MS NP NATR 3N18 3H27 ETC_GEO_Memo_adv.pdf
PDF 19 MB Posted
- Attached to
- MS NP NATR 3N18 3H27 ETC - Geotechnical, Pavement Rehabilitation, and Structural Repairs
- Solicitation number
- 693C73-25-B-000003
About this file
This document appears to be a memorandum related to a U.S. Department of Transportation Federal Highway Administration solicitation for geotechnical, pavement rehabilitation, and structural repairs. The solicitation number is 693C73-25-B-000003, and the opportunity is titled "MS NP NATR 3N18 3H27 ETC - Geotechnical, Pavement Rehabilitation, and Structural Repairs."
The solicitation is seeking services for geotechnical, pavement rehabilitation, and structural repairs. Key details are not provided in this memorandum, which appears to be an advisory document rather than the actual solicitation. No information is given on response dates, award dates, pricing terms, set-asides, or other salient solicitation details. This document does not appear to contain a Performance Work Statement, Statement of Objectives, or other essential solicitation content, and seems to be providing background or related information rather than directly addressing the required products or services.
View the file
Other files
Show 40 more
Latest 50 of 53 listed here. See the rest on GovTribe.
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
SOILS AND FOUNDATIONS
REPORT NO. 02-24
PROJECT: MS NP NATR 3N18 3H27 ETC
EMBANKMENT AND ROAD REPAIRS
BETWEEN MP 121 AND MP 204 (PHASE 2)
NATCHEZ TRACE PARKWAY
MISSISSIPPI
US DEPARTMENT OF TRANSPORTATION
FEDERAL HIGHWAY ADMINISTRATION
EASTERN FEDERAL LANDS HIGHWAY DIVISION
22001 LOUDOUN COUNTY PARKWAY
ASHBURN, VA 20147
JULY 2024
TABLE OF CONTENTS
1. INTRODUCTION
1.1. General
1.2. Project Location
1.3. Background
2. GEOLOGY
2.1. MP 121.40 TO MP 121.60
2.2. MP 131.30 TO MP 133.80
2.3. MP 156.80 TO MP 160.30
2.4. MP 164.29
2.5. MP 181.70 TO MP 197.80
3. SUBSURFACE EXPLORATION PROGRAM
3.1. General
3.2. Sampling
3.3. Data Summary
3.4. Laboratory Testing
4. SUBSURFACE CONDITIONS
4.1. M.P. 121.40 (BORING BH23-01)
4.2. M.P. 121.60 (BORINGS BH23-02 AND BH23-03)
4.3. M.P. 131.30 (BORINGS BH23-04 AND BH23-04A)
4.4. M.P. 133.80 (BORINGS BH23-05)
4.5. M.P. 156.20 (BORINGS BH23-06)
4.6. M.P. 160.30 (BORINGS BH23-07)
4.7. M.P. 181.70 (BORINGS BH23-08 AND BH23-09)
4.8. M.P. 182.00 (BORINGS BH23-10)
4.9. M.P. 182.70 (BORINGS BH23-11, BH23-12, AND BH23-13)
4.10. M.P. 184.00 (BORINGS BH23-14 AND BH23-15)
4.11. M.P. 184.50 (BORINGS BH23-16)
4.12. M.P. 184.80 (BORINGS BH23-17)
4.13. M.P. 185.20 (BORINGS BH23-18 AND BH23-19)
4.14. M.P. 186.80 (BORINGS BH23-20)
4.15. M.P. 193.00 (BORINGS BH23-21 AND BH23-22)
4.16. M.P. 195.10 (BORINGS BH23-23 AND BH23-24)
4.17. M.P. 195.50 (BORINGS BH23-25 AND BH23-26)
4.18. M.P. 197.80 (BORINGS BH23-27 AND BH23-28)
4.19. M.P. 200.00 (BORINGS BH23-29)
5. GEOTECHNICAL EVALUATION
6. DESIGN ANALYSIS AND RECOMMENDATIONS
6.1. Design Alternatives
6.2. Design Analysis
6.3. Recommendations
7. REFERENCES
8. DISCLAIMER/LIMITATIONS CLAUSE
APPENDICES
Note: Design changes subsequent to publication of this report and prior to the project’s advertisement will be documented by a memo attached after the title page.
PAGE - 1 DEPARTMENT OF TRANSPORTATION
EASTERN FEDERAL LANDS HIGHWAY DIVISION
ASHBURN, VA
SOILS AND FOUNDATIONS
REPORT NO. 02-24
EMBANKMENT AND ROAD REPAIRS
BETWEEN MP 121 AND MP 204 (PHASE 2)
NATCHEZ TRACE PARKWAY
MISSISSIPPI
1. INTRODUCTION
1.1. General
This Geotechnical Report presents the results of our subsurface exploration, laboratory testing, geotechnical analysis and presents our evaluations and recommendations for nineteen (19) sites in Natchez Trace Parkway, MS from Mile Post (MP) 121.00 to MP 204.00..
1.2. Project Location
The project includes recomendations regarding embankments failure and pavement cracks observed at the project site along the Natchez Tarace Parkway. The project is located in Attala, Choctaw, Leake, Madision, and Webster Counties in Mississippi. Table No. 1 includes a summary of the sites location.
Vicinity maps and a site location are shown in Figure 1 in Appendix A
Table No. 1 – Approximate Site Locations
Mile Post - MP Location
Remarks Lat. (°) Long. (°)
121.4 32.574669 -89.879535 Pavement distress
121.6 32.575623 -89.877486 Pavement distress
131.3 32.667081 -89.754635 Pavement distress
133.8 32.690293 -89.720898 Pavement distress, longitudinal and transverse cracks
156.2 32.987381 -89.60694 Slope erosion
156.3** 32.990000 -89.605556 Slope erosion
160.3 33.040343 -89.574599 Pavement distress
164.29 33.082650 -89.525405 Approach settlement
Bridge Structure 5570-112
181.7 33.30277 -89.390947 Slope erosion
PAGE - 2 DEPARTMENT OF TRANSPORTATION
EASTERN FEDERAL LANDS HIGHWAY DIVISION
ASHBURN, VA
Mile Post - MP Location
Remarks Lat. (°) Long. (°)
182.0* 33.303703 -89.387823 Settlement and longitudinal cracks, pavement distress
182.7 33.308272 -89.376606 Settlement and longitudinal cracks, pavement distress
184.0 33.324685 -89.367413 Pavement distress
184.1** 33.328056 -89.364722 Pavement distress
184.5 33.331708 -89.361558 Slope erosion
184.8 33.334881 -89.358557 Slope erosion
185.2 33.338331 -89.355975 Slope erosion
193 - Little Mountain
Summit Rd
33.414707 -89.263232 Pavement distress
33.416611 -89.267484 Pavement distress
195.1 33.43612 -89.246224 Slope erosion
195.5 33.442642 -89.236501 Approach settlement
Bridge Structure 5570-099
197.8 33.466400 -89.214852 Approach settlement
Bridge Structure 5570-095
*Excluded from project during field review.
**Added to project during field review.
1.3. Background
This section of the Parkway experienced shallow embankments failures, and pavement distress in the form of cracking and settlement. The Park management expressed their concern regarding the safety of the commuters and asked EFL to evaluate remedial actions needed.
2. GEOLOGY
The 1969 Mississippi Geological Survey indicates the project sites’ geology is part of the Claiborne group represented by the Jackson group, Cockfield, Zilpha and Winona, Tallahatta and Wilcox formations.
Figure 2 in Appendix A shows the geologic map of the project area together with geologic symbols. A geological description per Mile Post (MP) is presented below.
