About this file
This document contains structural general notes and engineering drawings for the USCG OCR Homeport Initiative OPC Pier 1 project at Naval Station Newport, Rhode Island. The project involves construction of a new pier structure with comprehensive foundation, pile, and environmental requirements.
The foundation work includes fender piles with service capacity of 5.6 tons compression and factored capacity of 12.5 tons compression, with specified pile tip elevations per drawing S-602. The contractor must anticipate pre-drilling polymeric fender piles between Bent 6 and 22 under Option 2. At-grade foundations must be designed per the Rhode Island State Building Code and UFC standards, founded on undisturbed glaciofluvial deposits at minimum 3.5 feet below grade for frost protection, with allowable bearing pressure of 3.0 KSF. Steel pipe piles are 36 inches diameter concrete-filled, with extensive provisions for obstruction mitigation including PDA testing, pile re-striking, offset relocation, battered driving, and drill-through options. The contractor should anticipate encountering obstructions at 52 of the Pier 1 piles, with personnel and equipment required on-site within 72 hours of discovery. Bulkhead materials include ASTM A690 steel sheet piling (Fy=50 KSI), ASTM A36 wide flange shapes and plates (Fy=36 KSI), and ASTM A615 tie rods (Fy=75 KSI), all requiring epoxy-polyamide coating system with hot dip galvanized fasteners per ASTM A153.
Environmental requirements mandate floating turbidity curtains at all pile driving, extraction, and drilling activities, with turbidity monitoring required outside designated dredging seasons per project permits. In-water work is restricted to daylight hours. Marine mammal protection includes establishment of 33-foot physical injury shutdown zones and Level A/B acoustic harassment monitoring zones, with three Protected Species Observers deployed (one land-based, two vessel-based) monitoring from 15 minutes pre-activity through 30 minutes post-completion. Soft start procedures using 40 percent reduced energy impacts are required for impact pile driving at day start and following 30-minute cessations. All shutdown zones must be visually confirmed clear before pile driving commences, with mandatory work halts if marine mammals approach exclusion zones or if take limits are exceeded.
View the file
Other files
Show 40 more
50 files listed here. See the rest on GovTribe.
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
FOUNDATION NOTES - FENDER PILES
1. FENDER PILE TIP ELEVATION IS LOCATED AT ON DRAWING S-602.
2. FENDER PILES SERVICE (ALLOWABLE) CAPACITY: 5.6 TONS (COMPRESSION), 0 TONS (TENSION)
3. FENDER PILES FACTORED (ULTIMATE) CAPACITY: 12.5 TONS (COMPRESSION), 0 TONS (TENSION)
4. MINIMUM PILE TIP FOR LATERAL FIXITY FOR FENDER PILES:
4.1 BENT 6-22 : PILE TIP ELEVATIONS PER PILE SCHEDULE (S-602)
4.2 BENT 22-43: EL. -61
5. THE CONTRACTOR SHALL ANTICIPATE REQUIRING TO PRE-DRILL POLYMERIC FENDER PILES
BETWEEN BENT 6 AND 22 (OPTION 2).
1. FLOATING TURBIDITY CURTAIN MUST BE UTILIZED AT ALL PILE DRIVING, PILE EXTRACTION, DRILLING, AND DREDGING ACTIVITIES. DREDGING ACTIVITIES WILL BE LIMITED TO THE TIME OF
YEAR PERIOD AS DICTATED IN PROJECT PERMITS. TURBIDITY MONITORING IS REQUIRED
DURING PILE DRIVING, PILE EXTRACTION, AND DRILLING ACTIVITIES OUTSIDE OF THE
DREDGING TIME OF YEAR PERIOD.
2. THE FOLLOWING MITIGATION MEASURES MUST BE IMPLEMENTED DURING ALL PILE DRIVING, PILE EXTRACTION, AND DRILLING ACTIVITIES TO MINIMIZE MARINE MAMMAL EXPOSURE TO
LEVEL A INJURIOUS NOISE LEVELS GENERATED AND TO REDUCE TO THE LOWEST EXTENT
PRACTICABLE EXPOSURE TO LEVEL B NOISE LEVELS. FOR ADDITIONAL ENVIRONMENTAL
REQUIREMENTS ASSOCIATED WITH THIS WORK, REFER TO SPECIFICATION SECTION 01 35 40.00
25 “MARINE MAMMAL PROTECTION.”
3. TIME RESTRICTION: IN-WATER CONSTRUCTION AND DEMOLITION WORK WILL OCCUR ONLY
DURING DAYLIGHT HOURS.
4. ESTABLISHMENT OF MONITORING AND SHUTDOWN ZONES:
4.1. FOR ALL RELEVANT IN-WATER CONSTRUCTION AND DEMOLITION ACTIVITIES, DESIGNATE
A LEVEL A ACOUSTIC HARASSMENT MONITORING ZONE, A LEVEL B BEHAVIORAL
HARASSMENT MONITORING ZONE, AND PHYSICAL INJURY SHUTDOWN ZONE, WITH
RADIAL DISTANCES AS IDENTIFIED IN SPECIFICATION SECTION 01 35 40.00 25 “MARINE
MAMMAL PROTECTION.”
4.2. DURING ALL IN-WATER CONSTRUCTION AND DEMOLITION ACTIVITIES, A 33-FT PHYSICAL
SHUTDOWN ZONE AROUND EACH ACTIVE PILE WILL BE IMPLEMENTED TO PROTECT
ANIMALS FROM PHYSICAL INJURY. FOR SOME SOUND-GENERATING ACTIVITIES, THE
POTENTIAL FOR LEVEL A HARASSMENT BY ACOUSTIC INJURY IS LESS THAN 33 FT. FOR
THESE ACTIVITIES, THE 33-FT PHYSICAL INJURY SHUTDOWN ZONE AUTOMATICALLY
REDUCES THE POTENTIAL FOR LEVEL A ACOUSTIC HARASSMENT. THE MAXIMUM
DISTANCES FOR LEVEL A AND LEVEL B HARASSMENT FOR HARBOR SEALS AND GRAY
SEALS FROM PROJECT-RELATED ACTIVITIES ARE PROVIDED IN SPECIFICATION SECTION
01 35 40.00 25 “MARINE MAMMAL PROTECTION” (NOTE THAT THE MAXIMUM DISTANCE MAY
BE REACHED IN ONLY ONE DIRECTION, DEPENDING ON THE SHAPE OF THE ZONE OF
INTEREST AND INTERSECTING LANDMASSES).
4.3. PILE DRIVING MUST ONLY TAKE PLACE WHEN THE 33-FT PHYSICAL INJURY SHUTDOWN
AND LEVEL A ACOUSTIC HARASSMENT ZONES ARE VISIBLE AND CAN BE ADEQUATELY
MONITORED. IF CONDITIONS PREVENT THE VISUAL DETECTION OF MARINE MAMMALS,
ACTIVITIES WITH THE POTENTIAL TO RESULT IN LEVEL A HARASSMENT MUST NOT BE
INITIATED. IF SUCH CONDITIONS ARISE AFTER THE ACTIVITY HAS BEGUN, PILE DRIVING
OR PILE EXTRACTION ACTIVITIES MUST BE HALTED IF THE 33-FT SHUTDOWN ZONE IS NOT
VISIBLE.
