This document is a Pile Driving Summary and associated Pile Driving Logs for a marine construction project at Newport Naval Station in Rhode Island. The project, identified as GTR Job #24.168, was conducted for NOAA OMAO (National Oceanic and Atmospheric Administration Office of Marine and Aviation Operations) by contractor Coastal Marine, with Skanska as the client and J. Roth serving as the GTR representative.

The project involved driving 19 bulkhead steel piles (BH79 through BH97) with the following specifications: 18-inch outer diameter, 0.5-inch wall thickness, 17-inch inner diameter, 60-foot length, and 680 kips ultimate load capacity. All piles were driven without vibration between July 1-2, 2024, using an ICE D-50 single-acting diesel hammer with a rated energy of 135 kips and ram weight of 11,355 lbs. Each pile achieved a driven depth of 60 feet with a working grade of 12.0 feet, tip elevation of 55.00 feet, top elevation of 10.25 feet, and cut-off elevation of -43.00 feet. Final blow counts ranged from 26 to 58 blows per foot, with end-of-drive strokes varying between 10.0 and 11.0 feet. Cut-off lengths ranged from 9.0 to 11.5 feet. The detailed pile driving logs document blow counts at each foot of depth for individual piles, with remarks noting completed pile batter and directional driving information (North/South and East/West components).

View the file

Other files

File Type Posted
USCG OPC Pier Amendment 0009 Drawings.pdf PDF
2026-0816-HAI-USCG Homeport OPC Pier-Geotech Engineering Report Rev 2.pdf PDF
Amendment 0009 USCG OPC.pdf PDF
Updated Attachment H - USCG OPC Pier Price Proposal Form REV 5.docx DOCX document
Amendment 0008 USCG OPC.pdf PDF
Amendment 0007 SPC USCG OPC Pier Appendix D (With Placeholders).pdf PDF
Updated Attachment H - USCG OPC Pier Price Proposal Form REV 6.docx DOCX document
USCG OPC Pier Amendment 0008 Drawings.pdf PDF
USCG OPC Pier Amendment 007 Drawings.pdf PDF
Amendment 0007 USCG OPC.pdf PDF
Attachment Z - Pier 1 - Amendment 006 Drawings.pdf PDF
Appendix A - Telecom Room Photos.pdf PDF
Updated Attachment H - UCCG OPC Pier Price Proposal Form REV 4.docx DOCX document
Amendment 0006 USCG OPC.pdf PDF
24.168 NOAA OMAO Prime Pier Pile Driving Summary Report.pdf PDF
Pier Pile Plan.pdf PDF
24.168 NOAA OMAO Bulkhead Pile Driving Summary Table 08.26.24 to 08.30.24 (1).pdf PDF
24.168 NOAA OMAO Bulkhead Pile Driving Summary Table 07.22.24 to 07.26.24.pdf PDF
24.168 NOAA OMAO Bulkhead Pile Driving Summary Table 07.15.24 to 07.19.24.pdf PDF
Attachment Y - Appendix A Record drawing 11836 125 Submarine Cable Relocation.pdf PDF
SUB-0123 Interim PDA and Test Pile Logs - Trestle Piles 10B 14B.pdf PDF
SUB-0TBD Interim PDA and Test Pile Logs For Trestle Pile 17B.pdf PDF
24.168 NOAA OMAO Bulkhead Pile Driving Summary Table 08.26.24 to 08.30.24.pdf PDF
Updated Attachment H - UCCG OPC Pier Price Proposal Form REV 3.docx DOCX document
SUB-0105 Trestle Piles 4C 6B - PDA and Test Pile Logs.pdf PDF
24.168 NOAA OMAO Bulkhead Pile Driving Summary Table 08.20.24 to 08.23.24.pdf PDF
24.107 NOAA OMAO Ship & Support Facility Relocation Newport RI - PDA Report - Pier Bent 19.pdf PDF
24.168 NOAA OMAO Bulkhead Pile Driving Summary Table 06.25.24 to 06.27.24.pdf PDF
24.168 NOAA OMAO Bulkhead Pile Driving Summary Table 07.31.24 to 08.01.24.pdf PDF
SUB-0284 PDA49B_A.pdf PDF
SUB-0262 Interim PDA Test Pile Logs for Pier Piles - Bent 35 B - A.pdf PDF
24.168 NOAA OMAO Bulkhead Pile Driving Summary Table 08.07.24 to 08.08.24.pdf PDF
Trestle Summary.pdf PDF
24.168 NOAA OMAO Bulkhead Pile Driving Summary Table 08.20.24 to 08.23.24 (1).pdf PDF
Bulkhead Pile Plan.pdf PDF
24.168 NOAA OMAO Bulkhead Pile Driving Summary Table 09.03.24 to 09.06.24.pdf PDF
24.168 NOAA OMAO Bulkhead Pile Driving Summary Table 08.13.24 to 08.15.24.pdf PDF
Attachment W - Pier 1 - Amendment 005 Drawings.pdf PDF
24.168 NOAA OMAO Bulkhead Pile Driving Summary Table 07.11.24.pdf PDF
24.107 NOAA OMAO Ship Support Facility Relocation Newport RI - PDA Report - Pier Bent 25 and 27.pdf PDF
NOAA OMAO Survey Reports 100 Percent Pre-Final Submittal 04072022.pdf PDF
Amendment 0005 USCG OPC.pdf PDF
Attachment X - Appendix A Record Drawing 12819 135 Submarine Cable.pdf PDF
Attachment U - Appendix A - Pier 1 Extension 1968.pdf PDF
Attachment V - Pier 1 - Amendment 004 Drawings.pdf PDF
Updated Attachment K - WD RI20260001 05-18-2026.pdf PDF
Amendment 0004 USCG OPC.pdf PDF
Attachment T - REF(m) Existing Pier 1 Drawings 1 of 2.pdf PDF
Attachment C - Construction Experience Project Data Sheet.docx DOCX document
Attachment E - Historical Small Business Utilization.docx DOCX document
Show 40 more