PAGE - 3 DEPARTMENT OF TRANSPORTATION
EASTERN FEDERAL LANDS HIGHWAY DIVISION
ASHBURN, VA
2.1. MP 121.40 TO MP 121.60
The Jackson group formation (Ej) exists from MP 121.40 to MP 121.60. The Jackson group formation consists of Yazoo clay which tends to be green and gray, calcareous clay containing some sand and marl.
The Moody’s Branch formation at base is also part of this group where shells are embedded in glauconitic clayey quartz sand.
2.2. MP 131.30 TO MP 133.80
The Cockfield formation (Ec) exists from MP 131.30 to MP 133.80. The Cockfield formation consists of irregularly bedded, more or less laminated brown coal clay, sand, and lignite.
2.3. MP 156.80 TO MP 160.30
The Zilpha and Winona formations (Ezw) exists from MP 156.80 to MP 160.30. The Zilpha formation consists of Zilpha clay which tends to be chocolate-colored clay containing some glauconitic sand. The Winona formation consists of Winona sand comprised of highly glauconitic sand, more or less clayey.
2.4. MP 164.29
The Tallahatta formation (Et) exists at MP 164.29 consisting of locally glauconitic sand, containing claystone and clay lenses and abundant clay stringers.
2.5. MP 181.70 TO MP 197.80
The Wilcox formation (Ew) exists from MP 181.70 to MP 197.80. The Wilcox formation irregularly bedded fine to coarse sand, more or less brown coal clay and lignite.
3. SUBSURFACE EXPLORATION PROGRAM
3.1. General
A subsurface exploration program was conducted between October 18 and November 1, 2023, by EFLHD’s Subsurface Exploration Team. The program consisted of drilling thirty (30) soil borings at the subject sites. Borings were drilled using a CME 45 drill rig. Boreholes were advanced using 3-¾-inch (ID) hollow stem augers (HSA) and were terminated upon reaching auger refusal or after reaching the planned borings depth. Boring locations were laid out by EFLHD field personnel by referencing topographic features, measuring distances from existing surface features, and using a hand-held GPS equipment.
Approximate boring locations are shown on Figures 3 to 10 in Appendix B.
3.2. Sampling
Soil samples were obtained using a standard split-barrel (split-spoon) sampler driven during Standard Penetration Tests (SPT) in general accordance with ASTM D 1586, Standard Method of Penetration Test and Split Barrel Sampling of Soils. SPT was performed by driving the split-spoon sampler 24 inches into
PAGE - 4 DEPARTMENT OF TRANSPORTATION
EASTERN FEDERAL LANDS HIGHWAY DIVISION
ASHBURN, VA
relatively undisturbed soil under the impact of a 140-pound automatic hammer free falling 30 inches. SPT was performed at 2.5-foot intervals. The number of blows required to advance the sampler through each 6-inch interval was recorded on field boring logs. The number of hammer blows required to advance the split-spoon sampler the middle foot is designated as the “Standard Penetration Resistance” or N value.
Boreholes were backfilled with auger cuttings.
Representative portions of the split-spoon samples were preserved in glass jars. The samples were visually classified and logged in the field by the drilling crew. Samples were then delivered to the EFLHD Materials Testing facility in Sevierville, TN for testing and storage.
3.3. Data Summary
The results of the field tests and measurements were recorded on the driller’s logs and appropriate data sheets in the field. These data sheets and logs contain information concerning the boring methods, samples attempted and recovered, indications of materials encountered. They also contain interpretations by the exploration foreman of the subsurface conditions based on the performance of the equipment and cuttings brought to the surface by the drilling tools. Therefore, the field data represents both factual and interpretative information.
The boring logs in Appendix C represent a compilation of field and laboratory data and description of the soil samples by the geotechnical engineer.
3.4. Laboratory Testing
A laboratory testing program was conducted on representative soil samples recovered during the subsurface exploration to aid in the classification, and the evaluation of engineering parameters of the subsurface materials. The following tests were performed on selected samples:
• Grain Size Distribution (AASHTO T-11 and T-27)
• Moisture Content (MC) (AASHTO T-265)
• Plastic Limit (PL) (AASHTO T-90)
• Liquid Limit (LL) (AASHTO T-89)
The laboratory testing results are included in Appendix D.
4. SUBSURFACE CONDITIONS
The boring logs in Appendix C represent a compilation of field and laboratory data and descriptions of the soil samples by a geotechnical engineer. These records occasionally may not include all data recorded on driller’s logs and field data sheets but do include all information considered relevant to the design and preparation of this memo.
PAGE - 5 DEPARTMENT OF TRANSPORTATION
EASTERN FEDERAL LANDS HIGHWAY DIVISION
ASHBURN, VA
A brief description of the soil conditions encountered in the borings is presented below. The stratification lines designating soil types and the interfaces between soil types in the boring logs in Appendix C represent approximate boundaries. The transition between materials may be gradual. It should be noted that one or more of the units may be absent at specific locations. Each of the soil types has been grouped according to its engineering properties and classification.
It should be noted that the stratification lines designating the interfaces between soil types on the boring logs, represent approximate boundaries. The transition between materials may be gradual. One or more of the units may be absent at specific locations.
Groundwater depth data mentioned in this report were collected during the drilling operation. However, changes in groundwater levels could be expected due to seasonal variations, precipitation, evaporation, and surface water runoff.
4.1. M.P. 121.40 (BORING BH23-01)
Fill
A 0.50± ft thick layer of topsoil was encountered at the boring. Underneath the topsoil, fill material consisting primarily of lean clay with trace of sand was encountered and extended to a depth of 5.0 ft below existing site grades. Recorded SPT N-values ranged from 5 to 11 blows per foot (bpf) indicating firm to stiff consistencies.
RS - Residual Soil – Lean Clay with Sand
Underlying the Fill layer, residual soils consisting primarily of lean clay with sand were encountered and extended from depths of 5 ft to 15 ft below existing site grades. N-values ranged from 3 to 4 bpf, indicating soft consistency.
RS - Residual Soil – Silty Sand
Underneath the lean clay layer, silty sand was encountered and extended to the termination depth of the boring. N-values ranged from 8 to 33 bpf, indicating loose to dense relative densities.
Groundwater
Groundwater was encountered at a depth of 15.4 ft below the existing site grade during the drilling operation.
4.2. M.P. 121.60 (BORINGS BH23-02 AND BH23-03)
Fill
A 0.10± ft thick layer of topsoil was encountered at the borings. Underneath the topsoil, fill material consisting primarily of lean clay with sand and silt were encountered and extended to depths of 3.0 ft and
PAGE - 6 DEPARTMENT OF TRANSPORTATION
EASTERN FEDERAL LANDS HIGHWAY DIVISION
ASHBURN, VA
7.0 ft below existing site grades. N-values ranged from 5 to 22 bpf indicating firm to very stiff consistencies.
RS - Residual Soil – Lean Clay and Silt
Underneath the fill layer, residual soils consisting primarily of lean clay and sandy lean clay, with various amounts of silt were encountered and extended to the termination depths of the soil borings. N-values ranged from 4 to 18 bpf, indicating firm to very stiff consistencies.
Groundwater
Groundwater was encountered at a depth of 15.0 ft below the existing site grade during the drilling operation on boring BH23-02. No groundwater was encountered during the drilling operation of boring
BH23-03.
4.3. M.P. 131.30 (BORINGS BH23-04 AND BH23-04A)
Fill
A 0.20± ft thick layer of topsoil was encountered at the borings. Underneath the topsoil, fill material consisting primarily of lean clay with sand and sandy silt were encountered and extended to depths of 7.0 ft and 13.0 ft below existing site grades. N-values ranged from 6 to 43 bpf indicating firm to hard consistencies.
RS - Residual Soil – Lean Clay, and Sandy Silt
Underneath the fill layer, residual soils consisting primarily of lean clay and sandy silt were encountered and extended to the termination depth of the borings. N-values ranged from 5 to 33 bpf, indicating firm to hard consistencies.
