This is a Pile Installation Inspection Final Report documenting steel pipe pile installation and monitoring work performed for the NAVFAC NOAA OMAO Ship & Support Facility Relocation project in Newport, Rhode Island.

Geosciences Testing and Research, Inc. (GTR) served as the Contractor's Geotechnical Consultant and observed pile installation activities between June 10, 2024 and October 10, 2024. The project involved the successful installation of eighteen 18-inch outer diameter by 0.5-inch wall thickness steel pipe piles for the trestle pier. Each pile was designed for a compression load of 300 kips with an ultimate compression capacity of 680 kips (based on a factor of safety of 2.25). All piles were driven using a BSP CG240 Hydraulic Hammer at a 2.0-foot stroke to meet a minimum drive criteria of 6 blows per inch for 6 inches, which was established through Pile Dynamic Analysis Testing performed between June 18 and July 5, 2024. Pile axial deviation was monitored during installation with a maximum allowable deviation of 1-inch over four feet per project specifications. All piles were driven to minimum tip elevations ranging between -30 and -60 feet. The report includes a summary table of driven depths, elevations, final blow counts, and individual pile logs documenting installation details for each of the 18 piles, along with numbered pile location plans showing completion status for the project areas.

View the file

Other files

File Type Posted
USCG OPC Pier Amendment 0008 Drawings.pdf PDF
Amendment 0007 SPC USCG OPC Pier Appendix D (With Placeholders).pdf PDF
Updated Attachment H - USCG OPC Pier Price Proposal Form REV 5.docx DOCX document
Appendix A - Telecom Room Photos.pdf PDF
Amendment 0006 USCG OPC.pdf PDF
Attachment Z - Pier 1 - Amendment 006 Drawings.pdf PDF
Updated Attachment H - UCCG OPC Pier Price Proposal Form REV 4.docx DOCX document
24.168 NOAA OMAO Bulkhead Pile Driving Summary Table 08.13.24 to 08.15.24.pdf PDF
24.168 NOAA OMAO Bulkhead Pile Driving Summary Table 07.22.24 to 07.26.24.pdf PDF
24.168 NOAA OMAO Bulkhead Pile Driving Summary Table 07.01.24 - 07.02.24.pdf PDF
24.168 NOAA OMAO Bulkhead Pile Driving Summary Table 08.26.24 to 08.30.24 (1).pdf PDF
24.168 NOAA OMAO Bulkhead Pile Driving Summary Table 08.26.24 to 08.30.24.pdf PDF
24.168 NOAA OMAO Bulkhead Pile Driving Summary Table 07.11.24.pdf PDF
24.168 NOAA OMAO Prime Pier Pile Driving Summary Report.pdf PDF
Pier Pile Plan.pdf PDF
SUB-0123 Interim PDA and Test Pile Logs - Trestle Piles 10B 14B.pdf PDF
Amendment 0005 USCG OPC.pdf PDF
Attachment W - Pier 1 - Amendment 005 Drawings.pdf PDF
Attachment Y - Appendix A Record drawing 11836 125 Submarine Cable Relocation.pdf PDF
24.168 NOAA OMAO Bulkhead Pile Driving Summary Table 08.07.24 to 08.08.24.pdf PDF
24.168 NOAA OMAO Bulkhead Pile Driving Summary Table 08.20.24 to 08.23.24 (1).pdf PDF
Bulkhead Pile Plan.pdf PDF
24.168 NOAA OMAO Bulkhead Pile Driving Summary Table 08.20.24 to 08.23.24.pdf PDF
24.168 NOAA OMAO Bulkhead Pile Driving Summary Table 09.03.24 to 09.06.24.pdf PDF
NOAA OMAO Survey Reports 100 Percent Pre-Final Submittal 04072022.pdf PDF
SUB-0105 Trestle Piles 4C 6B - PDA and Test Pile Logs.pdf PDF
SUB-0TBD Interim PDA and Test Pile Logs For Trestle Pile 17B.pdf PDF
Updated Attachment K - WD RI20260001 05-18-2026.pdf PDF
Amendment 0003 USCG OPC.pdf PDF
Attachment E - Historical Small Business Utilization.docx DOCX document
Attachment T - REF(m) Existing Pier 1 Drawings 1 of 2.pdf PDF
Updated Attachment H - UCCG OPC Pier Price Proposal Form REV 2.docx DOCX document
Attachment Q - Spc 100 Final Specs Appendix D - (With Placeholders).pdf PDF
Updated Attachment G - Individual SB Subcontracting Plan.docx DOCX document
Amendment 0002 USCG OPC.pdf PDF
Updated Attachment H - UCCG OPC Pier Price Proposal Form REV 1.pdf PDF
Attachment M - 01 45 35_Schedule_of_Special_Inspections.pdf PDF
Attachment N - 01 45 35_Statement_of_Special_Inspections.xlsx XLSX spreadsheet
Amendment 0001 USCG OPC.pdf PDF
Updated Attachment F - SB Participation Commitment Document.pdf PDF
Attachment A - Pre Proposal Inquiry Log.xlsx XLSX spreadsheet
Attachment C - Construction Experience Project Data Sheet.pdf PDF
Attachment F - SB Participation Commitment Document.pdf PDF
Attachment G - Individual SB Subcontrating Plan.pdf PDF
Attachment K - WD RI20260001 01-30-2026.pdf PDF
Solicitation - N4008526R0001.pdf PDF
Attachment D - Past Performance Questionnaire.pdf PDF
Attachment H - UCCG OPC Pier Price Proposal Form.pdf PDF
1826479dwg01of05_GEN-CIV.pdf PDF
Attachment E - Historical Small Business Utilization.pdf PDF
Show 40 more

