This is a Pile Driving Summary and detailed Pile Driving Log documenting the installation of bulkhead piles for a NOAA OMAO project at Newport RI Naval Station.

The project, GTR Job #24.168, was executed by Coastal Marine as contractor with Skanska as the client, under the supervision of GTR representative J. Roth. The work involved driving NZ26 sheet piles (47 feet in length, 0.5-inch steel thickness, 17.32-inch height, 27.56-inch width) using an ICE D-30 single-acting diesel hammer with 69,925 ft-lbs rated energy. Piles S40 through S52 were documented with driving dates of July 31 and August 1, 2024, and all piles were completed without vibration driving. The summary shows that all piles achieved the working grade of 12.25 feet with a driven depth of 47 feet, tip elevation of -30.25 feet, and top elevation of 16.75 feet. Cut-off elevations were standardized at 40.50 feet, with final blow counts for the last foot ranging from 6.5 to 11 blows per foot. Individual pile driving logs detail the blow count progression for each pile through 30-foot depth increments, with final 6-inch and blow count data recorded. All elevations are referenced to NAVD88 datum. The work was substantially completed by August 2, 2024.

View the file

Other files

File Type Posted
USCG OPC Pier Amendment 0009 Drawings.pdf PDF
2026-0816-HAI-USCG Homeport OPC Pier-Geotech Engineering Report Rev 2.pdf PDF
Amendment 0009 USCG OPC.pdf PDF
Updated Attachment H - USCG OPC Pier Price Proposal Form REV 5.docx DOCX document
Amendment 0008 USCG OPC.pdf PDF
Amendment 0007 SPC USCG OPC Pier Appendix D (With Placeholders).pdf PDF
Updated Attachment H - USCG OPC Pier Price Proposal Form REV 6.docx DOCX document
USCG OPC Pier Amendment 0008 Drawings.pdf PDF
USCG OPC Pier Amendment 007 Drawings.pdf PDF
Amendment 0007 USCG OPC.pdf PDF
Attachment Z - Pier 1 - Amendment 006 Drawings.pdf PDF
Appendix A - Telecom Room Photos.pdf PDF
Updated Attachment H - UCCG OPC Pier Price Proposal Form REV 4.docx DOCX document
Amendment 0006 USCG OPC.pdf PDF
24.168 NOAA OMAO Prime Pier Pile Driving Summary Report.pdf PDF
Pier Pile Plan.pdf PDF
24.168 NOAA OMAO Bulkhead Pile Driving Summary Table 08.26.24 to 08.30.24 (1).pdf PDF
24.168 NOAA OMAO Bulkhead Pile Driving Summary Table 07.22.24 to 07.26.24.pdf PDF
24.168 NOAA OMAO Bulkhead Pile Driving Summary Table 07.15.24 to 07.19.24.pdf PDF
Attachment Y - Appendix A Record drawing 11836 125 Submarine Cable Relocation.pdf PDF
SUB-0123 Interim PDA and Test Pile Logs - Trestle Piles 10B 14B.pdf PDF
SUB-0TBD Interim PDA and Test Pile Logs For Trestle Pile 17B.pdf PDF
24.168 NOAA OMAO Bulkhead Pile Driving Summary Table 08.26.24 to 08.30.24.pdf PDF
Updated Attachment H - UCCG OPC Pier Price Proposal Form REV 3.docx DOCX document
SUB-0105 Trestle Piles 4C 6B - PDA and Test Pile Logs.pdf PDF
24.168 NOAA OMAO Bulkhead Pile Driving Summary Table 08.20.24 to 08.23.24.pdf PDF
24.107 NOAA OMAO Ship & Support Facility Relocation Newport RI - PDA Report - Pier Bent 19.pdf PDF
24.168 NOAA OMAO Bulkhead Pile Driving Summary Table 06.25.24 to 06.27.24.pdf PDF
SUB-0284 PDA49B_A.pdf PDF
SUB-0262 Interim PDA Test Pile Logs for Pier Piles - Bent 35 B - A.pdf PDF
24.168 NOAA OMAO Bulkhead Pile Driving Summary Table 08.07.24 to 08.08.24.pdf PDF
Trestle Summary.pdf PDF
24.168 NOAA OMAO Bulkhead Pile Driving Summary Table 08.20.24 to 08.23.24 (1).pdf PDF
24.168 NOAA OMAO Bulkhead Pile Driving Summary Table 07.01.24 - 07.02.24.pdf PDF
Bulkhead Pile Plan.pdf PDF
24.168 NOAA OMAO Bulkhead Pile Driving Summary Table 09.03.24 to 09.06.24.pdf PDF
24.168 NOAA OMAO Bulkhead Pile Driving Summary Table 08.13.24 to 08.15.24.pdf PDF
Attachment W - Pier 1 - Amendment 005 Drawings.pdf PDF
24.168 NOAA OMAO Bulkhead Pile Driving Summary Table 07.11.24.pdf PDF
24.107 NOAA OMAO Ship Support Facility Relocation Newport RI - PDA Report - Pier Bent 25 and 27.pdf PDF
NOAA OMAO Survey Reports 100 Percent Pre-Final Submittal 04072022.pdf PDF
Amendment 0005 USCG OPC.pdf PDF
Attachment X - Appendix A Record Drawing 12819 135 Submarine Cable.pdf PDF
Attachment U - Appendix A - Pier 1 Extension 1968.pdf PDF
Attachment V - Pier 1 - Amendment 004 Drawings.pdf PDF
Updated Attachment K - WD RI20260001 05-18-2026.pdf PDF
Amendment 0004 USCG OPC.pdf PDF
Attachment T - REF(m) Existing Pier 1 Drawings 1 of 2.pdf PDF
Attachment C - Construction Experience Project Data Sheet.docx DOCX document
Attachment E - Historical Small Business Utilization.docx DOCX document
Show 40 more

