Attachment V - Pier 1 - Amendment 004 Drawings.pdf

PDF 6 MB Posted

Attached to
Design-Bid-Build, USCG Offshore Patrol Cutters (OPC) Homeport Pier, Naval Station Newport, Newport RI
Solicitation number
N4008526R0001
Issued by

About this file

This document is a set of architectural and engineering drawings for the demolition and reconstruction of Pier 1 at a U.S. Coast Guard facility. The project scope includes complete demolition of the existing pier structure and appurtenances, including fender pile systems, followed by new construction of a reinforced concrete pier with steel sheet piling bulkheads, utility systems, and associated infrastructure.

The demolition phase requires removal of all existing structures within designated limits, extraction of all piles and pile stubs, identification and proper handling of hazardous materials (lead-containing paint on steel mooring cleats, bollards, and pier surfaces; potentially PCB-containing electrical transformers and equipment; and mercury-containing fixtures in Buildings 394, 395, and 396). Lead content percentages are specified for different paint locations (0.14% on steel mooring cleats, 0.0043% on steel fender pier, 0.00055% on concrete deck curb). The new construction includes a concrete pier deck measuring 80 feet wide and approximately 1,000 feet long, supported by 36-inch diameter concrete-filled steel pipe piles arranged in multiple bents, reinforced concrete pile caps, precast concrete planks, and cast-in-place concrete structural elements. Utility infrastructure includes storm drainage pipe networks, fresh water distribution systems, electrical ductbanks, cast-iron manholes with drainage provisions, and hydrant connections. The drawings indicate expansion joints throughout the structure, load-bearing capacity specifications, and detailed reinforcement schedules for concrete elements with various rebar configurations and spacing requirements.

View the file

Other files

File Type Posted
Updated Attachment H - USCG OPC Pier Price Proposal Form REV 5.docx DOCX document
USCG OPC Pier Amendment 0008 Drawings.pdf PDF
Amendment 0007 SPC USCG OPC Pier Appendix D (With Placeholders).pdf PDF
Amendment 0006 USCG OPC.pdf PDF
Attachment Z - Pier 1 - Amendment 006 Drawings.pdf PDF
Updated Attachment H - UCCG OPC Pier Price Proposal Form REV 4.docx DOCX document
Appendix A - Telecom Room Photos.pdf PDF
Amendment 0005 USCG OPC.pdf PDF
Attachment W - Pier 1 - Amendment 005 Drawings.pdf PDF
Attachment Y - Appendix A Record drawing 11836 125 Submarine Cable Relocation.pdf PDF
24.168 NOAA OMAO Bulkhead Pile Driving Summary Table 08.07.24 to 08.08.24.pdf PDF
24.168 NOAA OMAO Bulkhead Pile Driving Summary Table 08.20.24 to 08.23.24 (1).pdf PDF
Bulkhead Pile Plan.pdf PDF
24.168 NOAA OMAO Bulkhead Pile Driving Summary Table 08.20.24 to 08.23.24.pdf PDF
24.168 NOAA OMAO Bulkhead Pile Driving Summary Table 09.03.24 to 09.06.24.pdf PDF
NOAA OMAO Survey Reports 100 Percent Pre-Final Submittal 04072022.pdf PDF
SUB-0105 Trestle Piles 4C 6B - PDA and Test Pile Logs.pdf PDF
Trestle Summary.pdf PDF
SUB-0TBD Interim PDA and Test Pile Logs For Trestle Pile 17B.pdf PDF
24.168 NOAA OMAO Bulkhead Pile Driving Summary Table 08.13.24 to 08.15.24.pdf PDF
24.168 NOAA OMAO Bulkhead Pile Driving Summary Table 07.22.24 to 07.26.24.pdf PDF
24.168 NOAA OMAO Bulkhead Pile Driving Summary Table 07.01.24 - 07.02.24.pdf PDF
24.168 NOAA OMAO Bulkhead Pile Driving Summary Table 08.26.24 to 08.30.24 (1).pdf PDF
24.168 NOAA OMAO Bulkhead Pile Driving Summary Table 08.26.24 to 08.30.24.pdf PDF
24.168 NOAA OMAO Bulkhead Pile Driving Summary Table 07.11.24.pdf PDF
24.168 NOAA OMAO Prime Pier Pile Driving Summary Report.pdf PDF
Pier Pile Plan.pdf PDF
SUB-0123 Interim PDA and Test Pile Logs - Trestle Piles 10B 14B.pdf PDF
Updated Attachment K - WD RI20260001 05-18-2026.pdf PDF
Updated Attachment H - UCCG OPC Pier Price Proposal Form REV 2.docx DOCX document
Attachment Q - Spc 100 Final Specs Appendix D - (With Placeholders).pdf PDF
Amendment 0003 USCG OPC.pdf PDF
Attachment E - Historical Small Business Utilization.docx DOCX document
Attachment T - REF(m) Existing Pier 1 Drawings 1 of 2.pdf PDF
Amendment 0002 USCG OPC.pdf PDF
Updated Attachment H - UCCG OPC Pier Price Proposal Form REV 1.pdf PDF
Attachment M - 01 45 35_Schedule_of_Special_Inspections.pdf PDF
Attachment N - 01 45 35_Statement_of_Special_Inspections.xlsx XLSX spreadsheet
Updated Attachment G - Individual SB Subcontracting Plan.docx DOCX document
Updated Attachment F - SB Participation Commitment Document.pdf PDF
Amendment 0001 USCG OPC.pdf PDF
Solicitation - N4008526R0001.pdf PDF
Attachment D - Past Performance Questionnaire.pdf PDF
Attachment H - UCCG OPC Pier Price Proposal Form.pdf PDF
1826479dwg01of05_GEN-CIV.pdf PDF
Attachment A - Pre Proposal Inquiry Log.xlsx XLSX spreadsheet
Attachment C - Construction Experience Project Data Sheet.pdf PDF
Attachment F - SB Participation Commitment Document.pdf PDF
Attachment G - Individual SB Subcontrating Plan.pdf PDF
Attachment K - WD RI20260001 01-30-2026.pdf PDF
Show 40 more

50 files listed here. See the rest on GovTribe.

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

1. DEMOLISH AND REMOVE FROM THE GOVERNMENT PROPERTY THE EXISTING PIER 1 STRUCTURE AND ALL APPURTENANCES WITHIN LIMITS OF DEMOLITION IN THEIR ENTIRETY, INCLUDING THE FENDER PILE SYSTEM, AS NOTED IN ALL DEMOLITION DRAWINGS. IDENTIFY AND REMOVE ALL CONSTRUCTION AND DEMOLITION DEBRIS FROM BAY AROUND CONSTRUCTION SITE, INCLUDING ALL MISCELLANEOUS SMALL DEBRIS AND BEAMS. USE APPROPRIATE METHODS TO PULL ALL PILES IN THEIR ENTIRETY AND REMOVE ALL PILE STUBS, RESULTING FROM DETERIORATION OR DEMOLITION ACTIVITIES, IN THEIR ENTIRETY.

PILE STUBS LOCATED BELOW THE MUDLINE THAT DO NOT CONFLICT WITH PROPOSED PILES MAY REMAIN IN PLACE GIVEN

REQUIREMENTS ARE SATISFIED.

2. FOR ADDITIONAL INFORMATION, SEE EXISTING PIER 1 RECORD DRAWINGS ATTACHED TO THE SPECIFICATIONS AS

REFERENCE DRAWINGS.

3. ASSUME ALL EXISTING COATINGS CONTAIN LEAD.

4. PROTECT EXISTING STRUCTURES, UTILITIES AND STRUCTURES SUPPORTING UTILITIES DESIGNATED TO REMAIN DURING

DEMOLITION.

5. ALL EXISTING STEEL SHEET PILING IS COATED WITH AN EPOXY POLYAMIDE PAINT SYSTEM.

DEMOLITION GENERAL NOTES:

ASBESTOS NOTES

ASBESTOS-CONTAINING MATERIALS (ACM) WERE NOT IDENTIFIED DURING THE HAZARDOUS MATERIALS SURVEY. IF ANY HIDDEN AND PREVIOUSLY UNDETECTED SUSPECT ACM IS UNCOVERED DURING DEMOLITION ACTIVITIES, WORK MUST BE STOPPED AND THE MATERIAL TESTED FOR ASBESTOS CONTENT. ALL ACM MUST BE REMOVED AND DISPOSED OF IN ACCORDANCE WITH ALL

APPLICABLE STATE AND FEDERAL REQUIREMENTS.

LEAD NOTES

LEAD IS CONTAINED IN PAINT IN THE FOLLOWING LOCATIONS:

DURING THE SURVEY, LEAD FILLING WAS OBSERVED IN THE ANCHORING HOLES OF THE MOORING CLEATS AND BOLLARDS ON THE

PIER. APPROXIMATELY 20 MOORING CLEATS AND TWO DOUBLE BOLLARDS WERE OBSERVED.