Latest 50 of 90 listed here. See the rest on GovTribe.

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

DATE:

PROJECT LOCATION:

CLIENT: CONTRACTOR:

GTR REP PILE INFO:

BH97 Not Vibed 1-Jul-24 12.0 60 55.00 10.25 -43.00 17.00 -53.25 34 10.0 - 11.0

BH96 Not Vibed 1-Jul-24 12.0 60 55.00 10.25 -43.00 17.00 -53.25 29 9.0 - 10.0

BH95 Not Vibed 1-Jul-24 12.0 60 55.00 10.25 -43.00 17.00 -53.25 58 9.5 - 10.5

BH94 Not Vibed 1-Jul-24 12.0 60 55.00 10.25 -43.00 17.00 -53.25 48 10.0 - 11.0

BH93 Not Vibed 1-Jul-24 12.0 60 55.00 10.25 -43.00 17.00 -53.25 47 9.5 - 10.5

BH92 Not Vibed 1-Jul-24 12.0 60 55.00 10.25 -43.00 17.00 -53.25 27 10.0 - 11.0

BH91 Not Vibed 1-Jul-24 12.0 60 55.00 10.25 -43.00 17.00 -53.25 26 10.0 - 11.0

BH90 Not Vibed 1-Jul-24 12.0 60 55.00 10.25 -43.00 17.00 -53.25 33 9.5 - 10.5

BH89 Not Vibed 1-Jul-24 12.0 60 55.00 10.25 -43.00 17.00 -53.25 49 10.0 - 11.0

BH88 Not Vibed 2-Jul-24 12.0 60 55.00 10.25 -43.00 17.00 -53.25 52 10.0 - 11.0

BH87 Not Vibed 2-Jul-24 12.0 60 55.00 10.25 -43.00 17.00 -53.25 40 9.5 - 10.5

BH86 Not Vibed 2-Jul-24 12.0 60 55.00 10.25 -43.00 17.00 -53.25 46 10.0 - 11.0

BH85 Not Vibed 2-Jul-24 12.0 60 55.00 10.25 -43.00 17.00 -53.25 52 9.5 - 10.5

BH84 Not Vibed 2-Jul-24 12.0 60 55.00 10.25 -43.00 17.00 -53.25 44 9.5 - 10.5

BH83 Not Vibed 2-Jul-24 12.0 60 55.00 10.25 -43.00 17.00 -53.25 54 10.5 - 11.5

BH82 Not Vibed 2-Jul-24 12.0 60 55.00 10.25 -43.00 17.00 -53.25 57 10.5 - 11.5

BH81 Not Vibed 2-Jul-24 12.0 60 55.00 10.25 -43.00 17.00 -53.25 47 10.5 - 11.5

BH80 Not Vibed 2-Jul-24 12.0 60 55.00 10.25 -43.00 17.00 -53.25 45 9.5 - 10.0

BH79 Not Vibed 2-Jul-24 12.0 60 55.00 10.25 -43.00 17.00 -53.25 55 10.5 - 11.5

GTR JOB # 24.168

GEOSCIENCES TESTING AND RESEARCH, INC.

55 Middlesex Street, Suite 225, North Chelmsford, MA, Phone: (978) 251-9395 Fax: (978) 251-9396

COMMENTS

PILE DRIVING SUMMARY

J. Roth Steel 18-inch O.D. X 0.5-inch wall open-ended Pipe

Newport RI Naval Station Coastal Marine

NOAA OMAO

Skanska

10-Jul-24

CUT-OFF

ELEVATION

(feet)

BLOW

COUNT

FINAL FOOT

BULKHEAD PILES

PILE

NO.

DRIVEN

DEPTH

(feet)

TIP

ELEVATION

(feet)

TOP

ELEVATION

(feet)

PILE

LENGTH

(feet)

EOD

STROKE

(feet)

WORKING

GRADE

(feet)

FINAL DRIVE

DATE

VIBRATION

DRIVE DATE

CUT-OFF

LENGTH