Latest 50 of 90 listed here. See the rest on GovTribe.

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

DATE:

PROJECT LOCATION:

CLIENT: CONTRACTOR:

GTR REP PILE INFO:

S44 Not Vibed 31-Jul-24 12.25 47 42.50 10.25 -30.25 16.75 40.50 50 7 - 8

S43 Not Vibed 31-Jul-24 12.25 47 42.50 10.25 -30.25 16.75 40.50 58 6.5 - 7.5 S42 Not Vibed 31-Jul-24 12.25 47 42.50 10.25 -30.25 16.75 40.50 54 7 - 8 S41 Not Vibed 31-Jul-24 12.25 47 42.50 10.25 -30.25 16.75 40.50 50 10 - 11 S40 Not Vibed 31-Jul-24 12.25 47 42.50 10.25 -30.25 16.75 40.50 50 10 - 11 S52 Not Vibed 1-Aug-24 12.25 47 42.50 10.25 -30.25 16.75 40.50 24 8 - 9 S51 Not Vibed 1-Aug-24 12.25 47 42.50 10.25 -30.25 16.75 40.50 52 9 - 10 S49 Not Vibed 1-Aug-24 12.25 47 42.50 10.25 -30.25 16.75 40.50 50 6.5 - 7.5 S48 Not Vibed 1-Aug-24 12.25 47 42.50 10.25 -30.25 16.75 40.50 50 6.5 - 7.5 S47 Not Vibed 1-Aug-24 12.25 47 42.50 10.25 -30.25 16.75 40.50 48 7 - 8 S46 Not Vibed 1-Aug-24 12.25 47 42.50 10.25 -30.25 16.75 40.50 56 8 - 9 S45 Not Vibed 1-Aug-24 12.25 47 42.50 10.25 -30.25 16.75 40.50 48 7.5 - 8.5

PILE

NO.

DRIVEN

DEPTH

(feet)

TIP

ELEVATION

(feet)

TOP

ELEVATION

(feet)

PILE

LENGTH

(feet)

EOD

STROKE

(feet)

WORKING

GRADE

(feet)

FINAL DRIVE

DATE

VIBRATION

DRIVE DATE

CUT-OFF

LENGTH

GTR JOB # 24.168

GEOSCIENCES TESTING AND RESEARCH, INC.

55 Middlesex Street, Suite 225, North Chelmsford, MA, Phone: (978) 251-9395 Fax: (978) 251-9396

COMMENTS

PILE DRIVING SUMMARY

J. Roth Steel 18-inch O.D. X 0.5-inch wall open-ended Pipe

Newport RI Naval Station Coastal Marine

NOAA OMAO

Skanska

2-Aug-24

CUT-OFF

ELEVATION

(feet)

BLOW

COUNT

FINAL FOOT

BULKHEAD PILES

File details come from the government source that posted it. Updated .