BRANCH MANAGER

CHIEF ENG/ARCH

FIRE PROTECTION

N A

V A

L F

A C

IL

IT

IE

S

E N

G

IN

E E

R

IN

G S

Y S

T E

M S

C O

M M

A N

D

M

ID

-A

TL

A N

T

IC

N A

V A

L S

T A

T

IO

N

N O

R F

O L

K V

A

AS NOTED

S Y

M D

E S

C R

IP

T

IO

N

D A

T E

A P

P R

/1

/2

:3

:4

P M

A u to d e s k D o c s /2

U

S C

G O

C R

H o m e p o rt

In iti a ti v e O

P C

P ie r_

/P

IE

R

U S

C G

-1

-S

.r v t

S-002

U S

C G

O C

R H

O M

E P

O R

T

IN

IT

IA

T

IV

E O

P C

P

IE

R

S

TR

U C

TU

R

A L

G E

N E

R A

L N

O

TE

S

S H

E E

T

O F

MJF

12936620

JZ AEP

Frank Cole USCG MASI

MRI/CWJ

1826479

N E

W P

O R

T , R

I N

A V

A L

S T

A T

IO

N

N E

W P

O R

T

JWJ

NEK

HPN

C I

C O

R E

H

A M

P T

O N

R O

A D

S

S -0

06 FEB 2026

A

M E

N D

M E

N T

/0

/2

V M

G

EL -14.0±, SEE NOTE

EL -24.5±

EL -40.0±

1072 PSF

3261 PSF

902 PSF

EL -2.12

EL 1.62

EL 11.0±

312 PSF 339 PSF

561 PSF

680 PSF

868 PSF

371 PSF

472 PSF

156 PSF

170 PSF

170 PSF

143 PSF

198 PSF

PASSIVE EARTH PRESSURE ACTIVE EARTH

PRESSURE AND

TIDAL LAG

SURCHARGE SEISMIC

NOTE:

EXISTING GROUNDLINE AT THE BULKHEAD FACE IS AT APPROXIMATE

ELEVATION -9. THE UPPER 5-FT OF SEDIMENT HAS BEEN IGNORED IN THE

DESIGN.

EL -14.0±, SEE NOTE

EL -24.5±

EL -40.0±

1072 PSF

3261 PSF

902 PSF

EL -2.12

EL 1.62

EL 11.0±

312 PSF 339 PSF

689 PSF

808 PSF

996 PSF

499 PSF

600 PSF

156 PSF

170 PSF

170 PSF

143 PSF

198 PSF

PASSIVE EARTH PRESSURE ACTIVE EARTH

PRESSURE AND

TIDAL LAG

SURCHARGE SEISMIC

SATISFACTORY TO DATE

APPROVED

ACTIVITY

FOR COMMANDER NAVFAC

SEAL

A/E INFO

A

B

C

D

1 2 3 4 5

1 2 3 4 5

A

B

C

D

SCALE:

CONSTR. CONTR. NO.

SHEET

NAVFAC DRAWING NO.

DES DRW CHK

OF

EPROJECT NO.:

D E

P A

R T

M E

N T

O F

T H

E N

A V

Y N

A V

A L

F A

C

IL

IT

IE

S E

N G

IN

E

E R

IN

G

S Y

S T

E M

S C

O M

M A

N D

DRAWFORM REVISION: 25 AUGUST 2020

PM/DM

BRANCH MANAGER

CHIEF ENG/ARCH

FIRE PROTECTION

N A

V A

L F

A C

IL

IT

IE

S

E N

G

IN

E E

R

IN

G S

Y S

T E

M S

C O

M M

A N

D

M

ID

-A

TL

A N

T

IC

N A

V A

L S

T A

T

IO

N

N O

R F

O L

K V

A

AS NOTED

S Y

M D

E S

C R

IP

T

IO

N

D A

T E

A P

P R

/1

/2

:3

:4

P M

A u to d e s k D o c s /2

U

S C

G O

C R

H o m e p o rt

In iti a ti v e O

P C

P ie r_

/P

IE

R

U S

C G

-1

-S

.r v t

S-005

U S

C G

O C

R H

O M

E P

O R

T

IN

IT

IA

T

IV

E O

P C

P

IE

R

S

TR

U C

TU

R

A L

D E

S

IG

N L

O A

D S

A N

D S

TA

N

D A

R D

D E

TA

IL

S

S H

E E

T

O F

JZ

12936623

MJF AEP

Frank Cole USCG MASI

MRI/CWJ

1826479

N E

W P

O R

T , R

I N

A V

A L

S T

A T

IO

N

N E

W P

O R

T

JWJ

NEK

HPN

C I

C O

R E

H

A M

P T

O N

R O

A D

S

S -0

06 FEB 2026

NOT TO SCALE

B3

DESIGN PRESSURE DIAGRAM @ MEAN HIGH WATER

NOT TO SCALE

C3

DESIGN PRESSURE DIAGRAM @ MEAN LOW WATER

1. ENVIRONMENTAL LOADS: ENVIRONMENTAL LOADS INCLUDE SELF WEIGHT

OF STRUCTURE, WEIGHT OF SUPPORTED EQUIPMENTS, AND VERTICAL OR

LATERAL EARTH/HYDRODYNAMIC PRESSURES AND EXCLUDED VERTICAL

LIVE LOADS.

A. SEA WATER = 64 PCF

B. REINFORCED CONCRETE = 150 PCF

C. STEEL = 490 PCF

D. FILL

1. COMPACTED GRANULAR FILL =1 30 PCF

2. PEASTONE FILL = 110 PCF

2. LIVE LOADS -

A. PIER DECK (VERTICAL LOADS)

1. 600 PSF UNIFORM LIVE LOAD)

2. MOBILE TRUCK CRANE:

a. 70 TON MOBILE CRANE

• OUTRIGGER 10 FT MIN FROM LEADING EDGE

3. VEHICULAR LOADING:

a. 105' LADDER FIRE TRUCK OR FUEL TRUCK

b. HS25-44 TRUCK

B. SEISMIC LOAD:

RISK CATEGORY - III

Ss = 0.2G

SITE CLASSIFICATION - D

DESIGN LOADS (BULKHEAD):

A

M E

N D

M E

N T

/0

/2

V M

A

B

E

F

383940414243

C1 S-304

6'

6"

7'

3"

7'

3"

6'

6"

EDGE OF PIER DECK

ABOVE

C PIER

3' - 0" 25' - 0" 25' - 0" 25' - 0" 25' - 0" 25' - 0"

C

L

M A

T C

H L

IN

E

S E

E A

S -1

C2 S-301

S 73° 56' 31.42" W

A1 S-519

25' - 0"

1000' - 0"

C3 S-307

D

LEGEND:

36" ⌀ CONCRETE-FILLED STEEL PIPE PILE

# BENT DESIGNATION

A PILE ROW DESIGNATION

36" ⌀ CONCRETE-FILLED STEEL PIPE PILE

(PDA TEST PILE)

SHEET KEYNOTES:

1. PIER-SUPPORTING PILES ARE 36" DIA x 7/8" THICK CONCRETE-FILLED

STEEL PIPE PILES WITH 10'-0" LONG HDPE PILE SLEEVE.

