Updated Attachment H - UCCG OPC Pier Price Proposal Form REV 4.docx

DOCX document 52 KB Posted

Attached to
Design-Bid-Build, USCG Offshore Patrol Cutters (OPC) Homeport Pier, Naval Station Newport, Newport RI
Solicitation number
N4008526R0001
Issued by

About this file

This is a Bid Price Schedule for the USCG Offshore Patrol Cutters (OPC) Homeport Initiative Pier construction project at Naval Station Newport, Newport, Rhode Island (eProject No. 1826479). The schedule is structured as a design-bid-build contract requiring bidders to provide line item unit prices and subtotals for a comprehensive pier construction and demolition project.

The base price (Line Item 0001) encompasses the entire scope of work including demolition of existing Pier 1, construction of landside areas and new Bulkhead S45S, and construction of a new OPC Pier 1. Detailed unit price line items cover pile installation (36-inch diameter reinforced concrete filled steel pipe piles at 30,510 linear feet; HP 14x102-inch piles at 416 linear feet; HP 10x42-inch piles at 512 linear feet; 30-inch diameter reinforced concrete filled steel pipe piles at 598 linear feet; and polymeric fender piles at 30,462 linear feet), dredging and disposal services with specific quantities for asbestos-containing materials (1,200 cubic yards) and non-ACM soil (21,630 tons), pile load testing (5 dynamic tests for steel pipe and 3 for polymeric fender piles), environmental remediation including subsurface water management, and extensive hazardous material removal from existing structures (asbestos roofing at 4,000 square feet, PCB caulking at 510 linear feet, mercury light ballasts, PCB transformers, and lead-containing components). The contract also includes bulkhead construction pricing with steel sheet pile sheeting (213 tons) and an in-lieu fee for potential eel grass damage mitigation. All pricing must be completed in accordance with contract drawings and specifications, with work to be performed at Naval Station Newport, Rhode Island.

View the file

Other files

File Type Posted
USCG OPC Pier Amendment 0009 Drawings.pdf PDF
2026-0816-HAI-USCG Homeport OPC Pier-Geotech Engineering Report Rev 2.pdf PDF
Amendment 0009 USCG OPC.pdf PDF
Updated Attachment H - USCG OPC Pier Price Proposal Form REV 5.docx DOCX document
Amendment 0008 USCG OPC.pdf PDF
Amendment 0007 SPC USCG OPC Pier Appendix D (With Placeholders).pdf PDF
Updated Attachment H - USCG OPC Pier Price Proposal Form REV 6.docx DOCX document
USCG OPC Pier Amendment 0008 Drawings.pdf PDF
USCG OPC Pier Amendment 007 Drawings.pdf PDF
Amendment 0007 USCG OPC.pdf PDF
Attachment Z - Pier 1 - Amendment 006 Drawings.pdf PDF
Appendix A - Telecom Room Photos.pdf PDF
Amendment 0006 USCG OPC.pdf PDF
24.168 NOAA OMAO Prime Pier Pile Driving Summary Report.pdf PDF
Pier Pile Plan.pdf PDF
24.168 NOAA OMAO Bulkhead Pile Driving Summary Table 08.26.24 to 08.30.24 (1).pdf PDF
24.168 NOAA OMAO Bulkhead Pile Driving Summary Table 07.22.24 to 07.26.24.pdf PDF
24.168 NOAA OMAO Bulkhead Pile Driving Summary Table 07.15.24 to 07.19.24.pdf PDF
Attachment Y - Appendix A Record drawing 11836 125 Submarine Cable Relocation.pdf PDF
SUB-0123 Interim PDA and Test Pile Logs - Trestle Piles 10B 14B.pdf PDF
SUB-0TBD Interim PDA and Test Pile Logs For Trestle Pile 17B.pdf PDF
24.168 NOAA OMAO Bulkhead Pile Driving Summary Table 08.26.24 to 08.30.24.pdf PDF
Updated Attachment H - UCCG OPC Pier Price Proposal Form REV 3.docx DOCX document
SUB-0105 Trestle Piles 4C 6B - PDA and Test Pile Logs.pdf PDF
24.168 NOAA OMAO Bulkhead Pile Driving Summary Table 08.20.24 to 08.23.24.pdf PDF
24.107 NOAA OMAO Ship & Support Facility Relocation Newport RI - PDA Report - Pier Bent 19.pdf PDF
24.168 NOAA OMAO Bulkhead Pile Driving Summary Table 06.25.24 to 06.27.24.pdf PDF
24.168 NOAA OMAO Bulkhead Pile Driving Summary Table 07.31.24 to 08.01.24.pdf PDF
SUB-0284 PDA49B_A.pdf PDF
SUB-0262 Interim PDA Test Pile Logs for Pier Piles - Bent 35 B - A.pdf PDF
24.168 NOAA OMAO Bulkhead Pile Driving Summary Table 08.07.24 to 08.08.24.pdf PDF
Trestle Summary.pdf PDF
24.168 NOAA OMAO Bulkhead Pile Driving Summary Table 08.20.24 to 08.23.24 (1).pdf PDF
24.168 NOAA OMAO Bulkhead Pile Driving Summary Table 07.01.24 - 07.02.24.pdf PDF
Bulkhead Pile Plan.pdf PDF
24.168 NOAA OMAO Bulkhead Pile Driving Summary Table 09.03.24 to 09.06.24.pdf PDF
24.168 NOAA OMAO Bulkhead Pile Driving Summary Table 08.13.24 to 08.15.24.pdf PDF
Attachment W - Pier 1 - Amendment 005 Drawings.pdf PDF
24.168 NOAA OMAO Bulkhead Pile Driving Summary Table 07.11.24.pdf PDF
24.107 NOAA OMAO Ship Support Facility Relocation Newport RI - PDA Report - Pier Bent 25 and 27.pdf PDF
NOAA OMAO Survey Reports 100 Percent Pre-Final Submittal 04072022.pdf PDF
Amendment 0005 USCG OPC.pdf PDF
Attachment X - Appendix A Record Drawing 12819 135 Submarine Cable.pdf PDF
Attachment U - Appendix A - Pier 1 Extension 1968.pdf PDF
Attachment V - Pier 1 - Amendment 004 Drawings.pdf PDF
Updated Attachment K - WD RI20260001 05-18-2026.pdf PDF
Amendment 0004 USCG OPC.pdf PDF
Attachment T - REF(m) Existing Pier 1 Drawings 1 of 2.pdf PDF
Attachment C - Construction Experience Project Data Sheet.docx DOCX document
Attachment E - Historical Small Business Utilization.docx DOCX document
Show 40 more