50 files listed here. See the rest on GovTribe.

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

55 Middlesex Street, Suite 225 80 Business Park Drive, Suite 306 No. Chelmsford, MA 01863 Armonk, NY 10504

(978) 251‐9395 (914) 600‐8101 www.gtrinc.net

November 15, 2024 GTR Project No. 24.168

Mr. Matt Coleman, P.E.

Quality Manager Skanska USA Civil 1365 Main Street Waltham, MA 01952

Re: Pile Installation Inspection Final – Trestle Piles NAVFAC NOAA OMAO Ship & Support Facility Relocation

Newport, Rhode Island

Dear Matt, Geosciences Testing and Research, Inc., (GTR) is pleased to present this report that summarizes steel Pipe‐pile installation and monitoring work performed at the above‐ referenced Project. At your request, GTR observed and documented installation activities between June 10, 2024 and October 10, 2024. GTR was on‐site to act as the Contractor’s Geotechnical Consultant as specified in the Project Specifications SECTION 31 62 16.13‐ STEEL PIPE PILES. Our scope of work included observing and documenting the Pipe‐pile installation process to ensure compliance with our proposed driving criteria. Refer to our PDA reports dated June 18, July 3, and July 8, 2024 for details on the testing.

Steel 18” O.D. x 0.5” Wall Pipe Pile Installation

Eighteen 18”x0.5” Pipe piles were successfully installed for the NAVFAC NOAA OMAO Ship & Support Trestle Pier. The piles have a design compression load of 300 kips. The ultimate compression capacity is 680 kips based on a factor of safety of 2.25. All of the piles were driven to a minimum drive criteria of 6 blows per inch for 6 inches using a BSP CG240 Hydraulic Hammer at a stroke of 2.0 feet. This drive criteria was established during Pile Dynamic Analysis Testing performed by GTR between June 18, 2024 and July, 5 2024 (see reports referenced above). In addition to the drive criteria, pile axial deviation was monitored during installation and recorded on the individual pile logs that can be found in Appendix A. A maximum angle of 1‐inch over four feet was the allowable maximum deviation per project specifications. All piles were driven to a minimum tip elevations ranging between elevations ‐30 and ‐60 feet. A summary table of driven depths, elevations, and final blow counts is attached in Table 1. A numbered pile location plan is presented in Figures 1A and 1B.

rwhitsel M&N SD Stamp

NAVFAC NOAA OMAO Ship & Support Facility Relocation November 15, 2024 GTR Project No. 24.168 Page 2 www.gtrinc.net

This report has been prepared in accordance with generally accepted geotechnical engineering principles with specific application to this project. Our conclusions are based on applicable standards of practice, including any information reported to and/or prepared for

us. No other warranty, expressed or implied, is made.