IF THERE ARE ANY MODIFICATIONS TO THE RENOVATION SCOPE OF WORK, THE CONTRACTOR IS RESPONSIBLE FOR VERIFYING THE PRESENCE OR ABSENCE OF LEAD IN PAINT TO BE IMPACTED BY THE MODIFICATIONS AND FOLLOWING THE APPROPRIATE

LEAD SAFE WORK PRACTICES.

THE PRESENCE OF LEAD IN PAINT REQUIRES THAT ANY RENOVATION OR DEMOLITION WORK BE PERFORMED UNDER THE WORKER

PROTECTION REQUIREMENTS OUTLINED IN 29 CFR 1926.62.

PCB/MERCURY NOTES

DURING THE INSPECTION, ELECTRICAL TRANSFORMERS AND EQUIPMENT WERE OBSERVED ON THE PIER 1, BUT IT IS UNKNOWN IF

THIS EQUIPMENT CONTAINS PCBS.

DURING THE INSPECTION, POTENTIAL MERCURY-CONTAINING FIXTURES WERE OBSERVED IN THE FOLLOWING

AREAS:

• BUILDING 394: 7 POTENTIAL MERCURY-CONTAINING FLUORESCENT LIGHT BULBS.

• BUILDING 395: 2 POTENTIAL MERCURY-CONTAINING FLUORESCENT LIGHT BULBS AND 1 ASSUMED

MERCURY-CONTAINING THERMOSTAT.

• BUILDING 396: 2 POTENTIAL MERCURY-CONTAINING FLUORESCENT LIGHT BULBS, 4 POTENTIAL

MERCURY-CONTAINING EXTERIOR LIGHTS, AND 1 ASSUMED MERCURY-CONTAINING THERMOSTAT.

HAZMAT NOTES FOR PIER 1 DEMOLITION

PAINT WITH LEAD

BLUE PAINT CHIPS - ON PIER CONC DECK CURB

GRAY PAINT CHIPS - ON STEEL FENDER PIER OUTBOARD

OF REINFORCED CONC DECK

BLACK PAINT CHIPS - ON STEEL MOORING

CLEATS AND DOUBLE BITS

LEAD CONTENT (% WEIGHT)

0.00055

0.0043

0.14

SATISFACTORY TO DATE

APPROVED

ACTIVITY

FOR COMMANDER NAVFAC

SEAL

A/E INFO

A

B

C

D

1 2 3 4 5

1 2 3 4 5

A

B

C

D

SCALE:

CONSTR. CONTR. NO.

SHEET

NAVFAC DRAWING NO.

DES DRW CHK

OF

EPROJECT NO.:

D E

P A

R T

M E

N T

O F

T H

E N

A V

Y N

A V

A L

F A

C

IL

IT

IE

S E

N G

IN

E

E R

IN

G

S Y

S T

E M

S C

O M

M A

N D

DRAWFORM REVISION: 25 AUGUST 2020

PM/DM

BRANCH MANAGER

CHIEF ENG/ARCH

FIRE PROTECTION

N A

V A

L

FA

C

IL

IT

IE

S E

N G

IN

E

E R

IN

G

S Y

S

TE

M S

C O

M M

A N

D

M

ID

-A

TL

A N

TI

C

N A

V A

L S

T A

T

IO

N

N O

R F

O L K

V

A

AS NOTED

S Y

M D

E S

C R

IP

T

IO

N

D A

T E

A P

P R

/1

/2

:0 :1

P

M

A u to d e s k D o c s /2

U

S C

G O

C R

H o m e p o rt

In it ia ti v e O

P C

P ie r_

/P

IE

R

U S

C G

-1 -S

.r v t

SD001

U S

C G

O C

R H

O M

E P

O R

T

IN

IT

IA

TI

V

E O

P C

P

IE

R

S

TR

U C

TU

R

A L

D E

M O

LI

TI

O N

N O

TE

S

B

A S

E B

ID

MJF

12936624

JZ KCJ

Frank Cole USCG MASI

MRI/CWJ

1826479

N E

W P

O R

T, R

I N

A V

A L

S T

A T

IO

N

N E

W P

O R

T

JWJ

NEK

HPN

C I

C O

R E

H

A M

P T

O N

R O

A D

S

S D

06 FEB 2026

A

M E

N D

M E

N T

/1

/2

V M

G

M H

T F

.6

F

IL

L E

D W

/D

IR

T

S T

E E

L S

H E

E T P

IL

E

B

IT

U M

IN

O

U S

C U

R B

W

WW

W x;D

W x;D x;D

W

W

REMOVED BY

OTHERS, SEE NOTE 2

BULKHEAD S45N

M A

T C

H

LI

N E

STONE BREAKWATER

EXPANSION JOINT, TYP

LIGHT POLE, TYP

TIMBER, TYP

RAILROAD TRACKS, TYP

METAL PLATE, TYP

BUILDING 395 BUILDING 394

SD103

A2

DEMO PART PLAN

FENDER SYSTEM, TYP

BULKHEAD S366

RIP RAP REVETMENT

1954 BULKHEAD

1,580' - 3"±

C3

SD301

TYP

SD104

B2

C3

SD601

C1

SD601

A3

SD602

- - - - - - - - - - - - - - - - - - - - - - - - - - - - C1

SD602

A1

SD602

C4

SD601

C3

SD602

A1

SD601

A4

SD601

A3

SD601

102030405060708090100

M A

T C

H

LI

N E

BUILDING 396

1580'-3" ±

EJ, TYP

LIGHT POLE, TYP

0'

0"

110120130140150159

LEGEND:

LIMITS OF DEMOLITION

SHEET KEYNOTES:

1. DEMOLISH EXISTING PORTION OF PIER 1 AND ALL APPURTENANCES. PIER

SUPPORT AND FENDER PILES WILL ALL BE CUT OFF AT THE LOWER ELEVATION

OF EITHER

A) THREE FEET BELOW THE DREDGE ELEVATION OR

B) TWO FEET BELOW THE MUDLINE ELEVATION IF THE MUDLINE ELEVATION IS

AT OR BELOW THE MINIMUM DRAFT ELEVATION. ALL REMOVED AND CUT-OFF

PILES WILL BE SHOWN ON THE AS-BUILT DRAWINGS.

2. REMOVE AND DISPOSE OF EXISTING TIMBER DEBRIS.

3. STONE FILL AT EXISTING STONE BREAKWATER TO BE REMOVED AND

REINSTALLED AFTER BULKHEAD S45S INSTALLATION.

4. CUT DOWN AND DISPOSE OF EXISTING STEEL SHEET PILING TO ELEVATION 4.0

ADJACENT TO PIER REPLACEMENT LIMIT, TYPICAL. SEE DRAWING SD201 FOR

DETAILS.

5. CUT DOWN AND DISPOSE OF EXISTING STEEL SHEET PILING TO ELEVATION 4.5.

6. REMOVAL OF EXISTING PIER PILES WILL BE PERFORMED USING ONLY THE

METHODS DESCRIBED HEREIN. VIBRATORY EXTRACTION METHODS ARE

EXPRESSLY PROHIBITED. REMOVAL OF SEDIMENT AROUND THE PILES USING A

CLAMSHELL BUCKET OR ANY METHOD THAT INVOLVES EXCAVATING AND

RELOCATING SEDIMENT IS NOT PERMITTED AND WILL BE CONSIDERED

DREDGING. ACCEPTABLE PILE REMOVAL METHODS INCLUDE: (1) ATTEMPTING

DIRECT EXTRACTION OF PILES USING A CRANE; (2) USE OF A LONG-REACH

EXCAVATOR EQUIPPED WITH A SMALL BUCKET TO GENTLY DISPLACE

SURROUNDING SEDIMENT TO PROVIDE ACCESS TO APPROXIMATELY 2 TO 3

FEET BELOW THE MUDLINE, PROVIDED THAT SEDIMENT IS NOT EXCAVATED,

STOCKPILED, OR SIDE-CAST; (3) USE OF WATER JETTING TO CREATE A

TEMPORARY VOID AROUND THE PILES TO FACILITATE ACCESS AND REMOVAL.

