This document is a Pile Driving Log and associated pile driving summary prepared by Geosciences Testing and Research, Inc. (GTR) for the NOAA OMAO project at Newport, Rhode Island Naval Station. The project involved the installation of 45 bulkhead piles (BH14-BH58) using vibratory and impact driving methods between July 15-19, 2024, with contractor Coastal Marine and GTR Representative J. Roth overseeing the work.

The piles consist of steel 18-inch outer diameter pipe with 0.5-inch wall thickness and 17-inch inner diameter, driven to a target depth of 60 feet with a working grade of 12.25 feet and pile length of 55.50 feet. All piles were not vibed during installation, with final drive dates spanning July 15-19, 2024. Final blow counts for the last foot ranged from 9 to 15.5 blows per foot, indicating adequate bearing capacity. The cut-off elevation was standardized at 53.50 feet for all piles, with tip elevations at -43.25 feet and top elevations at 16.75 feet. Detailed driving logs for individual piles (BH14 through BH58) document depth increments, blow counts, and driving data at regular intervals. All elevations referenced are based on NAVD 88 datum, and the completed pile batter alignment runs north-south with plumb orientation.

View the file

Other files

File Type Posted
USCG OPC Pier Amendment 0009 Drawings.pdf PDF
2026-0816-HAI-USCG Homeport OPC Pier-Geotech Engineering Report Rev 2.pdf PDF
Amendment 0009 USCG OPC.pdf PDF
Updated Attachment H - USCG OPC Pier Price Proposal Form REV 5.docx DOCX document
Amendment 0008 USCG OPC.pdf PDF
Amendment 0007 SPC USCG OPC Pier Appendix D (With Placeholders).pdf PDF
Updated Attachment H - USCG OPC Pier Price Proposal Form REV 6.docx DOCX document
USCG OPC Pier Amendment 0008 Drawings.pdf PDF
USCG OPC Pier Amendment 007 Drawings.pdf PDF
Amendment 0007 USCG OPC.pdf PDF
Attachment Z - Pier 1 - Amendment 006 Drawings.pdf PDF
Appendix A - Telecom Room Photos.pdf PDF
Updated Attachment H - UCCG OPC Pier Price Proposal Form REV 4.docx DOCX document
Amendment 0006 USCG OPC.pdf PDF
24.168 NOAA OMAO Prime Pier Pile Driving Summary Report.pdf PDF
Pier Pile Plan.pdf PDF
24.168 NOAA OMAO Bulkhead Pile Driving Summary Table 08.26.24 to 08.30.24 (1).pdf PDF
24.168 NOAA OMAO Bulkhead Pile Driving Summary Table 07.22.24 to 07.26.24.pdf PDF
Attachment Y - Appendix A Record drawing 11836 125 Submarine Cable Relocation.pdf PDF
SUB-0123 Interim PDA and Test Pile Logs - Trestle Piles 10B 14B.pdf PDF
SUB-0TBD Interim PDA and Test Pile Logs For Trestle Pile 17B.pdf PDF
24.168 NOAA OMAO Bulkhead Pile Driving Summary Table 08.26.24 to 08.30.24.pdf PDF
Updated Attachment H - UCCG OPC Pier Price Proposal Form REV 3.docx DOCX document
SUB-0105 Trestle Piles 4C 6B - PDA and Test Pile Logs.pdf PDF
24.168 NOAA OMAO Bulkhead Pile Driving Summary Table 08.20.24 to 08.23.24.pdf PDF
24.107 NOAA OMAO Ship & Support Facility Relocation Newport RI - PDA Report - Pier Bent 19.pdf PDF
24.168 NOAA OMAO Bulkhead Pile Driving Summary Table 06.25.24 to 06.27.24.pdf PDF
24.168 NOAA OMAO Bulkhead Pile Driving Summary Table 07.31.24 to 08.01.24.pdf PDF
SUB-0284 PDA49B_A.pdf PDF
SUB-0262 Interim PDA Test Pile Logs for Pier Piles - Bent 35 B - A.pdf PDF
24.168 NOAA OMAO Bulkhead Pile Driving Summary Table 08.07.24 to 08.08.24.pdf PDF
Trestle Summary.pdf PDF
24.168 NOAA OMAO Bulkhead Pile Driving Summary Table 08.20.24 to 08.23.24 (1).pdf PDF
24.168 NOAA OMAO Bulkhead Pile Driving Summary Table 07.01.24 - 07.02.24.pdf PDF
Bulkhead Pile Plan.pdf PDF
24.168 NOAA OMAO Bulkhead Pile Driving Summary Table 09.03.24 to 09.06.24.pdf PDF
24.168 NOAA OMAO Bulkhead Pile Driving Summary Table 08.13.24 to 08.15.24.pdf PDF
Attachment W - Pier 1 - Amendment 005 Drawings.pdf PDF
24.168 NOAA OMAO Bulkhead Pile Driving Summary Table 07.11.24.pdf PDF
24.107 NOAA OMAO Ship Support Facility Relocation Newport RI - PDA Report - Pier Bent 25 and 27.pdf PDF
NOAA OMAO Survey Reports 100 Percent Pre-Final Submittal 04072022.pdf PDF
Amendment 0005 USCG OPC.pdf PDF
Attachment X - Appendix A Record Drawing 12819 135 Submarine Cable.pdf PDF
Attachment U - Appendix A - Pier 1 Extension 1968.pdf PDF
Attachment V - Pier 1 - Amendment 004 Drawings.pdf PDF
Updated Attachment K - WD RI20260001 05-18-2026.pdf PDF
Amendment 0004 USCG OPC.pdf PDF
Attachment T - REF(m) Existing Pier 1 Drawings 1 of 2.pdf PDF
Attachment C - Construction Experience Project Data Sheet.docx DOCX document
Attachment E - Historical Small Business Utilization.docx DOCX document
Show 40 more