2. ALL PILES TO BE INSTALLED WITH SACRIFICIAL ANODES, SEE

DRAWING E-112 FOR MORE INFORMATION.

3. SEE PILE SCHEDULE DRAWING S-### FOR PILE TIP ELEVATION.

GENERAL SHEET NOTES:

S-601

491623303743 0

KEY PLAN

SATISFACTORY TO DATE

APPROVED

ACTIVITY

FOR COMMANDER NAVFAC

SEAL

A/E INFO

A

B

C

D

1 2 3 4 5

1 2 3 4 5

A

B

C

D

SCALE:

CONSTR. CONTR. NO.

SHEET

NAVFAC DRAWING NO.

DES DRW CHK

OF

EPROJECT NO.:

D E

P A

R T

M E

N T

O F

T H

E N

A V

Y N

A V

A L

F A

C

IL

IT

IE

S E

N G

IN

E

E R

IN

G

S Y

S T

E M

S C

O M

M A

N D

DRAWFORM REVISION: 25 AUGUST 2020

PM/DM

BRANCH MANAGER

CHIEF ENG/ARCH

FIRE PROTECTION

N A

V A

L F

A C

IL

IT

IE

S

E N

G

IN

E E

R

IN

G S

Y S

T E

M S

C O

M M

A N

D

M

ID

-A

TL

A N

T

IC

N A

V A

L S

T A

T

IO

N

N O

R F

O L

K V

A

AS NOTED

S Y

M D

E S

C R

IP

T

IO

N

D A

T E

A P

P R

/1

/2

:3

:4

P M

A u to d e s k D o c s /2

U

S C

G O

C R

H o m e p o rt

In iti a ti v e O

P C

P ie r_

/P

IE

R

U S

C G

-1

-S

.r v t

S-103

U S

C G

O C

R H

O M

E P

O R

T

IN

IT

IA

T

IV

E O

P C

P

IE

R

P

IL

E P

LA

N

S

H E

E T

O

F

MJF

12936639

JZ KM

Frank Cole USCG MASI

MRI/CWJ

1826479

N E

W P

O R

T , R

I N

A V

A L

S T

A T

IO

N

N E

W P

O R

T

JWJ

NEK

HPN

C I

C O

R E

H

A M

P T

O N

R O

A D

S

S -1

06 FEB 2026

PLAN

NORTH

SCALE: 1/8" = 1'-0"

PILE PLAN - SHEET 1 OF 7

A2

1/8" = 1' - 0" 0 5' 10' 15' 30'

1 36" DIAMETER CONCRETE-FILLED STEEL PIPE PILE, SEE DRAWING S-502.

A

M E

N D

M E

N T

/0

/2

V M

E

F

3031323334353637

C4 S-304

C3

S-304

M A

T C

H L

IN

E

S E

E A

S -1

M A

T C

H L

IN

E

S E

E A

S -1

EDGE OF PIER

DECK ABOVE

6'

6"

7'

3"

7'

3"

6'

6"

25' - 0" 25' - 0" 25' - 0" 25' - 0" 21' - 6" 21' - 6" 11' - 0"

C

C PIERL

A2 S-301

A3 S-308

S 73° 56' 31.42" W

C3 S-308

25' - 0" 25' - 0"

1000' - 0"

D

A3 S-307

LEGEND:

36" ⌀ CONCRETE-FILLED STEEL PIPE PILE

# BENT DESIGNATION

A PILE ROW DESIGNATION

36" ⌀ CONCRETE-FILLED STEEL PIPE PILE

(PDA TEST PILE)

SHEET KEYNOTES:

1. PIER-SUPPORTING PILES ARE 36" DIA x 7/8" THICK CONCRETE-FILLED

STEEL PIPE PILES WITH 10'-0" LONG HDPE PILE SLEEVE.

2. ALL PILES TO BE INSTALLED WITH SACRIFICIAL ANODES, SEE

DRAWING E-112 FOR MORE INFORMATION.

3. SEE PILE SCHEDULE DRAWING S-### FOR PILE TIP ELEVATION.

GENERAL SHEET NOTES:

S-601

491623303743 0

KEY PLAN

SATISFACTORY TO DATE

APPROVED

ACTIVITY

FOR COMMANDER NAVFAC

SEAL

A/E INFO

A

B

C

D

1 2 3 4 5

1 2 3 4 5

A

B

C

D

SCALE:

CONSTR. CONTR. NO.

SHEET

NAVFAC DRAWING NO.

DES DRW CHK

OF

EPROJECT NO.:

D E

P A

R T

M E

N T

O F

T H

E N

A V

Y N

A V

A L

F A

C

IL

IT

IE

S E

N G

IN

E

E R

IN

G

S Y

S T

E M

S C

O M

M A

N D

DRAWFORM REVISION: 25 AUGUST 2020

PM/DM

BRANCH MANAGER

CHIEF ENG/ARCH

FIRE PROTECTION

N A

V A

L F

A C

IL

IT

IE

S

E N

G

IN

E E

R

IN

G S

Y S

T E

M S

C O

M M

A N

D

M

ID

-A

TL

A N

T

IC

N A

V A

L S

T A

T

IO

N

N O

R F

O L

K V

A

AS NOTED

S Y

M D

E S

C R

IP

T

IO

N

D A

T E

A P

P R

/1

/2

:3

:5

P M

A u to d e s k D o c s /2

U

S C

G O

C R

H o m e p o rt

In iti a ti v e O

P C

P ie r_

/P

IE

R

U S

C G

-1

-S

.r v t

S-104

U S

C G

O C

R H

O M

E P

O R

T

IN

IT

IA

T

IV

E O

P C

P

IE

R

P

IL

E P

LA

N

S

H E

E T

O

F

MJF

12936640

JZ KM

Frank Cole USCG MASI

MRI/CWJ

1826479

N E

W P

O R

T , R

I N

A V

A L

S T

A T

IO

N

N E

W P

O R

T

JWJ

NEK

HPN

C I

C O

R E

H

A M

P T

O N

R O

A D

S

S -1

06 FEB 2026

PLAN

NORTH

SCALE: 1/8" = 1'-0"

PILE PLAN - SHEET 2 OF 7

A2

1/8" = 1' - 0" 0 5' 10' 15' 30'

1 36" DIAMETER CONCRETE-FILLED STEEL PIPE PILE, SEE DRAWING S-502.

A

M E

N D

M E

N T

/0

/2

V M

E

F

242526272829

M A

T C

H L

IN

E

S E

E A

S -1

M A

T C

H L

IN

E

S E

E A

S -1

EDGE OF PIER DECK

ABOVE

6'

6"

7'

3"

7'

3"

6'

6"

25' - 0" 25' - 0" 25' - 0"25' - 0" 25' - 0"

C

C PIERL

S 73° 56' 31.42" W

25' - 0" 25' - 0"

1000' - 0"

D

A3 S-311

SHEET KEYNOTES:

1. PIER-SUPPORTING PILES ARE 36" DIA x 7/8" THICK CONCRETE-FILLED

STEEL PIPE PILES WITH 10'-0" LONG HDPE PILE SLEEVE.

2. ALL PILES TO BE INSTALLED WITH SACRIFICIAL ANODES, SEE

DRAWING E-112 FOR MORE INFORMATION.