5. SHUTDOWN MEASURES:
5.1. THREE PROTECTED SPECIES OBSERVERS (PSO) WILL BE DEPLOYED TO MONITOR FOR
SEALS. ONE PSO MUST BE LOCATED ON LAND AND TWO MUST BE LOCATED IN A BOAT
TO MONITOR OFFSHORE LOCATIONS. FOR THOSE MONITORING AREAS THAT ARE LARGE,
VESSEL-BASED OBSERVERS WILL MOVE NORTH AND SOUTH (BACK AND FORTH) TO
CAPTURE ALL AREAS DURING IN-WATER PILE DRIVING, PILE EXTRACTION, AND DRILLING
ACTIVITIES.
5.2. MONITORING MUST TAKE PLACE FROM 15 MINUTES PRIOR TO INITIATION OF PILE DRIVING
OR PILE EXTRACTION ACTIVITIES THROUGH 30 MINUTES POST-COMPLETION OF PILE
DRIVING OR PILE EXTRACTION ACTIVITIES. PILE DRIVING OR PILE EXTRACTION MAY
COMMENCE WHEN OBSERVERS HAVE DECLARED THE SHUTDOWN ZONE CLEAR OF
MARINE MAMMALS PRIOR TO INITIATION OF PILE INSTALLATION OR REMOVAL. IN THE
EVENT OF A DELAY OR SHUTDOWN OF ACTIVITY RESULTING FROM MARINE MAMMALS IN
THE SHUTDOWN ZONE, ANIMALS MUST BE ALLOWED TO REMAIN IN THE SHUTDOWN
ZONE AND THEIR BEHAVIOR MUST BE MONITORED AND DOCUMENTED. MONITORING
MUST OCCUR THROUGHOUT THE TIME REQUIRED TO DRIVE OR REMOVE A PILE. A
DETERMINATION THAT THE SHUTDOWN ZONE IS CLEAR MUST BE MADE DURING A
PERIOD OF GOOD VISIBILITY.
5.3. IF A MARINE MAMMAL APPROACHES OR ENTERS THE SHUTDOWN ZONE, OR IF A MARINE
MAMMAL OTHER THAN A HARBOR SEAL OR GRAY SEAL ENTERS THE LEVEL B
HARASSMENT ZONE, OR IF THE TAKE OF A MARINE MAMMAL SPECIES OR STOCK HAS
REACHED THE LIMITS INDICATED IN SPECIFICATION SECTION 01 35 40.00 25 “MARINE
MAMMAL PROTECTION” AND ENTERS THE LEVEL B HARASSMENT ZONE, ALL PILE DRIVING
OR PILE EXTRACTION ACTIVITIES AT THAT LOCATION MUST BE HALTED. IF NONE OF THE
TAKE NUMBERS HAVE BEEN EXCEEDED, PILE DRIVING OR PILE EXTRACTION MAY
COMMENCE OR RESUME WHEN EITHER THE ANIMAL HAS VOLUNTARILY LEFT THE
SHUTDOWN ZONE, AND BEEN VISUALLY CONFIRMED BEYOND THE SHUTDOWN ZONE, OR
15 MINUTES HAVE PASSED WITHOUT RE-DETECTION OF THE ANIMAL.
6. SOFT START (IMPACT PILE DRIVING ONLY):
6.1. AN INITIAL SET OF THREE STRIKES FROM THE IMPACT HAMMER AT A REDUCED ENERGY
LEVEL (40 PERCENT OF FULL POWER), SEPARATED BY A 1-MINUTE WAITING PERIOD,
THEN TWO SUBSEQUENT THREE STRIKE SETS WILL BE IMPLEMENTED. PILE DRIVING
MAY COMMENCE AT FULL POWER ON THE FOURTH STRIKE.
6.2. SOFT START IS REQUIRED FOR ANY IMPACT PILE DRIVING, INCLUDING AT THE BEGINNING
OF THE DAY, AND AT ANY TIME FOLLOWING CESSATION OF IMPACT PILE DRIVING OF 30
MINUTES OR LONGER.
FOUNDATION NOTES - ENVIRONMENTAL REQUIREMENTS
FOUNDATION NOTES AT-GRADE STRUCTURES
1. AT-GRADE FOUNDATIONS MUST BE DESIGNED AND CONSTRUCTED IN ACCORDANCE WITH APPLICABLE SECTIONS OF THE RHODE ISLAND STATE BUILDING CODE, UNIFIED FACILITIES CRITERIA (UFC) AND RECOMMENDATIONS BELOW.
2. SPREAD FOOTINGS MUST BE FOUNDED ON UNDISTURBED GLACIOFLUVIAL DEPOSITS; OR, IF EXISTING FILL IS ENCOUNTERED AT THE DESIGN BEARING ELEVATION, ON GRANULAR FILL PLACED FOLLOWING REMOVAL OF THE EXISTING FILL TO THE TOP OF THE UNDISTURBED GLACIOFLUVIAL DEPOSITS. EXISTING FILL IS NOT SUITABLE FOR
FOUNDATION SUPPORT.
3. FOOTINGS MUST BE SIZED USING AN ALLOWABLE BEARING PRESSURE OF 3.0 KSF (CONTRACTOR TO VERIFY IN THE FIELD UPON INVESTIGATION). THE ALLOWABLE BEARING PRESSURE MAY BE INCREASED BY 1/3 FOR TRANSIENT
LOADING CONDITIONS.
4. FOR FOOTINGS LESS THAN 3 FT IN LEAST LATERAL DIM, DESIGN FOR AN ALLOWABLE BEARING PRESSURE IN KSF EQUAL
TO B, WHERE B EQUALS THE FOOTING WIDTH IN FEET.
5. MINIMUM FOOTING WIDTH IS 18”.
6. IF UNSUITABLE SOILS, SUCH AS EXISTING FILL, ARE ENCOUNTERED AT THE FOOTING BEARING ELEVATION, EITHER:
6.1. LOWER THE FOOTING TO THE SUITABLE BEARING MATERIAL, OR
6.2. MAINTAIN THE FOOTING AT THE DESIGN BEARING ELEVATION AND REPLACE UNSUITABLE MATERIALS WITHIN THE
ZONE OF INFLUENCE (ZOI) WITH GRANULAR FILL.
7. FOOTINGS MUST BEAR A MINIMUM OF 3.5 FT BELOW PROPOSED GRADES EXPOSED TO FREEZING TEMPERATURES FOR
FROST PROTECTION.