FOR ALL APPROVED METHODS, TURBIDITY GENERATED DURING PILE REMOVAL

ACTIVITIES WILL BE CONTAINED WITHIN TURBIDITY CURTAINS INSTALLED

AROUND THE PIER DEMOLITION AREA AND MAINTAINED FOR THE DURATION OF

WORK. IN ADDITION, LARGE RIP RAP AND DEBRIS LOCATED ALONG THE

SURFACE OF THE EXISTING S45S REVETMENT MAY BE REMOVED AS

NECESSARY TO FACILITATE THE WORK, TEMPORARILY STORED, AND

REPLACED IN THEIR ORIGINAL LOCATION FOLLOWING COMPLETION OF PILE

REMOVAL ACTIVITIES; HOWEVER NO DREDGING OR REMOVAL OF UNDERLYING

SEDIMENTS WILL BE ALLOWED.

SATISFACTORY TO DATE

APPROVED

ACTIVITY

FOR COMMANDER NAVFAC

SEAL

A/E INFO

A

B

C

D

1 2 3 4 5

1 2 3 4 5

A

B

C

D

SCALE:

CONSTR. CONTR. NO.

SHEET

NAVFAC DRAWING NO.

DES DRW CHK

OF

EPROJECT NO.:

D E

P A

R T

M E

N T

O F

T H

E N

A V

Y N

A V

A L

F A

C

IL

IT

IE

S E

N G

IN

E

E R

IN

G

S Y

S T

E M

S C

O M

M A

N D

DRAWFORM REVISION: 25 AUGUST 2020

PM/DM

BRANCH MANAGER

CHIEF ENG/ARCH

FIRE PROTECTION

N A

V A

L

FA

C

IL

IT

IE

S E

N G

IN

E

E R

IN

G

S Y

S

TE

M S

C O

M M

A N

D

M

ID

-A

TL

A N

TI

C

N A

V A

L S

T A

T

IO

N

N O

R F

O L K

V

A

AS NOTED

S Y

M D

E S

C R

IP

T

IO

N

D A

T E

A P

P R

/1

/2

:4

:4

P

M

A u to d e s k D o c s /2

U

S C

G O

C R

H o m e p o rt

In iti a tiv e O

P C

P ie r_

/P

IE

R

U S

C G

-1 -S

.r v t

SD101

U S

C G

O C

R H

O M

E P

O R

T

IN

IT

IA

TI

V

E O

P C

P

IE

R

O V

E R

A

LL

S

TR

U C

TU

R

A L

D E

M O

LI

TI

O N

P

LA

N

B A

S E

B

ID

MJF

12936625

JZ KCJ

Frank Cole USCG MASI

MRI/CWJ

1826479

N E

W P

O R

T, R

I N

A V

A L

S T

A T

IO

N

N E

W P

O R

T

JWJ

NEK

HPN

C I

C O

R E

H

A M

P T

O N

R O

A D

S

S D

06 FEB 2026

PLAN

NORTH

SCALE: 1" = 60'-0"

OVERALL STRUCTURAL DEMOLITION PLAN

1" = 60' 0 60' 240'120'

1. PROTECT EXISTING BULKHEAD SHEET PILES, TIE RODS, DEADMAN SYSTEM

AND CONCRETE HEADWALL AND COPING DURING DEMOLITION.

2. A PORTION OF THE EXISTING PIER 1 AND EXISTING BULKHEAD S366 NEAR THE

LANDWARD END OF THE PIER HAS BEEN DEMOLISHED TO FACILITATE

CONSTRUCTION OF BULKHEAD S366 UNDER A SEPARATE CONTRACT.

3. FOR EXISTING PORTION OF PIER STRUCTURE, SEE AS-BUILTS AND SURVEY

DRAWINGS V-105 THROUGH V-109. ALL ITEMS SHOWN ON THE DRAWINGS

SHALL BE DEMOLISHED.

4. THE EXISTING PIER IS CONDEMNED AND MUST NOT BE USED FOR ANY

PURPOSE.

5. VERTICAL LOAD AT BULKHEAD ALONG PIER 1 IS RESTRICTED TO AN

ALLOWABLE UNIFORM LIVE LOADING OF 600 PSF.

6. FOR ADDITIONAL INFORMATION ON DEMOLITION WITHIN BULKHEAD S45S

LIMITS, SEE DRAWING SD104.

7. REFER TO APPENDIX A OF THE SPECIFICATIONS FOR THE RECORD DRAWINGS

OF EXISTING CONDITIONS. NOTE THAT RECORD DRAWINGS REFLECT

ORIGINAL CONSTRUCTION AND SITE CONDITIONS ARE SUBJECT TO CHANGES

OVER TIME.

GENERAL SHEET NOTES:

A

M E

N D

M E

N T

/2

3/

V

M G

A

M E

N D

M E

N T

/1

5/

V

M G

C B

T Y

P E

C L

T F

.21

IN

V

O U

T

.7

S T

E E

L S H

E E

T P

ILE

W W x;E

W W

W

W

P

IE

R

W

ID

TH

BULKHEAD AND

OUTFALL DEMO

PART PLAN

SD103

A2

M A

T C

H L

IN

E

S E

E B

S D

EXPANSION JOINT, TYP

CONCRETE ENCLOSURE, TYP LIGHT POLE, TYP

TIMBER, TYP

RAILROAD TRACKS, TYP

METAL PLATE,

TYP

/2

CLEAT, TYP

SEE NOTE 1

469' - 10"±

SEE NOTE 3

5'

0"

1,580' - 3"±

M A

T C

H L

IN

E

S E

E A

S D

M A

T C

H L

IN

E

S E

E C

S D

548' - 10"

1,580' - 3"±

M A

T C

H L

IN

E

S E

E B

S D

1,580' - 3"±

548' - 5"±

LEGEND:

LIMITS OF DEMOLITION

SHEET KEYNOTES:

1. DEMOLISH EXISTING PIER 1 AND ALL APPURTENANCES.

PIER SUPPORT AND FENDER PILES MUST BE CUT OFF A

MINIMUM OF EITHER THREE FEET BELOW THE DREDGE

ELEVATION OR TWO FEET BELOW THE MUDLINE.

SATISFACTORY TO DATE

APPROVED

ACTIVITY

FOR COMMANDER NAVFAC

SEAL

A/E INFO

A

B

C

D

1 2 3 4 5

1 2 3 4 5

A

B

C

D

SCALE:

CONSTR. CONTR. NO.

SHEET

NAVFAC DRAWING NO.

DES DRW CHK

OF

EPROJECT NO.:

D E

P A

R T

M E

N T

O F

T H

E N

A V

Y N

A V

A L

F A

C

IL

IT

IE

S E

N G

IN

E

E R

IN

G

S Y

S T

E M

S C

O M

M A

N D

DRAWFORM REVISION: 25 AUGUST 2020

PM/DM

BRANCH MANAGER

CHIEF ENG/ARCH

FIRE PROTECTION

N A

V A

L

FA

C

IL

IT

IE

S E

N G

IN

E

E R

IN

G

S Y

S

TE

M S

C O

M M

A N

D

M

ID

-A

TL

A N

TI

C

N A

V A

L S

T A

T

IO

N

N O

R F

O L K

V

A

AS NOTED

S Y

M D

E S

C R

IP

T

IO

N

D A

T E

A P

P R

/1

/2

:4

:0

P

M

A u to d e s k D o c s /2

U

S C

G O

C R

H o m e p o rt

In iti a tiv e O

P C

P ie r_

/P

IE

R

U S

C G

-1 -S

.r v t

SD102

U S

C G

O C

R H

O M

E P

O R

T

IN

IT

IA

TI

V

E O

P C

P

IE

R

P

IE

R

D E

M O

LI

TI

O N

P

LA

N

MJF

12936626

JZ KCJ

Frank Cole USCG MASI

MRI/CWJ

1826479

N E

W P

O R

T, R

I N

A V

A L

S T

A T

IO

N

N E

W P

O R

T

JWJ

NEK

HPN

C I

C O

R E

H

A M

P T

O N

R O

A D

S

S D

06 FEB 2026

PLAN

NORTH

SCALE: 1" = 30'-0"

DEMOLITION PLAN - PART 1 OF 3

C2

PLAN

NORTH

SCALE: 1" = 30'-0"

DEMOLITION PLAN - PART 2 OF 3

B2

PLAN

NORTH

SCALE: 1" = 30'-0"

DEMOLITION PLAN - PART 3 OF 3

A2

1" = 30' 0 30' 120'60'

DOUBLE BITT, TYP

TIMBER, TYP (IN DISREPAIR)

1. A PORTION OF THE EXISTING PIER 1 AND EXISTING BULKHEAD S366 NEAR

THE LANDWARD END OF THE PIER HAS BEEN DEMOLISHED TO FACILITATE

CONSTRUCTION OF BULKHEAD S366 UNDER A SEPARATE CONTRACT.

