About this file

This document is a set of architectural substructure plans for a maritime facility project. The plans are prepared by MN+BMCD (Minnesota and BMCD Joint Venture) and depict detailed layout drawings across multiple areas (A through G) of what appears to be a pier or dock facility with bulkhead and fender pile systems.

The plans show comprehensive structural details including combi-wall bulkheads, cast-in-place bent caps, steel pipe piles (PP18.0 x 0.500, PP16.0 x 0.500, and PP30.0 x 0.500 typical specifications), fender piles spaced at 6'-8" on each side of the pier, utility trench drains, and various cap systems. Each area plan is drawn at 1/8" = 1'-0" scale and includes match lines for reference to other detailed sections (SB110-SB121). The plans reference multiple structural details across sections SB501, SB505, SB506, SB517, and SB521, with typical bay spacing of 30'-0" and varying fender pile configurations ranging from F1S to F101 designations. Coordinate information (N: 160,943.23', E: 378,506.72') and specific chamfer details (2'-0" typical) are noted. The document includes sheet notes referencing bulkhead pile details and existing bulkhead protection measures. This appears to be a design or tender document for a substantial maritime construction or renovation project.

View the file

Other files

File Type Posted
USCG OPC Pier Amendment 0008 Drawings.pdf PDF
Amendment 0007 SPC USCG OPC Pier Appendix D (With Placeholders).pdf PDF
Updated Attachment H - USCG OPC Pier Price Proposal Form REV 5.docx DOCX document
Appendix A - Telecom Room Photos.pdf PDF
Amendment 0006 USCG OPC.pdf PDF
Attachment Z - Pier 1 - Amendment 006 Drawings.pdf PDF
Updated Attachment H - UCCG OPC Pier Price Proposal Form REV 4.docx DOCX document
24.168 NOAA OMAO Bulkhead Pile Driving Summary Table 08.13.24 to 08.15.24.pdf PDF
24.168 NOAA OMAO Bulkhead Pile Driving Summary Table 07.22.24 to 07.26.24.pdf PDF
24.168 NOAA OMAO Bulkhead Pile Driving Summary Table 07.01.24 - 07.02.24.pdf PDF
24.168 NOAA OMAO Bulkhead Pile Driving Summary Table 08.26.24 to 08.30.24 (1).pdf PDF
24.168 NOAA OMAO Bulkhead Pile Driving Summary Table 08.26.24 to 08.30.24.pdf PDF
24.168 NOAA OMAO Bulkhead Pile Driving Summary Table 07.11.24.pdf PDF
24.168 NOAA OMAO Prime Pier Pile Driving Summary Report.pdf PDF
SUB-0123 Interim PDA and Test Pile Logs - Trestle Piles 10B 14B.pdf PDF
Amendment 0005 USCG OPC.pdf PDF
Attachment W - Pier 1 - Amendment 005 Drawings.pdf PDF
Attachment Y - Appendix A Record drawing 11836 125 Submarine Cable Relocation.pdf PDF
24.168 NOAA OMAO Bulkhead Pile Driving Summary Table 08.07.24 to 08.08.24.pdf PDF
24.168 NOAA OMAO Bulkhead Pile Driving Summary Table 08.20.24 to 08.23.24 (1).pdf PDF
Bulkhead Pile Plan.pdf PDF
24.168 NOAA OMAO Bulkhead Pile Driving Summary Table 08.20.24 to 08.23.24.pdf PDF
24.168 NOAA OMAO Bulkhead Pile Driving Summary Table 09.03.24 to 09.06.24.pdf PDF
NOAA OMAO Survey Reports 100 Percent Pre-Final Submittal 04072022.pdf PDF
SUB-0105 Trestle Piles 4C 6B - PDA and Test Pile Logs.pdf PDF
Trestle Summary.pdf PDF
SUB-0TBD Interim PDA and Test Pile Logs For Trestle Pile 17B.pdf PDF
Updated Attachment K - WD RI20260001 05-18-2026.pdf PDF
Amendment 0003 USCG OPC.pdf PDF
Attachment E - Historical Small Business Utilization.docx DOCX document
Attachment T - REF(m) Existing Pier 1 Drawings 1 of 2.pdf PDF
Updated Attachment H - UCCG OPC Pier Price Proposal Form REV 2.docx DOCX document
Attachment Q - Spc 100 Final Specs Appendix D - (With Placeholders).pdf PDF
Updated Attachment G - Individual SB Subcontracting Plan.docx DOCX document
Amendment 0002 USCG OPC.pdf PDF
Updated Attachment H - UCCG OPC Pier Price Proposal Form REV 1.pdf PDF
Attachment M - 01 45 35_Schedule_of_Special_Inspections.pdf PDF
Attachment N - 01 45 35_Statement_of_Special_Inspections.xlsx XLSX spreadsheet
Amendment 0001 USCG OPC.pdf PDF
Updated Attachment F - SB Participation Commitment Document.pdf PDF
Attachment A - Pre Proposal Inquiry Log.xlsx XLSX spreadsheet
Attachment C - Construction Experience Project Data Sheet.pdf PDF
Attachment F - SB Participation Commitment Document.pdf PDF
Attachment G - Individual SB Subcontrating Plan.pdf PDF
Attachment K - WD RI20260001 01-30-2026.pdf PDF
Solicitation - N4008526R0001.pdf PDF
Attachment D - Past Performance Questionnaire.pdf PDF
Attachment H - UCCG OPC Pier Price Proposal Form.pdf PDF
1826479dwg01of05_GEN-CIV.pdf PDF
Attachment E - Historical Small Business Utilization.pdf PDF
Show 40 more