Latest 50 of 90 listed here. See the rest on GovTribe.

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

DATE:

PROJECT LOCATION:

CLIENT: CONTRACTOR:

GTR REP PILE INFO:

BH58 Not Vibed 15-Jul-24 12.25 60 55.50 10.25 -43.25 16.75 53.50 32 9 - 10

BH57 Not Vibed 15-Jul-24 12.25 60 55.50 10.25 -43.25 16.75 53.50 28 9.5 - 10.5

BH56 Not Vibed 15-Jul-24 12.25 60 55.50 10.25 -43.25 16.75 53.50 28 9.5 - 10.5

BH55 Not Vibed 15-Jul-24 12.25 60 55.50 10.25 -43.25 16.75 53.50 28 9 - 10

BH54 Not Vibed 15-Jul-24 12.25 60 55.50 10.25 -43.25 16.75 53.50 36 10 - 11

BH53 Not Vibed 15-Jul-24 12.25 60 55.50 10.25 -43.25 16.75 53.50 38 10 - 11.5

BH52 Not Vibed 15-Jul-24 12.25 60 55.50 10.25 -43.25 16.75 53.50 64 10.5 - 11.5

BH51 Not Vibed 15-Jul-24 12.25 60 55.50 10.25 -43.25 16.75 53.50 70 10.5 - 11.5

BH50 Not Vibed 15-Jul-24 12.25 60 55.50 10.25 -43.25 16.75 53.50 48 9.5 - 10.5

BH49 Not Vibed 16-Jul-24 12.25 60 55.50 10.25 -43.25 16.75 53.50 36 10 - 11

BH48 Not Vibed 16-Jul-24 12.25 60 55.50 10.25 -43.25 16.75 53.50 42 10 - 11

BH47 Not Vibed 16-Jul-24 12.25 60 55.50 10.25 -43.25 16.75 53.50 38 10.5 - 11.5

BH46 Not Vibed 16-Jul-24 12.25 60 55.50 10.25 -43.25 16.75 53.50 60 15.5 - 11.5

BH45 Not Vibed 16-Jul-24 12.25 60 55.50 10.25 -43.25 16.75 53.50 54 10.5 - 11.5

BH44 Not Vibed 16-Jul-24 12.25 60 55.50 10.25 -43.25 16.75 53.50 58 10.5 - 11.5

BH43 Not Vibed 16-Jul-24 12.25 60 55.50 10.25 -43.25 16.75 53.50 56 10 - 11

BH42 Not Vibed 16-Jul-24 12.25 60 55.50 10.25 -43.25 16.75 53.50 44 10 - 11

BH41 Not Vibed 16-Jul-24 12.25 60 55.50 10.25 -43.25 16.75 53.50 38 10.5 - 11.5

BH40 Not Vibed 17-Jul-24 12.25 60 55.50 10.25 -43.25 16.75 53.50 36 10 - 11

BH39 Not Vibed 17-Jul-24 12.25 60 55.50 10.25 -43.25 16.75 53.50 38 10 - 11

BH38 Not Vibed 17-Jul-24 12.25 60 55.50 10.25 -43.25 16.75 53.50 38 10 - 11'

BH37 Not Vibed 17-Jul-24 12.25 60 55.50 10.25 -43.25 16.75 53.50 40 10 - 11

BH36 Not Vibed 17-Jul-24 12.25 60 55.50 10.25 -43.25 16.75 53.50 42 10 - 11

BH35 Not Vibed 17-Jul-24 12.25 60 55.50 10.25 -43.25 16.75 53.50 32 9.5 - 10.5

BH34 Not Vibed 17-Jul-24 12.25 60 55.50 10.25 -43.25 16.75 53.50 28 9 - 10

BH33 Not Vibed 17-Jul-24 12.25 60 55.50 10.25 -43.25 16.75 53.50 32 9.5 - 10.5

BH32 Not Vibed 17-Jul-24 12.25 60 55.50 10.25 -43.25 16.75 53.50 28 9 - 10

BH31 Not Vibed 18-Jul-24 12.25 60 55.50 10.25 -43.25 16.75 53.50 34 10 - 11

PILE

NO.

