This document is a Pile Driving Log and associated pile driving summary prepared by Geosciences Testing and Research, Inc. (GTR) for the NOAA OMAO project at Newport, Rhode Island Naval Station. The project involved the installation of 45 bulkhead piles (BH14-BH58) using vibratory and impact driving methods between July 15-19, 2024, with contractor Coastal Marine and GTR Representative J. Roth overseeing the work.
The piles consist of steel 18-inch outer diameter pipe with 0.5-inch wall thickness and 17-inch inner diameter, driven to a target depth of 60 feet with a working grade of 12.25 feet and pile length of 55.50 feet. All piles were not vibed during installation, with final drive dates spanning July 15-19, 2024. Final blow counts for the last foot ranged from 9 to 15.5 blows per foot, indicating adequate bearing capacity. The cut-off elevation was standardized at 53.50 feet for all piles, with tip elevations at -43.25 feet and top elevations at 16.75 feet. Detailed driving logs for individual piles (BH14 through BH58) document depth increments, blow counts, and driving data at regular intervals. All elevations referenced are based on NAVD 88 datum, and the completed pile batter alignment runs north-south with plumb orientation.
View the file
Other files
Show 40 more
Latest 50 of 90 listed here. See the rest on GovTribe.
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
DATE:
PROJECT LOCATION:
CLIENT: CONTRACTOR:
GTR REP PILE INFO:
BH58 Not Vibed 15-Jul-24 12.25 60 55.50 10.25 -43.25 16.75 53.50 32 9 - 10
BH57 Not Vibed 15-Jul-24 12.25 60 55.50 10.25 -43.25 16.75 53.50 28 9.5 - 10.5
BH56 Not Vibed 15-Jul-24 12.25 60 55.50 10.25 -43.25 16.75 53.50 28 9.5 - 10.5
BH55 Not Vibed 15-Jul-24 12.25 60 55.50 10.25 -43.25 16.75 53.50 28 9 - 10
BH54 Not Vibed 15-Jul-24 12.25 60 55.50 10.25 -43.25 16.75 53.50 36 10 - 11
BH53 Not Vibed 15-Jul-24 12.25 60 55.50 10.25 -43.25 16.75 53.50 38 10 - 11.5
BH52 Not Vibed 15-Jul-24 12.25 60 55.50 10.25 -43.25 16.75 53.50 64 10.5 - 11.5
BH51 Not Vibed 15-Jul-24 12.25 60 55.50 10.25 -43.25 16.75 53.50 70 10.5 - 11.5
BH50 Not Vibed 15-Jul-24 12.25 60 55.50 10.25 -43.25 16.75 53.50 48 9.5 - 10.5
BH49 Not Vibed 16-Jul-24 12.25 60 55.50 10.25 -43.25 16.75 53.50 36 10 - 11
BH48 Not Vibed 16-Jul-24 12.25 60 55.50 10.25 -43.25 16.75 53.50 42 10 - 11
BH47 Not Vibed 16-Jul-24 12.25 60 55.50 10.25 -43.25 16.75 53.50 38 10.5 - 11.5
BH46 Not Vibed 16-Jul-24 12.25 60 55.50 10.25 -43.25 16.75 53.50 60 15.5 - 11.5
BH45 Not Vibed 16-Jul-24 12.25 60 55.50 10.25 -43.25 16.75 53.50 54 10.5 - 11.5
BH44 Not Vibed 16-Jul-24 12.25 60 55.50 10.25 -43.25 16.75 53.50 58 10.5 - 11.5
BH43 Not Vibed 16-Jul-24 12.25 60 55.50 10.25 -43.25 16.75 53.50 56 10 - 11
BH42 Not Vibed 16-Jul-24 12.25 60 55.50 10.25 -43.25 16.75 53.50 44 10 - 11
BH41 Not Vibed 16-Jul-24 12.25 60 55.50 10.25 -43.25 16.75 53.50 38 10.5 - 11.5
BH40 Not Vibed 17-Jul-24 12.25 60 55.50 10.25 -43.25 16.75 53.50 36 10 - 11
BH39 Not Vibed 17-Jul-24 12.25 60 55.50 10.25 -43.25 16.75 53.50 38 10 - 11
BH38 Not Vibed 17-Jul-24 12.25 60 55.50 10.25 -43.25 16.75 53.50 38 10 - 11'
BH37 Not Vibed 17-Jul-24 12.25 60 55.50 10.25 -43.25 16.75 53.50 40 10 - 11
BH36 Not Vibed 17-Jul-24 12.25 60 55.50 10.25 -43.25 16.75 53.50 42 10 - 11
BH35 Not Vibed 17-Jul-24 12.25 60 55.50 10.25 -43.25 16.75 53.50 32 9.5 - 10.5
BH34 Not Vibed 17-Jul-24 12.25 60 55.50 10.25 -43.25 16.75 53.50 28 9 - 10
BH33 Not Vibed 17-Jul-24 12.25 60 55.50 10.25 -43.25 16.75 53.50 32 9.5 - 10.5
BH32 Not Vibed 17-Jul-24 12.25 60 55.50 10.25 -43.25 16.75 53.50 28 9 - 10
BH31 Not Vibed 18-Jul-24 12.25 60 55.50 10.25 -43.25 16.75 53.50 34 10 - 11
PILE
NO.