50 files listed here. See the rest on GovTribe.

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

EXP 06/30/24

L

A S

T RUTCUR

LA

R E

G

IS

T E R E

D

PROFESSION

E N

G

IN

E E

R

S AI

N

R

OFILACFO

ET

A T

S 5312

R O

D E

R

ICK D. WH

ITS

E

L

-1

-14

-1

-1

-1

-1

-1

-1

-1

-13

-1

-13

-12

-1

-1

-1

-1

-1

-1

-1

B

C

123456

30' - 0" 30' - 0" 30' - 0" 30' - 0"

4' - 6" ±

9' - 3" ±

30' - 0"

9'

4" 9'

4"

FACE OF EXISTING

BULKHEAD

PP18.0 x 0.500 TYP

B'

A'

C'

1'

2'

2'

- 6

2'

- 6

WP-2

POINT OF INTERSECTION

8' - 0"

1.6

17' - 0"

T Y

P

T Y

P

TYP

3' - 6"

COMBI-WALL BULKHEAD,

TYP, SEE SB110

M A

T C

H L

IN

E

R E

F E

R T

O C

/ S

B

123' - 11 1/4"

PP18.0 x 0.500 TYP

_________A1

SB501

BENT CAP

CAST-IN-PLACE, TYP

N: 161,244.47' E: 379,594.56'

MATCH LINE REFER TO A1 / SB117

_________C3

SB505

B1SB517

12' - 6" ±

1"

1"

_________C1

SB505

SATISFACTORY TO DATE

APPROVED

ACTIVITY

FOR COMMANDER NAVFAC

SEAL

A/E INFO

A

B

C

D

1 2 3 4 5

1 2 3 4 5

A

B

C

D

SCALE:

CONSTR. CONTR. NO.

SHEET

NAVFAC DRAWING NO.

DES DRW CHK

OF

EPROJECT NO.:

D E

P A

R T

M E

N T

O F

T H

E N

A V

Y N

A V

A L

F A

C

IL

IT

IE

S E

N G

IN

E

E R

IN

G

S Y

S T

E M

S C

O M

M A

N D

DRAWFORM REVISION: 25 AUGUST 2020

PM/DM

BRANCH MANAGER

CHIEF ENG/ARCH

FIRE PROTECTION

N A

V A

L F

A C

IL

IT

IE

S

E N

G

IN

E E

R

IN

G S

Y S

T E

M S

C O

M M

A N

D

M

ID

-A T

LA

N

TI

C

N A

V A

L S

T A

T

IO

N N

O R

F O

L K

N

O R

F O

L K

V

A

AS NOTED

N E

W P

O R

T , R

H O

D E

IS

LA

N D

M

ID

L A

N T

D C

B L

N A

V A

L S

T A

T

IO

N N

E W

P O

R T

N O

A A

O M

A O

S H

IP

S U

P P

O R

T F

A C

IL

IT

Y R

E

LO

C A

TI

O

N

1562331

RS/RC

EJA

DSN

04OCT2022

Timothy Calohan, PE, NOAA Senior Project Manager

N4008524C0002

SB111

P

IE

R

S U

B S

TR

U

C

TU

R E

P

LA

N

A R

E A

A

PRG

12873990

JMM CAM

NEK

1/8" = 1'-0" A1

SUBSTRUCTURE PLAN - AREA A

4' 8' 16'0'

PLAN

NORTH PLAN

NORTH

ABD CEFG

H

KEY PLAN

SHEET NOTES

1.

2. FOR BULKHEAD PILE PLAN SEE SB110.

3. SEE BULKHEAD NOTE 1 ON SHEET SB003.

4. THE EXISTING BULKHEAD TIE RODS (NOT SHOWN) MUST BE PROTECTED

IN PLACE BY EXPOSING THEM AND ADJUSTING BENT 1 PILES TO

AVOID DAMAGING THEM.

S Y

M D

E S

C R

IP

T

IO

N

D A

T E

A P

P R

R

E M

O V

E B

ID

O

P T

IO

N

/0

2/

R

D W

A

S A

W A

R D

E D

/0

5/

R

D W

A S

T RUTCUR

LA

R E

G

IS

T E R E

D

PROFESSION

E N

G

IN

E E

R

S AI

N

R

OFILACFO

ET

A T

S 5312

R O

D E

R

ICK D. WH

ITS

E

L

-2

-2

-2

- 2

-21 -1

-1

-1

-1

-17

-17

-16

-1

-14

-2

-2

-15

-15

-26

-26

-2

-2

-2

-2

-2 2-25

-2

B

C

789101112

30' - 0"30' - 0"30' - 0"30' - 0"30' - 0"30' - 0" 30'-0"

9'

4" 9'

4"

T Y

P

T Y

P

TYP

3' - 6"

M A

T C

H L

IN

E

R E

F E

R T

O A

/ S

B

M A

T C

H L

IN

E

R E

F E

R T

O A

/ S

B

PP18.0 x 0.500 TYP _________A1

SB501

BENT CAP

CAST-IN-PLACE, TYP

_________C3

SB505

_________C1

SB505

B

C

1314151617

30' - 0"30' - 0"30' - 0"30' - 0"30' - 0" 30' - 0"

9'

4" 9'

4"

T Y

P

T Y

P

TYP

3' - 6"

M A

T C

H L

IN

E

R E

F E

R T

O C

/ S

B

M A

T C

H L

IN

E

R E

F E

R T

O A

/ S

B

PP18.0 x 0.500 TYP _________A1

SB501

BENT CAP

CAST-IN-PLACE, TYP

_________C3

SB505

_________C1

SB505

SATISFACTORY TO DATE

APPROVED

ACTIVITY

FOR COMMANDER NAVFAC

SEAL

A/E INFO

A

B

C

D

1 2 3 4 5

1 2 3 4 5

A

B

C

D

SCALE:

CONSTR. CONTR. NO.

SHEET

NAVFAC DRAWING NO.

DES DRW CHK

OF

EPROJECT NO.:

