This document is a Pile Driving Summary and associated Pile Driving Logs prepared by Geosciences Testing and Research, Inc. (GTR) for a NOAA OMAO project located in Newport, Rhode Island. The work was performed by Skanska as the contractor with J. Roth as the GTR representative, documented under Job No. 24.168 with a final drive date of September 6, 2024.

The summary documents the installation of NZ26 Sheet Piles (47 feet in length) for bulkhead construction using an ICE D-50 single-acting diesel hammer with a rated energy of 33.5 kips and 11,355 lbs ram weight. Nine piles (S3, S4, S5, S6, S7, S8, S9, S24, S39, and S50) are recorded in the summary table with driven depths ranging from 28 to 62 feet, tip elevations from -30.25 feet, and working grades of 16.75 feet. The detailed driving logs for individual piles (S3, S4, S5, S6, S7, S8, S9, S24, S39, and S50) record blow counts, depths, and final drive conditions, with most piles achieving tip elevation of -30.25 feet and cut-off elevation of 40.50 feet. Notes indicate that S50 encountered a refusal count at 62 feet depth and that S24 sheet was widened to 63.5 feet due to location issues. All elevations referenced are per NAVD88, and stroke measurements range from 9-11 feet across all driven piles.

View the file

Other files

File Type Posted
USCG OPC Pier Amendment 0009 Drawings.pdf PDF
2026-0816-HAI-USCG Homeport OPC Pier-Geotech Engineering Report Rev 2.pdf PDF
Amendment 0009 USCG OPC.pdf PDF
Updated Attachment H - USCG OPC Pier Price Proposal Form REV 5.docx DOCX document
Amendment 0008 USCG OPC.pdf PDF
Amendment 0007 SPC USCG OPC Pier Appendix D (With Placeholders).pdf PDF
Updated Attachment H - USCG OPC Pier Price Proposal Form REV 6.docx DOCX document
USCG OPC Pier Amendment 0008 Drawings.pdf PDF
USCG OPC Pier Amendment 007 Drawings.pdf PDF
Amendment 0007 USCG OPC.pdf PDF
Attachment Z - Pier 1 - Amendment 006 Drawings.pdf PDF
Appendix A - Telecom Room Photos.pdf PDF
Updated Attachment H - UCCG OPC Pier Price Proposal Form REV 4.docx DOCX document
Amendment 0006 USCG OPC.pdf PDF
24.168 NOAA OMAO Prime Pier Pile Driving Summary Report.pdf PDF
Pier Pile Plan.pdf PDF
24.168 NOAA OMAO Bulkhead Pile Driving Summary Table 08.26.24 to 08.30.24 (1).pdf PDF
24.168 NOAA OMAO Bulkhead Pile Driving Summary Table 07.22.24 to 07.26.24.pdf PDF
24.168 NOAA OMAO Bulkhead Pile Driving Summary Table 07.15.24 to 07.19.24.pdf PDF
Attachment Y - Appendix A Record drawing 11836 125 Submarine Cable Relocation.pdf PDF
SUB-0123 Interim PDA and Test Pile Logs - Trestle Piles 10B 14B.pdf PDF
SUB-0TBD Interim PDA and Test Pile Logs For Trestle Pile 17B.pdf PDF
24.168 NOAA OMAO Bulkhead Pile Driving Summary Table 08.26.24 to 08.30.24.pdf PDF
Updated Attachment H - UCCG OPC Pier Price Proposal Form REV 3.docx DOCX document
SUB-0105 Trestle Piles 4C 6B - PDA and Test Pile Logs.pdf PDF
24.168 NOAA OMAO Bulkhead Pile Driving Summary Table 08.20.24 to 08.23.24.pdf PDF
24.107 NOAA OMAO Ship & Support Facility Relocation Newport RI - PDA Report - Pier Bent 19.pdf PDF
24.168 NOAA OMAO Bulkhead Pile Driving Summary Table 06.25.24 to 06.27.24.pdf PDF
24.168 NOAA OMAO Bulkhead Pile Driving Summary Table 07.31.24 to 08.01.24.pdf PDF
SUB-0284 PDA49B_A.pdf PDF
SUB-0262 Interim PDA Test Pile Logs for Pier Piles - Bent 35 B - A.pdf PDF
24.168 NOAA OMAO Bulkhead Pile Driving Summary Table 08.07.24 to 08.08.24.pdf PDF
Trestle Summary.pdf PDF
24.168 NOAA OMAO Bulkhead Pile Driving Summary Table 08.20.24 to 08.23.24 (1).pdf PDF
24.168 NOAA OMAO Bulkhead Pile Driving Summary Table 07.01.24 - 07.02.24.pdf PDF
Bulkhead Pile Plan.pdf PDF
24.168 NOAA OMAO Bulkhead Pile Driving Summary Table 08.13.24 to 08.15.24.pdf PDF
Attachment W - Pier 1 - Amendment 005 Drawings.pdf PDF
24.168 NOAA OMAO Bulkhead Pile Driving Summary Table 07.11.24.pdf PDF
24.107 NOAA OMAO Ship Support Facility Relocation Newport RI - PDA Report - Pier Bent 25 and 27.pdf PDF
NOAA OMAO Survey Reports 100 Percent Pre-Final Submittal 04072022.pdf PDF
Amendment 0005 USCG OPC.pdf PDF
Attachment X - Appendix A Record Drawing 12819 135 Submarine Cable.pdf PDF
Attachment U - Appendix A - Pier 1 Extension 1968.pdf PDF
Attachment V - Pier 1 - Amendment 004 Drawings.pdf PDF
Updated Attachment K - WD RI20260001 05-18-2026.pdf PDF
Amendment 0004 USCG OPC.pdf PDF
Attachment T - REF(m) Existing Pier 1 Drawings 1 of 2.pdf PDF
Attachment C - Construction Experience Project Data Sheet.docx DOCX document
Attachment E - Historical Small Business Utilization.docx DOCX document
Show 40 more

