Attachment C - Construction Experience Project Data Sheet.docx

DOCX document 13 KB Posted

Attached to
Design-Bid-Build, USCG Offshore Patrol Cutters (OPC) Homeport Pier, Naval Station Newport, Newport RI
Solicitation number
N4008526R0001
Issued by

About this file

This is a Construction Experience Project Data Sheet template designed for offerors to document relevant construction project experience as part of their proposal response to the Design-Bid-Build, USCG Offshore Patrol Cutters (OPC) Homeport Pier solicitation (N4008526R0001) at Naval Station Newport in Newport, Rhode Island.

The form captures essential project information including firm identification (name, address, UEI number, CAGE code), the offeror's role (prime contractor, subcontractor, or joint venture participant), and the percentage of work performed. Respondents must provide contract details such as contract/task order numbers, award and completion dates, and project location. The template requests specification of work type (new construction, renovation, repair, or alteration), contract type (firm-fixed price, cost/time and material, design-build, design-bid-build, or IDIQ delivery/task order), award amount, and final price. The form requires detailed narratives describing the project scope, relevance to the RFP requirements (including unique features, square footage, and construction methods), and a description of work self-performed by the firm. Offerors can submit up to five construction experience projects (CON #1 through CON #5) using this template, allowing the Department of the Navy Naval Facilities Engineering Command to evaluate contractor qualifications and experience for this pier construction project.

View the file

Other files

File Type Posted
2026-0816-HAI-USCG Homeport OPC Pier-Geotech Engineering Report Rev 2.pdf PDF
Amendment 0008 USCG OPC.pdf PDF
Updated Attachment H - USCG OPC Pier Price Proposal Form REV 6.docx DOCX document
USCG OPC Pier Amendment 0008 Drawings.pdf PDF
Amendment 0007 SPC USCG OPC Pier Appendix D (With Placeholders).pdf PDF
Appendix A - Telecom Room Photos.pdf PDF
Updated Attachment H - UCCG OPC Pier Price Proposal Form REV 3.docx DOCX document
24.168 NOAA OMAO Bulkhead Pile Driving Summary Table 07.31.24 to 08.01.24.pdf PDF
24.168 NOAA OMAO Bulkhead Pile Driving Summary Table 06.25.24 to 06.27.24.pdf PDF
SUB-0284 PDA49B_A.pdf PDF
SUB-0262 Interim PDA Test Pile Logs for Pier Piles - Bent 35 B - A.pdf PDF
24.107 NOAA OMAO Ship & Support Facility Relocation Newport RI - PDA Report - Pier Bent 19.pdf PDF
24.107 NOAA OMAO Ship Support Facility Relocation Newport RI - PDA Report - Pier Bent 25 and 27.pdf PDF
24.168 NOAA OMAO Bulkhead Pile Driving Summary Table 08.13.24 to 08.15.24.pdf PDF
24.168 NOAA OMAO Bulkhead Pile Driving Summary Table 07.22.24 to 07.26.24.pdf PDF
24.168 NOAA OMAO Bulkhead Pile Driving Summary Table 07.01.24 - 07.02.24.pdf PDF
24.168 NOAA OMAO Bulkhead Pile Driving Summary Table 08.26.24 to 08.30.24 (1).pdf PDF
24.168 NOAA OMAO Bulkhead Pile Driving Summary Table 08.26.24 to 08.30.24.pdf PDF
24.168 NOAA OMAO Bulkhead Pile Driving Summary Table 07.11.24.pdf PDF
24.168 NOAA OMAO Prime Pier Pile Driving Summary Report.pdf PDF
Pier Pile Plan.pdf PDF
SUB-0123 Interim PDA and Test Pile Logs - Trestle Piles 10B 14B.pdf PDF
Attachment V - Pier 1 - Amendment 004 Drawings.pdf PDF
Updated Attachment K - WD RI20260001 05-18-2026.pdf PDF
Attachment D - Past Performance Questionnaire.docx DOCX document
Updated Attachment F - SB Participation Commitment Document.docx DOCX document
Attachment S - Pier 1 - Amendment 003 Drawings.pdf PDF
CJA ML-23-80 - Redacted.pdf PDF
JA ML-26-40 USCG Kaeser Compressed Air System - Redacted.pdf PDF
JA ML-26-43 USCG Sanitary Pumps - Redacted.pdf PDF
Amendment 0003 USCG OPC.pdf PDF
Attachment E - Historical Small Business Utilization.docx DOCX document
Attachment T - REF(m) Existing Pier 1 Drawings 1 of 2.pdf PDF
Updated Attachment G - Individual SB Subcontracting Plan.docx DOCX document
Attachment L - Site Visit Log.pdf PDF
Amendment 0001 USCG OPC.pdf PDF
Updated Attachment F - SB Participation Commitment Document.pdf PDF
Attachment B - PIEE Vendor Access Instructions.pdf PDF
Attachment I - SECNAV FORM 5512.pdf PDF
1826479dwg04of05_MECH.pdf PDF
1826479dwg05of05_ELEC.pdf PDF
Attachment A - Pre Proposal Inquiry Log.xlsx XLSX spreadsheet
Attachment C - Construction Experience Project Data Sheet.pdf PDF
Attachment F - SB Participation Commitment Document.pdf PDF
Attachment G - Individual SB Subcontrating Plan.pdf PDF
Attachment K - WD RI20260001 01-30-2026.pdf PDF
Solicitation - N4008526R0001.pdf PDF
Attachment D - Past Performance Questionnaire.pdf PDF
Attachment H - UCCG OPC Pier Price Proposal Form.pdf PDF
1826479dwg01of05_GEN-CIV.pdf PDF
Show 40 more

50 files listed here. See the rest on GovTribe.

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

ATTACHMENT C

CONSTRUCTION EXPERIENCE PROJECT DATA SHEET

Project No. (check one) : CON #1 CON #2 CON #3 CON #4 CON #5

1. Experience for: Offeror Joint-Venture Other (Explain) Firm Name:

Address:

Phone Number:

UEI Number:

Cage Code:

Point of Contact: Contact Phone Number:

2. Work Performed as: Prime Contractor Sub Contractor Joint Venture Other (Explain) Percent of project work performed:

If subcontractor, who was prime (Name/Phone #):

3. Contract Number: Delivery/Task Order Number: Title:

Location:

4. Award Date (mm/dd/yy): Completion Date (mm/dd/yy):

5. Type of work:

New Construction Renovation Repair Alteration Other (explain):

6. Type of Contract/Task Order: (Check ALL that apply)

Firm-Fixed Price Cost/Time and Material Other (explain):

7. Construction Project:

Award Amount: Final Price:

Type of Contract/Task Order: (Check ALL that apply)

Design-Build Design-Bid-Build Delivery/Task Order (IDIQ) Other (explain):

If Design-Build, identify the Lead Design Firm:

Design-Bid-Build, USCG Offshore Patrol Cutters (OPC) Homeport Pier, Naval Station Newport, Newport RI N40085-26-R-0001

8. Provide a detailed description of the project and the relevancy to the project requirements of this RFP (i.e.: unique features, square footage, construction methods). If design-build, include a description of the design-effort.

9. Provide a detailed description of what work your firm self-performed on this project:

10. Other Information:

File details come from the government source that posted it. Updated .