If you have any questions regarding this report, please do not hesitate to contact us.

Sincerely, Geosciences Testing and Research, Inc.

John Roth Les Chernauskas P.E.

Geotechnical Engineer Principal

William D. Oder P.E.

Technical Manager

Encl. Table 1 ‐ Pile Summary

Figures ‐ Pile Location Plans Appendix A ‐ Pile Logs

24.168 NOAA OMAO Pile Driving Summary Report Trestle Piles.docx asolari Oval asolari Oval asolari Text Box Daily Field Sketch Sheet 1 of 3 as of October 10, 2024 (Note: Sketch as shown only depicts trestle pile installation) rwhitsel Engineer rwhitsel Cloud+ please include platform piles when driven

Text Box Daily Field Sketch Sheet 2 of 3 as of October 10, 2024 (Note: Sketch as shown only depicts trestle pile installation)

Text Box Daily Field Sketch Sheet 3 of 3 as of October 10, 2024 (Note: Sketch as shown only depicts trestle pile installation) rwhitsel Cloud rwhitsel Callout for pier show prime Bents and Rows, and indicate piles on original bents that have been cutoff at mudline

FIGURES

PILE LOCATION PLAN

DATE:

PROJECT: LOCATION:

CLIENT: CONTRACTOR:

GTR REP: PILE INFO:

4C 10-Jun-24 20-Jun-24 0 75 56.50 8.28 -56.50 18.50 64.78 1.75-2 6,6,6,6,6,6

5B 11-Jun-24 20-Jun-24 0 75 60.00 8.39 -60.00 15.00 68.39 2.00 6,6,7,7,8,8

5C 11-Jun-24 20-Jun-24 0 75 64.00 8.39 -64.00 11.00 72.39 2.00 6,6,7,7,8,7

3B 21-Jun-24 21-Jun-24 0 75 41.50 8.17 -41.50 33.50 49.67 2.00 6,6,6,7,6,7

4B 21-Jun-24 21-Jun-24 0 75 48.00 8.28 -48.00 27.00 56.28 2.00 6,6,6,6,6,6

6B 10-Jun-24 21-Jun-24 0 80 61.00 8.51 -61.00 19.00 69.51 2.00 7,7,8,7,8,8

6C 7-Jun-24 21-Jun-24 0 75 60.50 8.51 -60.50 14.50 69.01 2.00 6,6,6,6,6,6

7B 14-Jun-24 21-Jun-24 0 75 64.00 8.62 -64.00 11.00 72.62 2.00 6,6,6,6,6,6

7C 14-Jun-24 21-Jun-24 0 75 61.50 8.62 -61.50 13.50 70.12 2.00 6,6,6,6,6,6

8B 13-Jun-24 21-Jun-24 0 75 59.50 8.74 -59.50 15.50 68.24 2.00 6,6,6,6,6,6

8C 14-Jun-24 21-Jun-24 0 75 58.00 8.74 -58.00 17.00 66.74 2.00 6,6,6,6,6,6

3C 24-Jun-24 24-Jun-24 0 80 51.50 8.17 -51.50 28.50 59.67 2.00 6,6,6,6,6,7

10B 1-Jul-24 1-Jul-24 5.5 80 72.25 8.97 -66.75 13.25 75.72 2.00 6,6,6,6,6,6

11C 1-Jul-24 1-Jul-24 0 80 62.00 9.08 -62.00 18.00 71.08 2.00 5,6,6,6,10<1"