D E

P A

R T

M E

N T

O F

T H

E N

A V

Y N

A V

A L

F A

C

IL

IT

IE

S E

N G

IN

E

E R

IN

G

S Y

S T

E M

S C

O M

M A

N D

DRAWFORM REVISION: 25 AUGUST 2020

PM/DM

BRANCH MANAGER

CHIEF ENG/ARCH

FIRE PROTECTION

N A

V A

L F

A C

IL

IT

IE

S

E N

G

IN

E E

R

IN

G S

Y S

T E

M S

C O

M M

A N

D

M

ID

-A T

LA

N

TI

C

N A

V A

L S

T A

T

IO

N N

O R

F O

L K

N

O R

F O

L K

V

A

AS NOTED

N E

W P

O R

T , R

H O

D E

IS

LA

N D

M

ID

L A

N T

D C

B L

N A

V A

L S

T A

T

IO

N N

E W

P O

R T

N O

A A

O M

A O

S H

IP

S U

P P

O R

T F

A C

IL

IT

Y R

E

LO

C A

TI

O

N

1562331

RS/RC

EJA

DSN

04OCT2022

Timothy Calohan, PE, NOAA Senior Project Manager

N4008524C0002

SB112

P

IE

R

S U

B S

TR

U

C

TU

R E

P

LA

N

A R

E A

B

C

PRG

12873991

JMM CAM

NEK

1/8" = 1'-0" C1

SUBSTRUCTURE PLAN - AREA B

1/8" = 1'-0" A1

SUBSTRUCTURE PLAN AREA C

4' 8' 16'0'

PLAN

NORTH

PLAN

NORTH

PLAN

NORTH

ABD CEFG

H

KEY PLAN

4' 8' 16'0'

S Y

M D

E S

C R

IP

T

IO

N

D A

T E

A P

P R

R

E M

O V

E B

ID

O

P T

IO

N

/0

2/

R

D W

A S

T RUTCUR

LA

R E

G

IS

T E R E

D

PROFESSION

E N

G

IN

E E

R

S AI

N

R

OFILACFO

ET

A T

S 5312

R O

D E

R

ICK D. WH

ITS

E

L

-27 -27 -2

-27

EJ

B

C

A

D

181920212223242526

2' - 6"20' - 0"20' - 0"20' - 0"20' - 0"20' - 0"20' - 0"

9'

4" 9'

4"

3' - 9" 19' - 9" 30' - 0" 20' - 0"

PP18.0 x 0.500 TYP

PP16.0 x 0.500

FENDER PILE, TYP

T Y

P

T Y

P

3' - 6"

2' - 3"

TYP

4' - 6"

6'

6"

3'

3"

6'

6"3'

3"

F5SF10SF15SF20S

M A

T C

H L

IN

E

R E

F E

R T

O A

/ S

B

M A

T C

H L

IN

E

R E

F E

R T

O A

/ S

B

PP30.0 x 0.500 TYP _________A1

SB501

BENT CAP

CAST-IN-PLACE, TYP

F1S

3'

3"

3'

8"

1'

9"11

1' - 9"

PP30.0 x 0.500

_________B4

SB506

4' - 6"

2' - 5"

3' - 4"

EA SIDE OF PIER

FENDER PILES 86 SPA @ 6'-8"

2' - 11"

2'-0" CHAMFER, TYP

_________C3

SB505

_________B2

SB506

_________B2

SB506

_________A1

SB506

_________A1

SB506

_________A3

SB501

_________C1

SB505

SB507

A3

_________B4

SB506

UTILITY TRENCH

DRAIN, TYP

_________B3

SB521

SIM

SATISFACTORY TO DATE

APPROVED

ACTIVITY

FOR COMMANDER NAVFAC

SEAL

A/E INFO

A

B

C

D

1 2 3 4 5

1 2 3 4 5

A

B

C

D

SCALE:

CONSTR. CONTR. NO.

SHEET

NAVFAC DRAWING NO.

DES DRW CHK

OF

EPROJECT NO.:

D E

P A

R T

M E

N T

O F

T H

E N

A V

Y N

A V

A L

F A

C

IL

IT

IE

S E

N G

IN

E

E R

IN

G

S Y

S T

E M

S C

O M

M A

N D

DRAWFORM REVISION: 25 AUGUST 2020

PM/DM

BRANCH MANAGER

CHIEF ENG/ARCH

FIRE PROTECTION

N A

V A

L F

A C

IL

IT

IE

S

E N

G

IN

E E

R

IN

G S

Y S

T E

M S

C O

M M

A N

D

M

ID

-A T

LA

N

TI

C

N A

V A

L S

T A

T

IO

N N

O R

F O

L K

N

O R

F O

L K

V

A

AS NOTED

N E

W P

O R

T , R

H O

D E

IS

LA

N D

M

ID

L A

N T

D C

B L

N A

V A

L S

T A

T

IO

N N

E W

P O

R T

N O

A A

O M

A O

S H

IP

S U

P P

O R

T F

A C

IL

IT

Y R

E

LO

C A

TI

O

N

1562331

RS/RC

EJA

DSN

04OCT2022

Timothy Calohan, PE, NOAA Senior Project Manager

N4008524C0002

SB113

P

IE

R

S U

B S

TR

U

C

TU

R E

P

LA

N

A R

E A

D

PRG

12873992

JMM CAM

NEK

1/8" = 1'-0" A1

SUBSTRUCTURE PLAN - AREA D

4' 8' 16'0'

PLAN

NORTH PLAN

NORTH

ABD CEFG

H

KEY PLAN

1. FENDER PILE MARKS SHOWN ON SOUTH SIDE OF PIER,

NORTH SIDE SIMILAR.

SHEET NOTE

S Y

M D

E S

C R

IP

T

IO

N

D A

T E

A P

P R

R

E M

O V

E B

ID

O

P T

IO

N

/0

2/

R

A S

T RUTCUR

LA

R E

G

IS

T E R E

D

PROFESSION

E N

G

IN

E E

R

S AI

N

R

OFILACFO

ET

A T

S 5312

R O

D E

R

ICK D. WH

ITS

E

L

-28 -28

-28 -2 8 -28 -28-2 8 -28

-28

B

C

A

D

2728293031323334

9'

4" 9'

4"

20' - 0"20' - 0"20' - 0"20' - 0"20' - 0"20' - 0"20' - 0" 20' - 0" 20' - 0"

PP16.0 x 0.500

FENDER PILE, TYP

TYP

4' - 6"

6'

6"

3'

3"

6'

6"3'

3"

F25SF30SF35SF40SF45S

EA SIDE OF PIER

FENDER PILES 86 SPA @ 6' - 8"

M A

T C

H L

IN

E

R E

F E

R T

O A

/ S

B

M A

T C

H L

IN

E

R E

F E

R T

O A

/ S

B

PP30.0 x 0.500 TYP _________A1

SB501

BENT CAP

CAST-IN-PLACE, TYP

_________B3

SB506

_________B2

SB506

_________B2

SB506

_________A1

SB506

_________A1

SB506

_________A3

SB501

_________B4

SB506

UTILITY TRENCH

DRAIN, TYP

_________B3

SB521

SIM

_________B4

SB506

SATISFACTORY TO DATE

APPROVED

ACTIVITY

FOR COMMANDER NAVFAC

SEAL

A/E INFO

A

B

C

D

1 2 3 4 5

1 2 3 4 5

A

B

C

D

SCALE:

CONSTR. CONTR. NO.

SHEET

NAVFAC DRAWING NO.

DES DRW CHK

OF

EPROJECT NO.:

D E

P A

R T

M E

N T

O F

T H

E N

A V

Y N

A V

A L

F A

C

IL

IT

IE

S E

N G

IN

E

E R

IN

G

S Y

S T

E M

S C

O M

M A

N D

DRAWFORM REVISION: 25 AUGUST 2020

PM/DM

BRANCH MANAGER

CHIEF ENG/ARCH

FIRE PROTECTION

N A

V A

L F

A C

IL

IT

IE

S

E N

G

IN

E E

R

IN

G S

Y S

T E

M S

C O

M M

A N

D

M

ID

-A T

LA

N

TI

C

N A

V A

L S

T A

T

IO

N N

O R

F O

L K

N

O R

F O

L K

V

A

AS NOTED

N E

W P

O R

T , R

H O

D E

IS

LA

N D

M

ID

L A

N T

D C

B L

N A

V A

L S

T A

T

IO

N N

E W

P O

R T

N O

A A

O M

A O

S H

IP

S U

P P

O R

T F

A C

IL

IT

Y R

E

LO

C A

TI

O

N

1562331

RS/RC

EJA

DSN

04OCT2022

Timothy Calohan, PE, NOAA Senior Project Manager

N4008524C0002

SB114

P

IE

R

S U

B S

TR

U

C

TU

R E

P

LA

N

A R

E A

E

PRG

12873993

JMM CAM

NEK

1/8" = 1'-0" A1

SUBSTRUCTURE PLAN AREA E

4' 8' 16'0'

PLAN

NORTH PLAN

NORTH

ABD CEFG

H

KEY PLAN

1. FENDER PILE MARKS SHOWN ON SOUTH SIDE OF PIER,

NORTH SIDE SIMILAR.