3. SEE PILE SCHEDULE DRAWING S-### FOR PILE TIP ELEVATION.

GENERAL SHEET NOTES:

S-601

LEGEND:

36" ⌀ CONCRETE-FILLED STEEL PIPE PILE

# BENT DESIGNATION

A PILE ROW DESIGNATION

36" ⌀ CONCRETE-FILLED STEEL PIPE PILE

(PDA TEST PILE)

491623303743 0

KEY PLAN

SATISFACTORY TO DATE

APPROVED

ACTIVITY

FOR COMMANDER NAVFAC

SEAL

A/E INFO

A

B

C

D

1 2 3 4 5

1 2 3 4 5

A

B

C

D

SCALE:

CONSTR. CONTR. NO.

SHEET

NAVFAC DRAWING NO.

DES DRW CHK

OF

EPROJECT NO.:

D E

P A

R T

M E

N T

O F

T H

E N

A V

Y N

A V

A L

F A

C

IL

IT

IE

S E

N G

IN

E

E R

IN

G

S Y

S T

E M

S C

O M

M A

N D

DRAWFORM REVISION: 25 AUGUST 2020

PM/DM

BRANCH MANAGER

CHIEF ENG/ARCH

FIRE PROTECTION

N A

V A

L F

A C

IL

IT

IE

S

E N

G

IN

E E

R

IN

G S

Y S

T E

M S

C O

M M

A N

D

M

ID

-A

TL

A N

T

IC

N A

V A

L S

T A

T

IO

N

N O

R F

O L

K V

A

AS NOTED

S Y

M D

E S

C R

IP

T

IO

N

D A

T E

A P

P R

/1

/2

:3

:5

P M

A u to d e s k D o c s /2

U

S C

G O

C R

H o m e p o rt

In iti a ti v e O

P C

P ie r_

/P

IE

R

U S

C G

-1

-S

.r v t

S-105

U S

C G

O C

R H

O M

E P

O R

T

IN

IT

IA

T

IV

E O

P C

P

IE

R

P

IL

E P

LA

N

S

H E

E T

O

F

MJF

12936641

JZ KM

Frank Cole USCG MASI

MRI/CWJ

1826479

N E

W P

O R

T , R

I N

A V

A L

S T

A T

IO

N

N E

W P

O R

T

JWJ

NEK

HPN

C I

C O

R E

H

A M

P T

O N

R O

A D

S

S -1

06 FEB 2026

PLAN

NORTH

SCALE: 1/8" = 1'-0"

PILE PLAN - SHEET 3 OF 7

A2

1/8" = 1' - 0" 0 5' 10' 15' 30'

1 36" DIAMETER CONCRETE-FILLED STEEL PIPE PILE, SEE DRAWING S-502.

A

M E

N D

M E

N T

/0

/2

V M

E

F

17181920212223

M A

T C

H L

IN

E

S E

E A

S -1

M A

T C

H L

IN

E

S E

E A

S -1

25' - 0" 25' - 0"25' - 0" 25' - 0" 11' - 0" 25' - 0"

C

6'

6"

7'

3"

7'

3"

6'

6"

1000' - 0"

25' - 0" 25' - 0"

EDGE OF PIER DECK

ABOVE

C PIERL

S 73° 56' 31.42" W

D

C3 S-504

C1 S-504

SHEET KEYNOTES:

1. PIER-SUPPORTING PILES ARE 36" DIA x 7/8" THICK CONCRETE-FILLED

STEEL PIPE PILES WITH 10'-0" LONG HDPE PILE SLEEVE.

2. ALL PILES TO BE INSTALLED WITH SACRIFICIAL ANODES, SEE

DRAWING E-112 FOR MORE INFORMATION.

3. SEE PILE SCHEDULE DRAWING S-### FOR PILE TIP ELEVATION.

GENERAL SHEET NOTES:

S-601

LEGEND:

36" ⌀ CONCRETE-FILLED STEEL PIPE PILE

# BENT DESIGNATION

A PILE ROW DESIGNATION

36" ⌀ CONCRETE-FILLED STEEL PIPE PILE

(PDA TEST PILE)

491623303743 0

KEY PLAN

SATISFACTORY TO DATE

APPROVED

ACTIVITY

FOR COMMANDER NAVFAC

SEAL

A/E INFO

A

B

C

D

1 2 3 4 5

1 2 3 4 5

A

B

C

D

SCALE:

CONSTR. CONTR. NO.

SHEET

NAVFAC DRAWING NO.

DES DRW CHK

OF

EPROJECT NO.:

D E

P A

R T

M E

N T

O F

T H

E N

A V

Y N

A V

A L

F A

C

IL

IT

IE

S E

N G

IN

E

E R

IN

G

S Y

S T

E M

S C

O M

M A

N D

DRAWFORM REVISION: 25 AUGUST 2020

PM/DM

BRANCH MANAGER

CHIEF ENG/ARCH

FIRE PROTECTION

N A

V A

L F

A C

IL

IT

IE

S

E N

G

IN

E E

R

IN

G S

Y S

T E

M S

C O

M M

A N

D

M

ID

-A

TL

A N

T

IC

N A

V A

L S

T A

T

IO

N

N O

R F

O L

K V

A

AS NOTED

S Y

M D

E S

C R

IP

T

IO

N

D A

T E

A P

P R

/1

/2

:3

:0

P M

A u to d e s k D o c s /2

U

S C

G O

C R

H o m e p o rt

In iti a ti v e O

P C

P ie r_

/P

IE

R

U S

C G

-1

-S

.r v t

S-106

U S

C G

O C

R H

O M

E P

O R

T

IN

IT

IA

T

IV

E O

P C

P

IE

R

P

IL

E P

LA

N

S

H E

E T

O

F

MJF

12936642

JZ KM

Frank Cole USCG MASI

MRI/CWJ

1826479

N E

W P

O R

T , R

I N

A V

A L

S T

A T

IO

N

N E

W P

O R

T

JWJ

NEK

HPN

C I

C O

R E

H

A M

P T

O N

R O

A D

S

S -1

06 FEB 2026

PLAN

NORTH

SCALE: 1/8" = 1'-0"

PILE PLAN - SHEET 4 OF 7

A2

1/8" = 1' - 0" 0 5' 10' 15' 30'

1 36" DIAMETER CONCRETE-FILLED STEEL PIPE PILE, SEE DRAWING S-502.

A

M E

N D

M E

N T

/0

/2

V M

E

F

10111213141516 M

A T

C H

L

IN

E

S E

E A

S -1

EDGE OF PIER DECK

ABOVE

25' - 0" 25' - 0" 25' - 0" 25' - 0" 25' - 0" 11' - 0"

C

C PIERL

S 73° 56' 31.42" W

6'

6"

7'

3"

7'

3"

6'

6"

1000' - 0"

25' - 0" 25' - 0"

M A

T C

H L

IN

E

S E

E A

S -1

D

SHEET KEYNOTES:

1. PIER-SUPPORTING PILES ARE 36" DIA x 7/8" THICK CONCRETE-FILLED

STEEL PIPE PILES WITH 10'-0" LONG HDPE PILE SLEEVE.

