This document comprises architectural elevation drawings for a USCG (United States Coast Guard) pier construction project, specifically detailed pier elevations from Bent 14 to Bent 0 (South) and Bent 0 to Bent 14 (North). The drawings are prepared by Stantec and reference the USCG OCR Homeport Initiative OPC Pier 1 project, with file identifiers USCG-1737829-S and drawing numbers S-203 and S-206.

The pier structure includes multiple technical specifications and components: 125-ton mooring bollards (typical), 16-inch x 0.5-inch thick steel pipe fender piles (typical), 30-inch diameter 3/4-inch thick concrete-filled steel pipe piles, raised utility trenches with curbs, inboard substations, emergency showers, sewer pipe supports, manholes, and CIP concrete beams. Water elevations are marked at MHW EL 1.62 and MLLW EL -2.12, with the top of pier deck at 13.00 feet elevation. The drawings show bent spacing varying from 11 feet to 25 feet, with approach slab slopes at 6.7 percent. Existing conditions are referenced including existing pile fill requirements and concrete structures with batter piles. General sheet notes reference subsurface and geotechnical data, specifications for additional information, steel framing details, and construction coordination with existing infrastructure. The drawings were last updated on 8/18/2026 and include standard federal survey and navigation information.

View the file

Other files

File Type Posted
USCG OPC Pier Amendment 0008 Drawings.pdf PDF
Amendment 0007 SPC USCG OPC Pier Appendix D (With Placeholders).pdf PDF
Updated Attachment H - USCG OPC Pier Price Proposal Form REV 5.docx DOCX document
Appendix A - Telecom Room Photos.pdf PDF
Amendment 0006 USCG OPC.pdf PDF
Attachment Z - Pier 1 - Amendment 006 Drawings.pdf PDF
Updated Attachment H - UCCG OPC Pier Price Proposal Form REV 4.docx DOCX document
24.168 NOAA OMAO Bulkhead Pile Driving Summary Table 08.13.24 to 08.15.24.pdf PDF
24.168 NOAA OMAO Bulkhead Pile Driving Summary Table 07.22.24 to 07.26.24.pdf PDF
24.168 NOAA OMAO Bulkhead Pile Driving Summary Table 07.01.24 - 07.02.24.pdf PDF
24.168 NOAA OMAO Bulkhead Pile Driving Summary Table 08.26.24 to 08.30.24 (1).pdf PDF
24.168 NOAA OMAO Bulkhead Pile Driving Summary Table 08.26.24 to 08.30.24.pdf PDF
24.168 NOAA OMAO Bulkhead Pile Driving Summary Table 07.11.24.pdf PDF
24.168 NOAA OMAO Prime Pier Pile Driving Summary Report.pdf PDF
Pier Pile Plan.pdf PDF
SUB-0123 Interim PDA and Test Pile Logs - Trestle Piles 10B 14B.pdf PDF
Amendment 0005 USCG OPC.pdf PDF
Attachment W - Pier 1 - Amendment 005 Drawings.pdf PDF
Attachment Y - Appendix A Record drawing 11836 125 Submarine Cable Relocation.pdf PDF
24.168 NOAA OMAO Bulkhead Pile Driving Summary Table 08.07.24 to 08.08.24.pdf PDF
24.168 NOAA OMAO Bulkhead Pile Driving Summary Table 08.20.24 to 08.23.24 (1).pdf PDF
Bulkhead Pile Plan.pdf PDF
24.168 NOAA OMAO Bulkhead Pile Driving Summary Table 08.20.24 to 08.23.24.pdf PDF
24.168 NOAA OMAO Bulkhead Pile Driving Summary Table 09.03.24 to 09.06.24.pdf PDF
NOAA OMAO Survey Reports 100 Percent Pre-Final Submittal 04072022.pdf PDF
SUB-0105 Trestle Piles 4C 6B - PDA and Test Pile Logs.pdf PDF
Trestle Summary.pdf PDF
SUB-0TBD Interim PDA and Test Pile Logs For Trestle Pile 17B.pdf PDF
Updated Attachment K - WD RI20260001 05-18-2026.pdf PDF
Amendment 0003 USCG OPC.pdf PDF
Attachment E - Historical Small Business Utilization.docx DOCX document
Attachment T - REF(m) Existing Pier 1 Drawings 1 of 2.pdf PDF
Updated Attachment H - UCCG OPC Pier Price Proposal Form REV 2.docx DOCX document
Attachment Q - Spc 100 Final Specs Appendix D - (With Placeholders).pdf PDF
Updated Attachment G - Individual SB Subcontracting Plan.docx DOCX document
Amendment 0002 USCG OPC.pdf PDF
Updated Attachment H - UCCG OPC Pier Price Proposal Form REV 1.pdf PDF
Attachment M - 01 45 35_Schedule_of_Special_Inspections.pdf PDF
Attachment N - 01 45 35_Statement_of_Special_Inspections.xlsx XLSX spreadsheet
Amendment 0001 USCG OPC.pdf PDF
Updated Attachment F - SB Participation Commitment Document.pdf PDF
Attachment A - Pre Proposal Inquiry Log.xlsx XLSX spreadsheet
Attachment C - Construction Experience Project Data Sheet.pdf PDF
Attachment F - SB Participation Commitment Document.pdf PDF
Attachment G - Individual SB Subcontrating Plan.pdf PDF
Attachment K - WD RI20260001 01-30-2026.pdf PDF
Solicitation - N4008526R0001.pdf PDF
Attachment D - Past Performance Questionnaire.pdf PDF
Attachment H - UCCG OPC Pier Price Proposal Form.pdf PDF
1826479dwg01of05_GEN-CIV.pdf PDF
Show 40 more

50 files listed here. See the rest on GovTribe.

