Attachment E - Historical Small Business Utilization.docx

DOCX document 44 KB Posted

Attached to
Design-Bid-Build, USCG Offshore Patrol Cutters (OPC) Homeport Pier, Naval Station Newport, Newport RI
Solicitation number
N4008526R0001
Issued by

About this file

This is a template form for documenting historical small business utilization and participation in support of a Design-Bid-Build solicitation for USCG Offshore Patrol Cutters (OPC) Homeport Pier construction at Naval Station Newport, Newport, Rhode Island (Solicitation N4008526R0001).

The form requires all offerors—both large and small businesses—to complete Attachment E to support evaluation of Factor 5, Small Business Utilization and Participation. Offerors must document small business subcontracting performance on up to five historical projects submitted under Factor 1, Corporate Experience. For each project, offerors must provide: contract or task order number, project title, business size classification, performance role (prime contractor, subcontractor, or joint venture member), and subcontracting plan requirements. The form mandates completion of both "ACTUAL" and "GOAL" columns with dollar values and percentages rounded to one decimal place. Actual subcontracting values are required for all projects regardless of goal establishment, while goals are only reported for standalone contracts where applicable; task order goals at the contract level should not be included. The form tracks subcontracting across six socioeconomic categories: Small Business Concerns (overall), Large Business Concerns, Small Disadvantaged Business Concerns (SDB), Women-Owned Small Business Concerns (WOSB), HUBZone Small Business Concerns, Veteran-Owned Small Business Concerns (VOSB), and Service-Disabled Veteran-Owned Small Business Concerns (SDVOSB). Offerors must provide detailed explanations for any unmet goals and for any projects with zero small business subcontracting achievement; simple acknowledgment of missed goals is insufficient. The form does not permit alternative formats, attachments, or addendums.

View the file

Other files

File Type Posted
Amendment 0009 USCG OPC.pdf PDF
USCG OPC Pier Amendment 0009 Drawings.pdf PDF
Amendment 0007 USCG OPC.pdf PDF
USCG OPC Pier Amendment 007 Drawings.pdf PDF
USCG OPC Pier Amendment 0008 Drawings.pdf PDF
Amendment 0007 SPC USCG OPC Pier Appendix D (With Placeholders).pdf PDF
Appendix A - Telecom Room Photos.pdf PDF
Attachment X - Appendix A Record Drawing 12819 135 Submarine Cable.pdf PDF
24.168 NOAA OMAO Bulkhead Pile Driving Summary Table 07.15.24 to 07.19.24.pdf PDF
24.168 NOAA OMAO Bulkhead Pile Driving Summary Table 08.13.24 to 08.15.24.pdf PDF
24.168 NOAA OMAO Bulkhead Pile Driving Summary Table 07.22.24 to 07.26.24.pdf PDF
24.168 NOAA OMAO Bulkhead Pile Driving Summary Table 07.01.24 - 07.02.24.pdf PDF
24.168 NOAA OMAO Bulkhead Pile Driving Summary Table 08.26.24 to 08.30.24 (1).pdf PDF
24.168 NOAA OMAO Bulkhead Pile Driving Summary Table 08.26.24 to 08.30.24.pdf PDF
24.168 NOAA OMAO Bulkhead Pile Driving Summary Table 07.11.24.pdf PDF
24.168 NOAA OMAO Prime Pier Pile Driving Summary Report.pdf PDF
Pier Pile Plan.pdf PDF
SUB-0123 Interim PDA and Test Pile Logs - Trestle Piles 10B 14B.pdf PDF
Amendment 0004 USCG OPC.pdf PDF
Attachment U - Appendix A - Pier 1 Extension 1968.pdf PDF
Updated Attachment K - WD RI20260001 05-18-2026.pdf PDF
Attachment P - Spc 100 Final Specs Appendix F - Soil GW Sed Sampling Reports.pdf PDF
Attachment R - 26 08 00 - Electrical Shore Ties CSTO (Rev B) - Section 2.4.6 Testing.pdf PDF
JA ML-26-41 USCG Comm Shore Tie Receptacle - Redacted.pdf PDF
JA ML-26-42 USCG Line Insulation Monitor - Redacted.pdf PDF
Amendment 0003 USCG OPC.pdf PDF
Attachment T - REF(m) Existing Pier 1 Drawings 1 of 2.pdf PDF
Attachment C - Construction Experience Project Data Sheet.docx DOCX document
Attachment D - Past Performance Questionnaire.docx DOCX document
Updated Attachment F - SB Participation Commitment Document.docx DOCX document
Attachment S - Pier 1 - Amendment 003 Drawings.pdf PDF
CJA ML-23-80 - Redacted.pdf PDF
Attachment O - OPC Pier 1 - Amendment 002 Revised Drawings.pdf PDF
Updated Attachment G - Individual SB Subcontracting Plan.docx DOCX document
Amendment 0001 USCG OPC.pdf PDF
Attachment L - Site Visit Log.pdf PDF
Attachment E - Historical Small Business Utilization.pdf PDF
Attachment J Site Visit Meeting Location.pdf PDF
Specifications USCG OPC Newport.pdf PDF
1826479dwg02of05_STRUC1.pdf PDF
1826479dwg03of05_STRUC2.pdf PDF
Attachment A - Pre Proposal Inquiry Log.xlsx XLSX spreadsheet
Attachment C - Construction Experience Project Data Sheet.pdf PDF
Attachment F - SB Participation Commitment Document.pdf PDF
Attachment G - Individual SB Subcontrating Plan.pdf PDF
Attachment K - WD RI20260001 01-30-2026.pdf PDF
Attachment B - PIEE Vendor Access Instructions.pdf PDF
Attachment I - SECNAV FORM 5512.pdf PDF
1826479dwg04of05_MECH.pdf PDF
1826479dwg05of05_ELEC.pdf PDF
Show 40 more