Groundwater
No groundwater was encountered during the drilling operation of borings BH23-04 and BH23-04A.
4.4. M.P. 133.80 (BORINGS BH23-05)
Fill
A 0.15± ft thick layer of topsoil was encountered at the boring. Underneath the topsoil, fill material consisting primarily of silty sand was encountered and extended to a depth of 10.0 ft below existing site grades. N-values ranged from 12 to 23 blows bpf indicating medium dense to relative density.
RS - Residual Soil – Lean Clay with Sand
Underneath the Fill layer, residual soils consisting primarily of lean clay with sand were encountered and extended to the termination depth of the boring. N-values ranged from 8 to 16 bpf, indicating firm to very stiff consistencies.
PAGE - 7 DEPARTMENT OF TRANSPORTATION
EASTERN FEDERAL LANDS HIGHWAY DIVISION
ASHBURN, VA
Groundwater
No groundwater was encountered during the drilling operation of borings BH23-05.
4.5. M.P. 156.20 (BORINGS BH23-06)
Fill
A 0.10± ft thick layer of topsoil was encountered at the boring. Underneath the topsoil, fill material consisting primarily of silty sand was encountered and extended to a depth of 12.0 ft below existing site grades. N-values ranged from 9 to 18 bpf indicating loose to medium dense relative densities.
RS - Residual Soil – Silty Sand
Underneath the fill layer, residual soils consisting primarily of silty sand were encountered and extended from depth of 12 ft to 18 ft below existing site grades. N-values ranged from 19 to 21 bpf, indicating medium dense relative density.
RS - Residual Soil – Silty Clay with Sand
Underneath the Silty Sand layer, silty clay with sand was encountered and extended to the termination depth of the boring. N-values ranged from 10 to 15 bpf, indicating stiff consistency.
Groundwater
No groundwater was encountered during the drilling operation of boring BH23-06.
4.6. M.P. 160.30 (BORINGS BH23-07)
Fill
A 0.10± ft thick layer of topsoil was encountered at the boring. Underneath the topsoil, fill material consisting primarily of silty sand was encountered and extended to a depth of 10.0 ft below existing site grade. N-values ranged from 18 to 26 bpf indicating medium dense relative density.
RS - Residual Soil – Silty Sand
Underneath the fill layer, residual soils consisting primarily of silty sand were encountered and extended to the termination depth of the boring. N-values ranged from 5 to 10 bpf, indicating loose relative density.
Groundwater
No groundwater was encountered during the drilling operation of boring BH23-07.
4.7. M.P. 181.70 (BORINGS BH23-08 AND BH23-09)
Fill
PAGE - 8 DEPARTMENT OF TRANSPORTATION
EASTERN FEDERAL LANDS HIGHWAY DIVISION
ASHBURN, VA
A 0.10± ft thick layer of topsoil was encountered at the borings. Underneath the topsoil, fill material consisting primarily of sandy lean clay, lean clay with sand, and sandy silt were encountered and extended to a depth of 13.0 ft below existing site grades. Fill material was the only layer encountered at boring BH23-08. N-values ranged from 3 to 13 bpf indicating soft to stiff consistencies.
RS - Residual Soil – Sandy Silt
Underneath the fill layer of boring BH23-09, residual soils consisting primarily of sandy silt were encountered and extended to the termination depth of the boring. N-values ranged from 8 to 12 bpf, indicating firm to stiff consistencies.
Groundwater
No groundwater was encountered during the drilling operation of borings BH23-08 and BH23-09.
4.8. M.P. 182.00 (BORINGS BH23-10)
Fill
A 0.10± ft thick layer of topsoil was encountered at the boring. Underneath the topsoil, fill material consisting primarily of sandy silt was encountered and extended to depths of 7.0 ft below existing site grades. N-values ranged from 14 to 28 bpf indicating medium dense relative density.
RS - Residual Soil – Fat Clay
Underneath the fill layer, residual soils consisting primarily of fat clay were encountered and extended from depths of 7.0 ft to 15.0 ft below existing site grades. N-values ranged from 12 to 16 bpf, indicating stiff consistency.
RS - Residual Soil – Elastic Silt
Underneath the Fat Clay, elastic silt was encountered and extended to the termination depth of the boring.
N-values ranged from 12 to 18 bpf, indicating stiff to very stiff consistencies.
Groundwater
No groundwater was encountered during the drilling operation of boring BH23-10.
4.9. M.P. 182.70 (BORINGS BH23-11, BH23-12, AND BH23-13)
Fill
A 0.10± ft thick layer of topsoil was encountered at borings BH23-11 and BH23-12. Underneath the topsoil, fill material consisting primarily of lean clay with sand, sandy lean clay and fat clay were encountered and extended to depths of 10.0 ft below existing site grades. N-values ranged from 6 to 11 bpf indicating firm to stiff consistencies.
RS - Residual Soil – Lean Clay with Sand, Sandy Lean Clay and Fat Clay
PAGE - 9 DEPARTMENT OF TRANSPORTATION
EASTERN FEDERAL LANDS HIGHWAY DIVISION
ASHBURN, VA
Underneath the fill layer, residual soils consisting primarily of lean clay with sand, sandy lean clay and fat clay were encountered and extended to the termination depth of the boring. N-values ranged from 5 to 19 bpf, indicating firm to very stiff consistencies.
Groundwater
No groundwater was encountered during the drilling operation of borings BH23-11, BH23-12, and BH23- 13.
4.10. M.P. 184.00 (BORINGS BH23-14 AND BH23-15)
Fill
A 0.10± ft thick layer of topsoil was encountered at the borings. Underneath the topsoil, fill material consisting primarily of lean clay with various amounts of sand were encountered and extended to depths of 10.0 ft and 13.0 ft below existing site grades. N-values ranged from 5 to 10 bpf indicating firm to stiff consistencies.
RS - Residual Soil – Lean Clay
Underneath the fill layer, residual soils consisting primarily of lean clay were encountered and extended to the termination depth of the boring. N-values ranged from 6 to 21 bpf, indicating firm to very stiff consistencies.
Groundwater
No groundwater was encountered during the drilling operation of borings BH23-14 and BH23-15.
4.11. M.P. 184.50 (BORINGS BH23-16)
Fill
A 0.10± ft thick layer of topsoil was encountered at the boring. Underneath the topsoil, fill material consisting primarily of lean clay with sand was encountered and extended to a depth of 12.0 ft below existing site grade. N-values ranged from 6 to 8 bpf indicating firm consistency.
RS - Residual Soil – Silty Sand
Underneath the fill layer, residual soils consisting primarily of silty sand were encountered and extended to the termination depth of the boring. N-values ranged from 15 to 22 bpf, indicating medium dense relative density.
Groundwater
No groundwater was encountered during the drilling operation of boring BH23-16.
PAGE - 10 DEPARTMENT OF TRANSPORTATION
EASTERN FEDERAL LANDS HIGHWAY DIVISION
ASHBURN, VA
4.12. M.P. 184.80 (BORINGS BH23-17)
Fill
A 0.10± ft thick layer of topsoil was encountered at the boring. Underneath the topsoil, fill material consisting primarily of fat clay was encountered and extended to a depth of 7.0 ft below existing site grades. N-values ranged from 15 to 24 bpf indicating very stiff consistency.
RS - Residual Soil – Fat Clay with Sand
Underneath the fill layer, residual soils consisting primarily of fat clay with sand were encountered and extended to the termination depth of the boring. N-values ranged from 15 to 21 bpf, indicating very stiff consistency.
Groundwater
No groundwater was encountered during the drilling operation of boring BH23-17.