SHEET NOTE

S Y

M D

E S

C R

IP

T

IO

N

D A

T E

A P

P R

R

E M

O V

E B

ID

O

P T

IO

N

/0

2/

R

A S

T RUTCUR

LA

R E

G

IS

T E R E

D

PROFESSION

E N

G

IN

E E

R

S AI

N

R

OFILACFO

ET

A T

S 5312

R O

D E

R

ICK D. WH

ITS

E

L

-28 -2

-2

-2 8 -28 -28

-28

B

C

A

D

3536373839404142

9'

4" 9'

4"

20' - 0"20' - 0"20' - 0"20' - 0"20' - 0"20' - 0"20' - 0" 20' - 0" 20' - 0"

PP16.0 x 0.500

FENDER PILE, TYP

TYP

4' - 6"

6'

6"

3'

3"

6'

6"3'

3"

F50SF55SF60SF65SF70S

EA SIDE OF PIER

FENDER PILES 86 SPA @ 6' - 8"

M A

T C

H L

IN

E

R E

F E

R T

O A

/ S

B

M A

T C

H L

IN

E

R E

F E

R T

O A

/ S

B

PP30.0 x 0.500 TYP_________A1

SB501

BENT CAP

CAST-IN-PLACE, TYP

_________B3

SB506

_________B2

SB506

_________B2

SB506

_________A1

SB506

_________A1

SB506

_________A3

SB501

_________B4

SB506

UTILITY TRENCH

DRAIN, TYP

_________B3

SB521

SIM

_________B4

SB506

SATISFACTORY TO DATE

APPROVED

ACTIVITY

FOR COMMANDER NAVFAC

SEAL

A/E INFO

A

B

C

D

1 2 3 4 5

1 2 3 4 5

A

B

C

D

SCALE:

CONSTR. CONTR. NO.

SHEET

NAVFAC DRAWING NO.

DES DRW CHK

OF

EPROJECT NO.:

D E

P A

R T

M E

N T

O F

T H

E N

A V

Y N

A V

A L

F A

C

IL

IT

IE

S E

N G

IN

E

E R

IN

G

S Y

S T

E M

S C

O M

M A

N D

DRAWFORM REVISION: 25 AUGUST 2020

PM/DM

BRANCH MANAGER

CHIEF ENG/ARCH

FIRE PROTECTION

N A

V A

L F

A C

IL

IT

IE

S

E N

G

IN

E E

R

IN

G S

Y S

T E

M S

C O

M M

A N

D

M

ID

-A T

LA

N

TI

C

N A

V A

L S

T A

T

IO

N N

O R

F O

L K

N

O R

F O

L K

V

A

AS NOTED

N E

W P

O R

T , R

H O

D E

IS

LA

N D

M

ID

L A

N T

D C

B L

N A

V A

L S

T A

T

IO

N N

E W

P O

R T

N O

A A

O M

A O

S H

IP

S U

P P

O R

T F

A C

IL

IT

Y R

E

LO

C A

TI

O

N

1562331

RS/RC

EJA

DSN

04OCT2022

Timothy Calohan, PE, NOAA Senior Project Manager

N4008524C0002

SB115

P

IE

R

S U

B S

TR

U

C

TU

R E

P

LA

N

A R

E A

F

PRG

12873994

JMM CAM

NEK

1/8" = 1'-0" A1

SUBSTRUCTURE PLAN AREA F

4' 8' 16'0'

PLAN

NORTH PLAN

NORTH

ABD CEFG

H

KEY PLAN

1. FENDER PILE MARKS SHOWN ON SOUTH SIDE OF PIER,

NORTH SIDE SIMILAR.