Latest 50 of 90 listed here. See the rest on GovTribe.

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

USCG OCR Homeport Initiative OPC Pier eProject No. 1826479 Newport Naval Station – Newport, RI

BID PRICE SCHEDULE REV4

Provide line item prices, where indicated by blank underlines, for the following items:

Line Item
Description
Quantity
Unit
Unit Price
Sub-Total
Total Price
0001
BASE PRICE: Total Price for (subtotals of Line Items 0001A through 0001Y ) the entire work for USCG OCR Homeport OPC Pier, including demolition of existing Pier 1, construction of landside area and new Bulkhead S45S, and construction of new OPC Pier 1 at Naval Station Newport, RI, in accordance with the drawings and specifications, complete, but excluding work provided as Option Items.
1
LS
0001A
Price for the construction of the new OPC Pier, and all associated site work and utilities as indicated on the drawings and in the specifications excluding work provided in another priced line item.
1
LS
0001AA
Unit price for dredging and disposal of dredged material containing greater than 1% Asbestos Containing Material (ACM) in accordance with applicable environmental regulations, material not shown in contract drawings or specifications.
1,200*
CY
0001AB
Unit price to remove and dispose of all soil containing greater than 1% Asbestos Containing Material (ACM), not shown in contract drawings or specifications.
2,000*
Tons

0001B

Unit price to furnish and install 36” diameter reinforced concrete filled steel pipe piles for the pier, complete in accordance with the drawings and specifications, but excluding work provided in another priced line item.

30,510*
LF

0001C

Unit Price for providing all work in connection with installation of Steel Pipe Pile/Casing Pipe Obstruction (less than one cubic yard). Documents, complete in accordance with the drawings and specifications, but excluding work provided in another priced line item.

52*

EA

0001CA

Unit price for demolition, removal, and disposal of debris larger than 1 cubic yard (i.e. abandoned foundations, utility structures, timber piles, etc.) encountered within planned excavations (i.e., utilities, foundations) or encountered at planned pile locations that is not indicated on the Demolition Plans.