9B 2-Jul-24 2-Jul-24 0 80 66.00 8.85 -66.00 14.00 74.85 2.00 6,6,6,6,6,6

9C 2-Jul-24 2-Jul-24 0 80 47.00 8.85 -47.00 33.00 55.85 2.00 6,6,6,6,6,7

10C 2-Jul-24 2-Jul-24 0 80 66.00 8.97 -66.00 14.00 74.97 2.00 6,6,6,7,7,7

11B 2-Jul-24 2-Jul-24 0 80 61.00 9.08 -61.00 19.00 70.08 2.00 6,6,6,6,6,6

12B 2-Jul-24 2-Jul-24 0 80 62.50 9.20 -62.50 17.50 71.70 2.00 6,6,6,6,6,7

12C 2-Jul-24 2-Jul-24 0 80 62.00 9.20 -62.00 18.00 71.20 2.00 6,6,6,6,7,7

13B 2-Jul-24 2-Jul-24 0 80 63.40 9.31 -63.40 16.60 72.71 2.00 6,6,6,6,6,10

13C 2-Jul-24 2-Jul-24 0 80 64.80 9.31 -64.80 15.20 74.11 2.00 6,6,6,6,6,10

14B 2-Jul-24 2-Jul-24 5.5 80 79.17 9.42 -73.67 6.33 83.09 2.00 5,6,6,6,6,8

14C 2-Jul-24 2-Jul-24 0 80 65.70 9.42 -65.70 14.30 75.12 2.00 6,6,8,8,9,10

15B 5-Jul-24 5-Jul-24 5 80 71.58 9.54 -66.58 13.42 76.12 2-2.25 6,6,6,6,7,6

15C 5-Jul-24 5-Jul-24 5 80 73.25 9.54 -68.25 11.75 77.79 2-2.25 6,6,6,6,7,8

16B 5-Jul-24 5-Jul-24 5 80 73.92 9.65 -68.92 11.08 78.57 2-2.25 6,6,6,8,7,8

16C 5-Jul-24 5-Jul-24 5 80 73.75 9.65 -68.75 11.25 78.40 2-2.25 6,6,6,6,8,8

17B 5-Jul-24 5-Jul-24 5 85 79.00 9.77 -74.00 11.00 83.77 2-2.25 6,6,6,6,6,7

17C 5-Jul-24 5-Jul-24 5 80 72.08 9.77 -67.08 12.92 76.85 2-2.25 6,7,6,6,6,6

18B 8-Jul-24 8-Jul-24 0 90 73.22 9.88 -73.22 16.78 83.10 2.00 6,6,6,8,7,10

18C 8-Jul-24 8-Jul-24 0 90 70.33 9.88 -70.33 19.67 80.21 2.00 6,6,6,6,6,7

2C 24-Jul-24 24-Jul-24 12 80 53.50 8.05 -41.50 38.50 49.55 2.00 6,6,6,6,6,6

2B 24-Jul-24 24-Jul-24 12 80 53.00 8.05 -41.00 39.00 49.05 2.00 6,6,6,6,6,7

1B 10-Oct-24 10-Oct-24 12 75 45.50 7.99 -33.50 41.50 41.49 2.00 6,6,6,9,10,10

1C 10-Oct-24 10-Oct-24 12 75 45.17 7.99 -33.17 41.83 41.16 2.00 6,6,6,6,6,7

GTR JOB # 24.168

GEOSCIENCES TESTING AND RESEARCH, INC.

55 Middlesex Street, Suite 225, North Chelmsford, MA, Phone: (978) 251-9395 Fax: (978) 251-9396

COMMENTS

PILE DRIVING SUMMARY

TEST PILE

J. Roth Steel Pipe Pile 18" x 0.5"

Newport RI Naval Station Coastal Marine

NOAA OMAO

Skanska

13-Nov-24

CUT-OFF

ELEVATION

(feet)

TEST PILE

PILE NO. FINAL BLOW

COUNT

DRIVEN

DEPTH

(feet)

TIP

ELEVATION

(feet)

TOP

ELEVATION

(feet)

PILE

LENGTH

(feet)

EOD

STROKE

(feet)

WORKING

GRADE

(feet)

FINAL DRIVE

DATE

VIBRATION

DRIVE DATE

CUT-OFF

LENGTH

TEST PILE

Highlight rwhitsel Highlight rwhitsel Highlight rwhitsel Highlight rwhitsel Cloud+ rwhitsel Cloud+ Verify Length, as test piles are at least 5 ft longer that production piles, check math in driving logs rwhitsel Cloud+ rwhitsel Cloud+ Verify length (add 12 ft for working grade?)

APPENDIX A

PILE LOGS

Cloud+ rwhitsel Cloud+ Check Math

File details come from the government source that posted it. Updated .