This document is a Bridge Inspection Report for the Pigeon Roost Canal Bridge on the Natchez Trace Parkway. The report provides details on the condition of the bridge, including structural deficiencies, scour issues, and cracking in the deck, railings, and substructure. It includes recommendations for maintenance and rehabilitation work, as well as estimated costs. The bridge is owned by the National Park Service and carries the Natchez Trace Parkway over the Pigeon Roost Canal. The report indicates that the bridge is rated as a "moderate" priority for improvement. The related federal contract opportunity is for geotechnical, pavement rehabilitation, and structural repairs on the Natchez Trace Parkway, which may include work on this bridge.

View the file

Other files

File Type Posted
Tabulation of Bids - MS NP NATR 3N18 3H27 ETC - Signed.pdf PDF
Bid Opening Slides- MS NP NATR 3N18 3H27 etc.pdf PDF
Amendment 0003 - MS NP NATR 3N18 3H27 Etc.pdf PDF
Amendment 0002 - MS NP NATR 3N18 3H27 etc.pdf PDF
Amendment 0001 - MS NP NATR 3N18 3H27 etc.pdf PDF
5570-121P.pdf PDF
5570-100P.pdf PDF
5570-110P.pdf PDF
5570-496P.pdf PDF
5570-112P.pdf PDF
5570-101P.pdf PDF
5570-108P.pdf PDF
5570-114P.pdf PDF
5570-203P.pdf PDF
5570-117P.pdf PDF
5570-321P.pdf PDF
5570-113P.pdf PDF
5570-105P.pdf PDF
5570-122P.pdf PDF
5570-111P.pdf PDF
5570-103P.pdf PDF
5570-116P.pdf PDF
5570-109P.pdf PDF
5570-355P.pdf PDF
5570-102P.pdf PDF
5570-107P.pdf PDF
5570-099P.pdf PDF
5570-123P.pdf PDF
5570-106P.pdf PDF
5570-104P.pdf PDF
5570-118P.pdf PDF
5570-314P.pdf PDF
5570-119P.pdf PDF
5570-204P.pdf PDF
5570-120P.pdf PDF
5570-383P.pdf PDF
5570-098P.pdf PDF
NATR 3n18_3h27 Categorical Exclusion Form (NEPA).pdf PDF
FP14_Eng.pdf PDF
IFB Solicitation - MS NP NATR 3N18 3H27 ETC.pdf PDF
Subcontracting Plan - MS NP NATR 3N18 3H27 ETC.doc DOC document
5570-093P.pdf PDF
5570-096P.pdf PDF
MS NP NATR 3N18 3H27 ETC_GEO_Memo_adv.pdf PDF
5570-094P.pdf PDF
5570-091P.pdf PDF
5570-097P.pdf PDF
VETS-4212 Form.pdf PDF
5570-095P.pdf PDF
ADV Bidders Qualifications Form.doc DOC document
Show 40 more

Latest 50 of 53 listed here. See the rest on GovTribe.

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

BRIDGE INSPECTION REPORT

PIGEON ROOST CANAL BRIDGE

NATCHEZ TRACE PARKWAY OVER PIGEON ROOST CANAL

NATCHEZ TRACE PARKWAY

LS

STRUCTURE NO. 5570-090P

INSPECTION TYPE: ROUTINE

INSPECTION DATE: 3/8/2022

EU

Report prepared by:

Federal Highway Administration Federal Lands Bridge Office Bridge Inspection and Management Program 21400 Ridgetop Circle Sterling, Virginia 20166 https://bridge.flhd.fhwa.dot.gov

MILE POINT: 203.10

KILOMETER POINT: 326.79

RECOMMENDATIONS AND ESTIMATED COSTS STRUCTURE NO. 5570-090P

PIGEON ROOST CANAL BRIDGE INSPECTION DATE : 03/08/2022

PRIORITY OF IMPROVEMENT226

A (Critical) - Structure is closed, in immediate damage of collapse, or presents a critical safety danger.

B (Major) - Structure is seriously deficient or presents a safety hazard, but can remain open at reduced loads or with frequent inspections.

C (Moderate) - Structure is deficient, functionally obsolete, or requires substantial repairs to prevent a serious deficiency or unsafe condition.

D (Minor) - Structure is generally in good condition. Preventive maintenance may be required.

E (Special) - Structure is under construction or reconstruction.

C

Item No.

Maintenance Recommendations

(GENERALLY NOT FLHP ELIGIBLE)

QTY. UNIT UNIT

COST

PRELIM.

COST

ESTIMATE

61.4

REMOVE TREE GROWTH AT UPSTREAM SOUTH CHANNEL

BANK AND FALLEN TREES ACROSS UPSTREAM CHANNEL.

PRELIM. MAINTENANCE TOTAL :

Item No.

REHABILITATION/RECONSTRUCTION

(TYPICALLY NEEDED WITHIN 5 YEARS)

QTY. UNIT

UNIT

COST

PRELIM. COST ESTIMATES

REHAB RECONSTR

60.17 REPAIR SCOUR AND EROSION AT PIERS WITH

ENGINEERED RIPRAP.