2. ALL PILES TO BE INSTALLED WITH SACRIFICIAL ANODES, SEE

DRAWING E-112 FOR MORE INFORMATION.

3. SEE PILE SCHEDULE DRAWING S-### FOR PILE TIP ELEVATION.

GENERAL SHEET NOTES:

S-601

LEGEND:

36" ⌀ CONCRETE-FILLED STEEL PIPE PILE

# BENT DESIGNATION

A PILE ROW DESIGNATION

36" ⌀ CONCRETE-FILLED STEEL PIPE PILE

(PDA TEST PILE)

491623303743 0

KEY PLAN

SATISFACTORY TO DATE

APPROVED

ACTIVITY

FOR COMMANDER NAVFAC

SEAL

A/E INFO

A

B

C

D

1 2 3 4 5

1 2 3 4 5

A

B

C

D

SCALE:

CONSTR. CONTR. NO.

SHEET

NAVFAC DRAWING NO.

DES DRW CHK

OF

EPROJECT NO.:

D E

P A

R T

M E

N T

O F

T H

E N

A V

Y N

A V

A L

F A

C

IL

IT

IE

S E

N G

IN

E

E R

IN

G

S Y

S T

E M

S C

O M

M A

N D

DRAWFORM REVISION: 25 AUGUST 2020

PM/DM

BRANCH MANAGER

CHIEF ENG/ARCH

FIRE PROTECTION

N A

V A

L F

A C

IL

IT

IE

S

E N

G

IN

E E

R

IN

G S

Y S

T E

M S

C O

M M

A N

D

M

ID

-A

TL

A N

T

IC

N A

V A

L S

T A

T

IO

N

N O

R F

O L

K V

A

AS NOTED

S Y

M D

E S

C R

IP

T

IO

N

D A

T E

A P

P R

/1

/2

:3

:0

P M

A u to d e s k D o c s /2

U

S C

G O

C R

H o m e p o rt

In iti a ti v e O

P C

P ie r_

/P

IE

R

U S

C G

-1

-S

.r v t

S-107

U S

C G

O C

R H

O M

E P

O R

T

IN

IT

IA

T

IV

E O

P C

P

IE

R

P

IL

E P

LA

N

S

H E

E T

O

F

MJF

12936643

JZ KM

Frank Cole USCG MASI

MRI/CWJ

1826479

N E

W P

O R

T , R

I N

A V

A L

S T

A T

IO

N

N E

W P

O R

T

JWJ

NEK

HPN

C I

C O

R E

H

A M

P T

O N

R O

A D

S

S -1

06 FEB 2026

PLAN

NORTH

SCALE: 1/8" = 1'-0"

PILE PLAN - SHEET 5 OF 7

A2

1/8" = 1' - 0" 0 5' 10' 15' 30'

1 36" DIAMETER CONCRETE-FILLED STEEL PIPE PILE, SEE DRAWING S-502.

A

M E

N D

M E

N T

/0

/2

V M

E

F

456789

A3 S-304

A3 S-309

EDGE OF PIER DECK

ABOVE

M A

T C

H L

IN

E

S E

E A

S -1

M A

T C

H L

IN

E

S E

E A

S -1

25' - 0" 25' - 0" 25' - 0" 25' - 0" 21' - 6"

C

C3 S-309

C PIERL

C2 S-302

S 73° 56' 31.42" W

25' - 0"

1000' - 0"

6'

6"

7'

3"

7'

3"

6'

6"

D

SHEET KEYNOTES:

1. PIER-SUPPORTING PILES ARE 36" DIA x 7/8" THICK CONCRETE-FILLED

STEEL PIPE PILES WITH 10'-0" LONG HDPE PILE SLEEVE.

2. ALL PILES TO BE INSTALLED WITH SACRIFICIAL ANODES, SEE

DRAWING E-112 FOR MORE INFORMATION.

3. SEE PILE SCHEDULE DRAWING S-### FOR PILE TIP ELEVATION.

GENERAL SHEET NOTES:

S-601

LEGEND:

36" ⌀ CONCRETE-FILLED STEEL PIPE PILE

# BENT DESIGNATION

A PILE ROW DESIGNATION

36" ⌀ CONCRETE-FILLED STEEL PIPE PILE

(PDA TEST PILE)

491623303743 0

KEY PLAN

SATISFACTORY TO DATE

APPROVED

ACTIVITY

FOR COMMANDER NAVFAC

SEAL

A/E INFO

A

B

C

D

1 2 3 4 5

1 2 3 4 5

A

B

C

D

SCALE:

CONSTR. CONTR. NO.

SHEET

NAVFAC DRAWING NO.

DES DRW CHK

OF

EPROJECT NO.:

D E

P A

R T

M E

N T

O F

T H

E N

A V

Y N

A V

A L

F A

C

IL

IT

IE

S E

N G

IN

E

E R

IN

G

S Y

S T

E M

S C

O M

M A

N D

DRAWFORM REVISION: 25 AUGUST 2020

PM/DM

BRANCH MANAGER

CHIEF ENG/ARCH

FIRE PROTECTION

N A

V A

L F

A C

IL

IT

IE

S

E N

G

IN

E E

R

IN

G S

Y S

T E

M S

C O

M M

A N

D

M

ID

-A

TL

A N

T

IC

N A

V A

L S

T A

T

IO

N

N O

R F

O L

K V

A

AS NOTED

S Y

M D

E S

C R

IP

T

IO

N

D A

T E

A P

P R

/1

/2

:3

:1

P M

A u to d e s k D o c s /2

U

S C

G O

C R

H o m e p o rt

In iti a ti v e O

P C

P ie r_

/P

IE

R

U S

C G

-1

-S

.r v t

S-108

U S

C G

O C

R H

O M

E P

O R

T

IN

IT

IA

T

IV

E O

P C

P

IE

R

P

IL

E P

LA

N

S

H E

E T

O

F

MJF

12936644

JZ KM

Frank Cole USCG MASI

MRI/CWJ

1826479

N E

W P

O R

T , R

I N

A V

A L

S T

A T

IO

N

N E

W P

O R

T

JWJ

NEK

HPN

C I

C O

R E

H

A M

P T

O N

R O

A D

S

S -1

06 FEB 2026

1/8" = 1' - 0" 0 5' 10' 15' 30'

PLAN

NORTH

SCALE: 1/8" = 1'-0"

PILE PLAN - SHEET 6 OF 7

A2

1 36" DIAMETER CONCRETE-FILLED STEEL PIPE PILE, SEE DRAWING S-502.