2. SEE DEMOLITION GENERAL NOTES ON SD101.

3. SEE SD103 FOR BULKHEAD DEMOLITION LIMITS.

4. REFER TO APPENDIX A OF THE SPECIFICATIONS FOR THE RECORD

DRAWINGS OF EXISTING CONDITIONS. NOTE THAT RECORD DRAWINGS

REFLECT ORIGINAL CONSTRUCTION AND SITE CONDITIONS ARE SUBJECT

TO CHANGES OVER TIME.

GENERAL SHEET NOTES:

SD101

SD101

SD101

A

M E

N D

M E

N T

/1

5/

V

M G

A

E

F

383940414243

C1

S-304

6'

6"

6'

6"

M A

T C

H L

IN

E

S E

E A

S -1

EDGE OF PIER

DECK, TYP

3' - 0" 25' - 0" 25' - 0" 25' - 0" 25' - 0" 25' - 0"

C

C PIERL

C2

S-301

25' - 0"

1000' - 0"

1 6

5' - 6"

TYP

7' - 4"3' - 3"

T Y

P 3'

0"

TYP

7' - 8"

LIMITS OF

SUBSTATION

ABOVE

C3

S-307

D

TYP

5' - 0"

TYP

20' - 0"

T Y

P 3'

6"

T Y

P 2'

0"

T Y

P 1'

6"

1' - 6"

1' - 6"

S-508 A1

BLOCKOUT AND

REINF DETAILS,

TYP

T Y

P

8'

9"

T Y

P 3'

6"

S-508 A1

S-509 A1

B4

S-512

TYP

T Y

P

8'

3/

4"

B1

S-512

C2

S-513

A2

S-513

A1

S-513

C2

S-513

TYP

B4

S-513

TYP

TYP

11' - 9"

A1

S-513

SIM

SIM

SIM

SIM

B2

S-510

SIM

C1

S-510

SIM

A1

S-510

SIM

B2

S-510

TYP

C2

S-510

TYP

B1

S-513

TYP

A1

S-513

SIM

T Y

P

T Y

P

8'

9"

6'

1/

2"

A3

S-512

8' - 0"

LEGEND:

# BENT DESIGNATION

A PILE ROW DESIGNATION

36" ⌀ PILE BELOW

ELECTRICAL DUCT BANK

CAST-IN-PLACE CONC SLAB

SHEET KEYNOTES:

1. CONCRETE PIER DECK NOT SHOWN FOR CLARITY.

2. PROVIDE SLEEVE WITH PROPER DIAMETER FOR UTILITY

PIPES AT CONCRETE HEAD WALLS CONCRETE HEAD

WALLS AND WITHIN UTILITY TRENCHES. SEE DRAWING

S-511 FOR DETAILS.

3. SEE DRAWING S-512 FOR REINFORCEMENT DETAILS IN

CAST-IN-PLACE SLAB, UNLESS NOTED OTHERWISE.

4. PLACE VAULT DRAIN AT CENTER OF EACH VAULT UNLESS

NOTED OTHERWISE.

GENERAL SHEET NOTES:

491623303743 0

KEY PLAN

SATISFACTORY TO DATE

APPROVED

ACTIVITY

FOR COMMANDER NAVFAC

SEAL

A/E INFO

A

B

C

D

1 2 3 4 5

1 2 3 4 5

A

B

C

D

SCALE:

CONSTR. CONTR. NO.

SHEET

NAVFAC DRAWING NO.

DES DRW CHK

OF

EPROJECT NO.:

D E

P A

R T

M E

N T

O F

T H

E N

A V

Y N

A V

A L

F A

C

IL

IT

IE

S E

N G

IN

E

E R

IN

G

S Y

S T

E M

S C

O M

M A

N D

DRAWFORM REVISION: 25 AUGUST 2020

PM/DM

BRANCH MANAGER

CHIEF ENG/ARCH

FIRE PROTECTION

N A

V A

L F

A C

IL

IT

IE

S

E N

G

IN

E E

R

IN

G S

Y S

T E

M S

C O

M M

A N

D

M

ID

-A

TL

A N

T

IC

N A

V A

L S

T A

T

IO

N

N O

R F

O L

K V

A

AS NOTED

S Y

M D

E S

C R

IP

T

IO

N

D A

T E

A P

P R

/1

/2

:2 :3

A

M

A u to d e s k D o c s /2

U

S C

G O

C R

H o m e p o rt

In iti a ti v e O

P C

P ie r_

/P

IE

R

U S

C G

-1

-S

.r v t

S-110

U S

C G

O C

R H

O M

E P

O R

T

IN

IT

IA

T

IV

E O

P C

P

IE

R

F R

A M

IN

G

P

LA

N

S H

E E

T

O F

MJF

12936646

JZ AAN

Frank Cole USCG MASI

MRI/CWJ

1826479

N E

W P

O R

T , R

I N

A V

A L

S T

A T

IO

N

N E

W P

O R

T

JWJ

NEK

HPN

C I

C O

R E

H

A M

P T

O N

R O

A D

S

S -1

06 FEB 2026

PLAN

NORTH

SCALE: 1/8" = 1'-0"

FRAMING PLAN - SHEET 1 OF 7

A2

1/8" = 1' - 0" 0 5' 10' 15' 30'

1. CAST-IN-PLACE UTILITY TRENCHES AT BOTH SIDES OF PIER, TYPICAL.

2. 5'-0" WIDE BY 4'-0" DEEP CAST-IN-PLACE CONCRETE PILE CAP, TYPICAL.

3. PRECAST CONCRETE MANHOLE, TYPICAL.

4. 3'-0" WIDE BY 4'-0" DEEP CAST-IN-PLACE CONCRETE BEAM, TYPICAL.

5. 10" HEAVY DUTY SLEEVED DECK DRAIN (2'-9" LONG) WITH FRAME AND

GRATE, TYPICAL.

6. UTILITY TRENCH DRAIN WITH ONE WAY VALVE, TYPICAL

7. 3'-6" WIDE BY 4'-0" DEEP CAST-IN-PLACE CONCRETE BEAM, TYPICAL.

8. 5'-0" WIDE BY 4'-0" DEEP CAST-IN-PLACE CONCRETE BEAM, TYPICAL.

14. 5'-6" WIDE BY 4'-0" DEEP CAST-IN-PLACE CONCRETE PILE CAP, TYPICAL.

15. CAST-IN-PLACE 12" THICK VAULT SLAB, TYPICAL.

18. 6'-2 1/2" WIDE BY 4'-0" DEEP CAST-IN-PLACE CONCRETE BEAM, TYPICAL.

19. 10" HEAVY DUTY SLEEVED DECK DRAIN (6'-9" LONG) WITH FRAME AND

GRATE, TYPICAL.

A

M E

N D

M E

N T

/2

/2

V M

G

A

M E

N D

M E

N T

/1

/2

V M

G

SEAL

E

F

3031323334353637

M A

T C

H L

IN

E

S E

E A

S -1

M A

T C

H L

IN

E

S E

E A

S -1

EDGE OF PIER

DECK, TYP

25' - 0" 25' - 0" 25' - 0" 25' - 0" 21' - 6" 21' - 6" 11' - 0"

C

C PIERL

A2

S-301

A3

S-308

C3

S-308

25' - 0" 25' - 0"

1000' - 0"

6'

6"

6'

6"

GAP, TYP

5"

TYP

16' - 6"

TYP

5' - 6"

TYP

5' - 0"

TYP

20' - 0"

TYP

5' - 0"

TYP

5' - 0"

TYP

2' - 0"

D

A3

S-307

T Y

P 3'

0"

T Y

P

8'

9"T Y

P 3'

6"

T Y

P 1'

6"

T Y

P 2'

0"

B4

S-512

TYP

B3

S-512

TYP

C2

S-513

TYP

B2

S-510

TYP

C1

S-510

TYP

A2

S-513

SIM

A1

S-513

SIM

C2

S-513

TYP

C1

S-510

TYP

A2

S-513

SIM

B1

S-510

SIM

B1

S-513

A1

S-516

TYP

TYP

8' - 9"

A1

S-507

A3

S-507

T Y

P

TYP

4' - 7"

A4

S-512

SIM

A4

S-512

SIM

SIM

TYP

4' - 8"

T Y

P 2'

4"

8' - 0"

8'

0"

20' - 0"

8' - 0"

SHEET KEYNOTES:

LEGEND:

# BENT DESIGNATION

A PILE ROW DESIGNATION

36" ⌀ PILE BELOW

ELECTRICAL DUCT BANK

CAST-IN-PLACE CONC SLAB

1. CONCRETE PIER DECK NOT SHOWN FOR CLARITY.

2. PROVIDE SLEEVE WITH PROPER DIAMETER FOR UTILITY

PIPES AT CONCRETE HEAD WALLS CONCRETE HEAD

WALLS AND WITHIN UTILITY TRENCHES. SEE DRAWING

S-511 FOR DETAILS.