DRIVEN

DEPTH

(feet)

TIP

ELEVATION

(feet)

TOP

ELEVATION

(feet)

PILE

LENGTH

(feet)

EOD

STROKE

(feet)

WORKING

GRADE

(feet)

FINAL DRIVE

DATE

VIBRATION

DRIVE DATE

CUT-OFF

LENGTH

GTR JOB # 24.168

GEOSCIENCES TESTING AND RESEARCH, INC.

55 Middlesex Street, Suite 225, North Chelmsford, MA, Phone: (978) 251-9395 Fax: (978) 251-9396

COMMENTS

PILE DRIVING SUMMARY

J. Roth Steel 18-inch O.D. X 0.5-inch wall open-ended Pipe

Newport RI Naval Station Coastal Marine

NOAA OMAO

Skanska

24-Jul-24

CUT-OFF

ELEVATION

(feet)

BLOW

COUNT

FINAL FOOT

BULKHEAD PILES

DATE:

PROJECT LOCATION:

CLIENT: CONTRACTOR:

GTR REP PILE INFO:

PILE

NO.

DRIVEN

DEPTH

(feet)

TIP

ELEVATION

(feet)

TOP

ELEVATION

(feet)

PILE

LENGTH

(feet)

EOD

STROKE

(feet)

WORKING

GRADE

(feet)

FINAL DRIVE

DATE

VIBRATION

DRIVE DATE

CUT-OFF

LENGTH

GTR JOB # 24.168

GEOSCIENCES TESTING AND RESEARCH, INC.

55 Middlesex Street, Suite 225, North Chelmsford, MA, Phone: (978) 251-9395 Fax: (978) 251-9396

COMMENTS

PILE DRIVING SUMMARY

J. Roth Steel 18-inch O.D. X 0.5-inch wall open-ended Pipe

Newport RI Naval Station Coastal Marine

NOAA OMAO

Skanska

24-Jul-24

CUT-OFF

ELEVATION

(feet)

BLOW

COUNT

FINAL FOOT

BULKHEAD PILES

BH30 Not Vibed 18-Jul-24 12.25 60 55.50 10.25 -43.25 16.75 53.50 44 10.5 - 11.5

BH29 Not Vibed 18-Jul-24 12.25 60 55.50 10.25 -43.25 16.75 53.50 38 10.5 - 11.5

BH28 Not Vibed 18-Jul-24 12.25 60 55.50 10.25 -43.25 16.75 53.50 34 10.5 - 11.5

BH27 Not Vibed 18-Jul-24 12.25 60 55.50 10.25 -43.25 16.75 53.50 34 10 - 11

BH26 Not Vibed 18-Jul-24 12.25 60 55.50 10.25 -43.25 16.75 53.50 82 10.5 - 11.5

BH25 Not Vibed 18-Jul-24 12.25 60 55.50 10.25 -43.25 16.75 53.50 56 10.5 - 11.5

BH24 Not Vibed 18-Jul-24 12.25 60 55.50 10.25 -43.25 16.75 53.50 74 10.5 - 11.5

BH23 Not Vibed 18-Jul-24 12.25 60 55.50 10.25 -43.25 16.75 53.50 78 10.5 - 11.5

BH22 Not Vibed 19-Jul-24 12.25 60 55.50 10.25 -43.25 16.75 53.50 32 10 - 11

BH21 Not Vibed 19-Jul-24 12.25 60 55.50 10.25 -43.25 16.75 53.50 46 10.5 - 11.5

BH20 Not Vibed 19-Jul-24 12.25 60 55.50 10.25 -43.25 16.75 53.50 60 10.5 - 11.5

BH19 Not Vibed 19-Jul-24 12.25 60 55.50 10.25 -43.25 16.75 53.50 56 10.5 - 11.5

BH18 Not Vibed 19-Jul-24 12.25 60 55.50 10.25 -43.25 16.75 53.50 64 10.5 - 11.5

BH17 Not Vibed 19-Jul-24 12.25 60 55.50 10.25 -43.25 16.75 53.50 68 10.5 - 11.5

BH16 Not Vibed 19-Jul-24 12.25 60 55.50 10.25 -43.25 16.75 53.50 70 10.5 - 11.5

BH15 Not Vibed 19-Jul-24 12.25 60 55.50 10.25 -43.25 16.75 53.50 28 10.5 - 11.5

BH14 Not Vibed 19-Jul-24 12.25 60 55.50 10.25 -43.25 16.75 53.50 46 10.5 - 11.5

Pile was pulled and reset with the vibratory hammer after it moved out of verticality.