DRIVEN
DEPTH
(feet)
TIP
ELEVATION
(feet)
TOP
ELEVATION
(feet)
PILE
LENGTH
(feet)
EOD
STROKE
(feet)
WORKING
GRADE
(feet)
FINAL DRIVE
DATE
VIBRATION
DRIVE DATE
CUT-OFF
LENGTH
GTR JOB # 24.168
GEOSCIENCES TESTING AND RESEARCH, INC.
55 Middlesex Street, Suite 225, North Chelmsford, MA, Phone: (978) 251-9395 Fax: (978) 251-9396
COMMENTS
PILE DRIVING SUMMARY
J. Roth Steel 18-inch O.D. X 0.5-inch wall open-ended Pipe
Newport RI Naval Station Coastal Marine
NOAA OMAO
Skanska
24-Jul-24
CUT-OFF
ELEVATION
(feet)
BLOW
COUNT
FINAL FOOT
BULKHEAD PILES
DATE:
PROJECT LOCATION:
CLIENT: CONTRACTOR:
GTR REP PILE INFO:
PILE
NO.
DRIVEN
DEPTH
(feet)
TIP
ELEVATION
(feet)
TOP
ELEVATION
(feet)
PILE
LENGTH
(feet)
EOD
STROKE
(feet)
WORKING
GRADE
(feet)
FINAL DRIVE
DATE
VIBRATION
DRIVE DATE
CUT-OFF
LENGTH
GTR JOB # 24.168
GEOSCIENCES TESTING AND RESEARCH, INC.
55 Middlesex Street, Suite 225, North Chelmsford, MA, Phone: (978) 251-9395 Fax: (978) 251-9396
COMMENTS
PILE DRIVING SUMMARY
J. Roth Steel 18-inch O.D. X 0.5-inch wall open-ended Pipe
Newport RI Naval Station Coastal Marine
NOAA OMAO
Skanska
24-Jul-24
CUT-OFF
ELEVATION
(feet)
BLOW
COUNT
FINAL FOOT
BULKHEAD PILES
BH30 Not Vibed 18-Jul-24 12.25 60 55.50 10.25 -43.25 16.75 53.50 44 10.5 - 11.5
BH29 Not Vibed 18-Jul-24 12.25 60 55.50 10.25 -43.25 16.75 53.50 38 10.5 - 11.5
BH28 Not Vibed 18-Jul-24 12.25 60 55.50 10.25 -43.25 16.75 53.50 34 10.5 - 11.5
BH27 Not Vibed 18-Jul-24 12.25 60 55.50 10.25 -43.25 16.75 53.50 34 10 - 11
BH26 Not Vibed 18-Jul-24 12.25 60 55.50 10.25 -43.25 16.75 53.50 82 10.5 - 11.5
BH25 Not Vibed 18-Jul-24 12.25 60 55.50 10.25 -43.25 16.75 53.50 56 10.5 - 11.5
BH24 Not Vibed 18-Jul-24 12.25 60 55.50 10.25 -43.25 16.75 53.50 74 10.5 - 11.5
BH23 Not Vibed 18-Jul-24 12.25 60 55.50 10.25 -43.25 16.75 53.50 78 10.5 - 11.5
BH22 Not Vibed 19-Jul-24 12.25 60 55.50 10.25 -43.25 16.75 53.50 32 10 - 11
BH21 Not Vibed 19-Jul-24 12.25 60 55.50 10.25 -43.25 16.75 53.50 46 10.5 - 11.5
BH20 Not Vibed 19-Jul-24 12.25 60 55.50 10.25 -43.25 16.75 53.50 60 10.5 - 11.5
BH19 Not Vibed 19-Jul-24 12.25 60 55.50 10.25 -43.25 16.75 53.50 56 10.5 - 11.5
BH18 Not Vibed 19-Jul-24 12.25 60 55.50 10.25 -43.25 16.75 53.50 64 10.5 - 11.5
BH17 Not Vibed 19-Jul-24 12.25 60 55.50 10.25 -43.25 16.75 53.50 68 10.5 - 11.5
BH16 Not Vibed 19-Jul-24 12.25 60 55.50 10.25 -43.25 16.75 53.50 70 10.5 - 11.5
BH15 Not Vibed 19-Jul-24 12.25 60 55.50 10.25 -43.25 16.75 53.50 28 10.5 - 11.5
BH14 Not Vibed 19-Jul-24 12.25 60 55.50 10.25 -43.25 16.75 53.50 46 10.5 - 11.5
Pile was pulled and reset with the vibratory hammer after it moved out of verticality.