50*
Tons (Truck Scale Measure)

0001D

Unit price to furnish and install HP 14x102” piles for the pier, complete in accordance with the drawings and specifications, but excluding work provided in another priced line item.

416*
LF

0001E

Unit price to furnish and install HP 10x42” piles for the pier, complete in accordance with the drawings and specifications, but excluding work provided in another priced line item.
512*
LF

0001F

Unit price to furnish and install 30” diameter reinforced concrete filled steel pipe piles for the pier, complete in accordance with the drawings and specifications, but excluding work provided in another priced line item.
598*
LF

0001G

Unit price to furnish and install polymeric fender piles for the pier, complete in accordance with the drawings and specifications, but excluding work provided in another priced line item.

30,462*

LF

0001H

Unit price to provide dynamic pile load PDA test for 36" diameter steel pipe piles (includes re-strike) for the pier, complete in accordance with the drawings and specifications, but excluding work provided in another priced line item.

5
EA

0001I

Unit price to provide dynamic pile load test for polymeric fender piles with steel H-pile extension, complete in accordance with the drawings and specifications, but excluding work provided in another priced line item.
3
EA
0001J
Sampling, testing, treatment, and discharge or off‑site disposal of subsurface water encountered during construction. On‑site discharge must comply with RIPDES Remediation General Permit requirements, complete in accordance with the drawings and specifications, but excluding work provided in another priced line item.
1
LS
0001K
Price for entire work for Bulkhead S45S construction, complete in accordance with the drawings and specifications, but excluding work provided in another priced line item.
1
LS
0001L
Unit price to furnish and install steel sheet pile sheeting for Bulkhead S45S, including delivery, handling, driving, splicing, trimming, and application of coatings, complete in accordance with the drawings and specifications, but excluding work provided in another priced line item. Costs of deadman anchors, tie rods, wales, should not be included in this line item.
213
TON
0001M
“In lieu” Fee for potential Eel Grass damage / disturbance adjacent to new S45S bulkhead.
1
LS
0001N
Price for the demolition of existing Pier 1 in its entirety and all associated landside demolition excluding work provided in another priced line item.
1
LS

0001O

Unit price to remove and dispose of all soil considered to be non-hazardous from the site to a licensed RCRA facility, complete in accordance with the drawings and specifications, but excluding work provided in another priced line item

21,630*
Tons (Truck Scale Measure)

0001P

Unit price to remove and dispose of all soil considered hazardous, non-asbestos containing (asbestos <1%) from the site to a licensed RCRA facility, complete in accordance with the drawings and specifications, but excluding work provided in another priced line item.
1,350*
Tons (Truck Scale Measure)
0001Q
Unit price to remove and dispose of asbestos containing materials (>1% ACM) from existing Pier 1 – Glazing compound from 24 windows at existing Pier 1 buildings, complete in accordance with the drawings and specifications, but excluding work provided in another priced line item.
372
LF
0001R
Unit price to remove and dispose of asbestos containing materials (>1% ACM) from existing Pier 1 –Tar roofing on existing buildings, complete in accordance with the drawings and specifications, but excluding work provided in another priced line item.
4,000
SF
0001S
Unit price to remove and dispose of caulking containing PCBs on existing Pier 1 Buildings, complete in accordance with the drawings and specifications, but excluding work provided in another priced line item.
510
LF
0001T
Unit price to remove and dispose of PCB-Impacted CMU and Concrete/Asphalt from existing Pier 1 and existing Pier 1 buildings, complete in accordance with the drawings and specifications, but excluding work provided in another priced line item.
606
CF
0001U
Unit price to remove and dispose of Mercury containing light ballasts from Pier 1 buildings, complete in accordance with the drawings and specifications, but excluding work provided in another priced line item.
15
Each
0001V
Unit price to remove and dispose of PCB containing transformers from existing Pier 1, complete in accordance with the drawings and specifications, but excluding work provided in another priced line item.

*1 transformer and 1 substation are located at each pier building.