Latest 50 of 90 listed here. See the rest on GovTribe.

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

DATE:

PROJECT: LOCATION:

CLIENT: CONTRACTOR:

GTR REP: PILE INFO:

S3 Not Vibed 4-Sep-24 12.25 47 42.50 10.25 -30.25 16.75 40.50 36 9 - 10 S4 Not Vibed 4-Sep-24 12.25 47 42.50 10.25 -30.25 16.75 40.50 32 9 - 10 S5 Not Vibed 4-Sep-24 12.25 47 42.50 10.25 -30.25 16.75 40.50 28 8 - 9 S6 Not Vibed 4-Sep-24 12.25 47 42.50 10.25 -30.25 16.75 40.50 30 8 - 9 S7 Not Vibed 4-Sep-24 12.25 47 42.50 10.25 -30.25 16.75 40.50 30 9 - 10 S8 Not Vibed 4-Sep-24 12.25 47 42.50 10.25 -30.25 16.75 40.50 28 9 - 10 S9 Not Vibed 4-Sep-24 12.25 47 42.50 10.25 -30.25 16.75 40.50 34 9 - 10

S24 Not Vibed 4-Sep-24 12.25 47 42.50 10.25 -30.25 16.75 40.50 40 10 - 11

S39 Not Vibed 4-Sep-24 12.25 47 42.50 10.25 -30.25 16.75 40.50 38 9 - 10

S50 Not Vibed 5-Sep-24 12.25 47 42.50 10.25 -30.25 16.75 40.50 62 10 - 11 and NZ26 Sheet Piles

PILE NO.

DRIVEN

DEPTH

(feet)

TIP

ELEVATION

(feet)

TOP

ELEVATION

(feet)

PILE

LENGTH

(feet)

EOD

STROKE

(feet)

WORKING

GRADE

(feet)

FINAL DRIVE

DATE

VIBRATION

DRIVE DATE

CUT-OFF

LENGTH

GTR JOB # 24.168

GEOSCIENCES TESTING AND RESEARCH, INC.

55 Middlesex Street, Suite 225, North Chelmsford, MA, Phone: (978) 251-9395 Fax: (978) 251-9396

COMMENTS

PILE DRIVING SUMMARY

J. Roth Steel 18-inch O.D. X 0.5-inch wall open-ended Pipe

Newport RI Naval Station Coastal Marine

NOAA OMAO

Skanska

6-Sep-24

CUT-OFF

ELEVATION

(feet)

BLOW

COUNT

FINAL FOOT

BULKHEAD PILES

Hit a Refusal Count at a depth of 39 ft with the ICE D-30. Got back on it with the ICE D-50 and successfully drove to minimum tip elevation.

This sheet was widened to 63.5 inches due to the location placement issue with BH23.