4.13. M.P. 185.20 (BORINGS BH23-18 AND BH23-19)
Fill
A 0.25± ft thick layer of topsoil was encountered at the boring BH23-19. Underneath the topsoil, fill material consisting primarily of lean clay was encountered and extended to depths of 10.0 ft and 13.0 ft below existing site grades. Fill material was the only layer encountered at boring BH23-19. N-values ranged from 5 to 17 bpf indicating firm to very stiff consistencies.
RS - Residual Soil – Sandy Fat Clay
Underneath the fill layer of boring BH23-18, residual soils consisting primarily of sandy fat clay were encountered and extended to the termination depth of the boring. N-values ranged to 12 bpf, indicating stiff consistency.
Groundwater
No groundwater was encountered during the drilling operation of borings BH23-18 and BH23-19.
4.14. M.P. 186.80 (BORINGS BH23-20)
Fill
A 0.20± ft thick layer of topsoil was encountered at the boring. Underneath the topsoil, fill material consisting primarily of sandy silty clay was encountered and extended to a depth of 10.0 ft below existing site grades. N-values ranged from 6 to 14 bpf indicating stiff consistency.
RS - Residual Soil – Sandy Silty Clay and Sandy Silt
PAGE - 11 DEPARTMENT OF TRANSPORTATION
EASTERN FEDERAL LANDS HIGHWAY DIVISION
ASHBURN, VA
Underneath the fill layer, residual soils consisting primarily of sandy silty clay and sandy silt were encountered and extended to the termination depth of the boring. N-values ranged from 4 to 13 bpf, indicating soft to stiff consistencies.
Groundwater
No groundwater was encountered during the drilling operation of boring BH23-20.
4.15. M.P. 193.00 (BORINGS BH23-21 AND BH23-22)
Fill
A 1.0± ft thick layer of asphalt pavement and base course was encountered in boring BH23-21. Underneath the pavement and base course layer, fill material consisting primarily of sandy lean clay, sandy silt and silty sand were encountered and extended to depths of 18.0 ft and 12.0 ft below existing site grades. Fill material was the only layer encountered at boring BH23-21. N-values ranged from 10 to 15 bpf indicating stiff consistencies.
A 0.50± ft thick layer of topsoil was encountered at boring BH23-22. Underneath the topsoil, fill material consisting primarily of silt with sand was encountered and extended to a depth of 12.0 ft below existing site grade. N-values ranged from 6 to 17 bpf indicating firm to very stiff consistencies.
RS - Residual Soil – Sandy Fat Clay
Underneath the fill layer of boring BH23-22, residual soils consisting primarily of lean clay with sand were encountered and extended to the termination depth of the boring. N-values ranged from 13 to 16 bpf, indicating stiff to very stiff consistencies.
Groundwater
No groundwater was encountered during the drilling operation of borings BH23-21 and BH23-22.
4.16. M.P. 195.10 (BORINGS BH23-23 AND BH23-24)
Fill
A 0.20± ft to 0.30± ft thick layer of topsoil was encountered at the borings. Underneath the topsoil, fill material consisting primarily of fat clay and sandy lean clay were encountered and extended to a depth of 10 ft below existing site grades. N-values ranged from 8 to 13 bpf indicating firm to stiff consistencies.
RS - Residual Soil – Lean Clay, Sandy Lean Clay, and Lean Clay with Sand
Underneath the fill layer, residual soils consisting primarily of lean clay, sandy lean clay, and lean clay with sand were encountered and extended to the termination depths of the borings. N-values ranged from 3 to 11 bpf, indicating soft to stiff consistencies.
Groundwater
PAGE - 12 DEPARTMENT OF TRANSPORTATION
EASTERN FEDERAL LANDS HIGHWAY DIVISION
ASHBURN, VA
No groundwater was encountered during the drilling operation of borings BH23-23 and BH23-24.
4.17. M.P. 195.50 (BORINGS BH23-25 AND BH23-26)
Fill
A 0.15± ft to 0.20± ft thick layer of topsoil was encountered at the borings. Underneath the topsoil, fill material consisting primarily of sandy fat clay and sandy elastic silt were encountered and extended to depths of 10.0 ft to 12.0 ft below existing site grades. N-values ranged from 5 to 11 bpf indicating firm to stiff consistencies.
RS - Residual Soil – Elastic Silt with Sand and Fat Clay with Sand
Underneath the fill layer, residual soils consisting primarily of elastic silt with sand and fat clay with sand were encountered and extended to the termination depth of the borings. N-values ranged from 8 to 13 bpf, indicating firm to very stiff consistencies.
Groundwater
No groundwater was encountered during the drilling operation of borings BH23-25 and BH23-26.
4.18. M.P. 197.80 (BORINGS BH23-27 AND BH23-28)
Fill
A 0.30± ft to 0.40± ft thick layer of topsoil was encountered at the borings. Underneath the topsoil, fill material consisting primarily of sandy silt and silty clay with sand were encountered and extended to depths of 5.0 ft to 10.0 ft below existing site grades. N-values ranged from 8 to 13 bpf indicating firm to stiff consistencies.
RS - Residual Soil – Sandy Silt, Elastic Silt with Sand and Fat Clay
Underneath the fill layer, residual soils consisting primarily of sandy silt, elastic silt with sand and fat clay were encountered and extended to the termination depths of the soil borings. N-values ranged from 6 to 19 bpf, indicating firm to very stiff consistencies.
Groundwater
No groundwater was encountered during the drilling operation of borings BH23-27 and BH23-28.
4.19. M.P. 200.00 (BORINGS BH23-29)
Fill
A 0.15± ft thick layer of topsoil was encountered at the boring. Underneath the topsoil, fill material consisting primarily of lean clay with sand was encountered and extended to depths of 12.0 ft below existing site grade. N-values ranged from 6 to 12 bpf indicating firm to stiff consistencies.
PAGE - 13 DEPARTMENT OF TRANSPORTATION
EASTERN FEDERAL LANDS HIGHWAY DIVISION
ASHBURN, VA
RS - Residual Soil – Lean Clay
Underneath the fill layer, residual soils consisting primarily of lean clay were encountered and extended to the termination depth of the boring. N-values ranged from 4 to 13 bpf, indicating soft to stiff consistencies.
Groundwater
No groundwater was encountered during the drilling operation of boring BH23-29.
5. GEOTECHNICAL EVALUATION
Fill materials, probably associated with the embankment construction, were encountered in all the borings.
The fill included highly plastic soils known for their low shear resistance and their potential to shrink and swell. In our opinion, replacing the existing fill material with granular and high-quality fill represents a long-term and cost-effective approach to address the pavement distress and embankment failures observed. In addition, surface drainage should be enhanced and evaluated carefully.
6. DESIGN ANALYSIS AND RECOMMENDATIONS
6.1. Design Alternatives
Four alternatives were considered given their feasibility,, constructability, cost, and our experience with similar projects. A brief discussion of each alternative is presented below.
Alternative No. 1 – Slope Reinforcement Technology (SRT)
This alternative entails stabilizing the slopes/embankments of the roadway by employing Slope Reinforcement Technology (SRT). These closely spaced elements create a series of horizontal barriers, that form soil arches that establish a continuous line to effectively resist downhill movement. SRTs can be installed efficiently using an excavator and a vibratory hammer, facilitating a rapid installation process.
Alternative No. 2 – Gravity Gabion Wall
This alternative consists of re-establishing the roadway and stabilize the slope by constructing a gravity gabion wall. These walls are typically constructed by filling pre-assembled wire baskets with clean 4” to 8” rock. These walls are self-draining and can sustain a considerable deformation and differential settlement. The gabion facing may enhance vegetation growth and mimic the surrounding landscape.
Alternative No. 3 – Deep patch
This alternative consists of stabilizing the slopes and addressing settlement in the road by implementing a deep patch system. This system consists of excavating to a depth typically ranging from 3 to 6 feet, backfilling with granular material, and installing multiple layers of geosynthetic reinforcement (geogrid) spaced vertically from 6 to 18 inches apart.