6
Each
0001W
Unit price to remove and dispose of mercury containing thermostats from Pier 1 buildings, complete in accordance with the drawings and specifications, but excluding work provided in another priced line item.
2
Each
0001X
Unit price to remove and dispose of lead from anchor bolts in cleats and bollards from existing Pier 1, complete in accordance with the drawings and specifications, but excluding work provided in another priced line item.
238
EA
0001Y
Unit price for dredging and dredge disposal (Including allowable over dredge), complete in accordance with the drawings and specifications, but excluding work provided in another priced line item. Assumes dredged material contains <1% Asbestos Containing Material (ACM)
10,175*
CY
0002
Option Item No. 1: Compressed Air System: Furnish and install in accordance with the drawings and specifications
1
LS
0003
Option Item No. 2: Additional costs to provide cast-in-place concrete pavement for the designated laydown area in lieu of asphalt pavement, complete.
1
LS

TOTAL

Line Items 0001 – 0003

GENERAL BID NOTES

a. Award will be evaluated on the total proposed price for Line Items 0001 – 0003, Base Price and the sum of all Option Item prices. The subtotal of Line Item 0001A-0001Y is included in Line Item 0001.

b. The Government reserves the unilateral right to award any and all of Line Items 0002 and 0003 to the Contractor at the proposed price within 365 calendar days after the contract award and in accordance with all bid notes. A firm fixed proposed price is required for Line Items 0001-0003. No provision is made for economic price adjustment. The Contract Completion Date (CDD) does not change if any or all of Line Items 0002 and 0003 are exercised.

c. Quantities on the bid schedule that are followed by an asterisk (*) are estimated quantities. Contractor shall only be paid for quantities/units of work actually performed. If the estimated quantity used in the bid schedule is not reached, a deductive modification shall be taken at the end of contract for quantities/units not performed. If the estimated quantity is exceeded, an equitable adjustment shall be made to the contract price for work performed over the estimated quantity. If the quantity of a unit-priced item in this contract is an estimated quantity and the actual quantity of the unit-priced item varies more than 15 percent above or below the estimated quantity, an equitable adjustment in the contract price shall be made upon demand of either party. The equitable adjustment shall be based upon any increase or decrease in costs due solely to the variation above 15 percent or below 85 percent of the estimated quantity. If the quantity variation is such as to cause an increase in the time necessary for completion, the Contractor may request, in writing, an extension of time, to be received by the Contracting Officer within 10 days from the beginning of the delay, or within such further period as may be granted by the Contracting Officer before the date of final settlement of the contract. Upon the receipt of a written request for an extension, the Contracting Officer shall ascertain the facts and make an adjustment for extending the completion date as, in the judgement of the Contracting Officer, is justified.

d. Pile quantities on the bid schedule that are followed by an asterisk (*) are estimated quantities. Requirements mentioned in Item C of the General Bid Notes shall not apply to payment for piling. Each pile and test pile acceptably provided will be paid for at the bid unit price for units actually installed. The unit price shall include items incidental to furnishing and driving the piles including mobilization and demobilization, predrilling, probing, redriving uplifted piles, and cutting off piles at the cutoff elevation. Payment shall be made for production and test piles at the bid unit price for the length of pile, from tip to final cutoff, actually provided, including buildups and splices directed by the Contracting Officer to be made. Should the actual cumulative pile length driven (tip to cutoff) vary more than 25 percent from the total estimated pile length specified as a basis for bidding, the price shall be adjusted based upon any increase or decrease in costs due solely to the variation.

e. Evaluations of Options (JUL 1990). Except when it is determined in accordance with FAR 17.202 (b) (DEVIATION 2026-O0027) not to be in the Government's best interest, the Government will evaluate offers for award purposes by adding the price for Line Items 0002 through 0003 to the total price for the Base Bid, (Line Item 0001). Evaluation of options will not obligate the Government to exercise the Option(s). (FAR 52.217-5 DEVIATION 2026-O0038).

f. The Government may reject an offer as non-responsive if it is materially unbalanced as to prices for the basic requirement and the option quantities. An offer is unbalanced when it is based on prices significantly less than cost for some work and prices which are significantly overstated for other work.

g. Failure to enter a price for any Line Item will result in a proposal being rejected.

h. For bid items where unit prices are indicated as required, bidders shall enter unit prices and extended totals in spaces provided. If there is a difference between a unit price and the extended total, the unit price will be held to be the intended bid and the total recomputed accordingly. If an Offeror provides a total but fails to enter a unit price, the total divided by the specified quantity will be held to be the intended unit price.

i. If any or all of Line Item 0002 and 0003 are exercised, additional bonding and consent of surety is required. Consequently, the Performance Bond must reflect 100 percent of the aggregate amount of all items.