24.168 NOAA OMAO Bulkhead Pile Driving Summary Table 08.07.24 to 08.08.24.pdf

PDF 27 MB Posted

Attached to
Design-Bid-Build, USCG Offshore Patrol Cutters (OPC) Homeport Pier, Naval Station Newport, Newport RI
Solicitation number
N4008526R0001
Issued by

About this file

This is a summary table documenting bulkhead pile driving work conducted by NOAA's Office of Marine and Aviation Operations (OMAO) between August 7-8, 2024. The table tracks operational metrics for pile driving activities, likely related to marine infrastructure maintenance or construction. The document appears to be a daily or shift-level work log capturing specific details about pile driving operations, including work duration, quantities of piles driven, equipment used, and personnel involved in the underwater/waterfront construction activities.

The data in this summary table would typically support project documentation, progress reporting, and cost tracking for the USCG Offshore Patrol Cutters (OPC) Homeport Pier project at Naval Station Newport in Newport, Rhode Island. This Design-Bid-Build solicitation (N4008526R0001) involves substantial marine construction work, and the pile driving summary represents actual field work execution data that contractors would need to document for progress billing, schedule compliance, and quality assurance purposes. The file serves as an operational record demonstrating the scope and intensity of the marine construction activities required for the pier homeport facility.

View the file

Other files

File Type Posted
USCG OPC Pier Amendment 0009 Drawings.pdf PDF
2026-0816-HAI-USCG Homeport OPC Pier-Geotech Engineering Report Rev 2.pdf PDF
Amendment 0009 USCG OPC.pdf PDF
Updated Attachment H - USCG OPC Pier Price Proposal Form REV 5.docx DOCX document
Amendment 0008 USCG OPC.pdf PDF
Amendment 0007 SPC USCG OPC Pier Appendix D (With Placeholders).pdf PDF
Updated Attachment H - USCG OPC Pier Price Proposal Form REV 6.docx DOCX document
USCG OPC Pier Amendment 0008 Drawings.pdf PDF
USCG OPC Pier Amendment 007 Drawings.pdf PDF
Amendment 0007 USCG OPC.pdf PDF
Attachment Z - Pier 1 - Amendment 006 Drawings.pdf PDF
Appendix A - Telecom Room Photos.pdf PDF
Updated Attachment H - UCCG OPC Pier Price Proposal Form REV 4.docx DOCX document
Amendment 0006 USCG OPC.pdf PDF
24.168 NOAA OMAO Prime Pier Pile Driving Summary Report.pdf PDF
Pier Pile Plan.pdf PDF
24.168 NOAA OMAO Bulkhead Pile Driving Summary Table 08.26.24 to 08.30.24 (1).pdf PDF
24.168 NOAA OMAO Bulkhead Pile Driving Summary Table 07.22.24 to 07.26.24.pdf PDF
24.168 NOAA OMAO Bulkhead Pile Driving Summary Table 07.15.24 to 07.19.24.pdf PDF
Attachment Y - Appendix A Record drawing 11836 125 Submarine Cable Relocation.pdf PDF
SUB-0123 Interim PDA and Test Pile Logs - Trestle Piles 10B 14B.pdf PDF
SUB-0TBD Interim PDA and Test Pile Logs For Trestle Pile 17B.pdf PDF
24.168 NOAA OMAO Bulkhead Pile Driving Summary Table 08.26.24 to 08.30.24.pdf PDF
Updated Attachment H - UCCG OPC Pier Price Proposal Form REV 3.docx DOCX document
SUB-0105 Trestle Piles 4C 6B - PDA and Test Pile Logs.pdf PDF
24.168 NOAA OMAO Bulkhead Pile Driving Summary Table 08.20.24 to 08.23.24.pdf PDF
24.107 NOAA OMAO Ship & Support Facility Relocation Newport RI - PDA Report - Pier Bent 19.pdf PDF
24.168 NOAA OMAO Bulkhead Pile Driving Summary Table 06.25.24 to 06.27.24.pdf PDF
24.168 NOAA OMAO Bulkhead Pile Driving Summary Table 07.31.24 to 08.01.24.pdf PDF
SUB-0284 PDA49B_A.pdf PDF
SUB-0262 Interim PDA Test Pile Logs for Pier Piles - Bent 35 B - A.pdf PDF
Trestle Summary.pdf PDF
24.168 NOAA OMAO Bulkhead Pile Driving Summary Table 08.20.24 to 08.23.24 (1).pdf PDF
24.168 NOAA OMAO Bulkhead Pile Driving Summary Table 07.01.24 - 07.02.24.pdf PDF
Bulkhead Pile Plan.pdf PDF
24.168 NOAA OMAO Bulkhead Pile Driving Summary Table 09.03.24 to 09.06.24.pdf PDF
24.168 NOAA OMAO Bulkhead Pile Driving Summary Table 08.13.24 to 08.15.24.pdf PDF
Attachment W - Pier 1 - Amendment 005 Drawings.pdf PDF
24.168 NOAA OMAO Bulkhead Pile Driving Summary Table 07.11.24.pdf PDF
24.107 NOAA OMAO Ship Support Facility Relocation Newport RI - PDA Report - Pier Bent 25 and 27.pdf PDF
NOAA OMAO Survey Reports 100 Percent Pre-Final Submittal 04072022.pdf PDF
Amendment 0005 USCG OPC.pdf PDF
Attachment X - Appendix A Record Drawing 12819 135 Submarine Cable.pdf PDF
Attachment U - Appendix A - Pier 1 Extension 1968.pdf PDF
Attachment V - Pier 1 - Amendment 004 Drawings.pdf PDF
Updated Attachment K - WD RI20260001 05-18-2026.pdf PDF
Amendment 0004 USCG OPC.pdf PDF
Attachment T - REF(m) Existing Pier 1 Drawings 1 of 2.pdf PDF
Attachment C - Construction Experience Project Data Sheet.docx DOCX document
Attachment E - Historical Small Business Utilization.docx DOCX document
Show 40 more

Latest 50 of 90 listed here. See the rest on GovTribe.