3. SEE DRAWING S-512 FOR REINFORCEMENT DETAILS IN

CAST-IN-PLACE SLAB, UNLESS NOTED OTHERWISE.

4. PLACE VAULT DRAIN AT CENTER OF EACH VAULT UNLESS

NOTED OTHERWISE.

GENERAL SHEET NOTES:

491623303743 0

KEY PLAN

SATISFACTORY TO DATE

APPROVED

ACTIVITY

FOR COMMANDER NAVFAC

SEAL

A/E INFO

A

B

C

D

1 2 3 4 5

1 2 3 4 5

A

B

C

D

SCALE:

CONSTR. CONTR. NO.

SHEET

NAVFAC DRAWING NO.

DES DRW CHK

OF

EPROJECT NO.:

D E

P A

R T

M E

N T

O F

T H

E N

A V

Y N

A V

A L

F A

C

IL

IT

IE

S E

N G

IN

E

E R

IN

G

S Y

S T

E M

S C

O M

M A

N D

DRAWFORM REVISION: 25 AUGUST 2020

PM/DM

BRANCH MANAGER

CHIEF ENG/ARCH

FIRE PROTECTION

N A

V A

L F

A C

IL

IT

IE

S

E N

G

IN

E E

R

IN

G S

Y S

T E

M S

C O

M M

A N

D

M

ID

-A

TL

A N

T

IC

N A

V A

L S

T A

T

IO

N

N O

R F

O L

K V

A

AS NOTED

S Y

M D

E S

C R

IP

T

IO

N

D A

T E

A P

P R

/1

/2

:3

:1

A

M

A u to d e s k D o c s /2

U

S C

G O

C R

H o m e p o rt

In iti a ti v e O

P C

P ie r_

/P

IE

R

U S

C G

-1

-S

.r v t

S-111

U S

C G

O C

R H

O M

E P

O R

T

IN

IT

IA

T

IV

E O

P C

P

IE

R

F R

A M

IN

G

P

LA

N

S H

E E

T

O F

MJF

12936647

JZ AAN

Frank Cole USCG MASI

MRI/CWJ

1826479

N E

W P

O R

T , R

I N

A V

A L

S T

A T

IO

N

N E

W P

O R

T

JWJ

NEK

HPN

C I

C O

R E

H

A M

P T

O N

R O

A D

S

S -1

06 FEB 2026

PLAN

NORTH

SCALE: 1/8" = 1'-0"

FRAMING PLAN - SHEET 2 OF 7

A2

1/8" = 1' - 0" 0 5' 10' 15' 30'

1. CAST-IN-PLACE UTILITY TRENCHES AT BOTH SIDES OF PIER, TYPICAL.

3. PRECAST CONCRETE MANHOLE, TYPICAL.

4. 3'-0" WIDE BY 4'-0" DEEP CAST-IN-PLACE CONCRETE BEAM, TYPICAL.

5. 10" HEAVY DUTY SLEEVED DECK DRAIN (2'-9" LONG) WITH FRAME AND

GRATE, TYPICAL.

6. UTILITY TRENCH DRAIN WITH ONE WAY VALVE, TYPICAL

7. 3'-6" WIDE BY 4'-0" DEEP CAST-IN-PLACE CONCRETE BEAM, TYPICAL.

16. CAST-IN-PLACE 8" THICK HEAD WALL, TYPICAL.

17. 4'-0" WIDE BY 1'-0" DEEP END WALL AT EJ, TYPICAL.

19. 10" HEAVY DUTY SLEEVED DECK DRAIN (6'-9" LONG) WITH FRAME AND

GRATE, TYPICAL.

A

M E

N D

M E

N T

/2

/2

V M

G

A

M E

N D

M E

N T

/1

/2

V M

G

SEAL

E

F

242526272829

M A

T C

H L

IN

E

S E

E A

S -1

M A

T C

H L

IN

E

S E

E A

S -1

EDGE OF PIER

DECK TYP

25' - 0" 25' - 0" 25' - 0" 25' - 0" 25' - 0" 25' - 0"

C

25' - 0"

1000' - 0"

6'

6"

6'

6"

C PIERL

TY

P

3'

0"

TYP

5' - 0"

TYP

20' - 0"

D

TY

P

3'

6"

TY

P

8'

9"

TY

P

2'

0"

TY

P

1'

6"

A3 S-311

B4 S-512

TYP

C1

S-510

TYP

- - - - - - - - - - - - - - - - - - - - - - - - - - - - A2 S-513

SIM

B1 S-513

TYP

- - - - - - - - - - - - - - - - - - - - - - - - - - - - B1 S-510

SIM

TY

P

8" THK PARTITION

WALL, SEE NOTE 4.

8"

20'-0" A4 S-517

TYP

SHEET KEYNOTES:

LEGEND:

# BENT DESIGNATION

A PILE ROW DESIGNATION

36" ⌀ PILE BELOW

ELECTRICAL DUCT BANK

CAST-IN-PLACE CONC SLAB

1. CONCRETE PIER DECK NOT SHOWN FOR CLARITY.

2. PROVIDE SLEEVE WITH PROPER DIAMETER FOR UTILITY

PIPES AT CONCRETE HEAD WALLS AND WITHIN UTILITY

TRENCHES. SEE DRAWING S-511 FOR DETAILS.

3. SEE DRAWING S-512 FOR REINFORCEMENT DETAILS IN

CAST-IN-PLACE SLAB.

4. SEE DRAWING S-511 FOR REINFORCEMENT DETAILS IN

PARTITION WALL, UNLESS NOTED OTHERWISE.

5. PLACE VAULT DRAIN AT CENTER OF EACH VAULT UNLESS

NOTED OTHERWISE.

GENERAL SHEET NOTES:

491623303743 0

KEY PLAN

SATISFACTORY TO DATE

APPROVED

ACTIVITY

FOR COMMANDER NAVFAC

SEAL

A/E INFO

A

B

C

D

1 2 3 4 5

1 2 3 4 5

A

B

C

D

SCALE:

CONSTR. CONTR. NO.

SHEET

NAVFAC DRAWING NO.

DES DRW CHK

OF

EPROJECT NO.:

D E

P A

R T

M E

N T

O F

T H

E N

A V

Y N

A V

A L

F A

C

IL

IT

IE

S E

N G

IN

E

E R

IN

G

S Y

S T

E M

S C

O M

M A

N D

DRAWFORM REVISION: 25 AUGUST 2020

PM/DM

BRANCH MANAGER

CHIEF ENG/ARCH

FIRE PROTECTION

N A

V A

L F

A C

IL

IT

IE

S

E N

G

IN

E E

R

IN

G S

Y S

T E

M S

C O

M M

A N

D

M

ID

-A T

LA

N

T

IC

N A

V A

L S

T A

T

IO

N

N O

R F

O L K

V

A

AS NOTED

S Y

M D

E S

C R

IP

T

IO

N

D A

T E

A P

P R

/2

/2

:2 :2

A

M

A u to d e s k D o c s /2

U

S C

G O

C R

H o m e p o rt

In it ia ti v e O

P C

P ie r_

/P

IE

R

U S

C G

-1 -S

.r v t

S-112

U S

C G

O C

R H

O M

E P

O R

T

IN

IT

IA

T

IV

E O

P C

P

IE

R

F R

A M

IN

G

P

LA

N

S H

E E

T

O F

MJF

12936648

JZ AAN

Frank Cole USCG MASI

MRI/CWJ

1826479

N E

W P

O R

T, R

I N

A V

A L

S T

A T

IO

N

N E

W P

O R

T

JWJ

NEK

HPN

C I

C O

R E

H

A M

P T

O N

R O

A D

S

S -1

06 FEB 2026

PLAN

NORTH

SCALE: 1/8" = 1'-0"

FRAMING PLAN - SHEET 3 OF 7

A2

1/8" = 1' - 0" 0 5' 10' 15' 30'

1. CAST-IN-PLACE UTILITY TRENCHES AT BOTH SIDES OF PIER, TYPICAL.

2. 5'-0" WIDE BY 4'-0" DEEP CAST-IN-PLACE CONCRETE PILE CAP, TYPICAL.

3. PRECAST CONCRETE MANHOLE, TYPICAL.

4. 3'-0" WIDE BY 4'-0" DEEP CAST-IN-PLACE CONCRETE BEAM, TYPICAL.

6. UTILITY TRENCH DRAIN WITH ONE WAY VALVE, TYPICAL

7. 3'-6" WIDE BY 4'-0" DEEP CAST-IN-PLACE CONCRETE BEAM, TYPICAL.

16. CAST-IN-PLACE 8" THICK HEAD WALL, TYPICAL.

17. 4'-0" WIDE BY 1'-0" DEEP END WALL AT EJ, TYPICAL.