50 files listed here. See the rest on GovTribe.

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

ATTACHMENT E

HISTORICAL SMALL BUSINESS UTILIZATION N4008526R0001

This form is to be completed by ALL offerors (both large AND small businesses) in order to provide supporting information for the evaluation of Factor 5, Small Business Utilization and Participation. Attachment E documents the offeror’s historical small business utilization and achievements for each project submitted under Factor 1, Corporate Experience. Round all percentages to the nearest tenth of a percent (i.e., include only 1 number after the decimal point).

Information provided in a different format and/or on a form created by the offeror will not be evaluated. Attachments or addendums to Attachment E will not be evaluated. Only complete Attachment E. Offerors are permitted to expand portions of the form, as needed, to provide sufficient response.

INSTRUCTIONS FOR COMPLETING ATTACHMENT E:

· Complete the “PROJECT DETAILS” section for each Project submitted under Factor 1, Corporate Experience.

· Include contract or task order number; project title; the offeror’s business size; whether the contract was performed as a prime, subcontractor, or JV member; and whether a subcontracting plan was required.

· Complete the “ACTUAL” column (required for all projects regardless of whether goals were established)

· Enter dollar values actually subcontracted for each of the categories listed.

· Provide actual percentages calculated as a percentage of total subcontract value, unless goals were calculated as a percentage of total contract value.

· Complete the “GOAL” column - Enter goals, if applicable.

· If the project was a task order and no goals were established at the task order level, only complete the “ACTUAL” column. Goals for the overarching IDIQ contract should not be included in the “GOAL” column for task orders.

· Goals shall be included for standalone contracts when established.

· Goals can be entered as a percentage of total subcontract value or total contract value based on how the goals were established in the contract award.

· If goals were not established for the project submitted, or if goals were not established for a specific socioeconomic category, check N/A where applicable. The N/A block does not apply to the “ACTUAL” column, as actual subcontracted values are required for ALL projects, regardless of whether goals were established.

· If a goal was unmet for a Project, complete the section below titled “TO BE COMPLETED AS REQUIRED” under item #1.