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

DATE:

PROJECT LOCATION:

CLIENT: CONTRACTOR:

GTR REP PILE INFO:

S67 Not Vibed 7-Aug-24 12.25 47 42.50 10.25 -30.25 16.75 40.50 40 9 - 10 S66 Not Vibed 7-Aug-24 12.25 47 42.50 10.25 -30.25 16.75 40.50 38 8 - 9 S65 Not Vibed 7-Aug-24 12.25 47 42.50 10.25 -30.25 16.75 40.50 42 8 - 9 S64 Not Vibed 7-Aug-24 12.25 47 42.50 10.25 -30.25 16.75 40.50 36 8 - 9 S63 Not Vibed 7-Aug-24 12.25 47 42.50 10.25 -30.25 16.75 40.50 38 8 - 9 S62 Not Vibed 7-Aug-24 12.25 47 42.50 10.25 -30.25 16.75 40.50 34 9 - 10 S61 Not Vibed 7-Aug-24 12.25 47 42.50 10.25 -30.25 16.75 40.50 38 9 - 10 S60 Not Vibed 7-Aug-24 12.25 47 42.50 10.25 -30.25 16.75 40.50 36 8 - 9 S59 Not Vibed 7-Aug-24 12.25 47 42.50 10.25 -30.25 16.75 40.50 32 8 - 9 S58 Not Vibed 7-Aug-24 12.25 47 42.50 10.25 -30.25 16.75 40.50 30 8 - 9 S57 Not Vibed 7-Aug-24 12.25 47 42.50 10.25 -30.25 16.75 40.50 38 9 - 10 S56 Not Vibed 7-Aug-24 12.25 47 42.50 10.25 -30.25 16.75 40.50 34 9 - 10 S55 Not Vibed 7-Aug-24 12.25 47 42.50 10.25 -30.25 16.75 40.50 34 8 - 9 S54 Not Vibed 7-Aug-24 12.25 47 42.50 10.25 -30.25 16.75 40.50 30 8 - 9 S53 Not Vibed 7-Aug-24 12.25 47 42.50 10.25 -30.25 16.75 40.50 28 8 - 9 S83 Not Vibed 8-Aug-24 12.25 47 42.50 10.25 -30.25 16.75 40.50 42 9 - 10 S82 Not Vibed 8-Aug-24 12.25 47 42.50 10.25 -30.25 16.75 40.50 36 8 - 9 S80 Not Vibed 8-Aug-24 12.25 47 42.50 10.25 -30.25 16.75 40.50 32 8 - 9 S79 Not Vibed 8-Aug-24 12.25 47 42.50 10.25 -30.25 16.75 40.50 32 8 - 9 S78 Not Vibed 8-Aug-24 12.25 47 42.50 10.25 -30.25 16.75 40.50 34 8 - 9 S77 Not Vibed 8-Aug-24 12.25 47 42.50 10.25 -30.25 16.75 40.50 34 8 - 9 S76 Not Vibed 8-Aug-24 12.25 47 42.50 10.25 -30.25 16.75 40.50 36 8 - 9 S75 Not Vibed 8-Aug-24 12.25 47 42.50 10.25 -30.25 16.75 40.50 34 8 - 9 S74 Not Vibed 8-Aug-24 12.25 47 42.50 10.25 -30.25 16.75 40.50 38 8 - 9 S73 Not Vibed 8-Aug-24 12.25 47 42.50 10.25 -30.25 16.75 40.50 32 8 - 9 S72 Not Vibed 8-Aug-24 12.25 47 42.50 10.25 -30.25 16.75 40.50 38 8 - 9 S71 Not Vibed 8-Aug-24 12.25 47 42.50 10.25 -30.25 16.75 40.50 36 8 - 9 S70 Not Vibed 8-Aug-24 12.25 47 42.50 10.25 -30.25 16.75 40.50 38 8 - 9 S69 Not Vibed 8-Aug-24 12.25 47 42.50 10.25 -30.25 16.75 40.50 40 8 - 9 S68 Not Vibed 8-Aug-24 12.25 47 42.50 10.25 -30.25 16.75 40.50 38 9 - 10

PILE

NO.

DRIVEN

DEPTH

(feet)

TIP

ELEVATION

(feet)

TOP

ELEVATION

(feet)

PILE

LENGTH

(feet)

EOD

STROKE

(feet)

WORKING

GRADE

(feet)

FINAL DRIVE

DATE

VIBRATION

DRIVE DATE

CUT-OFF

LENGTH

GTR JOB # 24.168

GEOSCIENCES TESTING AND RESEARCH, INC.

55 Middlesex Street, Suite 225, North Chelmsford, MA, Phone: (978) 251-9395 Fax: (978) 251-9396

COMMENTS

PILE DRIVING SUMMARY

J. Roth Steel 18-inch O.D. X 0.5-inch wall open-ended Pipe

Newport RI Naval Station Coastal Marine

NOAA OMAO

Skanska

9-Aug-24

CUT-OFF

ELEVATION

(feet)

BLOW

COUNT

FINAL FOOT

BULKHEAD PILES

File details come from the government source that posted it. Updated .