A

M E

N D

M E

N T

/0

/2

V M

A A

E

F

A3 S-304

6'

6"

6'

6"

EXIST SHT PILE

DEADMAN, TYP

C

C3 S-310

A3 S-303

C PIERL

C2 S-302

A3 S-305

A3 S-310

A3

S-306

- - - - - - - - - - - - - - - - - - - - - - - - - - - - EXIST 1954 CONC

DEADMAN

EXIST STL

BP, TYP

S 73° 56' 31.42" W

S 16° 03' 28.58" E

EXIST 30" STL

PIPE PILE, TYP

1' - 6"

M A

T C

H L

IN

E

S E

E A

S -1

A'

B.1

B.8

C.3

D.9

2'

7"

1"

1/

2" 8'

1/ 2"

/2

/2

7'

3"

EDGE OF PIER DECK

ABOVE

-1 -2

EDGE OF ABUT ABOVE

AIR COMPRESSOR

ENCLOSURE ABOVE G

H

I

J

D

C3 S-311

2' - 9 1/2"

A2 S-302

N 162084.1844'

E 379346.6863'

7' - 0"±

2'

7"

CONC

HEADWALL

ABOVE

EXIST 18" DIA

RCP ABOVE

PDA TEST PILE

9' - 4"

1000'-0"

25' - 0" 25' - 0" 15' - 6" 9' - 0" 9' - 0"

LEGEND:

36" ⌀ CONCRETE-FILLED STEEL PIPE PILE

30" ⌀ CONCRETE-FILLED STEEL PIPE PILE

(PDA TEST PILE)

HP 14x102 (PDA TEST PILE)

# BENT DESIGNATION

A PILE ROW DESIGNATION

30" ⌀ CONCRETE-FILLED STEEL PIPE PILE

36" ⌀ CONCRETE-FILLED STEEL PIPE PILE

(PDA TEST PILE)

HP 14x102

SHEET KEYNOTES:

1. PIER-SUPPORTING PILES ARE 36" DIA x 3/4" THICK CONCRETE-FILLED

STEEL PIPE PILES WITH 10'-0" LONG HDPE PILE SLEEVE.

2. ALL PILES SUPPORTING PIER TO BE INSTALLED WITH SACRIFICIAL

ANODES, SEE DRAWING E-112 FOR MORE INFORMATION.

3. SEE PILE SCHEDULE DRAWING S-601 FOR PILE TIP ELEVATION

4. PILE TIP ELEVATION FOR 30" DIA STEEL PIPE PILES AND HP PILES

IS -85.00' (NAVD88)

5. DRIVEN PILES ARE NOT ALLOWED TO DRIVE THROUGH EXISTING RIPRAP.

PRE-DRILLING, SPUDDING, MOVING/RESETTING THE RIPRAP OR OTHER

MECHANISM ARE TO BE IMPLEMENTED FOR PILE CONSTRUCTION.

6. VERIFY LOCATIONS OF EXISTING TIE RODS, STEEL BATTER PILES AND

CONCRETE DEADMAN IN THE FIELD TO PROTECT EXISTING TIE RODS,

BULKHEAD SHEET PILES, AND AVOID PILE OBSTRUCTION.

GENERAL SHEET NOTES:

S-601

491623303743 0

KEY PLAN

SATISFACTORY TO DATE

APPROVED

ACTIVITY

FOR COMMANDER NAVFAC

SEAL

A/E INFO

A

B

C

D

1 2 3 4 5

1 2 3 4 5

A

B

C

D

SCALE:

CONSTR. CONTR. NO.

SHEET

NAVFAC DRAWING NO.

DES DRW CHK

OF

EPROJECT NO.:

D E

P A

R T

M E

N T

O F

T H

E N

A V

Y N

A V

A L

F A

C

IL

IT

IE

S E

N G

IN

E

E R

IN

G

S Y

S T

E M

S C

O M

M A

N D

DRAWFORM REVISION: 25 AUGUST 2020

PM/DM

BRANCH MANAGER

CHIEF ENG/ARCH

FIRE PROTECTION

N A

V A

L F

A C

IL

IT

IE

S

E N

G

IN

E E

R

IN

G S

Y S

T E

M S

C O

M M

A N

D

M

ID

-A

TL

A N

T

IC

N A

V A

L S

T A

T

IO

N

N O

R F

O L

K V

A

AS NOTED

S Y

M D

E S

C R

IP

T

IO

N

D A

T E

A P

P R

/1

/2

:3

:2

P M

A u to d e s k D o c s /2

U

S C

G O

C R

H o m e p o rt

In iti a ti v e O

P C

P ie r_

/P

IE

R

U S

C G

-1

-S

.r v t

S-109

U S

C G

O C

R H

O M

E P

O R

T

IN

IT

IA

T

IV

E O

P C

P

IE

R

P

IL

E P

LA

N

S

H E

E T

O

F

MJF

12936645

JZ KM

Frank Cole USCG MASI

MRI/CWJ

1826479

N E

W P

O R

T , R

I N

A V

A L

S T

A T

IO

N

N E

W P

O R

T

JWJ

NEK

HPN

C I

C O

R E

H

A M

P T

O N

R O

A D

S

S -1

06 FEB 2026

PLAN

NORTH

SCALE: 1/8" = 1'-0"

PILE PLAN - SHEET 7 OF 7

A2

1/8" = 1' - 0" 0 5' 10' 15' 30'

1 36" DIAMETER CONCRETE-FILLED STEEL PIPE PILE, SEE DRAWING S-502.

2 HP14x102 (8 TOTAL), TYPICAL

3 30" DIAMETER x 3/4" THICK STEEL PIPE PILE (6 TOTAL), TYPICAL

A

M E

N D

M E

N T

/2

/2

V M

G

A

M E

N D

M E

N T

/0

/2

V M

E

F

383940414243

C1 S-304

6'

6"

6'

6"

M A

T C

H L

IN

E

S E

E A

S -1

EDGE OF PIER

DECK, TYP

3' - 0" 25' - 0" 25' - 0" 25' - 0" 25' - 0" 25' - 0"

C

C PIERL

C2 S-301

25' - 0"

1000' - 0"

1 6

5' - 6"

TYP

7' - 4"3' - 3"

T Y

P 3'

0"

TYP

7' - 8"

LIMITS OF

SUBSTATION

ABOVE

C3 S-307

D

TYP

5' - 0"

TYP

20' - 0"

T Y

P 3'

6"

T Y

P 2'

0"

T Y

P 1'

6"

1' - 6"

1' - 6"

S-508 A1

BLOCKOUT AND

REINF DETAILS,

TYP

T Y

P

8'

9"

T Y

P 3'

6"

S-508 A1

S-509 A1

B4 S-512

TYP

T Y

P

8'

3/

4"

B1 S-512

C2 S-513

A2 S-513

A1 S-513

C2 S-513

TYP

B4 S-513

TYP

TYP

11' - 9"

A1 S-513

SIM

SIM

SIM

SIM

B2 S-510

SIM

C1 S-510

SIM

A1 S-510

SIM

B2 S-510

TYP

C2 S-510

TYP

B1 S-513

TYP

A1 S-513

SIM

T Y

P

T Y

P

8'

9"

6'

1/

2"

A3 S-512

8' - 0"

LEGEND:

# BENT DESIGNATION

A PILE ROW DESIGNATION

36" ⌀ PILE BELOW

ELECTRICAL DUCT BANK

CAST-IN-PLACE CONC SLAB

SHEET KEYNOTES:

1. CONCRETE PIER DECK NOT SHOWN FOR CLARITY.

2. PROVIDE SLEEVE WITH PROPER DIAMETER FOR UTILITY

PIPES AT CONCRETE HEAD WALLS CONCRETE HEAD

WALLS AND WITHIN UTILITY TRENCHES. SEE DRAWING

S-511 FOR DETAILS.

3. SEE DRAWING S-512 FOR REINFORCEMENT DETAILS IN

CAST-IN-PLACE SLAB, UNLESS NOTED OTHERWISE.