A

M E

N D

M E

N T

/0

/2

V M

G

A

M E

N D

M E

N T

/1

/2

V M

G

E

F

17181920212223

M A

T C

H L

IN

E

S E

E A

S -1

EDGE OF PIER

DECK, TYP

25' - 0" 25' - 0" 11' - 0" 25' - 0" 25' - 0" 25' - 0"

C

C PIERL

25' - 0"

1000' - 0"

25' - 0" 6'

6"

6'

6"

M A

T C

H L

IN

E

S E

E A

S -1

TYP

5' - 7"

GAP, TYP

5"

TY

P

3'

0"

TYP

5' - 0"

TYP

20' - 0"

D

TY

P

3'

6"

TY

P

8'

9" TY

P

1'

6"

TY

P

2'

0"

TY

P

3'

6"

B4 S-512

TYP

3C1 S-510

TYP

A2 S-513

SIM

B1 S-513

TYP

- - - - - - - - - - - - - - - - - - - - - - - - - - - - B1 S-510

SIM

C1 S-516

TYP

TYP

8' - 9"

TY

P

8" THK PARTITION

WALL, SEE NOTE 4.

A4 S-517

20' - 0"

8"

SHEET KEYNOTES:

LEGEND:

# BENT DESIGNATION

A PILE ROW DESIGNATION

36" ⌀ PILE BELOW

ELECTRICAL DUCT BANK

CAST-IN-PLACE CONC SLAB

1. CONCRETE PIER DECK NOT SHOWN FOR CLARITY.

2. PROVIDE SLEEVE WITH PROPER DIAMETER FOR UTILITY

PIPES AT CONCRETE HEAD WALLS AND WITHIN UTILITY

TRENCHES. SEE DRAWING S-511 FOR DETAILS.

3. SEE DRAWING S-512 FOR REINFORCEMENT DETAILS IN

CAST-IN-PLACE SLAB.

4. SEE DRAWING S-511 FOR REINFORCEMENT DETAILS IN

PARTITION WALL, UNLESS NOTED OTHERWISE.

5. PLACE VAULT DRAIN AT CENTER OF EACH VAULT UNLESS

NOTED OTHERWISE.

GENERAL SHEET NOTES:

491623303743 0

KEY PLAN

SATISFACTORY TO DATE

APPROVED

ACTIVITY

FOR COMMANDER NAVFAC

SEAL

A/E INFO

A

B

C

D

1 2 3 4 5

1 2 3 4 5

A

B

C

D

SCALE:

CONSTR. CONTR. NO.

SHEET

NAVFAC DRAWING NO.

DES DRW CHK

OF

EPROJECT NO.:

D E

P A

R T

M E

N T

O F

T H

E N

A V

Y N

A V

A L

F A

C

IL

IT

IE

S E

N G

IN

E

E R

IN

G

S Y

S T

E M

S C

O M

M A

N D

DRAWFORM REVISION: 25 AUGUST 2020

PM/DM

BRANCH MANAGER

CHIEF ENG/ARCH

FIRE PROTECTION

N A

V A

L F

A C

IL

IT

IE

S

E N

G

IN

E E

R

IN

G S

Y S

T E

M S

C O

M M

A N

D

M

ID

-A T

LA

N

T

IC

N A

V A

L S

T A

T

IO

N

N O

R F

O L K

V

A

AS NOTED

S Y

M D

E S

C R

IP

T

IO

N

D A

T E

A P

P R

/2

/2

:2 :3

A

M

A u to d e s k D o c s /2

U

S C

G O

C R

H o m e p o rt

In it ia ti v e O

P C

P ie r_

/P

IE

R

U S

C G

-1 -S

.r v t

S-113

U S

C G

O C

R H

O M

E P

O R

T

IN

IT

IA

T

IV

E O

P C

P

IE

R

F R

A M

IN

G

P

LA

N

S H

E E

T

O F

MJF

12936649

JZ AAN

Frank Cole USCG MASI

MRI/CWJ

1826479

N E

W P

O R

T, R

I N

A V

A L

S T

A T

IO

N

N E

W P

O R

T

JWJ

NEK

HPN

C I

C O

R E

H

A M

P T

O N

R O

A D

S

S -1

06 FEB 2026

PLAN

NORTH

SCALE: 1/8" = 1'-0"

FRAMING PLAN - SHEET 4 OF 7

A2

1/8" = 1' - 0" 0 5' 10' 15' 30'

1. CAST-IN-PLACE UTILITY TRENCHES AT BOTH SIDES OF PIER, TYPICAL.

2. 5'-0" WIDE BY 4'-0" DEEP CAST-IN-PLACE CONCRETE PILE CAP, TYPICAL.

3. PRECAST CONCRETE MANHOLE, TYPICAL.

4. 3'-0" WIDE BY 4'-0" DEEP CAST-IN-PLACE CONCRETE BEAM, TYPICAL.

6. UTILITY TRENCH DRAIN WITH ONE WAY VALVE, TYPICAL

7. 3'-6" WIDE BY 4'-0" DEEP CAST-IN-PLACE CONCRETE BEAM, TYPICAL.

16. CAST-IN-PLACE 8" THICK HEAD WALL, TYPICAL.

17. 4'-0" WIDE BY 1'-0" DEEP END WALL AT EJ, TYPICAL.

A

M E

N D

M E

N T

/0

/2

V M

G

A

M E

N D

M E

N T

/1

/2

V M

G

E

F

10111213141516

M A

T C

H L

IN

E

S E

E A

S -1

M A

T C

H L

IN

E

S E

E A

S -1

25' - 0" 25' - 0" 25' - 0" 25' - 0" 25' - 0" 11' - 0"

C

6'

6"

6'

6"

C PIERL

25' - 0" 25' - 0"

1000' - 0"

EDGE OF PIER

DECK, TYP

EJ, TYP

5"

TYP

5' - 0"

TYP

2' - 0"

TYP

5' - 6"

TYP

5' - 0"

TYP

20' - 0"

TYP

5' - 7"

D

TY

P

3'

6"

TY

P

8'

9"

TY

P 3'

0"

TY

P

1'

6"

TY

P

2'

0" B3 S-512

B4 S-512

TYP

C1 S-510

TYP

A2 S-513

SIM

B1 S-513

TYP

- - - - - - - - - - - - - - - - - - - - - - - - - - - - B1 S-510

SIM

C2 S-513

TYP

B2

S-510

TYP

B2 S-510

TYP

C1 S-513

C1 S-516

A4 S-512

TYP

8' - 9"

TY

P

A4 S-512

TYP

4' - 9"

TY

P

5'

9"

8' - 0"

8"

8' - 0"

8' - 0"

8'

0" 20' - 0"

8' - 0"

20'-0"

A4 S-517

TYP

LEGEND:

# BENT DESIGNATION

A PILE ROW DESIGNATION

36" ⌀ PILE BELOW

ELECTRICAL DUCT BANK

CAST-IN-PLACE CONC SLAB

SHEET KEYNOTES:

1. CONCRETE PIER DECK NOT SHOWN FOR CLARITY.

2. PROVIDE SLEEVE WITH PROPER DIAMETER FOR UTILITY

PIPES AT CONCRETE HEAD WALLS CONCRETE HEAD

WALLS AND WITHIN UTILITY TRENCHES. SEE DRAWING

S-511 FOR DETAILS.

3. SEE DRAWING S-512 FOR REINFORCEMENT DETAILS IN

CAST-IN-PLACE SLAB, UNLESS NOTED OTHERWISE.

4. PLACE VAULT DRAIN AT CENTER OF EACH VAULT UNLESS

NOTED OTHERWISE.

GENERAL SHEET NOTES:

491623303743 0

KEY PLAN

SATISFACTORY TO DATE

APPROVED

ACTIVITY

FOR COMMANDER NAVFAC

SEAL

A/E INFO

A

B

C

D

1 2 3 4 5

1 2 3 4 5

A

B

C

D

SCALE:

CONSTR. CONTR. NO.

SHEET

NAVFAC DRAWING NO.