BULKHEAD MATERIALS:
1. STRUCTURAL STEEL:
A. STEEL SHEET PILING: ASTM A690, Fy = 50 KSI, HOT ROLLED.
B. WIDE FLANGE SHAPES, CHANNELS, ANGLE, PLATES, AND TEES: ASTM A36, Fy = 36 KSI.
C. TIE RODS: ASTM A615, Fy = 75 KSI.
D. BOLTS:
a. 3/4" DIA ASTM F3125 GRADE A325, UNLESS NOTED OTHERWISE.
b. FRAMING CONNECTIONS: SNUG TIGHT JOINTS WITH STANDARD HOLES, UNLESS NOTED OTHERWISE.
c. DIRECT TENSION INDICATOR WASHERS: ASTM F959.
d. HOLES MUST BE DRILLED OR REAMED. FLAME CUTTING OF HOLES IN PERMANENT STRUCTURE MUST NOT
BE ALLOWED.
F. WELDING: AWS D1.1 USING E70 ELECTRODE, WITH LOW HYDROGEN AS INDICATED ON PLANS.
2. STEEL WATERFRONT STRUCTURES COATING:
A. SHEET PILE, STEEL WALES, BULKHEAD CAP, MISCELLANEOUS STEEL:
a. COAT WITH EPOXY-POLYAMIDE SYSTEM.
b. SURFACE PREP AND COATING ON STEEL SHEET PILES MUST BE INSTALLED ON BOTH LAND SIDE AND WATER
SIDE TO MINIMUM DEPTH OF 5' BELOW THE PLANNED DREDGE DEPTH.
B. STEEL HARDWARE AND FASTENERS, THREADED TIE RODS:
a. THREADED TIE RODS MUST BE HOT DIP GALVANIZED PER ASTM A153 AND WRAPPED IN PETROLATUM TAPE.
b. ANY COATING DAMAGED DURING INSTALLATION MUST BE TOUCHED UP PRIOR TO BEING WRAPPED IN
PETROLATUM TAPE.
13.3.c. PROBE THE LIMITS OF THE OBSTRUCTION TO DETERMINE IF THE STEEL PIPE PILE CAN
BE PULLED, OFFSET ALONG THE LONGITUDINAL AXIS OF THE CAST-IN-PLACE
CONCRETE BEAM, AND RE-DRIVEN TO THE ESTIMATED PILE TIP ELEVATION AND
REQUIRED ULTIMATE VERTICAL CAPACITY. THE CONTRACTING OFFICER WILL UTILIZE
THE REQUIRED OFFSET INFORMATION TO DETERMINE IF THE BENT CAP, BEAM, AND
PILES CAN ACCOMMODATE RELOCATION TO AVOID THE OBSTRUCTION. NOTE THAT
THIS OPTION WILL REQUIRE MODIFICATIONS TO THE BEAM WIDTH IN ORDER TO FULLY
ENCAPSULATE THE 36"Ø STEEL PIPE PILE WITHIN THE BEAM WHILE MAINTAINING 6”
CLEAR FROM THE EDGE OF PILE TO EDGE OF BEAM. AT THE CONTRACTOR'S OPTION,
THE PILE ENCOUNTERING THE OBSTRUCTION MAY BE ABANDONED IN PLACE AND A
NEW STEEL PIPE PILE INSTALLED AT THE REQUIRED OFFSET LOCATION AT NO
ADDITIONAL COST TO THE GOVERNMENT.
13.3.d. PROBE THE LIMITS OF THE OBSTRUCTION TO DETERMINE IF THE STEEL PIPE PILE CAN
BE PULLED AND RE-DRIVEN AT A SLIGHT BATTER (NOT MORE THAN 1” PER FOOT) TO
AVOID THE OBSTRUCTION. PILES MUST BE BATTERED PERPENDICULAR TO THE
LONGITUDINAL AXIS OF THE BENT CAP AND RE-DRIVEN TO THE ESTIMATED PILE TIP
ELEVATION AND REQUIRED ULTIMATE VERTICAL CAPACITY.
13.3.e. USE A DTH HAMMER TO DRILL THROUGH THE OBSTRUCTION AND ATTEMPT TO RE-
DRIVE THE PILE THROUGH THE OBSTRUCTION TO THE ESTIMATED PILE TIP ELEVATION
AND REQUIRED ULTIMATE VERTICAL CAPACITY.
13.4. IF THE DRIVEN STEEL PIPE PILE ENCOUNTERS AN OBSTRUCTION ABOVE MINIMUM PILE TIP
ELEVATION FOR LATERAL FIXITY, POSSIBLE CONTRACTOR OPTIONS TO MITIGATE THE
OBSTRUCTION INCLUDE, BUT ARE NOT LIMITED TO:
13.4.a. IF THE OBSTRUCTION IS DETERMINED TO BE RELATIVELY CLOSE TO THE
APPROXIMATE MUDLINE ELEVATION, PULL THE PILE, ATTEMPT TO EXTRACT THE
OBSTRUCTION BY MEANS AND METHODS DETERMINED BY THE CONTRACTOR, AND RE-
DRIVE THE PILE TO THE ESTIMATED PILE TIP ELEVATION AND REQUIRED ULTIMATE
VERTICAL CAPACITY.
FOUNDATION NOTES - STEEL PIPE PILES CONT
11. EPOXY COAT ENTIRE STEEL PIPE PILES IN ACCORDANCE WITH SPECIFICATION SECTION 09 97 02
"PAINTING : HYDRAULIC STRUCTURES." INSTALL ANODES AS SHOWN ON DRAWING E-112.
12. FOR THE PURPOSE OF BIDDING, ANTICIPATE ENCOUNTERING OBSTRUCTIONS (52 TOTAL PILES) DURING DRIVING OF THE STEEL PIPE PILES FOR PIER 1. IF OBSTRUCTIONS ARE ENCOUNTERED DURING PILE
DRIVING:
12.1. NOTIFY THE CONTRACTING OFFICER IMMEDIATELY OF THE DEPTH AND APPARENT SIZE OF THE
OBSTRUCTION.
12.2. OBTAIN APPROVAL OF THE CONTRACTING OFFICER THAT THE CONTRACTOR HAS
ENCOUNTERED AN OBSTRUCTION.
13. FOLLOWING ARE SUGGESTED ALTERNATIVES FOR MITIGATING OBSTRUCTIONS ENCOUNTERED DURING DRIVING OF THE PIER 1 STEEL PIPE PILES. NOTE THAT THE CONTRACTOR MAY ALSO SUBMIT ALTERNATE METHODS FOR MITIGATING OBSTRUCTIONS FOR APPROVAL BY THE CONTRACTING OFFICER. PERSONNEL AND EQUIPMENT REQUIRED TO PERFORM ANY AND ALL OBSTRUCTION MITIGATION MEASURES MUST BE AVAILABLE TO BE ON-SITE WITHIN 72 HOURS OF ENCOUNTERING THE OBSTRUCTION. THE FOLLOWING
ITEMS ARE CONSIDERED AS PART OF CONTRACT AS DESCRIBED IN THE PRICE SCHEDULE:
13.1. IF THE DRIVEN STEEL PIPE PILE REACHES THE ESTIMATED PILE TIP ELEVATION SHOWN ON THE
PROJECT DRAWINGS WHILE ALSO ACHIEVING THE REQUIRED ULTIMATE VERTICAL CAPACITY,
THE PILE WOULD BE CONSIDERED ACCEPTABLE.