4. PLACE VAULT DRAIN AT CENTER OF EACH VAULT UNLESS

NOTED OTHERWISE.

GENERAL SHEET NOTES:

491623303743 0

KEY PLAN

SATISFACTORY TO DATE

APPROVED

ACTIVITY

FOR COMMANDER NAVFAC

SEAL

A/E INFO

A

B

C

D

1 2 3 4 5

1 2 3 4 5

A

B

C

D

SCALE:

CONSTR. CONTR. NO.

SHEET

NAVFAC DRAWING NO.

DES DRW CHK

OF

EPROJECT NO.:

D E

P A

R T

M E

N T

O F

T H

E N

A V

Y N

A V

A L

F A

C

IL

IT

IE

S E

N G

IN

E

E R

IN

G

S Y

S T

E M

S C

O M

M A

N D

DRAWFORM REVISION: 25 AUGUST 2020

PM/DM

BRANCH MANAGER

CHIEF ENG/ARCH

FIRE PROTECTION

N A

V A

L F

A C

IL

IT

IE

S

E N

G

IN

E E

R

IN

G S

Y S

T E

M S

C O

M M

A N

D

M

ID

-A

TL

A N

T

IC

N A

V A

L S

T A

T

IO

N

N O

R F

O L

K V

A

AS NOTED

S Y

M D

E S

C R

IP

T

IO

N

D A

T E

A P

P R

/1

/2

:3

:0

P M

A u to d e s k D o c s /2

U

S C

G O

C R

H o m e p o rt

In iti a ti v e O

P C

P ie r_

/P

IE

R

U S

C G

-1

-S

.r v t

S-110

U S

C G

O C

R H

O M

E P

O R

T

IN

IT

IA

T

IV

E O

P C

P

IE

R

F R

A M

IN

G

P

LA

N

S H

E E

T

O F

MJF

12936646

JZ AAN

Frank Cole USCG MASI

MRI/CWJ

1826479

N E

W P

O R

T , R

I N

A V

A L

S T

A T

IO

N

N E

W P

O R

T

JWJ

NEK

HPN

C I

C O

R E

H

A M

P T

O N

R O

A D

S

S -1

06 FEB 2026

PLAN

NORTH

SCALE: 1/8" = 1'-0"

FRAMING PLAN - SHEET 1 OF 7

A2

1/8" = 1' - 0" 0 5' 10' 15' 30'

1. CAST-IN-PLACE UTILITY TRENCHES AT BOTH SIDES OF PIER, TYPICAL.

2. 5'-0" WIDE BY 4'-0" DEEP CAST-IN-PLACE CONCRETE PILE CAP, TYPICAL.

3. PRECAST CONCRETE MANHOLE, TYPICAL.

4. 3'-0" WIDE BY 4'-0" DEEP CAST-IN-PLACE CONCRETE BEAM, TYPICAL.

5. 10" HEAVY DUTY SLEEVED DECK DRAIN (2'-9" LONG) WITH FRAME AND

GRATE, TYPICAL.

6. UTILITY TRENCH DRAIN WITH ONE WAY VALVE, TYPICAL

7. 3'-6" WIDE BY 4'-0" DEEP CAST-IN-PLACE CONCRETE BEAM, TYPICAL.

8. 5'-0" WIDE BY 4'-0" DEEP CAST-IN-PLACE CONCRETE BEAM, TYPICAL.

14. 5'-6" WIDE BY 4'-0" DEEP CAST-IN-PLACE CONCRETE PILE CAP, TYPICAL.

15. CAST-IN-PLACE 12" THICK VAULT SLAB, TYPICAL.

18. 6'-2 1/2" WIDE BY 4'-0" DEEP CAST-IN-PLACE CONCRETE BEAM, TYPICAL.

19. 10" HEAVY DUTY SLEEVED DECK DRAIN (6'-9" LONG) WITH FRAME AND

GRATE, TYPICAL.

A

M E

N D

M E

N T

/2

/2

V M

G

A

M E

N D

M E

N T

/1

/2

V M

G

A

M E

N D

M E

N T

/0

/2

V M

G

E

F

456789

A3 S-304

EDGE OF PIER

DECK, TYP

M A

T C

H L

IN

E

S E

E A

S -1

25' - 0" 25' - 0" 25' - 0" 25' - 0" 21' - 6"

C

T Y

P 1'

6"

T Y

P 3'

0"

3'

6"

T Y

P

8'

9"

T Y

P

3'

0"

C3 S-309

C PIERL

C2 S-302

25' - 0"

1000' - 0"

6'

6"

6'

6"

TYP

5' - 0"

TYP

6' - 2" 5' - 0"

TYP

8' - 10"

M A

T C

H L

IN

E

S E

E A

S -1

LIMITS OF

SUBSTATION ABOVE

C1 S-512

D

5'

3"

T Y

P 1'

6"

T Y

P 2'

0"

A3 S-309

T Y

P 3'

6"

B4 S-512

TYP

B2 S-513

C2 S-513

TYP

C1 S-513

TYP

C1 S-510

TYP

B2 S-510

TYP

B1 S-510

SIM

A2 S-510

C2 S-513

TYP

A4 S-510

B4

S-513

C1 S-513

TYP

SIMTYP

SIMTYP

A4 S-512

TYP

4'-8" Wx 2'-0" H OPNG, TYP

TYP

4' - 8"

TYP

5' - 4"

T Y

P

9'

3"

12' - 6"

TYP

16' - 6"

TYP

20' - 0"

T Y

P

8" THK PARTITION

WALL, SEE NOTE 4.

2'

3"4' - 8"

8' - 0"

8'-0"

8"

7'

0"

20' - 0"

8' - 0"

20'-0"

4A4 S-517

TYP

LEGEND:

# BENT DESIGNATION

A PILE ROW DESIGNATION

36" ⌀ PILE BELOW

ELECTRICAL DUCT BANK

CAST-IN-PLACE CONC SLAB

SHEET KEYNOTES:

1. CONCRETE PIER DECK NOT SHOWN FOR CLARITY.

2. PROVIDE SLEEVE WITH PROPER DIAMETER FOR UTILITY

PIPES AT CONCRETE HEAD WALLS AND WITHIN UTILITY

TRENCHES. SEE DRAWING S-511 FOR DETAILS.

3. SEE DRAWING S-512 FOR REINFORCEMENT DETAILS IN

CAST-IN-PLACE SLAB.

4. SEE DRAWING S-511 FOR REINFORCEMENT DETAILS IN

PARTITION WALL, UNLESS NOTED OTHERWISE.

5. PLACE VAULT DRAIN AT CENTER OF EACH VAULT UNLESS

NOTED OTHERWISE.

GENERAL SHEET NOTES:

491623303743 0

KEY PLAN

SATISFACTORY TO DATE

APPROVED

ACTIVITY

FOR COMMANDER NAVFAC

SEAL

A/E INFO

A

B

C

D

1 2 3 4 5

1 2 3 4 5

A

B

C

D

SCALE:

CONSTR. CONTR. NO.

SHEET

NAVFAC DRAWING NO.