Alternative No. 4 – Reinforced Soil Slope (RSS)
PAGE - 14 DEPARTMENT OF TRANSPORTATION
EASTERN FEDERAL LANDS HIGHWAY DIVISION
ASHBURN, VA
Reinforced soil slopes are constructed using common construction materials, and conventional equipment and techniques, providing an economical and durable structure. It is a cost-effective, self-draining, and can tolerate larger differential settlements compared to other repair alternatives. In addition, RSS structures can accommodate and reflect surrounding slope conditions, making it more esthetically pleasant.
Our recommendations are listed below in Table No. 2, these recommendations are based on our observations during the site reconnaissance, the results of our subsurface exploration program, geotechnical analyses, and our familiarity with similar projects.
Table No. 2: Recommendations
Mile Post - MP Recommendation
121.40 Deep patch
121.60 Deep patch
131.30 Deep patch
133.80 Deep patch
156.20 Embankment reconstruction
160.30 Deep patch
164.29
Structure No.5570-112 Remove and replace the fill in the approaches
181.70 SRT
182.00 Deep patch
182.70 Deep patch
184.00 Deep patch
184.50 SRT
184.80 SRT
185.20 SRT
193 - Little Mountain Summit Rd
Pavement distress
Pavement distress
195.10 SRT
195.50
Structure No. 5570-099 Remove and replace the fill in the approaches
PAGE - 15 DEPARTMENT OF TRANSPORTATION
EASTERN FEDERAL LANDS HIGHWAY DIVISION
ASHBURN, VA
Mile Post - MP Recommendation
197.80
Structure No. 5570-095 Remove and replace the fill in the approaches
*Slope Reinforcement Technology (SRT)
6.2. Design Analysis
Global/overall stability analysis computations were performed using the computer program Slide v. 9.031 and RSPile v. 3.0019 by Rocscience, Inc. A summary of soil engineering parameters assumed in the external, internal, and global stability analyses are presented in Table No. 3. Factors of Safety requirements for the design of SRT are presented in Table No. 4.
A uniform distributed live surcharge load was applied along the travelway to account for traffic loading following AASHTO-LRFD (2020).
Table No. 3: Summary of assumed engineering properties for analysis and design
Material Type Unit Weight (pcf)
Cohesion (psf)
Internal Friction Angle ϕ (°)
Granular Backfill 110 – 120 0.0 34 – 36
Aggregate Base 115 – 120 0.0 34 – 36
Lean Clay (CL) 110 – 120 0.0 – 1000 20 – 26
Fat Clay (CH) 110 – 120 0.0 – 1000 18 – 24
Concrete Infinite Strength
Table No. 4: SRT design factors of safety
Analysis Factor of Safety Overall/Global & Compound SF: 1.50
Overall/Global & Compound Extreme Event I SF: 1.1
6.3. Recommendations
It should be noted that the above-listed (4) alternatives wre submitted to our partner for their review.
However, during our Plan in Hand (PIH) meeting of June 5, 2024, the Chief of Maintenance, based on his own experience and familriaty with the site, proposed other alternatives which were implemented in the final design, These alternatives are listed below:
PAGE - 16 DEPARTMENT OF TRANSPORTATION
EASTERN FEDERAL LANDS HIGHWAY DIVISION
ASHBURN, VA
6.3.1. M.P. 121.4
A 100± ft long, 2-foot thick, type 1 patch, utilizing geogrid and geotextile at the base is recommended.
6.3.2. M.P. 121.6
A 1,000± ft long, 2 ft thick, type 1 patch, utilizing geogrid and geotextile at the base is recommended.
6.3.3. M.P. 131.3
A 700± ft long, 2 ft thick, type 1 patch, utilizing geogrid and geotextile at the base is recommended.
6.3.4. M.P. 133.8
A 200± ft long, 2 ft thick, type 1 patch, utilizing geogrid and geotextile at the base is recommended.
6.3.5. M.P. 156.2
A 700± ft long, 3 ft thick deep patch is recommended.
6.3.6. M.P. 156.3
A 500± ft long, 3 ft thick deep patch, employing geogrid and geotextile at the base is recommended.
6.3.7. M.P. 160.3
A 300± ft long, 2 ft thick, type 1 patch, utilizing geogrid and geotextile at the base is recommended.
6.3.8. M.P. 164.29 Bridge No. 5570-112
A 4 ft thick Geosynthetic Reinforced Soil is recommended - Integrated Bridge System (GRS-IBS).
6.3.9. M.P. 181.7
A 3 ft thick, type 1 patch, utilizing geogrid and geotextile at the base is recommended.
6.3.10. M.P. 182.0
This site (70± ft long) shall be excluded from the project.
6.3.11. M.P. 182.7
A 800± ft long, 3 ft thick, type 1 patch, utilizing geogrid and geotextile at the base is recommmended.
6.3.12. M.P. 184.0
A 550± ft long, 3 ft thick, type 1 patch, utilizing geogrid and geotextile at the base is recommended.
PAGE - 17 DEPARTMENT OF TRANSPORTATION
EASTERN FEDERAL LANDS HIGHWAY DIVISION
ASHBURN, VA
6.3.13. M.P. 184.1
A 2 ft thick, type 1 patch, employing geogrid and geotextile at the base is recommended.
6.3.14. M.P. 184.5
A 3 ft thick, type 1 patch, utilizing geogrid and geotextile at the base is recommended.
6.3.15. M.P. 184.8
A 3 ft thick, type 1 patch, utilizing geogrid and geotextile at the base is recommended.
6.3.16. M.P. 185.2
A 6 ft thick deep patch is recommended.
6.3.17. M.P. 193.0 Little Mountain Summit Rd.
• Site 1:
A 130± ft long, 2 ft thick, type 1 patch, utilizing geogrid and geotextile at the base is recommended.
• Site 2:
A 100± ft long, 2 ft thick, type 1 patch, utilizing geogrid and geotextile at the base is recommended.
6.3.18. 195.1
A 6 ft thick deep patch is recommended.
6.3.19. M.P. 195.5 Bridge No. 5570-099
A 4 ft thick Geosynthetic Reinforced Soil is recommended.
6.3.20. M.P. 197.80 Bridge No. 5570-095
A 4 ft thick Geosynthetic Reinforced Soil is recommended.
6.3.21. Subsurface Water Drainage System
All depp patchs and slope einforcements shall include a subsurface water drainage system composed of granular backfill and a perforated 4” diameter pipe. The drainage system is surrounded by a filter fabric to prevent the migration of fines. The perforated 4” diameter pipe will drain subsurface water into a 4” diameter non-perforated outlet pipe located in the lowest point behind the wall. To keep wildlife out of the retaining wall drainage system a 1/4” mesh should be installed to cover the 4” diameter non-perforated pipe outlet.
PAGE - 18 DEPARTMENT OF TRANSPORTATION
EASTERN FEDERAL LANDS HIGHWAY DIVISION
ASHBURN, VA
7. REFERENCES
NPS Stats (2024). Annual Park Recreation Visitation Graph (1904 - Last Calendar Year): Natchez Trace PKWY. Accessed on 1/4/2024.
https://irma.nps.gov/Stats/SSRSReports/Park%20Specific%20Reports/Annual%20Park%20Recreation% 20Visitation%20Graph%20(1904%20-%20Last%20Calendar%20Year)?Park=NATR
Mississippi Office of Geology (2011). Geologic Map of Mississippi, after Alvin R. Bicker, Jr., 1969.
