This document is a Pile Driving Summary and associated Pile Driving Logs prepared by Geosciences Testing and Research, Inc. (GTR) for a project at Newport Naval Station in Newport, Rhode Island.

The summary documents the driving of 18 bulkhead piles (BH98 through BH115) completed between June 24-27, 2024, for client NOAA OMAO with contractor Skanska and Coastal Marine. All piles are steel 18-inch outer diameter pipe with 0.5-inch wall thickness and 17-inch inner diameter. The piles share consistent specifications: 12.0-foot driven depth, 60-foot pile length, 55.00-foot top elevation, 10.25-foot EOD stroke, -43.00-foot tip elevation, 17.00-foot cut-off elevation, and -53.25-foot cut-off length. Blow counts for the final foot range from 41 to 72, with final drive strokes between 8.0 and 11.5 feet. Eight piles (BH98-BH106) were not vibed during installation, while ten piles (BH107-BH115) underwent vibration driving on June 25, 2024, followed by final driving on the same date.

The detailed pile driving logs for individual piles (BH100, BH101, BH103, BH109, BH110, BH111, BH112, and BH115) include depth-by-depth blow count data, hammer specifications (single-acting diesel with 33.5 kips rated energy and 11,355 pounds ram weight), and driving data documenting the progression from surface to tip elevation. All documentation is referenced under GTR Job #24.168 with GTR Representative J. Roth overseeing the work at the Newport, Rhode Island location.

View the file

Other files

File Type Posted
USCG OPC Pier Amendment 0009 Drawings.pdf PDF
2026-0816-HAI-USCG Homeport OPC Pier-Geotech Engineering Report Rev 2.pdf PDF
Amendment 0009 USCG OPC.pdf PDF
Updated Attachment H - USCG OPC Pier Price Proposal Form REV 5.docx DOCX document
Amendment 0008 USCG OPC.pdf PDF
Amendment 0007 SPC USCG OPC Pier Appendix D (With Placeholders).pdf PDF
Updated Attachment H - USCG OPC Pier Price Proposal Form REV 6.docx DOCX document
USCG OPC Pier Amendment 0008 Drawings.pdf PDF
USCG OPC Pier Amendment 007 Drawings.pdf PDF
Amendment 0007 USCG OPC.pdf PDF
Attachment Z - Pier 1 - Amendment 006 Drawings.pdf PDF
Appendix A - Telecom Room Photos.pdf PDF
Updated Attachment H - UCCG OPC Pier Price Proposal Form REV 4.docx DOCX document
Amendment 0006 USCG OPC.pdf PDF
24.168 NOAA OMAO Prime Pier Pile Driving Summary Report.pdf PDF
Pier Pile Plan.pdf PDF
24.168 NOAA OMAO Bulkhead Pile Driving Summary Table 08.26.24 to 08.30.24 (1).pdf PDF
24.168 NOAA OMAO Bulkhead Pile Driving Summary Table 07.22.24 to 07.26.24.pdf PDF
24.168 NOAA OMAO Bulkhead Pile Driving Summary Table 07.15.24 to 07.19.24.pdf PDF
Attachment Y - Appendix A Record drawing 11836 125 Submarine Cable Relocation.pdf PDF
SUB-0123 Interim PDA and Test Pile Logs - Trestle Piles 10B 14B.pdf PDF
SUB-0TBD Interim PDA and Test Pile Logs For Trestle Pile 17B.pdf PDF
24.168 NOAA OMAO Bulkhead Pile Driving Summary Table 08.26.24 to 08.30.24.pdf PDF
Updated Attachment H - UCCG OPC Pier Price Proposal Form REV 3.docx DOCX document
SUB-0105 Trestle Piles 4C 6B - PDA and Test Pile Logs.pdf PDF
24.168 NOAA OMAO Bulkhead Pile Driving Summary Table 08.20.24 to 08.23.24.pdf PDF
24.107 NOAA OMAO Ship & Support Facility Relocation Newport RI - PDA Report - Pier Bent 19.pdf PDF
24.168 NOAA OMAO Bulkhead Pile Driving Summary Table 07.31.24 to 08.01.24.pdf PDF
SUB-0284 PDA49B_A.pdf PDF
SUB-0262 Interim PDA Test Pile Logs for Pier Piles - Bent 35 B - A.pdf PDF
24.168 NOAA OMAO Bulkhead Pile Driving Summary Table 08.07.24 to 08.08.24.pdf PDF
Trestle Summary.pdf PDF
24.168 NOAA OMAO Bulkhead Pile Driving Summary Table 08.20.24 to 08.23.24 (1).pdf PDF
24.168 NOAA OMAO Bulkhead Pile Driving Summary Table 07.01.24 - 07.02.24.pdf PDF
Bulkhead Pile Plan.pdf PDF
24.168 NOAA OMAO Bulkhead Pile Driving Summary Table 09.03.24 to 09.06.24.pdf PDF
24.168 NOAA OMAO Bulkhead Pile Driving Summary Table 08.13.24 to 08.15.24.pdf PDF
Attachment W - Pier 1 - Amendment 005 Drawings.pdf PDF
24.168 NOAA OMAO Bulkhead Pile Driving Summary Table 07.11.24.pdf PDF
24.107 NOAA OMAO Ship Support Facility Relocation Newport RI - PDA Report - Pier Bent 25 and 27.pdf PDF
NOAA OMAO Survey Reports 100 Percent Pre-Final Submittal 04072022.pdf PDF
Amendment 0005 USCG OPC.pdf PDF
Attachment X - Appendix A Record Drawing 12819 135 Submarine Cable.pdf PDF
Attachment U - Appendix A - Pier 1 Extension 1968.pdf PDF
Attachment V - Pier 1 - Amendment 004 Drawings.pdf PDF
Updated Attachment K - WD RI20260001 05-18-2026.pdf PDF
Amendment 0004 USCG OPC.pdf PDF
Attachment T - REF(m) Existing Pier 1 Drawings 1 of 2.pdf PDF
Attachment C - Construction Experience Project Data Sheet.docx DOCX document
Attachment E - Historical Small Business Utilization.docx DOCX document
Show 40 more