DES DRW CHK

OF

EPROJECT NO.:

D E

P A

R T

M E

N T

O F

T H

E N

A V

Y N

A V

A L

F A

C

IL

IT

IE

S E

N G

IN

E

E R

IN

G

S Y

S T

E M

S C

O M

M A

N D

DRAWFORM REVISION: 25 AUGUST 2020

PM/DM

BRANCH MANAGER

CHIEF ENG/ARCH

FIRE PROTECTION

N A

V A

L F

A C

IL

IT

IE

S

E N

G

IN

E E

R

IN

G S

Y S

T E

M S

C O

M M

A N

D

M

ID

-A

TL

A N

T

IC

N A

V A

L S

T A

T

IO

N

N O

R F

O L

K V

A

AS NOTED

S Y

M D

E S

C R

IP

T

IO

N

D A

T E

A P

P R

/1

/2

:3

:5

P M

A u to d e s k D o c s /2

U

S C

G O

C R

H o m e p o rt

In iti a ti v e O

P C

P ie r_

/P

IE

R

U S

C G

-1

-S

.r v t

S-115

U S

C G

O C

R H

O M

E P

O R

T

IN

IT

IA

T

IV

E O

P C

P

IE

R

F R

A M

IN

G

P

LA

N

S H

E E

T

O F

MJF

12936651

JZ AAN

Frank Cole USCG MASI

MRI/CWJ

1826479

N E

W P

O R

T , R

I N

A V

A L

S T

A T

IO

N

N E

W P

O R

T

JWJ

NEK

HPN

C I

C O

R E

H

A M

P T

O N

R O

A D

S

S -1

06 FEB 2026

PLAN

NORTH

SCALE: 1/8" = 1'-0"

FRAMING PLAN - SHEET 6 OF 7

A2

1/8" = 1' - 0" 0 5' 10' 15' 30'

1. CAST-IN-PLACE UTILITY TRENCHES AT BOTH SIDES OF PIER, TYPICAL.

2. 5'-0" WIDE BY 4'-0" DEEP CAST-IN-PLACE CONCRETE PILE CAP, TYPICAL.

3. PRECAST CONCRETE MANHOLE, TYPICAL.

4. 3'-0" WIDE BY 4'-0" DEEP CAST-IN-PLACE CONCRETE BEAM, TYPICAL.

5. 10" HEAVY DUTY SLEEVED DECK DRAIN (2'-9" LONG) WITH FRAME AND

GRATE, TYPICAL.

6. UTILITY TRENCH DRAIN WITH ONE WAY VALVE, TYPICAL

7. 3'-6" WIDE BY 4'-0" DEEP CAST-IN-PLACE CONCRETE BEAM, TYPICAL.

9. 5'-3" WIDE BY 4'-0" DEEP CAST-IN-PLACE CONCRETE BEAM, ALONG PILE

ROW C UNDER SUBSTATION.

15. CAST-IN-PLACE 12" THICK VAULT SLAB, TYPICAL.

18. PROVIDE LATERAL UTILITY TRENCH WITH TWO 2'-4" WIDE BY 4'-0" DEEP

CAST-IN-PLACE CONCRETE BEAMS.

19. 10" HEAVY DUTY SLEEVED DECK DRAIN (6'-9" LONG) WITH FRAME AND

GRATE, TYPICAL.

A

M E

N D

M E

N T

/2

/2

V M

G

A

M E

N D

M E

N T

/0

/2

V M

G

A

M E

N D

M E

N T

/1

/2

V M

G

A

M E

N D

M E

N T

/0

/2

V M

G

BOT P/C PLANK EL 7.50'

TOP OF SHT PILE REPAIR EL 5.00' (MIN)

EXIST STL SHT PILE TOP EL 4.00'

CL EXIST TIE

RODS EL 3.00' ±

TOP OF STL SHT PILE REPAIR,

TOP OF LANDING EL 10.00

APPROX RIPRAP BOT EL -12.00' ±

SEE NOTE 1

APPROX MUDLINE TOP EL -14.00' ±

SEE NOTE 1

NAVD88

EL 0.00'

A

F

▽MHW EL 1.62

▽MLLW EL -2.12

C PIERL

4' - 0"

A' B.1 B.8 C.3 D.9

ELEC

DUCTBANK,

TYP

HEADWALL TOP EL

7.00

5' - 11 1/2" 3' - 2 1/2" 8' - 6"

TOP EL OF STL PIPE

PILE, 6.50, TYP

0+400+300+200+10STA BK 0+00 0+50 0+60 0+70 0+80 0+90

S-525

A1 STL SHT PILE

REPAIR AT

BULKHEAD, TYP

STL SHT PILE

REPAIR AT CONC

HEADWALL, TYP

S-525 B3

TYP

1' - 0"

TYP

1' - 8"

2' - 0" 8' - 9 1/2"

T Y

P

S-525 A1

S-524 A1

EXIST STL SHT PILE BULKHEAD

REPAIR

LIMIT OF STL

SHT PILE

EXIST CONC OUTFALL,

INVERT EL 1.60 ±

REPAIR LIMIT OF STL SHT PILE

8"

S-525 B1

1' - 6"

5'

4"

S-512 A1

3' - 9" 9' - 6" 5' - 3 1/2" 5' - 7" 5' - 1"

3" C

LR

2" C

LR

3" C

LR

5' - 11 1/2" 11' - 0 1/2" 3' - 4"

1/4

18" LONG

18" LONG

TYP @ BF

EL 7.00' (MAX)

2"

T Y

P 2"

2"

10 1/2" ±

TYP

6"

T Y

P 7"

2"

D.9C.3B.8B.1A'

14' - 6" 10' - 11 1/2" 8' - 2 1/2" 22' - 5 1/2" 13' - 6" 6' - 6"

4' - 9" ±

5" x 5" x 48" 120LB HIGH

POTENTIAL ALUMINUM

SACRIFICIAL ANODE @

11'-0" O.C.

1. SUBSURFACE PROFILES SHOWN ARE APPROXIMATE BASED ON LIMITED

GEOTECHNICAL DATA.

NOTES:

SATISFACTORY TO DATE

APPROVED

ACTIVITY

FOR COMMANDER NAVFAC

SEAL

A/E INFO

A

B

C

D

1 2 3 4 5

1 2 3 4 5

A

B

C

D

SCALE:

CONSTR. CONTR. NO.

SHEET

NAVFAC DRAWING NO.