Accessed on 1/19/2024. https://www.mdeq.ms.gov/wp-content/uploads/2017/05/MS_Geology1969.pdf
Mississippi Department of Environmental Quality, Office of Geology, Mississippi Surface Geologic Unit Descriptions. Accessed on 1/19/2024. https://www.mdeq.ms.gov/wp-content/uploads/2017/05/MS_GeologicUnit_Desc.pdf
Geopier SRT ® System. Accessed on 1/09/2024.
https://www.geostructures.com/solutions/structures/geopier-str-system.htm
AASHTO-LRFD. (2020). AASHTO LRFD Bridge Design Specification (9th ed.). Washington, D.C.:
American Association of State Highway and Transportation Officials.
https://irma.nps.gov/Stats/SSRSReports/Park%20Specific%20Reports/Annual%20Park%20Recreation%20Visitation%20Graph%20(1904%20-%20Last%20Calendar%20Year)?Park=NATR https://irma.nps.gov/Stats/SSRSReports/Park%20Specific%20Reports/Annual%20Park%20Recreation%20Visitation%20Graph%20(1904%20-%20Last%20Calendar%20Year)?Park=NATR https://www.mdeq.ms.gov/wp-content/uploads/2017/05/MS_Geology1969.pdf https://www.mdeq.ms.gov/wp-content/uploads/2017/05/MS_GeologicUnit_Desc.pdf https://www.mdeq.ms.gov/wp-content/uploads/2017/05/MS_GeologicUnit_Desc.pdf https://www.geostructures.com/solutions/structures/geopier-str-system.htm
PAGE - 19 DEPARTMENT OF TRANSPORTATION
EASTERN FEDERAL LANDS HIGHWAY DIVISION
ASHBURN, VA
8. DISCLAIMER/LIMITATIONS CLAUSE
The subsurface explorations and tests described in this report have been conducted in accordance with standard practices and procedures (except as specifically noted). The results of these exploration and tests represent conditions at the specific locations and dates indicated. Subsurface conditions between these locations may vary. The Geotechnical Design Analyses and Recommendations Sections of this report include interpretations and recommendations developed by the Government in the process of preparing the design. These interpretations are not intended as a substitute for the personal investigation, independent interpretation, and judgment of the Contractor. Our analysis and recommendations are based on boring logs and subsurface profiles prepared by others.
Yesenia Pérez Geotechnical Engineer
Mounir Abouzakhm, P.E.
Division Geotechnical Engineer
PAGE - 20 DEPARTMENT OF TRANSPORTATION
EASTERN FEDERAL LANDS HIGHWAY DIVISION
ASHBURN, VA
APPENDICES
NATCHEZ TRACE PARKWAY IN MISSISSIPPI
Department of Transportation Federal Highway Administration
Eastern Federal Lands Highway Division Ashburn, VA
APPENDIX A – FIGURES
MP-193MP-193
MP-184
MP-182
MP-197.8
MP-195.5MP-195.1
MP-185.2
MP-184.8
MP-182.7
MP-181.7
MP-160.3
MP-156.2
MP-133.8
MP-131.3
MP-121.6MP-121.4
MP-164.29
§̈¦55
£¤82
£¤51
£¤82
UV35
UV12
UV25
UV16
UV19
UV488UV487
UV407
UV17
UV43
UV14
UV429
UV15
UV9
UV413
UV492
UV21
UV411
UV430
UV395
UV440
UV415
UV489
UV13
UV500
UV483
UV427
UV485
UV424 UV431
UV483
UV35
UV19
UV19
UV35
UV17
UV19
UV492
UV12 UV19
UV492
UV16
UV429
UV407
UV15
UV12
UV413
Dr Martin Luther King Jr
Sources: Esri, HERE, Garmin, Intermap, increment P Corp., GEBCO, USGS, FAO, NPS, NRCAN, GeoBase, IGN, Kadaster NL, Ordnance Survey, Esri Japan, METI, Esri China (Hong Kong), (c) OpenStreetMap contributors, and the GIS User Community
U.S DEPARTMENT OF TRANSPORTATION
FEDERAL LANDS HIGHWAY DIVISION
EASTERN FEDERAL LANDS HIGHWAY DIVISION
ASHBURN, VIRGINIA
FIGURE 1
Site Location and Vicinity Map
STATE
Mississippi
PROJECT
MS NP NATR 3N18 3H27 etc t
0 4 8 12 162 Miles
MP-193MP-193
MP-184
MP-182
MP-197.8
MP-195.5MP-195.1
MP-184.8
MP-184.5
MP-182.7
MP-181.7
MP-160.3
MP-156.2
MP-133.8
MP-131.3
MP-121.6MP-121.4
MP-164.29
Ek
Et
Ew
Ec
Ezw
Ej
Ecm
U.S DEPARTMENT OF TRANSPORTATION
FEDERAL LANDS HIGHWAY DIVISION
EASTERN FEDERAL LANDS HIGHWAY DIVISION
ASHBURN, VIRGINIA
FIGURE 2
Geology Map
STATE
Mississippi
PROJECT
MS NP NATR 3N18 3H27 etc
Data to create map retrieved from https://www.mdeq.ms.gov/geology/work-areas/surface-geology/ t
GEO_SYMBOL
Ec - Cockfield Ecm - Cook Mountain
Ej - Jackson group Ek - Kosciusko Et - Tallahatta
Ew - Wilcox Ezw - Zilpha and Winona
0 4 8 12 162
Department of Transportation Federal Highway Administration
APPENDIX B – BORING LOCATION MAPS
BH23-29
BH23-28
BH23-27BH23-26
BH23-25BH23-23
BH23-22 BH23-21
BH23-20
BH23-19
BH23-18BH23-14
BH23-13
BH23-08
BH23-07
BH23-06
BH23-05
BH23-04
BH23-03BH23-02
BH23-01
BH23-04-A
§̈¦55
£¤82
£¤51
£¤82
UV35
UV12
UV25
UV16
UV488UV487
UV19
UV407
UV17
UV43
UV429
UV9
UV14
UV413
UV492
UV21
UV15
UV411
UV430
UV395
UV440
UV415
UV13
UV500
UV427
UV485
UV483
UV424 UV431
UV35 UV492
UV407
UV19
UV17
UV429
UV12 UV19
UV413
UV21
UV19
UV14
UV17
UV12
UV492
UV15
Dr Martin Luther King Jr
Sources: Esri, HERE, Garmin, Intermap, increment P Corp., GEBCO, USGS, FAO, NPS, NRCAN, GeoBase, IGN, Kadaster NL, Ordnance Survey, Esri Japan, METI, Esri China (Hong Kong), (c) OpenStreetMap contributors, and the GIS User Community
U.S DEPARTMENT OF TRANSPORTATION
FEDERAL LANDS HIGHWAY DIVISION
EASTERN FEDERAL LANDS HIGHWAY DIVISION
ASHBURN, VIRGINIA
FIGURE 3
Boring Location Map
STATE
Mississippi
PROJECT
MS NP NATR 3N18 3H27 etc t
0 2 4 6 81
!.MP-121.4
BH23-03
BH23-02
Natchez Trace
MP-121.6
Sources: Esri, HERE, Garmin, Intermap, increment P Corp., GEBCO, USGS, FAO, NPS, NRCAN, GeoBase, IGN, Kadaster NL, Ordnance Survey, Esri Japan, METI, Esri China (Hong Kong), (c) OpenStreetMap contributors, and the GIS User Community
U.S DEPARTMENT OF TRANSPORTATION