· Explanation is required for each unmet goal.

· Item #1 is to be completed for each Project with unmet goal(s).

· If a Project has no small business subcontracting achievement (i.e.: $0 subcontracting in (d)), complete the “TO BE COMPLETED AS REQUIRED” under item #2.

· Item #2 is to be addressed for each Project with no small business subcontracting achievement.

· Enter zeroes (0) where applicable.

DEFINITION OF TERMS IN ATTACHMENT E:

· Total Project Dollar Value: the total contract or task order value; this is the actual value of the contract or task order, rather than a “Not To Exceed” dollar value on an IDIQ type contract.

· Total Self-Performed Value: the contract or task order dollar amount performed by the prime contractor, subcontractor or JV.

· Total Subcontract Value: the dollar amount of the contract or task order performed by subcontractors.

Design-Bid-Build, USCG Offshore Patrol Cutters (OPC) Homeport Pier, Naval Station Newport, Newport RI N40085-26-R-0001

PROJECT DETAILS: Project #1

Contract/Project Number/Task Order Number:Project Title:
Offeror Size: Large BusinessSmall Business Performed as: Prime Contractor

Subcontractor JV Member

Subcontracting Plan Required:YesNo
ACTUAL
GOAL

(if applicable)

(a)Total Project Dollar Value: $
Whole Dollars
Percent of line (a) or (c)
Whole Dollars
Percent of line (a) or (c)

N/A

(b) Total Self-Performed Value: $

(c) Total Subcontracted Value: $

SUBCONTRACTING BREAKDOWN:

(d) Small Business Concerns (Includes overall SB subcontracting and subcontracting values from f-j below)
$
%
$
%
(e) Large Business Concerns
$
%
$
%
(f) Small Disadvantaged Business Concerns (SDB)
$
%
$
%
(g) Women-Owned Small Business Concerns (WOSB)
$
%
$
%
(h) HUBZone Small Business Concerns
$
%
$
%
(i) Veteran-Owned Small Business Concerns (VOSB)
$
%
$
%

(j) Service-Disabled Veteran-Owned Small Business Concerns (SDVOSB)

TO BE COMPLETED AS REQUIRED:

1. Provide an explanation for each unmet goal. Simply acknowledging that a goal was missed is not considered an adequate explanation:

2. Provide an explanation for no small business subcontracting achievement (i.e.: $0 subcontracting in (d)) (if applicable):

PROJECT DETAILS: Project #2

Contract/Project Number/Task Order Number:Project Title:
Offeror Size: Large BusinessSmall Business Performed as: Prime Contractor

Subcontractor JV Member

Subcontracting Plan Required:YesNo
ACTUAL
GOAL

(if applicable)

(a) Total Project Dollar Value: $
Whole Dollars
Percent of line (a) or (c)
Whole Dollars
Percent of line (a) or (c)

(b) Total Self-Performed Value: $

(c) Total Subcontracted Value: $

SUBCONTRACTING BREAKDOWN:

(d) Small Business Concerns (Includes overall SB subcontracting and subcontracting values from f-j below)
$
%
$
%
(e) Large Business Concerns
$
%
$
%
(f) Small Disadvantaged Business Concerns (SDB)
$
%
$
%
(g) Women-Owned Small Business Concerns (WOSB)
$
%
$
%
(h) HUBZone Small Business Concerns
$
%
$
%
(i) Veteran-Owned Small Business Concerns (VOSB)
$
%
$
%

(j) Service-Disabled Veteran-Owned Small Business Concerns

(SDVOSB)

$
%
$
%

1. Provide an explanation for each unmet goal. Simply acknowledging that a goal was missed is not considered an adequate explanation:

2. Provide an explanation for no small business subcontracting achievement (i.e.: $0 subcontracting in (d)) (if applicable):

PROJECT DETAILS: Project #3

Contract/Project Number/Task Order Number:Project Title:
Offeror Size: Large BusinessSmall Business Performed as: Prime Contractor