13.2. IF THE DRIVEN STEEL PIPE PILE ENCOUNTERS AN OBSTRUCTION BELOW MINIMUM PILE TIP
ELEVATION FOR LATERAL FIXITY, THE CONTRACTING OFFICER MUST BE NOTIFIED TO
DETERMINE IF THE OBSTRUCTION AND PILE TIP IS WITHIN DENSE DEPOSITS/WEATHERED ROCK.
ONCE THE TIP IS CONFIRMED TO BE DENSE DEPOSITS/WEATHERED ROCK IN GLACIAL
DEPOSITS BY THE CONTRACTING OFFICER, THE CONTRACTOR MUST PERFORM PDA TESTING
TO DETERMINE THE ULTIMATE VERTICAL CAPACITY OF THE PILE (USING A CAPWAP ANALYSIS)
AND IF THE PILE WAS DAMAGED DURING INSTALLATION. THE PDA REPORT AND CAPWAP
ANALYSIS MUST BE PROVIDED TO THE CONTRACTING OFFICER WITHIN 72 HOURS OF
CONFIRMATION FROM THE CONTRACTING OFFICER CONFIRMING THE OBSTRUCTION IS
WITHIN DENSE GLACIAL DEPOSITS. RESULTS OF THE CAPWAP ANALYSIS WILL BE COMPARED
VERSUS THE REQUIRED ULTIMATE VERTICAL CAPACITY OF THE SPECIFIC PILE ENCOUNTERING
THE OBSTRUCTION. IF IT IS DETERMINED THAT THE PILE WAS DAMAGED DURING
INSTALLATION, THE CONTRACTOR MUST REMOVE AND REPLACE THE PILE AT NO ADDITIONAL
COST TO THE GOVERNMENT. IF THE PILE HAS NOT BEEN DAMAGED, IS OF SUITABLE DEPTH,
AND HAS ACHIEVED THE REQUIRED ULTIMATE VERTICAL CAPACITY, THE PILE WOULD BE
CONSIDERED ACCEPTABLE.
13.3. IF THE DRIVEN STEEL PIPE PILE ENCOUNTERS AN OBSTRUCTION BELOW MINIMUM PILE TIP
ELEVATION FOR LATERAL FIXITY, BUT THE REQUIRED ULTIMATE VERTICAL CAPACITY IS NOT
ACHIEVED (AS DETERMINED THROUGH INITIAL PDA TESTING), POSSIBLE CONTRACTOR
OPTIONS TO MITIGATE THE OBSTRUCTION INCLUDE, BUT ARE NOT LIMITED TO:
13.3.a. RE-STRIKE THE PILE AND PERFORM FURTHER PDA TESTING (WITH CAPWAP ANALYSIS)
TO DETERMINE IF THE PILE IS ABLE TO ACHIEVE THE REQUIRED ULTIMATE VERTICAL
CAPACITY THROUGH SETUP OF THE UNDERLYING SOILS.
13.3.b. PERFORM FURTHER PDA TESTING (WITH CAPWAP ANALYSIS) TO DETERMINE THE
ULTIMATE VERTICAL CAPACITY OF BOTH THE PILE ENCOUNTERING AN OBSTRUCTION
AND THE TWO (2) ADJACENT PILES IN THE BENT CAP. THE CONTRACTING OFFICER
WILL UTILIZE THIS INFORMATION TO DETERMINE IF THE BENT CAP CAN STRUCTURALLY
ACCOMMODATE A LOWER CAPACITY PILE AT THE OBSTRUCTION LOCATION.
13.4.b. PROBE THE LIMITS OF THE OBSTRUCTION TO DETERMINE IF THE STEEL PIPE PILE CAN
BE PULLED, OFFSET ALONG THE LONGITUDINAL AXIS OF THE CAST-IN-PLACE
CONCRETE BEAM, AND RE-DRIVEN TO THE ESTIMATED PILE TIP ELEVATION AND
REQUIRED ULTIMATE VERTICAL CAPACITY. THE CONTRACTING OFFICER WILL UTILIZE
THE REQUIRED OFFSET INFORMATION TO DETERMINE IF THE BENT CAP, BEAM, AND
PILES CAN ACCOMMODATE RELOCATION TO AVOID THE OBSTRUCTION. NOTE THAT
THIS OPTION WILL REQUIRE MODIFICATIONS TO THE BEAM WIDTH IN ORDER TO FULLY
ENCAPSULATE THE 36"Ø STEEL PIPE PILE WITHIN THE BEAM WHILE MAINTAINING 6”
CLEAR FROM THE EDGE OF PILE TO EDGE OF BEAM. AT THE CONTRACTOR'S OPTION,
THE PILE ENCOUNTERING THE OBSTRUCTION MAY BE ABANDONED IN PLACE AND A
NEW STEEL PIPE PILE INSTALLED AT THE REQUIRED OFFSET LOCATION AT NO
ADDITIONAL COST TO THE GOVERNMENT.
13.4.c. PROBE THE LIMITS OF THE OBSTRUCTION TO DETERMINE IF THE STEEL PIPE PILE CAN
BE PULLED AND RE-DRIVEN AT A SLIGHT BATTER (NOT MORE THAN 1” PER FOOT) TO
AVOID THE OBSTRUCTION. PILES MUST BE BATTERED PERPENDICULAR TO THE
LONGITUDINAL AXIS OF THE BENT CAP AND RE-DRIVEN TO THE ESTIMATED PILE TIP
ELEVATION AND REQUIRED ULTIMATE VERTICAL CAPACITY.
13.4.d. USE A DTH HAMMER TO DRILL THROUGH THE OBSTRUCTION AND ATTEMPT TO RE-
DRIVE THE PILE THROUGH THE OBSTRUCTION TO THE ESTIMATED PILE TIP ELEVATION
AND REQUIRED ULTIMATE VERTICAL CAPACITY.
FOUNDATION NOTES - STEEL PIPE PILES CONT
SATISFACTORY TO DATE
APPROVED
ACTIVITY
FOR COMMANDER NAVFAC
SEAL
A/E INFO
A
B
C
D
1 2 3 4 5
1 2 3 4 5
A
B
C
D
SCALE:
CONSTR. CONTR. NO.
SHEET
NAVFAC DRAWING NO.