DES DRW CHK

OF

EPROJECT NO.:

D E

P A

R T

M E

N T

O F

T H

E N

A V

Y N

A V

A L

F A

C

IL

IT

IE

S E

N G

IN

E

E R

IN

G

S Y

S T

E M

S C

O M

M A

N D

DRAWFORM REVISION: 25 AUGUST 2020

PM/DM

BRANCH MANAGER

CHIEF ENG/ARCH

FIRE PROTECTION

N A

V A

L F

A C

IL

IT

IE

S

E N

G

IN

E E

R

IN

G S

Y S

T E

M S

C O

M M

A N

D

M

ID

-A T

LA

N

T

IC

N A

V A

L S

T A

T

IO

N

N O

R F

O L K

V

A

AS NOTED

S Y

M D

E S

C R

IP

T

IO

N

D A

T E

A P

P R

/2

/2

:1 :2

A

M

A u to d e s k D o c s /2

U

S C

G O

C R

H o m e p o rt

In it ia ti v e O

P C

P ie r_

/P

IE

R

U S

C G

-1 -S

.r v t

S-114

U S

C G

O C

R H

O M

E P

O R

T

IN

IT

IA

T

IV

E O

P C

P

IE

R

F R

A M

IN

G

P

LA

N

S H

E E

T

O F

MJF

12936650

JZ AAN

Frank Cole USCG MASI

MRI/CWJ

1826479

N E

W P

O R

T, R

I N

A V

A L

S T

A T

IO

N

N E

W P

O R

T

JWJ

NEK

HPN

C I

C O

R E

H

A M

P T

O N

R O

A D

S

S -1

06 FEB 2026

PLAN

NORTH

SCALE: 1/8" = 1'-0"

FRAMING PLAN - SHEET 5 OF 7

A2

1/8" = 1' - 0" 0 5' 10' 15' 30'

1. CAST-IN-PLACE UTILITY TRENCHES AT BOTH SIDES OF PIER, TYPICAL.

2. 5'-0" WIDE BY 4'-0" DEEP CAST-IN-PLACE CONCRETE PILE CAP, TYPICAL.

3. PRECAST CONCRETE MANHOLE, TYPICAL.

4. 3'-0" WIDE BY 4'-0" DEEP CAST-IN-PLACE CONCRETE BEAM, TYPICAL.

5. 10" HEAVY DUTY SLEEVED DECK DRAIN (2'-9" LONG) WITH FRAME AND

GRATE, TYPICAL.

6. UTILITY TRENCH DRAIN WITH ONE WAY VALVE, TYPICAL

7. 3'-6" WIDE BY 4'-0" DEEP CAST-IN-PLACE CONCRETE BEAM, TYPICAL.

16. CAST-IN-PLACE 8" THICK HEAD WALL, TYPICAL.

17. 4'-0" WIDE BY 1'-0" DEEP END WALL AT EJ, TYPICAL.

19. 10" HEAVY DUTY SLEEVED DECK DRAIN (6'-9" LONG) WITH FRAME AND

GRATE, TYPICAL.

A

M E

N D

M E

N T

/2

/2

V M

G

A

M E

N D

M E

N T

/0

/2

V M

G

A

M E

N D

M E

N T

/1

/2

V M

G

E

F

456789

A3 S-304

EDGE OF PIER

DECK, TYP

M A

T C

H L

IN

E

S E

E A

S -1

25' - 0" 25' - 0" 25' - 0" 25' - 0" 21' - 6"

C

TY

P

1'

6"

TY

P

3'

0"

3'

6"

TY

P

8'

9"

TY

P

3'

0"

C3 S-309

C PIERL

C2 S-302

25' - 0"

1000' - 0"

6'

6"

6'

6"

TYP

5' - 0"

TYP

6' - 2" 5' - 0"

TYP

8' - 10"

M A

T C

H L

IN

E

S E

E A

S -1

LIMITS OF

SUBSTATION ABOVE

C1 S-512

D

5'

3"

TY

P

1'

6"

TY

P

2'

0"

A3 S-309

TY

P

3'

6"

B4 S-512

TYP

B2 S-513

C2 S-513

TYP

C1 S-513

TYP

C1 S-510

TYP

B2 S-510

TYP

B1 S-510

SIM

A2 S-510

C2 S-513

TYP

A4 S-510

B4

S-513

C1 S-513

TYP

SIMTYP

SIMTYP

A4 S-512

TYP

4'-8" Wx 2'-0" H OPNG, TYP

TYP

4' - 8"

TYP

5' - 4"

TY

P

9'

3"

12' - 6"

TYP

16' - 6"

TYP

20' - 0"

TY

P

8" THK PARTITION

WALL, SEE NOTE 4.

2'

3"4' - 8"

8' - 0"

8'-0"

8"

7'

0"

20' - 0"

8' - 0"

20'-0"

A4 S-517

TYP

LEGEND:

# BENT DESIGNATION

A PILE ROW DESIGNATION

36" ⌀ PILE BELOW

ELECTRICAL DUCT BANK

CAST-IN-PLACE CONC SLAB

SHEET KEYNOTES:

1. CONCRETE PIER DECK NOT SHOWN FOR CLARITY.

2. PROVIDE SLEEVE WITH PROPER DIAMETER FOR UTILITY

PIPES AT CONCRETE HEAD WALLS AND WITHIN UTILITY

TRENCHES. SEE DRAWING S-511 FOR DETAILS.

3. SEE DRAWING S-512 FOR REINFORCEMENT DETAILS IN

CAST-IN-PLACE SLAB.

4. SEE DRAWING S-511 FOR REINFORCEMENT DETAILS IN

PARTITION WALL, UNLESS NOTED OTHERWISE.

5. PLACE VAULT DRAIN AT CENTER OF EACH VAULT UNLESS

NOTED OTHERWISE.

GENERAL SHEET NOTES:

491623303743 0

KEY PLAN

SATISFACTORY TO DATE

APPROVED

ACTIVITY

FOR COMMANDER NAVFAC

SEAL

A/E INFO

A

B

C

D

1 2 3 4 5

1 2 3 4 5

A

B

C

D

SCALE:

CONSTR. CONTR. NO.

SHEET

NAVFAC DRAWING NO.

DES DRW CHK

OF

EPROJECT NO.:

D E

P A

R T

M E

N T

O F

T H

E N

A V

Y N

A V

A L

F A

C

IL

IT

IE

S E

N G

IN

E

E R

IN

G

S Y

S T

E M

S C

O M

M A

N D

DRAWFORM REVISION: 25 AUGUST 2020

PM/DM

BRANCH MANAGER

CHIEF ENG/ARCH

FIRE PROTECTION

N A

V A

L F

A C

IL

IT

IE

S

E N

G

IN

E E

R

IN

G S

Y S

T E

M S

C O

M M

A N

D

M

ID

-A T

LA

N

T

IC

N A

V A

L S

T A

T

IO

N

N O

R F

O L K

V

A

AS NOTED

S Y

M D

E S

C R

IP

T

IO

N

D A

T E

A P

P R

/2

/2

:5 :0

A

M

A u to d e s k D o c s /2

U

S C

G O

C R

H o m e p o rt

In it ia ti v e O

P C

P ie r_

/P

IE

R

U S

C G

-1 -S

.r v t

S-115

U S

C G

O C

R H

O M

E P

O R

T

IN

IT

IA

T

IV

E O

P C

P

IE

R

F R

A M

IN

G

P

LA

N

S H

E E

T

O F

MJF

12936651

JZ AAN

Frank Cole USCG MASI

MRI/CWJ

1826479

N E

W P

O R

T, R

I N

A V

A L

S T

A T

IO

N

N E

W P

O R

T

JWJ

NEK

HPN

C I

C O

R E

H

A M

P T

O N

R O

A D

S

S -1

06 FEB 2026

PLAN

NORTH

SCALE: 1/8" = 1'-0"

FRAMING PLAN - SHEET 6 OF 7

A2

1/8" = 1' - 0" 0 5' 10' 15' 30'

1. CAST-IN-PLACE UTILITY TRENCHES AT BOTH SIDES OF PIER, TYPICAL.

2. 5'-0" WIDE BY 4'-0" DEEP CAST-IN-PLACE CONCRETE PILE CAP, TYPICAL.

3. PRECAST CONCRETE MANHOLE, TYPICAL.

4. 3'-0" WIDE BY 4'-0" DEEP CAST-IN-PLACE CONCRETE BEAM, TYPICAL.

5. 10" HEAVY DUTY SLEEVED DECK DRAIN (2'-9" LONG) WITH FRAME AND

GRATE, TYPICAL.

6. UTILITY TRENCH DRAIN WITH ONE WAY VALVE, TYPICAL

7. 3'-6" WIDE BY 4'-0" DEEP CAST-IN-PLACE CONCRETE BEAM, TYPICAL.

9. 5'-3" WIDE BY 4'-0" DEEP CAST-IN-PLACE CONCRETE BEAM, ALONG PILE

ROW C UNDER SUBSTATION.

15. CAST-IN-PLACE 12" THICK VAULT SLAB, TYPICAL.

18. PROVIDE LATERAL UTILITY TRENCH WITH TWO 2'-4" WIDE BY 4'-0" DEEP

CAST-IN-PLACE CONCRETE BEAMS.

19. 10" HEAVY DUTY SLEEVED DECK DRAIN (6'-9" LONG) WITH FRAME AND

GRATE, TYPICAL.