Subcontractor JV Member

Subcontracting Plan Required:YesNo
ACTUAL
GOAL

(if applicable)

(a) Total Project Dollar Value: $
Whole Dollars
Percent of line (a) or (c)
Whole Dollars
Percent of line (a) or (c)

(b) Total Self-Performed Value: $

(c) Total Subcontracted Value: $

SUBCONTRACTING BREAKDOWN:

(d) Small Business Concerns (Includes overall SB subcontracting and subcontracting values from f-j below)
$
%
$
%
(e) Large Business Concerns
$
%
$
%
(f) Small Disadvantaged Business Concerns (SDB)
$
%
$
%
(g) Women-Owned Small Business Concerns (WOSB)
$
%
$
%
(h) HUBZone Small Business Concerns
$
%
$
%
(i) Veteran-Owned Small Business Concerns (VOSB)
$
%
$
%

(j) Service-Disabled Veteran-Owned Small Business Concerns

$
%
$
%

1. Provide an explanation for each unmet goal. Simply acknowledging that a goal was missed is not considered an adequate explanation:

2. Provide an explanation for no small business subcontracting achievement (i.e.: $0 subcontracting in (d)) (if applicable):

PROJECT DETAILS: Project #4

Contract/Project Number/Task Order Number:Project Title:
Offeror Size: Large BusinessSmall Business Performed as: Prime Contractor

Subcontractor JV Member

Subcontracting Plan Required:YesNo
ACTUAL
GOAL

(if applicable)

(a) Total Project Dollar Value: $
Whole Dollars
Percent of line (a) or (c)
Whole Dollars
Percent of line (a) or (c)

(b) Total Self-Performed Value: $

(c) Total Subcontracted Value: $

SUBCONTRACTING BREAKDOWN:

(d) Small Business Concerns (Includes overall SB subcontracting and subcontracting values from f-j below)
$
%
$
%
(e) Large Business Concerns
$
%
$
%
(f) Small Disadvantaged Business Concerns (SDB)
$
%
$
%
(g) Women-Owned Small Business Concerns (WOSB)
$
%
$
%
(h) HUBZone Small Business Concerns
$
%
$
%
(i) Veteran-Owned Small Business Concerns (VOSB)
$
%
$
%

(j) Service-Disabled Veteran-Owned Small Business Concerns

$
%
$
%

1. Provide an explanation for each unmet goal. Simply acknowledging that a goal was missed is not considered an adequate explanation:

2. Provide an explanation for no small business subcontracting achievement (i.e.: $0 subcontracting in (d)) (if applicable):

PROJECT DETAILS: Project #5

Contract/Project Number/Task Order Number:Project Title:
Offeror Size: Large BusinessSmall Business Performed as: Prime Contractor

Subcontractor JV Member

Subcontracting Plan Required:YesNo
ACTUAL
GOAL

(if applicable)

(a) Total Project Dollar Value: $
Whole Dollars
Percent of line (a) or (c)
Whole Dollars
Percent of line (a) or (c)

(b) Total Self-Performed Value: $

(c) Total Subcontracted Value: $

SUBCONTRACTING BREAKDOWN:

(d) Small Business Concerns (Includes overall SB subcontracting and subcontracting values from f-j below)
$
%
$
%
(e) Large Business Concerns
$
%
$
%
(f) Small Disadvantaged Business Concerns (SDB)
$
%
$
%
(g) Women-Owned Small Business Concerns (WOSB)
$
%
$
%
(h) HUBZone Small Business Concerns
$
%
$
%
(i) Veteran-Owned Small Business Concerns (VOSB)
$
%
$
%

(j) Service-Disabled Veteran-Owned Small Business Concerns

$
%
$
%

1. Provide an explanation for each unmet goal. Simply acknowledging that a goal was missed is not considered an adequate explanation:

2. Provide an explanation for no small business subcontracting achievement (i.e.: $0 subcontracting in (d)) (if applicable):