DES DRW CHK
OF
EPROJECT NO.:
D E
P A
R T
M E
N T
O F
T H
E N
A V
Y N
A V
A L
F A
C
IL
IT
IE
S E
N G
IN
E
E R
IN
G
S Y
S T
E M
S C
O M
M A
N D
DRAWFORM REVISION: 25 AUGUST 2020
PM/DM
BRANCH MANAGER
CHIEF ENG/ARCH
FIRE PROTECTION
N A
V A
L F
A C
IL
IT
IE
S
E N
G
IN
E E
R
IN
G S
Y S
T E
M S
C O
M M
A N
D
M
ID
-A
TL
A N
T
IC
N A
V A
L S
T A
T
IO
N
N O
R F
O L
K V
A
AS NOTED
S Y
M D
E S
C R
IP
T
IO
N
D A
T E
A P
P R
/1
/2
:4 :4
P
M
A u to d e s k D o c s /2
U
S C
G O
C R
H o m e p o rt
In iti a ti v e O
P C
P ie r_
/P
IE
R
U S
C G
-1
-S
.r v t
S-003
U S
C G
O C
R H
O M
E P
O R
T
IN
IT
IA
T
IV
E O
P C
P
IE
R
S
TR
U C
TU
R
A L
G E
N E
R A
L N
O
TE
S
S H
E E
T
O F
MJF
12936621
JZ AEP
Frank Cole USCG MASI
MRI/CWJ
1826479
N E
W P
O R
T , R
I N
A V
A L
S T
A T
IO
N
N E
W P
O R
T
JWJ
NEK
HPN
C I
C O
R E
H
A M
P T
O N
R O
A D
S
S -0
06 FEB 2026
A
M E
N D
M E
N T
/1
/2
V M
G
A
M E
N D
M E
N T
/2
/2
V M
G
A
M E
N D
M E
N T
/1
/2
V M
G
29303132333435363738394041
TOP OF PIER DECK
EL 13.00'
▽ MHW EL 1.62
▽ MLLW EL -2.12
LIFE RING, TYP
EMERGENCY LADDER, TYP
16" X 0.5" THK STL PIPE
FENDER PILE, TYP
FFF, TYP
OUTBOARD SUBSTATION
125-TON MOORING
BOLLARD, TYP
36" DIA CONC-FILLED
STL PIPE PILE, TYP
M A
T C
H L
IN
E
S E
E A
S -2
CIP CONC
BEAM
EL 18.00'
RAISED UTIL
TRENCH CURB
APPROX MUDLINE.
SEE NOTE 1
25' - 0" 25' - 0" 25' - 0" 25' - 0" 25' - 0" 25' - 0" 25' - 0" 25' - 0" 25' - 0" 25' - 0" 21' - 6" 21' - 6" 11' - 0" 25' - 0"
OPTION 1
SEE NOTE 1
SEE NOTE 1
1. SEE S-601 AND S-602 FOR SUBSURFACE AND PILE TIP ELEVATIONS.
SUBSURFACE INFORMATION IS APPROXIMATE BASED ON LIMITED
GEOTECHNICAL DATA.
2. SEE ATTACHMENT A IN THE SPECIFICATIONS FOR ADDITIONAL INFORMATION
FOR EXISTING CONDITIONS.
GENERAL SHEET NOTES:
SATISFACTORY TO DATE
APPROVED
ACTIVITY
FOR COMMANDER NAVFAC
SEAL
A/E INFO
A
B
C
D
1 2 3 4 5
1 2 3 4 5
A
B
C
D
SCALE:
CONSTR. CONTR. NO.
SHEET
NAVFAC DRAWING NO.
DES DRW CHK
OF
EPROJECT NO.:
D E
P A
R T
M E
N T
O F
T H
E N
A V
Y N
A V
A L
F A
C
IL
IT
IE
S E
N G
IN
E
E R
IN
G
S Y
S T
E M
S C
O M
M A
N D
DRAWFORM REVISION: 25 AUGUST 2020
PM/DM
BRANCH MANAGER
CHIEF ENG/ARCH
FIRE PROTECTION
N A
V A
L F
A C
IL
IT
IE
S
E N
G
IN
E E
R
IN
G S
Y S
T E
M S
C O
M M
A N
D
M
ID
-A
TL
A N
T
IC
N A
V A
L S
T A
T
IO
N
N O
R F
O L
K V
A
AS NOTED
S Y
M D
E S
C R
IP
T
IO
N
D A
T E
A P
P R
/1
/2
:4 :4
P
M
A u to d e s k D o c s /2
U
S C
G O
C R
H o m e p o rt
In iti a ti v e O
P C
P ie r_
/P
IE
R
U S
C G
-1
-S
.r v t
S-201
U S
C G
O C
R H
O M
E P
O R
T
IN
IT
IA
T
IV
E O
P C
P
IE
R
P
IE
R S
O U
TH
E
R N
E
LE
V A
TI
O
N
S H
E E
T
O F
MJF
12936675
JZ SA
Frank Cole USCG MASI
MRI/CWJ
1826479
N E
W P
O R
T , R
I N
A V
A L
S T
A T
IO
N
N E
W P
O R
T
JWJ
NEK
HPN
C I
C O
R E
H
A M
P T
O N
R O
A D
S
S -2
06 FEB 2026
SCALE: 1/16" = 1'-0"
A2
PIER ELEVATION BENT 43 TO BENT 29 - SOUTH
1/16" = 1' - 0" 0 5' 10' 20' 30' 60'
A
M E
N D
M E
N T
/2
/2
V M
G
A
M E
N D
M E
N T
/1
/2
V M
G
1516171819202122232425262728
EL 13.00'
▽ MHW EL 1.62
▽ MLLW EL -2.12
FFF, TYP125-TON MOORING
BOLLARD, TYP
36" DIA CONC-FILLED
STL PIPE PILE,TYP
M A
T C
H L
IN
E
S E
E A
S -2
EMERGENCY
LADDER, TYP
M A
T C
H L
IN
E
S E
E A
S -2
16" X 0.5" THK STL PIPE
FENDER PILE, TYP
CIP CONC
BEAM
APPROX MUDLINE.
SEE NOTE 1
25' - 0" 25' - 0" 25' - 0" 25' - 0" 25' - 0" 25' - 0" 25' - 0" 11' - 0" 25' - 0" 25' - 0" 25' - 0" 25' - 0" 25' - 0"
LIFE RING,
TYP
SEWER PIPE
SUPPORT,
TYP
SEE NOTE 1
SEE NOTE 1
1. SEE S-601 AND S-602 FOR SUBSURFACE AND PILE TIP ELEVATIONS.
SUBSURFACE INFORMATION IS APPROXIMATE BASED ON LIMITED
GEOTECHNICAL DATA.
2. SEE ATTACHMENT A IN THE SPECIFICATIONS FOR ADDITIONAL INFORMATION
FOR EXISTING CONDITIONS.
GENERAL SHEET NOTES:
SATISFACTORY TO DATE
APPROVED
ACTIVITY
FOR COMMANDER NAVFAC
SEAL
A/E INFO
A
B
C
D
1 2 3 4 5
1 2 3 4 5
A
B
C
D
SCALE:
CONSTR. CONTR. NO.