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

34567891011121314

TOP OF PIER DECK

EL 13.00'

▽MHW EL 1.62

▽MLLW EL -2.12

INBOARD

SUBSTATION

LIFE RING, TYP

EMERGENCY

LADDER, TYP

16" X 0.5" THK STL PIPE

FENDER PILE, TYP

FFF, TYP

125-TON MOORING

BOLLARD, TYP

36" DIA CONC-FILLED

STL PIPE PILE, TYP

M A

T C

H L

IN

E

S E

E A

S -2

30" DIA 3/4" THK

CONC-FILLED

STL PIPE PILE,

TYP

EXIST PZ35 PILE W/

TIP EL -29.00 ±

RAISED UTIL

TRENCH CURB

CIP CONC

BEAM

TOP OF EXIST CAP

CHANNEL, EL 11.0 ±

APPROX MUDLINE.

SEE NOTE 1

SLOPE 6.7%

25' - 0" 25' - 0" 25' - 0" 11' - 0" 25' - 0" 25' - 0" 25' - 0" 25' - 0" 25' - 0" 21' - 6" 25' - 0" 25' - 0" 15' - 6" 18' - 0"

EXIST CONC DM W/

BATTER PILES

EXIST PZ32

SHT PILE

MANHOLE,

TYP

SEWER PIPE

SUPPORT,

TYP

SEE S-601 FOR

ESTIMATED HWR

EL AT LANDSIDE

SEE NOTE 1

SEE NOTE 1

1. SEE S-601 AND S-602 FOR SUBSURFACE AND PILE TIP ELEVATIONS.

SUBSURFACE INFORMATION IS APPROXIMATE BASED ON LIMITED

GEOTECHNICAL DATA.

2. SEE ATTACHMENT A IN THE SPECIFICATIONS FOR ADDITIONAL INFORMATION

FOR EXISTING CONDITIONS.

3. BASE STEEL FRAMING FOR AC ENCLOSURE NOT SHOWN FOR CLARITY.

4. SEE NOTE 5 ON S-109 FOR PILE CONSTRUCTION WITHIN EXISTING RIPRAP.

5. SEE DRAINAGE DRAWINGS S-137 AND S-138 FOR LONGITUDINAL SLOPE,

TYPICAL.

GENERAL SHEET NOTES:

SATISFACTORY TO DATE

APPROVED

ACTIVITY

FOR COMMANDER NAVFAC

SEAL

A/E INFO

A

B

C

D

1 2 3 4 5

1 2 3 4 5

A

B

C

D

SCALE:

CONSTR. CONTR. NO.

SHEET

NAVFAC DRAWING NO.

DES DRW CHK

OF

EPROJECT NO.:

D E

P A

R T

M E

N T

O F

T H

E N

A V

Y N

A V

A L

F A

C

IL

IT

IE

S E

N G

IN

E

E R

IN

G

S Y

S T

E M

S C

O M

M A

N D

DRAWFORM REVISION: 25 AUGUST 2020

PM/DM

BRANCH MANAGER

CHIEF ENG/ARCH

FIRE PROTECTION

N A

V A

L F

A C

IL

IT

IE

S

E N

G

IN

E E

R

IN

G S

Y S

T E

M S

C O

M M

A N

D

M

ID

-A T

LA

N

T

IC

N A

V A

L S

T A

T

IO

N

N O

R F

O L K

V

A

AS NOTED

S Y

M D

E S

C R

IP

T

IO

N

D A

T E

A P

P R

/1

/2

:1 :1

P

M

A u to d e s k D o c s /2

U

S C

G O

C R

H o m e p o rt

In it ia ti v e O

P C

P ie r_

/P

IE

R

U S

C G

-1 -S

.r v t

S-203

U S

C G

O C

R H

O M

E P

O R

T

IN

IT

IA

T

IV

E O

P C

P

IE

R

P

IE

R S

O U

TH

E

R N

E

LE

V A

TI

O

N

S H

E E

T

O F

MJF

12936677

JZ SA

Frank Cole USCG MASI

MRI/CWJ

1826479

N E

W P

O R

T, R

I N

A V

A L

S T

A T

IO

N

N E

W P

O R

T

JWJ

NEK

HPN

C I

C O

R E

H

A M

P T

O N

R O

A D

S

S -2

06 FEB 2026

SCALE: 1/16" = 1'-0"