A

M E

N D

M E

N T

/2

/2

V M

G

A

M E

N D

M E

N T

/0

/2

V M

G

A

M E

N D

M E

N T

/1

/2

V M

G

A

M E

N D

M E

N T

/2

/2

V M

G

TOP OF PIER DECK EL 13.00'

BOT OF PILE CAP EL 6.50

MLLW EL -2.12

MHW EL 1.62

TOP OF PIER DECK EL 13.00'

BOT OF PILE CAP EL 6.50

MLLW EL -2.12

MHW EL 1.62

#6 @6"

SPA, EW

#6 'U' @6" SPA, TYP

1" NON-SHRINK

GROUT, TYP

#8 @6"

SPA, EW, TYP

4 - #6 EF

9 - 2 #10 BUNDLED

(TOT 18)

36" DIA CONC-FILLED STEEL

PIPE PILE, TYP

GROUT FILLED HDPE

PILE JACKET

9 - 2#9 BUNDLED (TOT 18) #10 @6" SPA,

EA 9'-0" PASSING

BENT CL (TOT 18'-0")

BOT OF PILE CAP

EL 6.50' TYP, UNO

5' - 0"

5" M

IN

V A

R

IE

S

8'

0" 4'

0"

2' - 6" 2' - 6"

3"

C BENT

4 - #6 EFL

P/C CONC

PLANK, TYP

8"

TY

P

1'

6" V

A R

IE

S

0"

M

IN

6 - #8

#5 'U' @6" SPA, TYP

TOP OF PIER DECK

EL 13.00'

BOT OF PILE CAP

EL 6.50'

PILE CAP, TYP

4 - #9 ADD'L

8 - #9 & 1 - #9 ADD'L

SEE FOR

EJ DETAILS

ADD'L 4 - #9 EA 18'-0" LONG

4 - #6

EF

12 - #9

#5 'U' BAR, TYP

P/C CONC

PLANK, TYP

NOTE:

1. REINFORCEMENT IN PILE CAP, BEAM, AND

TOPPING SLAB ARE NOT SHOWN FOR

CLARITY.

2. SEE DRAWING S-516 FOR ADDITIONAL

REINFORCEMENT.

ADD'L #9

4' - 3" TO END OF 2' - 6"

1'

6"

2" MAX

EL 13.00'

END WALL AT EJ,

FOR REINF DETAILS.

D1 S-522

6"

TYP

S-516 C1

5"1' - 0"

TYP

#6 @6"

SPA, EW

#4 TIES

#6 'U' @6" SPA, TYP

1" NON-SHRINK GROUT, TYP

#8 @6"

SPA, EW,

TYP

4 -#7 EF

9 - 2 #11 BUNDLED

(TOT 18)

36" DIA CONC-FILLED STEEL

PIPE PILE, TYP

GROUT FILLED HDPE

PILE JACKET

9 - 2 #10 BUNDLED (TOT 18)

#10 @6" SPA

18'-0" LONG

BOT OF PILE CAP

EL 6.50' TYP, UNO

5' - 0"

5" M

IN

V A

R

IE

S

8'

0" 4'

0"

2' - 6" 2' - 6"

3"

C BENT

3 - #6 EF

L

P/C CONC PLANK, TYP

8"

TY

P

1'

6" V

A R

IE

S

0"

M

IN

6 - #8

#5 'U' @6" SPA, TYP#6 ALT TIES @

6" SPA, TYP

1. SEE DRAWING S-515 FOR ADDITIONAL INFORMATION ON

REINFORCEMENT IN PRECAST PLANKS.

NOTES:

TOP OF PIER DECK

EL 13.00'

BOT OF PILE CAP

EL 6.50'

NOTE: A MINIMUM OF 50% OF #11 BUNDELED BARS AT BOT OF BEAM

MUST BE CONTINUOUS THROUGH THE PILE CAP. THE REMAINING BARS

MAY BE TERMINATED IN 90 DEGREE HOOKS. SEE B1 ON DRAWING S-512

FOR MORE INFORMATION.

PILE CAP

(BEYOND), TYP

M

IN

1'

6" 4'

1"

5 - #6#11 BUNDLED, SEE

B1 S-512

#11 BUNDLED,

SEE NOTE

4 - #9 3 - #6

PILE CAP PILE CAP

P/C PLANK (BEYOND), TYP.

5" max #5/#6 @ 6" O.C.

SATISFACTORY TO DATE

APPROVED

ACTIVITY

FOR COMMANDER NAVFAC

SEAL

A/E INFO

A

B

C

D

1 2 3 4 5

1 2 3 4 5

A

B

C

D

SCALE:

CONSTR. CONTR. NO.

SHEET

NAVFAC DRAWING NO.

DES DRW CHK

OF

EPROJECT NO.:

D E

P A

R T

M E

N T

O F

T H

E N

A V

Y N

A V

A L

F A

C

IL

IT

IE

S E

N G

IN

E

E R

IN

G

S Y

S T

E M

S C

O M

M A

N D

DRAWFORM REVISION: 25 AUGUST 2020

PM/DM

BRANCH MANAGER

CHIEF ENG/ARCH

FIRE PROTECTION

N A

V A

L F

A C

IL

IT

IE

S

E N

G

IN

E E

R

IN

G S

Y S

T E

M S

C O

M M

A N

D

M

ID

-A T

LA

N

T

IC

N A

V A

L S

T A

T

IO

N

N O

R F

O L K

V

A

AS NOTED

S Y

M D

E S

C R

IP

T

IO

N

D A

T E

A P

P R

/2

/2

:3 :2

A

M

A u to d e s k D o c s /2

U

S C

G O

C R

H o m e p o rt

In it ia ti v e O

P C

P ie r_

/P

IE

R

U S

C G

-1 -S

.r v t

S-504

U S

C G

O C

R H

O M

E P

O R

T

IN

IT

IA

T

IV

E O

P C

P

IE

R

C O

N C

R E

TE

P

IL

E

C A

P D

E

TA

IL

S

S

H E

E T

O

F

MJF

12936701

JZ AFC

Frank Cole USCG MASI

MRI/CWJ

1826479

N E

W P

O R

T, R

I N

A V

A L

S T

A T

IO

N

N E

W P

O R

T

JWJ

NEK

HPN

C I

C O

R E

H

A M

P T

O N

R O

A D

S

S -5

06 FEB 2026

1/2" = 1' - 0" 0 1' 5'6" 2' 3' 4'

SCALE: 1/2" = 1'-0" (S-508)

A1

TYPICAL PILE CAP SECTION AT BENTS 1-6, 12-16, & 22-43

SCALE: 1/2" = 1'-0" (S-106)

C3

CANTILEVERED BEAM SECTION AT EXPANSION JOINT

(S-120)

NOT TO SCALE

A3

TYPICAL PILE CAP SECTION AT BENTS 7-11 & 17-21

SCALE = 1/2" = 1'-0" (S-504)

A

M E

N D

M E

N T

/1

/2

V M

G

SCALE: 1/4" = 1'-0" (S-106)

C1

TYPICAL BEAM ELEVATION

BOT OF MH EL 2.08'

TOP OF PIER DECK

EL 13.00'

BOT OF PILE CAP

EL 6.50'

CIP CONC SLAB

SWELLABLE

WATERSTOP, TYP

30" OR 36"Ø WATERTIGHT HEAVY-

DUTY CAST IRON MH FRAME

AND COVER (SLAB TYPE)

C MHL

#5 @12" SPA,

T&B, TYP

CIP CONC PILE

CAP, TYP

#5 @12" SPA,

EW, EF,

TYP

EL 7.75' , TYP

POST-INSTALLED

AB 3/4 DIA W/ 10"

EMBED INTO PILE

CAP @ 24", TYP

5"

M

IN

7'

6"

1'

3"

TYP

2"

CONT L8x6x1/2, TYP

#4 U BARS @ 12 @

SWELLABLE WATERSTOP,

TYP

CAST-IN 3/4" DIA

BOLTS @12" SPA, TYP

#8@6"

SPA, EF

P/C MH, TYP

CONT PL 1'-6"Wx1/2"

THK, TYP

TY

P

M

IN

10" MIN

C

C1 S-517

36"⌀ CONC-FILLED

STL PIPE PILE, TYP

CIP CONC

BEAM, TYP

CIP CONC PILE

CAP, TYP

SWELLABLE WATERSTOP,

TYP

#8 @6" OC ,EF

D

C2 S-505

POST-INSTALLED

AB 3/4 DIA W/ 10"

MIN EMBED INTO

PILE CAP @24" SPA,

TYP

CONT L8x6x1/2, TYP

1/2" THK AND 1'-6"

WIDE CONT PL, TYP

CAST-IN 3/4" DIA

File details come from the government source that posted it. Updated .