Latest 50 of 90 listed here. See the rest on GovTribe.

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

DATE:

PROJECT LOCATION:

CLIENT: CONTRACTOR:

GTR REP PILE INFO:

BH115 25-Jun-24 25-Jun-24 12.0 60 55.00 10.25 -43.00 17.00 -53.25 55 10.0 - 11.0

BH114 25-Jun-24 25-Jun-24 12.0 60 55.00 10.25 -43.00 17.00 -53.25 42 10.0 - 11.0

BH113 25-Jun-24 25-Jun-24 12.0 60 55.00 10.25 -43.00 17.00 -53.25 59 10.0 - 11.0

BH112 25-Jun-24 25-Jun-24 12.0 60 55.00 10.25 -43.00 17.00 -53.25 45 9.5 - 10.5

BH111 25-Jun-24 25-Jun-24 12.0 60 55.00 10.25 -43.00 17.00 -53.25 47 10.0 - 11.0

BH110 25-Jun-24 25-Jun-24 12.0 60 55.00 10.25 -43.00 17.00 -53.25 41 9.0 - 10.0

BH109 25-Jun-24 25-Jun-24 12.0 60 55.00 10.25 -43.00 17.00 -53.25 41 9.5 - 10.5

BH108 25-Jun-24 25-Jun-24 12.0 60 55.00 10.25 -43.00 17.00 -53.25 41 9.0 - 10.0

BH107 24-Jun-24 25-Jun-24 12.0 60 55.00 10.25 -43.00 17.00 -53.25 43 10.0 - 11.0

BH106 Not Vibed 27-Jun-24 12.0 60 55.00 10.25 -43.00 17.00 -53.25 48 10.0 - 11.0

BH105 Not Vibed 27-Jun-24 12.0 60 55.00 10.25 -43.00 17.00 -53.25 44 11.0 - 11.5

BH104 Not Vibed 27-Jun-24 12.0 60 55.00 10.25 -43.00 17.00 -53.25 54 10.5 - 11.5

BH103 Not Vibed 27-Jun-24 12.0 60 55.00 10.25 -43.00 17.00 -53.25 59 11.0 - 11.5

BH102 Not Vibed 27-Jun-24 12.0 60 55.00 10.25 -43.00 17.00 -53.25 48 11.0 - 11.5

BH101 Not Vibed 27-Jun-24 12.0 60 55.00 10.25 -43.00 17.00 -53.25 61 11.0 - 11.5

BH100 Not Vibed 27-Jun-24 12.0 60 55.00 10.25 -43.00 17.00 -53.25 72 10.0 - 11.0

BH99 Not Vibed 27-Jun-24 12.0 60 55.00 10.25 -43.00 17.00 -53.25 54 11.0 - 11.5

BH98 Not Vibed 27-Jun-24 12.0 60 55.00 10.25 -43.00 17.00 -53.25 57 8.0 - 9.0

PILE

NO.

DRIVEN

DEPTH

(feet)

TIP

ELEVATION

(feet)

TOP

ELEVATION

(feet)

PILE

LENGTH

(feet)

EOD

STROKE

(feet)

WORKING

GRADE

(feet)

FINAL DRIVE

DATE

VIBRATION

DRIVE DATE

CUT-OFF

LENGTH

GTR JOB # 24.168

GEOSCIENCES TESTING AND RESEARCH, INC.

55 Middlesex Street, Suite 225, North Chelmsford, MA, Phone: (978) 251-9395 Fax: (978) 251-9396

COMMENTS

PILE DRIVING SUMMARY

J. Roth Steel 18-inch O.D. X 0.5-inch wall open-ended Pipe

Newport RI Naval Station Coastal Marine

NOAA OMAO

Skanska

3-Jul-24

CUT-OFF

ELEVATION

(feet)

BLOW

COUNT

FINAL FOOT

BULKHEAD PILES