FEDERAL LANDS HIGHWAY DIVISION
EASTERN FEDERAL LANDS HIGHWAY DIVISION
ASHBURN, VIRGINIA
FIGURE 4
Boring Location Map BH23-01 to BH23-03
STATE
Mississippi
PROJECT
MS NP NATR 3N18 3H27 etc t 0 0.2 0.4 0.6 0.80.1
BH23-05
BH23-04
BH23-04-A
UV16
Na tch ez Tra ce
MP-133.8
MP-131.3
Sources: Esri, HERE, Garmin, Intermap, increment P Corp., GEBCO, USGS, FAO, NPS, NRCAN, GeoBase, IGN, Kadaster NL, Ordnance Survey, Esri Japan, METI, Esri China (Hong Kong), (c) OpenStreetMap contributors, and the GIS User Community
U.S DEPARTMENT OF TRANSPORTATION
FEDERAL LANDS HIGHWAY DIVISION
EASTERN FEDERAL LANDS HIGHWAY DIVISION
ASHBURN, VIRGINIA
FIGURE 5
Boring Location Map BH23-04 to BH23-05
STATE
Mississippi
PROJECT
MS NP NATR 3N18 3H27 etc t
MP-160.3
MP-164.29
BH23-06
UV12
UV14
UV35
UV43
UV19
UV19
UV12
UV35
UV19
UV19
MP-156.2
Sources: Esri, HERE, Garmin, Intermap, increment P Corp., GEBCO, USGS, FAO, NPS, NRCAN, GeoBase, IGN, Kadaster NL, Ordnance Survey, Esri Japan, METI, Esri China (Hong Kong), (c) OpenStreetMap contributors, and the GIS User Community
U.S DEPARTMENT OF TRANSPORTATION
FEDERAL LANDS HIGHWAY DIVISION
EASTERN FEDERAL LANDS HIGHWAY DIVISION
ASHBURN, VIRGINIA
FIGURE 6
Boring Location Map
BH23-06 and BH23-07
STATE
Mississippi
PROJECT
MS NP NATR 3N18 3H27 etc t 0 0.4 0.8 1.2 1.60.2
MP-182
BH23-12
BH23-11
BH23-09
BH23-08
Natchez Trace
MP-182.7
MP-181.7
BH23-13
BH23-10
Sources: Esri, HERE, Garmin, Intermap, increment P Corp., GEBCO, USGS, FAO, NPS, NRCAN, GeoBase, IGN, Kadaster NL, Ordnance Survey, Esri Japan, METI, Esri China (Hong Kong), (c) OpenStreetMap contributors, and the GIS User Community
U.S DEPARTMENT OF TRANSPORTATION
FEDERAL LANDS HIGHWAY DIVISION
EASTERN FEDERAL LANDS HIGHWAY DIVISION
ASHBURN, VIRGINIA
FIGURE 7
Boring Location Map BH23-08 to BH23-13
STATE
Mississippi
PROJECT
MS NP NATR 3N18 3H27 etc t 0 0.1 0.2 0.3 0.40.05
!.BH23-20
BH23-19
BH23-18
BH23-17
BH23-16
BH23-15
BH23-14
Na tch ez Tra ce
MP-184
MP-185.2
MP-184.8
MP-184.5
Sources: Esri, HERE, Garmin, Intermap, increment P Corp., GEBCO, USGS, FAO, NPS, NRCAN, GeoBase, IGN, Kadaster NL, Ordnance Survey, Esri Japan, METI, Esri China (Hong Kong), (c) OpenStreetMap contributors, and the GIS User Community
U.S DEPARTMENT OF TRANSPORTATION
FEDERAL LANDS HIGHWAY DIVISION
EASTERN FEDERAL LANDS HIGHWAY DIVISION
ASHBURN, VIRGINIA
FIGURE 8
Boring Location Map BH23-14 to BH23-20
STATE
Mississippi
PROJECT
MS NP NATR 3N18 3H27 etc t
MP-193
BH23-26
BH23-25
BH23-24
BH23-23
UV9
BH23-22
BH23-21
Sources: Esri, HERE, Garmin, Intermap, increment P Corp., GEBCO, USGS, FAO, NPS, NRCAN, GeoBase, IGN, Kadaster NL, Ordnance Survey, Esri Japan, METI, Esri China (Hong Kong), (c) OpenStreetMap contributors, and the GIS User Community
U.S DEPARTMENT OF TRANSPORTATION
FEDERAL LANDS HIGHWAY DIVISION
EASTERN FEDERAL LANDS HIGHWAY DIVISION
ASHBURN, VIRGINIA
FIGURE 9
Boring Location Map BH23-21 to BH23-26
STATE
Mississippi
PROJECT
MS NP NATR 3N18 3H27 etc t
BH23-29
BH23-28
BH23-27
Natc hez
Tra ce
Sources: Esri, HERE, Garmin, Intermap, increment P Corp., GEBCO, USGS, FAO, NPS, NRCAN, GeoBase, IGN, Kadaster NL, Ordnance Survey, Esri Japan, METI, Esri China (Hong Kong), (c) OpenStreetMap contributors, and the GIS User Community
U.S DEPARTMENT OF TRANSPORTATION
FEDERAL LANDS HIGHWAY DIVISION
EASTERN FEDERAL LANDS HIGHWAY DIVISION
ASHBURN, VIRGINIA
FIGURE 10
Boring Location Map BH23-27 to BH23-29
STATE
Mississippi
PROJECT
MS NP NATR 3N18 3H27 etc t 0 0.1 0.2 0.3 0.40.05
Department of Transportation Federal Highway Administration
APPENDIX C – BORING LOGS
D ep th Sc al e
(ft
O ct
Sy m bo l
Material Description
Ground Surface
FILL
Topsoil 0.5', Lean CLAY, soft to firm, tan to brown, moist.
5 ft
_Lean _CLAY _(CL) _with sand some fine-medium sand, low plasticity, soft to firm, tan to brown, moist.
15 ft
_Silty _SAND (SM) fine to medium grained, very loose to medium dense, gray-tan, moist to wet. A-2-4(0)
20 ft
A-6(9)
Boring terminated at 20 ft.
Sa m pl e
No. Ty pe
J-6
J-7
J-8
J-5
J-2
J-3
J-4
J-1
Re co ve ry
1.7
1.7
1.8
1.8
1.6
PP
/R
Q D
1.5
1.5
0.5
2.5
SP
T
Bl ow s pe r6 in
5-7-4-5
2-3-3-5
2-4-4-6
WH-2-2-3
WH-2-1-2
2-3-5-6
7-15-18-19
3-9-10-12
M oi st ur e Co nt en t(
20.9
12.6
At te rb er g Li m its
LL
PL
29.7 15.3
SPT- N Value
0 8010 20 30 40 50 60 70
R
SL
og
EF
L
G eo te ch ni ca l L og
-S
PT
_U pd at ed fh w a-ea st er n-fe de ra l-l an ds
-h ig hw ay
-d iv ad m in
Fe br ua ry
4, :5
PM
_BORING LOG
BH23-01Project Name: _MS _NP _NATR _3N18 _3H27 ETC
Project Location: _Natchez _Trace _Parkway, MS
Project Datum:
Boring Location: _32.57472, -89.87944
Hammer Wt/Type:
Boring Began:
_CME 45Equipment:
2023-10-29
Logged By: _G. Moody
Operator: _J. Farley
Weather: _Clear, 70°F
BH Type/Size:
Boring No.:
_HSA _/ 2.75Surface Elev.:
Groundwater Depth (ft): 15.4 Completed: 2023-10-29
NAD83 _140 lbs/Automatic
US Department of Transportation Federal Highway Administration
Eastern Federal Lands Highway Divion
SHEET: 1 of 1Remarks: Boring was backfilled with auger cuttings upon completion.
https://www.google.com/maps/?q=32.57472, -89.87944 https://www.google.com/maps/?q=32.57472, -89.87944 th Sc al e
(ft
O ct
Sy m bo l
Material Description
Ground Surface
FILL
Topsoil 0.10', Lean CLAY, very stiff, tan to brown, moist.
3 ft
_Lean _CLAY (CL) some fine to medium sand, medium plasticity, firm to stiff, tan and brown, moist.