A2

PIER ELEVATION BENT 14 TO BENT 0 - SOUTH

A

M E

N D

M E

N T

/2

/2

V M

G

A

M E

N D

M E

N T

/1

/2

V M

G

A

M E

N D

M E

N T

/1

/2

V M

G

3 4 5 6 7 8 9 10 11 12 13 14

TOP OF PIER DECK

EL 13.00'

▽ MHW EL 1.62

▽ MLLW EL -2.12

0 1 2

EXIST PZ32 PILE

16" X 0.5" THK STL PIPE

FENDER PILE, TYP

FFF, TYP 125-TON MOORING

BOLLARD, TYP

36" DIA CONC-FILLED

STL PIPE PILE, TYP

INBOARD SUBSTATION

M A

T C

H L

IN

E

S E

E A

S -2

30" DIA 3/4" THK

CONC-FILLED

STL PIPE PILE,

TYP

EXIST PZ35 PILE

W/ TIP EL -29.00 +/-

RAISED UTILITY

TRENCH CURB

CIP CONC

BEAM

MANHOLE,

TYP

APPROACH SLAB

APPROX MUDLINE.

SEE NOTE 1

SLOPE 6.7%

25' - 0"25' - 0"25' - 0"11' - 0"25' - 0"25' - 0"25' - 0"25' - 0"25' - 0"21' - 6"25' - 0"25' - 0"15' - 6"18' - 0"

EXIST CONC DM

W/ BATTER PILES

25' - 0"

SEWER PIPE

SUPPORT, TYP

SEE NOTE 1

SEE NOTE 1

1. SEE S-601 AND S-602 FOR SUBSURFACE AND PILE TIP ELEVATIONS.

SUBSURFACE INFORMATION IS APPROXIMATE BASED ON LIMITED

GEOTECHNICAL DATA.

2. SEE ATTACHMENT A IN THE SPECIFICATIONS FOR ADDITIONAL INFORMATION

FOR EXISTING CONDITIONS.

3. BASE STEEL FRAMING FOR AC ENCLOSURE NOT SHOWN FOR CLARITY.

4. SEE NOTE 5 ON S-109 FOR PILE CONSTRUCTION WITHIN EXISTING RIPRAP.

5. SEE DRAINAGE DRAWINGS S-137 AND S-138 FOR LONGITUDINAL SLOPE,

TYPICAL.

GENERAL SHEET NOTES:

SATISFACTORY TO DATE

APPROVED

ACTIVITY

FOR COMMANDER NAVFAC

SEAL

A/E INFO

A

B

C

D

1 2 3 4 5

1 2 3 4 5

A

B

C

D

SCALE:

CONSTR. CONTR. NO.

SHEET

NAVFAC DRAWING NO.

DES DRW CHK

OF

EPROJECT NO.:

D E

P A

R T

M E

N T

O F

T H

E N

A V

Y N

A V

A L

F A

C

IL

IT

IE

S E

N G

IN

E

E R

IN

G

S Y

S T

E M

S C

O M

M A

N D

DRAWFORM REVISION: 25 AUGUST 2020

PM/DM

BRANCH MANAGER

CHIEF ENG/ARCH

FIRE PROTECTION

N A

V A

L F

A C

IL

IT

IE

S

E N

G

IN

E E

R

IN

G S

Y S

T E

M S

C O

M M

A N

D

M

ID

-A T

LA

N

T

IC

N A

V A

L S

T A

T

IO

N

N O

R F

O L K

V

A

AS NOTED

S Y

M D

E S

C R

IP

T

IO

N

D A

T E

A P

P R

/1

/2

:1 :1

P

M

A u to d e s k D o c s /2

U

S C

G O

C R

H o m e p o rt

In it ia ti v e O

P C

P ie r_

/P

IE

R

U S

C G

-1 -S

.r v t

S-206

U S

C G

O C

R H

O M

E P

O R

T

IN

IT

IA

T

IV

E O

P C

P

IE

R

P

IE

R N

O R

T H

E R

N E

LE

V

A

TI

O N

S

H E

E T

O

F

MJF

12936680

JZ SA

Frank Cole USCG MASI

MRI/CWJ

1826479

N E

W P

O R

T, R

I N

A V

A L

S T

A T

IO

N

N E

W P

O R

T

JWJ

NEK

HPN

C I

C O

R E

H

A M

P T

O N

R O

A D

S

S -2

06 FEB 2026

SCALE: 1/16" = 1'-0"

A2

PIER ELEVATION BENT 0 TO BENT 14 - NORTH

1/16" = 1' - 0" 0 5' 10' 20' 30' 60'

A

M E

N D

M E

N T

/2

/2

V M

G

A

M E

N D

M E

N T

/1

/2

V M

G

A

M E

N D

M E

N T

/1

/2

V M

G

Sheets
S-203 - PIER SOUTHERN ELEVATION - SHEET 3 OF 3
S-206 - PIER NORTHERN ELEVATION - SHEET 3 OF 3
2026-08-19T14:11:31-0400
Norfolk, VA
James E. Donahue, R.A.
I, James E. Donahue, R.A., am signing this document to confirm that it has been reviewed.
2026-08-19T14:11:32-0400
Norfolk, VA
James E. Donahue, R.A.
I, James E. Donahue, R.A., am signing this document to confirm that it has been reviewed.