SHEET
NAVFAC DRAWING NO.
DES DRW CHK
OF
EPROJECT NO.:
D E
P A
R T
M E
N T
O F
T H
E N
A V
Y N
A V
A L
F A
C
IL
IT
IE
S E
N G
IN
E
E R
IN
G
S Y
S T
E M
S C
O M
M A
N D
DRAWFORM REVISION: 25 AUGUST 2020
PM/DM
BRANCH MANAGER
CHIEF ENG/ARCH
FIRE PROTECTION
N A
V A
L F
A C
IL
IT
IE
S
E N
G
IN
E E
R
IN
G S
Y S
T E
M S
C O
M M
A N
D
M
ID
-A
TL
A N
T
IC
N A
V A
L S
T A
T
IO
N
N O
R F
O L
K V
A
AS NOTED
S Y
M D
E S
C R
IP
T
IO
N
D A
T E
A P
P R
/1
/2
:4 :4
P
M
A u to d e s k D o c s /2
U
S C
G O
C R
H o m e p o rt
In iti a ti v e O
P C
P ie r_
/P
IE
R
U S
C G
-1
-S
.r v t
S-202
U S
C G
O C
R H
O M
E P
O R
T
IN
IT
IA
T
IV
E O
P C
P
IE
R
P
IE
R S
O U
TH
E
R N
E
LE
V A
TI
O
N
S H
E E
T
O F
MJF
12936676
JZ SA
Frank Cole USCG MASI
MRI/CWJ
1826479
N E
W P
O R
T , R
I N
A V
A L
S T
A T
IO
N
N E
W P
O R
T
JWJ
NEK
HPN
C I
C O
R E
H
A M
P T
O N
R O
A D
S
S -2
06 FEB 2026
SCALE: 1/16" = 1'-0"
A2
PIER ELEVATION BENT 29 TO BENT 15 - SOUTH
1/16" = 1' - 0" 0 5' 10' 20' 30' 60'
A
M E
N D
M E
N T
/2
/2
V M
G
A
M E
N D
M E
N T
/1
/2
V M
G
34567891011121314
EL 13.00'
▽MHW EL 1.62
▽MLLW EL -2.12
INBOARD
SUBSTATION
LIFE RING, TYP
EMERGENCY
LADDER, TYP
16" X 0.5" THK STL PIPE
FENDER PILE, TYP
FFF, TYP
125-TON MOORING
BOLLARD, TYP
36" DIA CONC-FILLED
STL PIPE PILE, TYP
M A
T C
H L
IN
E
S E
E A
S -2
30" DIA 3/4" THK
CONC-FILLED
STL PIPE PILE,
TYP
EXIST PZ35 PILE W/
TIP EL -29.00 ±
RAISED UTIL
TRENCH CURB
CIP CONC
BEAM
TOP OF EXIST CAP
CHANNEL, EL 11.0 ±
APPROX MUDLINE.
SEE NOTE 1
SLOPE 6.7%
25' - 0" 25' - 0" 25' - 0" 11' - 0" 25' - 0" 25' - 0" 25' - 0" 25' - 0" 25' - 0" 21' - 6" 25' - 0" 25' - 0" 15' - 6" 18' - 0"
EXIST CONC DM W/
BATTER PILES
EXIST PZ32
SHT PILE
MANHOLE,
TYP
SEWER PIPE
SUPPORT,
TYP
SEE S-601 FOR
ESTIMATED HWR
EL AT LANDSIDE
SEE NOTE 1
SEE NOTE 1
1. SEE S-601 AND S-602 FOR SUBSURFACE AND PILE TIP ELEVATIONS.
SUBSURFACE INFORMATION IS APPROXIMATE BASED ON LIMITED
GEOTECHNICAL DATA.
2. SEE ATTACHMENT A IN THE SPECIFICATIONS FOR ADDITIONAL INFORMATION
FOR EXISTING CONDITIONS.
3. BASE STEEL FRAMING FOR AC ENCLOSURE NOT SHOWN FOR CLARITY.
4. SEE NOTE 5 ON S-109 FOR PILE CONSTRUCTION WITHIN EXISTING RIPRAP.
5. SEE DRAINAGE DRAWINGS S-137 AND S-138 FOR LONGITUDINAL SLOPE,
TYPICAL.
GENERAL SHEET NOTES:
SATISFACTORY TO DATE
APPROVED
ACTIVITY
FOR COMMANDER NAVFAC
SEAL
A/E INFO
A
B
C
D
1 2 3 4 5
1 2 3 4 5
A
B
C
D
SCALE:
CONSTR. CONTR. NO.
SHEET
NAVFAC DRAWING NO.
DES DRW CHK
OF
EPROJECT NO.:
D E
P A
R T
M E
N T
O F
T H
E N
A V
Y N
A V
A L
F A
C
IL
IT
IE
S E
N G
IN
E
E R
IN
G
S Y
S T
E M
S C
O M
M A
N D
DRAWFORM REVISION: 25 AUGUST 2020
PM/DM
BRANCH MANAGER
CHIEF ENG/ARCH
FIRE PROTECTION
N A
V A
L F
A C
IL
IT
IE
S
E N
G
IN
E E
R
IN
G S
Y S
T E
M S
C O
M M
A N
D
M
ID
-A
TL
A N
T
IC
N A
V A
L S
T A
T
IO
N
N O
R F
O L
K V
A
AS NOTED
S Y
M D
E S
C R
IP
T
IO
N
D A
T E
A P
P R
/1
/2
:4 :4
P
M
A u to d e s k D o c s /2
U
S C
G O
C R
H o m e p o rt
In iti a ti v e O
P C
P ie r_
/P
IE
R
U S
C G
-1
-S
.r v t
S-203
U S
C G
O C
R H
O M
E P
O R
T
IN
IT
IA
T
IV
E O
P C
P
IE
R
P
IE
R S
O U
TH
E
R N
E
LE
V A
TI
O
N
S H
E E
T
O F
MJF
12936677
JZ SA
Frank Cole USCG MASI
MRI/CWJ
1826479
N E
W P
O R
T , R
I N
A V
A L
S T
A T
IO
N
N E
W P
O R
T
JWJ
NEK
HPN
C I
C O
R E
H
A M
P T
O N
R O
A D
S
S -2
06 FEB 2026
SCALE: 1/16" = 1'-0"
A2
PIER ELEVATION BENT 14 TO BENT 0 - SOUTH
A
M E
N D
M E
N T
/2
/2
V M
G
A
M E
N D
M E
N T
/1
/2
V M
G
29 30 31 32 33 34 35 36 37 38 39 40 41
EL 13.00'
42 43
▽MHW EL 1.62
▽MLLW EL -2.12
M A
T C
H L
IN
E
S E
E A
S -2
16" X 0.5" THK STL PIPE
FENDER PILE, TYP
APPROX MUDLINE.