10 ft
_Lean _CLAY _(CL) _with sand some fine to medium sand, low plasticity, firm to very stiff, gray and tan, moist to wet. A-4(5)
20 ft
A-6(13)
Boring terminated at 20 ft.
Sa m pl e
No. Ty pe
J-2
J-8
J-3
J-5
J-1
J-7
J-4
J-6
Re co ve ry
1.55
1.40
1.40
1.90
1.80
1.65
1.65
2.00
PP
/R
Q D
2.5
SP
T
Bl ow s pe r6 in
6-11-11-11
2-2-2-3
2-2-4-6
3-5-4-5
2-4-4-6
2-3-9-16
5-7-11-9
1-3-5-6
M oi st ur e Co nt en t(
20.9
At te rb er g Li m its
LL
PL
36 20.5
27.2 16.9
SPT- N Value
0 8010 20 30 40 50 60 70
R
SL
og
EF
L
G eo te ch ni ca l L og
-S
PT
_U pd at ed fh w a-ea st er n-fe de ra l-l an ds
-h ig hw ay
-d iv ad m in
Fe br ua ry
4, :5
PM
_BORING LOG
BH23-02Project Name: _MS _NP _NATR _3N18 _3H27 ETC
Project Location: _Natchez _Trace _Parkway, MS
Project Datum:
Boring Location: _32.57611, -89.87639
Hammer Wt/Type:
Boring Began:
_CME 45Equipment:
2023-10-29
Logged By: _G. Moody
Operator: _J. Farley
Weather: _Clear, 80°F
BH Type/Size:
Boring No.:
_HSA _/ 2.75Surface Elev.:
Groundwater Depth (ft): 15 Completed: 2023-10-29
NAD83 _140 lbs/Automatic
US Department of Transportation Federal Highway Administration
Eastern Federal Lands Highway Divion
SHEET: 1 of 1Remarks: Boring was backfilled with auger cuttings upon completion.
https://www.google.com/maps/?q=32.57611, -89.87639 https://www.google.com/maps/?q=32.57611, -89.87639 th Sc al e
(ft
Sy m bo l
Material Description
Ground Surface
FILL
Topsoil 0.10' SILT, soft to stiff, brown, moist.
7 ft
_SILT (ML)
trace fine to coarse sand, non-plastic, soft to stiff, brown and gray, moist. A-4(0)
13 ft
_Sandy _Lean _CLAY (CL) fine to coarse sand, low plasticity, firm to stiff, gray and tan, moist.
20 ft
A-6(5)
Boring terminated at 20 ft.
Sa m pl e
No. Ty pe
J-8
J-2
J-3
J-6
J-1
J-7
J-5
J-4
Re co ve ry
1.40
1.40
1.30
1.65
1.60
1.80
2.00
1.70
PP
/R
Q D
3.00
SP
T
Bl ow s pe r6 in
6-8-5-6
3-2-3-3
1-2-2-3
4-2-2-3
3-6-6-6
2-4-5-6
2-3-5-6
3-5-6-5
M oi st ur e Co nt en t(
16.9
22.3
At te rb er g Li m its
LL
PL
27.5 15.9
22.7
SPT- N Value
0 8010 20 30 40 50 60 70
R
SL
og
EF
L
G eo te ch ni ca l L og
-S
PT
_U pd at ed fh w a-ea st er n-fe de ra l-l an ds
-h ig hw ay
-d iv ad m in
Fe br ua ry
4, :5
PM
_BORING LOG
BH23-03Project Name: _MS _NP _NATR _3N18 _3H27 ETC
Project Location: _Natchez _Trace _Parkway, MS
Project Datum:
Boring Location: _32.57694, -89.87472
Hammer Wt/Type:
Boring Began:
_CME 45Equipment:
2023-10-28
Logged By: _G. Moody
Operator: _J. Farley
Weather: _Clear, 80°F
BH Type/Size:
Boring No.:
_HSA _/ 2.75Surface Elev.:
Groundwater Depth (ft): Completed: 2023-10-28
NAD83 _140 lbs/Automatic
US Department of Transportation Federal Highway Administration
Eastern Federal Lands Highway Divion
SHEET: 1 of 1Remarks: Boring was backfilled with auger cuttings upon completion.
https://www.google.com/maps/?q=32.57694, -89.87472 https://www.google.com/maps/?q=32.57694, -89.87472 th Sc al e
(ft
Sy m bo l
Material Description
Ground Surface
FILL
Topsoil 0.20' Lean CLAY with Sand, fine to coarse sand, low plasticity, firm to hard, tan and brown, moist.
13 ft
_Lean _CLAY (CL) trace fine to medium sand, medium plasticity, firm to stiff, gray, tan, moist.
20 ft
A-4(5)
A-6(16)
Boring terminated at 20 ft.
Sa m pl e
No. Ty pe
J-1
J-8
J-6
J-2
J-7
J-5
J-3
J-4
Re co ve ry
1.80
2.00
1.75
1.75
1.70
1.70
1.85
2.00
PP
/R
Q D
1.70
1.85
2.00
SP
T
Bl ow s pe r6 in
9-23-20-13
10-19-24-21
10-12-10-16
3-5-8-8
2-2-4-5
2-4-5-8
2-2-4-5
2-2-4-4
M oi st ur e Co nt en t(
21.4
16.8
At te rb er g Li m its
LL
PL
37.1 17.5
27.4 18.1
SPT- N Value
0 8010 20 30 40 50 60 70
R
SL
og
EF
L
G eo te ch ni ca l L og
-S
PT
_U pd at ed fh w a-ea st er n-fe de ra l-l an ds
-h ig hw ay
-d iv ad m in
Fe br ua ry
4, :5
PM
_BORING LOG
BH23-04Project Name: _MS _NP _NATR _3N18 _3H27 ETC
Project Location: _Natchez _Trace _Parkway, MS
Project Datum:
Boring Location: _32.6675, -89.75417
Hammer Wt/Type:
Boring Began:
_CME 45Equipment:
2023-10-28
Logged By: _G. Moody
Operator: _J. Farley
Weather: _Clear, 72°F
BH Type/Size:
Boring No.:
_HSA _/ 2.75Surface Elev.:
Groundwater Depth (ft): Completed: 2023-10-28
NAD83 _140 lbs/Automatic
US Department of Transportation Federal Highway Administration
Eastern Federal Lands Highway Divion
SHEET: 1 of 1Remarks: Boring was backfilled with auger cuttings upon completion.
https://www.google.com/maps/?q=32.6675, -89.75417 https://www.google.com/maps/?q=32.6675, -89.75417 th Sc al e
(ft
Sy m bo l
Material Description
Ground Surface
FILL
Topsoil 0.20' Sandy Silt (ML), hard to firm, tan, brown, moist.
7 ft
_Sandy _SILT (ML) some fine to medium sand, non-plastic, firm to hard, gray and brown, moist.
20 ft
A-4(0)
A-4(0)
Boring terminated at 20 ft.
Sa m pl e
No. Ty pe
J-3
J-1
J-4
J-6
J-2
J-8
J-7
J-5
Re co ve ry
1.75
1.70
1.70
1.75
1.70
1.70
1.90
2.00
PP
/R
Q D
2.00
2.50
SP
T
Bl ow s pe r6 in
7-15-20-19
11-17-15-14
4-8-9-8
5-8-10-13
5-12-21-24
8-9-8-6
2-2-3-5
3-4-4-7
M oi st ur e Co nt en t(
13.4
13.4
At te rb er g Li m its
LL
PL
22.4
19.7
SPT- N Value
0 8010 20 30 40 50 60 70
R
SL
og
EF
L
G eo te ch ni ca l L og
-S
PT
_U pd at ed fh w a-ea st er n-fe…
This is the start of the file's text. The full file is on GovTribe.
File details come from the government source that posted it. Updated .