SHEET NOTE

S Y

M D

E S

C R

IP

T

IO

N

D A

T E

A P

P R

R

E M

O V

E B

ID

O

P T

IO

N

/0

2/

R

A S

T RUTCUR

LA

R E

G

IS

T E R E

D

PROFESSION

E N

G

IN

E E

R

S AI

N

R

OFILACFO

ET

A T

S 5312

R O

D E

R

ICK D. WH

ITS

E

L

-29 -29 -2

-29 -2

-2 9-29

-29-2 9-29-2

-29

B

C

A

D

43444546474849

9'

4" 9'

4"

20' - 0"20' - 0"20' - 0"20' - 0"20' - 0"21' - 3" 20' - 0"

PP16.0 x 0.500

FENDER PILE, TYP

N: 160,943.23' E: 378,506.72'

WP-3

TYP

4' - 6"

6'

6"

3'

3"

6'

6"3'

3"

3' - 6" 3' - 6"

F75SF80SF85SF90S

F101

F100S

F95S

M A

T C

H L

IN

E

R E

F E

R T

O A

/ S

B

PP30.0 x 0.500 TYP _________A1

SB501

BENT CAP

CAST-IN-PLACE, TYP

4' - 0"3' - 9"

2' - 10"

1' - 6"

1'

6"

2'

8' - 2"

EA SIDE OF PIER

FENDER PILES 86 SPA @ 6'-8"

3'

9" 4'

0"

6'

4" F

E N

D E

R P

IL

E

S

S P

A

'-0

2'-0" CHAMFER, TYP

_________B3

SB506

_________B2

SB506

_________B2

SB506

_________A1

SB506

_________A1

SB506

_________C1

SB506

_________A3

SB501

_________B4

SB506

UTILITY TRENCH

DRAIN, TYP

_________B3

SB521

SIM

_________B4

SB506

UTILITY TRENCH

DRAIN, TYP

_________B3

SB521

SIM

SATISFACTORY TO DATE

APPROVED

ACTIVITY

FOR COMMANDER NAVFAC

SEAL

A/E INFO

A

B

C

D

1 2 3 4 5

1 2 3 4 5

A

B

C

D

SCALE:

CONSTR. CONTR. NO.

SHEET

NAVFAC DRAWING NO.

DES DRW CHK

OF

EPROJECT NO.:

D E

P A

R T

M E

N T

O F

T H

E N

A V

Y N

A V

A L

F A

C

IL

IT

IE

S E

N G

IN

E

E R

IN

G

S Y

S T

E M

S C

O M

M A

N D

DRAWFORM REVISION: 25 AUGUST 2020

PM/DM

BRANCH MANAGER

CHIEF ENG/ARCH

FIRE PROTECTION

N A

V A

L F

A C

IL

IT

IE

S

E N

G

IN

E E

R

IN

G S

Y S

T E

M S

C O

M M

A N

D

M

ID

-A T

LA

N

TI

C

N A

V A

L S

T A

T

IO

N N

O R

F O

L K

N

O R

F O

L K

V

A

AS NOTED

N E

W P

O R

T , R

H O

D E

IS

LA

N D

M

ID

L A

N T

D C

B L

N A

V A

L S

T A

T

IO

N N

E W

P O

R T

N O

A A

O M

A O

S H

IP

S U

P P

O R

T F

A C

IL

IT

Y R

E

LO

C A

TI

O

N

1562331

RS/RC

EJA

DSN

04OCT2022

Timothy Calohan, PE, NOAA Senior Project Manager

N4008524C0002

SB116

P

IE

R

S U

B S

TR

U

C

TU

R E

P

LA

N

A R

E A

G

PRG

12873995

JMM CAM

NEK

1/8" = 1'-0" A1

SUBSTRUCTURE PLAN - AREA G

4' 8' 16'0'

PLAN

NORTH PLAN

NORTH

ABD CEFG

H

KEY PLAN

1. FENDER PILE MARKS SHOWN ON SOUTH SIDE OF PIER,

NORTH SIDE SIMILAR.

SHEET NOTE

S Y

M D

E S

C R

IP

T

IO

N

D A

T E

A P

P R

R

E M

O V

E B

ID

O

P T

IO

N

/0

2/

R

File details come from the government source that posted it. Updated .