DES DRW CHK

OF

EPROJECT NO.:

D E

P A

R T

M E

N T

O F

T H

E N

A V

Y N

A V

A L

F A

C

IL

IT

IE

S E

N G

IN

E

E R

IN

G

S Y

S T

E M

S C

O M

M A

N D

DRAWFORM REVISION: 25 AUGUST 2020

PM/DM

BRANCH MANAGER

CHIEF ENG/ARCH

FIRE PROTECTION

N A

V A

L F

A C

IL

IT

IE

S

E N

G

IN

E E

R

IN

G S

Y S

T E

M S

C O

M M

A N

D

M

ID

-A

TL

A N

T

IC

N A

V A

L S

T A

T

IO

N

N O

R F

O L

K V

A

AS NOTED

S Y

M D

E S

C R

IP

T

IO

N

D A

T E

A P

P R

/1

/2

:3

:5

P M

A u to d e s k D o c s /2

U

S C

G O

C R

H o m e p o rt

In iti a ti v e O

P C

P ie r_

/P

IE

R

U S

C G

-1

-S

.r v t

S-207

U S

C G

O C

R H

O M

E P

O R

T

IN

IT

IA

T

IV

E O

P C

P

IE

R

R E

P A

IR

E

D S

N

B U

LK

H

E A

D E

LE

V

A

TI

O N

P

IE

R

S

E C

TI

O

N

MJF

12936681

JZ KCJ

Frank Cole USCG MASI

MRI/CWJ

1826479

N E

W P

O R

T , R

I N

A V

A L

S T

A T

IO

N

N E

W P

O R

T

JWJ

NEK

HPN

C I

C O

R E

H

A M

P T

O N

R O

A D

S

S -2

06 FEB 2026

SCALE: 1/4" = 1'-0" (S-130)

A2

S45N REPAIRED BULKHEAD ELEVATION & PIER 1 SECTION

1/4" = 1' - 0" 0 5' 10' 15'1'

A

M E

N D

M E

N T

/0

/2

V M

▽MHW EL 1.62

▽MLLW EL -2.12

END POINT

CONNECTION TO

EXIST BULKHEAD

S45N

END POINT TIE IN

AT S50 BULKHEAD

APPROX. GROUNDLINE

EL -9.00

15" RCP OUTFALL

SACRIFICIAL

ANODES, TYP

WALE AND C

OF TIE ROD EL 5.00'

WALE AND C

OF TIE ROD EL 3.00'

TOP OF CAP CHANNEL

TIP EL -31.00'

STL BENT PLATE AT

OUTFALL, SEE A1 ON S-526

EL 12.0 TOP OF CAP CHANNEL

L L

290' - 0"±

75' - 2" 106' - 1"±

TRANSITION FROM EL 11.0 TO 12.0

29' - 11 1/2" 78' - 10 1/2"

SATISFACTORY TO DATE

APPROVED

ACTIVITY

FOR COMMANDER NAVFAC

SEAL

A/E INFO

A

B

C

D

1 2 3 4 5

1 2 3 4 5

A

B

C

D

SCALE:

CONSTR. CONTR. NO.

SHEET

NAVFAC DRAWING NO.

DES DRW CHK

OF

EPROJECT NO.:

D E

P A

R T

M E

N T

O F

T H

E N

A V

Y N

A V

A L

F A

C

IL

IT

IE

S E

N G

IN

E

E R

IN

G

S Y

S T

E M

S C

O M

M A

N D

DRAWFORM REVISION: 25 AUGUST 2020

PM/DM

BRANCH MANAGER

CHIEF ENG/ARCH

FIRE PROTECTION

N A

V A

L F

A C

IL

IT

IE

S

E N

G

IN

E E

R

IN

G S

Y S

T E

M S

C O

M M

A N

D

M

ID

-A

TL

A N

T

IC

N A

V A

L S

T A

T

IO

N

N O

R F

O L

K V

A

AS NOTED

S Y

M D

E S

C R

IP

T

IO

N

D A

T E

A P

P R

/1

/2

:3

:5

P M

A u to d e s k D o c s /2

U

S C

G O

C R

H o m e p o rt

In iti a ti v e O

P C

P ie r_

/P

IE

R

U S

C G

-1

-S

.r v t

S-208

U S

C G

O C

R H

O M

E P

O R

T

IN

IT

IA

T

IV

E O

P C

P

IE

R

S

S B

U

LK

H E

A D

E

LE

V A

TI

O

N

JZ

12936682

MJF KCJ

Frank Cole USCG MASI

MRI/CWJ

1826479

N E

W P

O R

T , R

I N

A V

A L

S T

A T

IO

N

N E

W P

O R

T

JWJ

NEK

HPN

C I

C O

R E

H

A M

P T

O N

R O

A D

S

S -2

06 FEB 2026

1" = 10' 0 5' 10' 40'20'

1. SACRIFICIAL ANODES TO BE INSTALLED ON BOTH SIDES

OF STEEL SHEET PILE BULKHEAD. ANODES TO BE

INSTALLED FOR EVERY THREE PAIRS OF STEEL SHEETING.

ANODES TO BE 5" x 5" x 48" 120LB HIGH POTENTIAL

ALUMINUM.

2. PROVIDE MINIMUM 3" CONTINUITY WELD AT THE TOP OF

EACH SHEET PILE KNUCKLE.

NOTES:

SCALE: 3/32" = 1'-0" (S-404)

B2

ELEVATION BULKHEAD S45S

A

M E

N D

M E

N T

/2

/2

V M

G

A

M E

N D

M E

N T

/0

/2

V M

G

TOP OF PILE CAP

TOP OF PILE CAP

ABEF

TOP OF PIER DECK

EL 13.00'

BOT OF PILE CAP

EL 6.50'

▽MHW EL 1.62

▽MLLW EL -2.12

CD

6' - 6" 11' - 9" 14' - 6" 14' - 6" 14' - 6" 11' - 9" 6' - 6"

SLOPE

10" CONC CURB, TYP

CIP CONC BEAM, TYP

CIP CONC PILE

CAP (BEYOND)

1'-6" P/C CONC

PLANK, TYP

C POLYMERIC FENDER

PILE, TYP SEE

FOR DETAILS

L C PIER

L S-519

CIP CONC SUBSTATION

PLATFORM WALL

7' - 0" 22' - 0 3/4"

EL 18.00 EL 18.00

10 1/2" 20' - 5" 9"

12' - 10" 12' - 10" 10' - 1"

CJ, TYP

CIP SUBSTATION WALL,

TYP

5'-0"Wx4'-0"H CIP BEAM

(BEYOND), TOP EL 8.50

1" NON-SHRINK GROUT, TYP

CIP CONC TOPPING SLAB,

THK VAR

10" HEAVY DUTY SLEEVED

DECK DRAIN WITH FRAME

AND GRATE, TYP

EL 18.03

( , , , )S-110 S-117

1' - 0" TYP

EL 18.04

S-103 S-124

6' - 2 1/4"

3'

6" T

Y P

SLOPESLOPE SLOPE

ABEF

TOP OF PIER DECK

EL 13.00'

BOT OF PILE CAP

EL 6.50'

▽MHW EL 1.62

C

▽MLW EL -1.97

D

SLOPE

10" CONC CURB, TYP

UTIL TRENCH OPNG IN

PILE CAP, TYP

SLOPE

CIP CONC BEAM, TYP

1'-6" P/C CONC

PLANK, TYP

C POLYMERIC FENDER

PILE, TYP SEE

FOR DETAILS

1" NON-SHRINK GROUT,

TYP

12" THK REMOVABLE

P/C UTIL TRENCH

COVER, TYP

L C PIER

S-519

FFF, TYP

6' - 6" 11' - 9" 14' - 6" 14' - 6" 14' - 6" 11' - 9" 6' - 6"

CIP CONC TOPPING

SLAB, THK VAR

GUARD POST,

TYP

3' - 0" 8' - 9" 3' - 6"

L

80' - 0"

CJ, TYP

TRENCH DRAIN, TYP

CIP CONC PILE

CAP (BEYOND)

S-111 S-118

T