SEE NOTE 1
RAISED UTILITY
TRENCH CURB
LIFE RING,
TYP
125-TON MOORING
BOLLARD, TYP
FFF, TYP OUTBOARD
SUBSTATION
EMERGENCY
LADDER
25' - 0"25' - 0"25' - 0"25' - 0"25' - 0"25' - 0"25' - 0"25' - 0"25' - 0"25' - 0"21' - 6"21' - 6"11' - 0"25' - 0"
36" DIA CONC-FILLED
STL PIPE PILE, TYP
HIGH-MAST
LIGHT POLE, TYP
OPTION 1
SEE NOTE 1
SEE NOTE 1
1. SEE S-601 AND S-602 FOR SUBSURFACE AND PILE TIP ELEVATIONS.
SUBSURFACE INFORMATION IS APPROXIMATE BASED ON LIMITED
GEOTECHNICAL DATA.
2. SEE ATTACHMENT A IN THE SPECIFICATIONS FOR ADDITIONAL INFORMATION
FOR EXISTING CONDITIONS.
GENERAL SHEET NOTES:
SATISFACTORY TO DATE
APPROVED
ACTIVITY
FOR COMMANDER NAVFAC
SEAL
A/E INFO
A
B
C
D
1 2 3 4 5
1 2 3 4 5
A
B
C
D
SCALE:
CONSTR. CONTR. NO.
SHEET
NAVFAC DRAWING NO.
DES DRW CHK
OF
EPROJECT NO.:
D E
P A
R T
M E
N T
O F
T H
E N
A V
Y N
A V
A L
F A
C
IL
IT
IE
S E
N G
IN
E
E R
IN
G
S Y
S T
E M
S C
O M
M A
N D
DRAWFORM REVISION: 25 AUGUST 2020
PM/DM
BRANCH MANAGER
CHIEF ENG/ARCH
FIRE PROTECTION
N A
V A
L F
A C
IL
IT
IE
S
E N
G
IN
E E
R
IN
G S
Y S
T E
M S
C O
M M
A N
D
M
ID
-A
TL
A N
T
IC
N A
V A
L S
T A
T
IO
N
N O
R F
O L
K V
A
AS NOTED
S Y
M D
E S
C R
IP
T
IO
N
D A
T E
A P
P R
/1
/2
:4 :4
P
M
A u to d e s k D o c s /2
U
S C
G O
C R
H o m e p o rt
In iti a ti v e O
P C
P ie r_
/P
IE
R
U S
C G
-1
-S
.r v t
S-204
U S
C G
O C
R H
O M
E P
O R
T
IN
IT
IA
T
IV
E O
P C
P
IE
R
P
IE
R N
O R
TH
E
R N
E
LE
V A
TI
O
N
S H
E E
T
O F
MJF
12936678
JZ SA
Frank Cole USCG MASI
MRI/CWJ
1826479
N E
W P
O R
T , R
I N
A V
A L
S T
A T
IO
N
N E
W P
O R
T
JWJ
NEK
HPN
C I
C O
R E
H
A M
P T
O N
R O
A D
S
S -2
06 FEB 2026
1/16" = 1' - 0" 0 5' 10' 20' 30' 60'
SCALE: 1/16" = 1'-0"
A2
PIER ELEVATION BENT 29 TO BENT 43 - NORTH
A
M E
N D
M E
N T
/2
/2
V M
G
A
M E
N D
M E
N T
/1
/2
V M
G
15 16 17 18 19 20 21 22 23 24 25 26 27 28 29
EL 13.00'
▽MHW EL 1.62
▽MLLW EL -2.12
M A
T C
H L
IN
E
S E
E A
S -2
16" X 0.5" THK STL PIPE
FENDER PILE, TYP
APPROX MUDLINE.
SEE NOTE 1
125-TON MOORING
BOLLARD, TYP
FFF, TYP EMERGENCY
LADDER
36" DIA CONC-FILLED
STL PIPE PILE, TYP
25' - 0"25' - 0"25' - 0"25' - 0"25' - 0"25' - 0"25' - 0"25' - 0"11' - 0"25' - 0"25' - 0"25' - 0"25' - 0"25' - 0" 25' - 0"
LIFE RING,
TYP
SEWER PIPE
SUPPORT,
TYP
SEE NOTE 1
SEE NOTE 1
1. SEE S-601 AND S-602 FOR SUBSURFACE AND PILE TIP ELEVATIONS.
SUBSURFACE INFORMATION IS APPROXIMATE BASED ON LIMITED
GEOTECHNICAL DATA.
2. SEE ATTACHMENT A IN THE SPECIFICATIONS FOR ADDITIONAL INFORMATION
FOR EXISTING CONDITIONS.
GENERAL SHEET NOTES:
SATISFACTORY TO DATE
APPROVED
ACTIVITY
FOR COMMANDER NAVFAC
SEAL
A/E INFO
A
B
C
D
1 2 3 4 5
1 2 3 4 5
A
B
C
D
SCALE:
CONSTR. CONTR. NO.
SHEET
NAVFAC DRAWING NO.
DES DRW CHK
OF
EPROJECT NO.:
D E
P A
R T
M E
N T
O F
T H
E N
A V
Y N
A V
A L
F A
C
IL
IT
IE
S E
N G
IN
E
E R
IN
G
S Y
S T
E M
S C
O M
M A
N D
DRAWFORM REVISION: 25 AUGUST 2020
PM/DM
BRANCH MANAGER
CHIEF ENG/ARCH
FIRE PROTECTION
N A
V A
L F
A C
IL
IT
IE
S
E N
G
IN
E E
R
IN
G S
Y S
T E
M S
C O
M M
A N
D
M
ID
-A
TL
A N
T
IC
N A
V A
L S
T A
T
IO
N
N O
R F
O L
K V
A
AS NOTED
S Y
M D
E S
C R
IP
T
IO
N
D A
T E
A P
P R
/1
/2
:4 :5
P
M
A u to d e s k D o c s /2
U
S C
G O
C R
H o m e p o rt
In iti a ti v e O
P C
P ie r_
/P
IE
R
U S
C G
-1
-S
.r v t
S-205
U S
C G
O C
R H
O M
E P
O R
T
IN
IT
IA
T
IV
E O
P C
P
IE
R
P
IE
R N
O R
TH
E
R N
E
LE
V A
TI
O
N
S H
E E
T
O F
MJF
12936679
JZ SA
Frank Cole USCG MASI
MRI/CWJ
1826479
N E
W P
O R
T , R
I N
A V
A L
S T
A T
IO
N
N E
W P
O R
T
JWJ
NEK
HPN
C I
C O
R E
H
A M
P T
O N
R O
A D
S
S -2
06 FEB 2026
SCALE: 1/16" = 1'-0"
A2
PIER ELEVATION BENT 15 TO BENT 29 - NORTH
1/16" = 1' - 0" 0 5' 10' 20' 30' 60'
A
M E
N D
M E
N T
/2
/2
V M
G
A
M E
N D
M E
N T
/1
/2
V M
G
3 4 5 6 7 8 9 10 11 12 13 14
EL 13.00'
▽ MHW EL 1.62
▽ MLLW EL -2.12
0 1 2
EXIST PZ32 PILE
16" X 0.5" THK STL PIPE
FENDER PILE, TYP
FFF, TYP 125-TON MOORING
BOLLARD, TYP
36" DIA CONC-FILLED
STL PIPE PILE, TYP
INBOARD SUBSTATION
M A
T C
H L
IN
E
S E
E A
S -2
30" DIA 3/4" THK
CONC-FILLED
STL PIPE PILE,
TYP
EXIST PZ35 PILE
W/ TIP EL -29.00 +/-
RAISED UTILITY
TRENCH CURB
CIP CONC
BEAM
MANHOLE,
TYP
APPROACH SLAB
APPROX MUDLINE.
SEE NOTE 1
SLOPE 6.7%
25' - 0"25' - 0"25' - 0"11' - 0"25' - 0"25' - 0"25' - 0"25' - 0"25' - 0"21' - 6"25' - 0"25' - 0"15' - 6"18' - 0"
EXIST CONC DM
W/ BATTER PILES
25' - 0"
SEWER PIPE
SUPPORT, TYP
SEE NOTE 1
SEE NOTE 1
1. SEE S-601 AND S-602 FOR SUBSURFACE AND PILE TIP ELEVATIONS.
SUBSURFACE INFORMATION IS APPROXIMATE BASED ON LIMITED
GEOTECHNICAL DATA.
2. SEE ATTACHMENT A IN THE SPECIFICATIONS FOR ADDITIONAL INFORMATION
FOR EXISTING CONDITIONS.
3. BASE STEEL FRAMING FOR AC ENCLOSURE NOT SHOWN FOR CLARITY.
4. SEE NOTE 5 ON S-109 FOR PILE CONSTRUCTION WITHIN EXISTING RIPRAP.
5. SEE DRAINAGE DRAWINGS S-137 AND S-138 FOR LONGITUDINAL SLOPE,
TYPICAL.
GENERAL SHEET NOTES:
SATISFACTORY TO DATE
APPROVED
ACTIVITY
FOR COMMANDER NAVFAC
SEAL
A/E INFO
A
B
C
D
1 2 3 4 5
1 2 3 4 5
A
B
C
D
SCALE:
CONSTR. CONTR. NO.
SHEET
NAVFAC DRAWING NO.
DES DRW CHK
OF
EPROJECT NO.:
D E
P A
R T
M E
N T
O F
T H
E N
A V
Y N
A V
A L
F A
C
IL
IT
IE
S E
N G
IN
E
E R
IN
G
S Y
S T
E M
S C
O M
M A
N D
DRAWFORM REVISION: 25 AUGUST 2020
PM/DM
BRANCH MANAGER
CHIEF ENG/ARCH
FIRE PROTECTION
N A
V A
L F
A C
IL
IT
IE
S
E N
G
IN
E E
R
IN
G S
Y S
T E
M S
C O
M M
A N
D
M
ID
-A
TL
A N
T
IC
N A
V A
L S
T A
T
IO
N
N O
R F
O L
K V
A
AS NOTED
S Y
M D
E S
C R
IP
T
IO
N
D A
T E
A P
P R
/1
/2
:4 :5
P
M
A u to d e s k D o c s /2
U
S C
G O
C R
H o m e p o rt
In iti a ti v e O
P C
P ie r_
/P
IE
R
U S
C G
-1
-S
.r v t
S-206
U S
C G
O C
R H
O M
E P
O R
T
IN
IT
IA
T
IV
E O
P C
P
IE
R
P
IE
R N
O R
TH
E
R N
E
LE
V A
TI
O
N
S H
E E
T
O F
MJF
12936680
JZ SA
Frank Cole USCG MASI
MRI/CWJ
1826479
N E
W P
O R
T , R
I N
A V
A L
S T
A T
IO
N
N E
W P
O R
T
JWJ
NEK
HPN
C I
C O
R E
H
A M
P T
O N
R O
A D
S
S -2
06 FEB 2026
SCALE: 1/16" = 1'-0"
A2
PIER ELEVATION BENT 0 TO BENT 14 - NORTH
1/16" = 1' - 0" 0 5' 10' 20' 30' 60'
A
M E
N D
M E
N T
/2
/2
V M
G
A
M E
N D
M E
N T
/1
/2
V M
G
| Sheets |
| S-003 - STRUCTURAL GENERAL NOTES - SHEET 2 OF 2 |
| S-201 - PIER SOUTHERN ELEVATION - SHEET 1 OF 3 |
| S-202 - PIER SOUTHERN ELEVATION - SHEET 2 OF 3 |
| S-203 - PIER SOUTHERN ELEVATION - SHEET 3 OF 3 |
| S-204 - PIER NORTHERN ELEVATION - SHEET 1 OF 3 |
| S-205 - PIER NORTHERN ELEVATION - SHEET 2 OF 3 |
| S-206 - PIER NORTHERN ELEVATION - SHEET 3 OF 3 |
| 2026-08-13T11:18:37-0400 | |
| Norfolk, VA | |
| James E. Donahue, R.A. | |
| I, James E. Donahue, R.A., am signing this document to confirm that it has been reviewed. |
| 2026-08-13T11:18:38-0400 | |
| Norfolk, VA | |
| James E. Donahue, R.A. | |
| I, James E. Donahue, R.A., am signing this document to confirm that it has been reviewed. |
| 2026-08-13T11:18:39-0400 | |
| Norfolk, VA | |
| James E. Donahue, R.A. | |
| I, James E. Donahue, R.A., am signing this document to confirm that it has been reviewed. |
| 2026-08-13T11:18:39-0400 | |
| Norfolk, VA | |
| James E. Donahue, R.A. | |
| I, James E. Donahue, R.A., am signing this document to confirm that it has been reviewed. |
| 2026-08-13T11:18:40-0400 | |
| Norfolk, VA | |
| James E. Donahue, R.A. | |
| I, James E. Donahue, R.A., am signing this document to confirm that it has been reviewed. |
| 2026-08-13T11:18:41-0400 | |
| Norfolk, VA | |
| James E. Donahue, R.A. | |
| I, James E. Donahue, R.A., am signing this document to confirm that it has been reviewed. |
| 2026-08-13T11:18:41-0400 | |
| Norfolk, VA | |
| James E. Donahue, R.A. | |
| I, James E. Donahue, R.A., am signing this document to confirm that it has been reviewed. |
2026-08-13T11:20:27-0400
2026-08-13T11:20:27-0400
2026-08-13T11:20:28-0400
2026-08-13T11:20:28-0400
2026-08-13T11:20:28-0400
2026-08-13T11:20:29-0400
2026-08-13T11:20:29-0400
File details come from the government source that posted it. Updated .