222.4,58.

SEAL TRANSVERSE CRACKING OF PAVEMENT

AT SOUTH APPROACH AND ON DECK.

CONTRACT COSTS FOR MOBILIZATION,

TRAFFIC CONTROL, AND CONTINGENCIES.

PRELIM. REHABILITATION/RECONSTRUCTION TOTAL :

COST ESTIMATE SUMMARY

PRELIM. MAINTENANCE TOTAL :

PRELIM. REHABILITATION TOTAL :

PRELIM. RECONSTRUCTION TOTAL : ..

TOTAL ITEMIZED COSTS:

PRELIMINARY ESTIMATE TOTAL * :

(*Includes typical contract costs for mobilization, traffic control and design/construction engineering: but does not include detour bridges, work beyond the bridge limits, or work not listed above. Estimates are approximate and are for planning purposes only; they should not be used as a complete or final engineers estimate.)

Remarks : Cost estimates assume that recommended actions will be combined with similar work being performed on other structures.

STRUCTURE LOAD RATING STRUCTURE NO. 5570-090P

PIGEON ROOST CANAL BRIDGE INSPECTION DATE: 03/07/2022

TRUCK TYPE

INVENTORY RATING (NORMAL TRAFFIC) OPERATING RATING (MAXIMUM LOAD)

TONS METRIC TONS TONS METRIC TONS

H 24 22 41 37

HS 36 33 61 55

TYPE 3 34 31 58 53

TYPE 3S2 42 38 70 64

TYPE 3-3 53 48 89 81

DESIGN LOADING: 2 - H 15

X CAPACITY MEETS OR EXCEEDS DESIGN LOAD

CAPACITY IS LESS THAN DESIGN LOAD

ORIGINAL LOAD RATING CALCULATION APPLICABLE

ORIGINAL LOAD RATING CALCULATION REVISED

DATE OF LOAD RATING CALCULATION: 07/13/2015

LOAD RATING CONTROLLED BY: NEGATIVE MOMENT

REMARKS: SEE BRIDGE FILE FOR LOAD RATING CALCULATIONS.

STRUCTURE INVENTORY AND APPRAISAL STRUCTURE NO. 5570-090P

STRUCTURE IDENTIFICATION

(201) PARK: NATCHEZ TRACE PARKWAY

(202) STRUCTURE NAME:..............PIGEON ROOST CANAL BRIDGE

(203) STRUCTURE KIND:............... 1 - BRIDGE

(204) STRUCTURE NUMBER:.........5570-090 P

4 - SOUTHEAST(205) NPS REGION:

(206) ROUTE CODE NUMBER:

(207) ROAD SECTION NO:............. 090P

(208) NPS ROAD CLASS:............... 1 - PRINCIPAL PARK ROAD

(209) WITHIN NPS BNDRY?:.......... Yes

(210) OPERATING UNIT:.................DANCY

(211) PROJECT NO(S):................... 3H3

(212) DRAWING NUMBERS:

(21) MAINTAINED BY:......................66 - NATIONAL PARK SERVICE

(22) OWNER:................................... 66 - NATIONAL PARK SERVICE

(1) STATE:

(2) STATE HWY. AGENCY DIST:

(3) COUNTY CODE:

(4) CITY / PLACE CODE:

(5) INVENTORY ROUTE:

(6) FEATURES INTERSECTED:

(7) FACILITY CARRIED:

(8) STATE STRUCTURE NO:

(9) LOCATION:

(10) INV. RTE. - MIN. VERT. CLR:

(11) MILE POINT:

(27) YEAR BUILT:

(106) YEAR RECONSTRUCTED:

(20) TOLL:

(37) HISTORIC DESIGNATION:

284 - MISSISSIPPI

28019 CHOCTAW

00000

1 6 1 00001 0

PIGEON ROOST CANAL

NATCHEZ TRACE PARKWAY

5570090P0000000

1 0 MILES SOUTH OF U.S. ROUTE 82

99.99 FT ( 99.99 M)

203.1 (KM PT: 326.7)

0 9

3 - ON FREE ROAD

5 - NOT ELIGIBLE

STRUCTURE DESCRIPTION, FOUNDATION, AND DECK TYPE

(43A) MAIN STR. MATERIAL:..........2 - CONCRETE CONTINUOUS (44A) APPR. STR. MATERIAL:............ 0 - Other

(43B) MAIN STR. TYPE:.................. 01 - SLAB (44B) APPR. STR. TYPE:.................... 00 - OTHER

(45) NO. OF MAIN SPANS:..............003 (46) NO OF APPROACH SPANS:

(48) MAX. SPAN LENGTH:..............38.7 FT ( 11.8 M)

(49) STRUCTURE LENGTH:........... 105. FT ( 32.2 M) (108) WEAR SURFACE/PROTECT SYSTEM:

(216A) ABUTMENT #1 FDN:........... 3 - SPREAD FOOTING ON PILES A) TYPE WEARING SURFACE:.. 6 - BITUMINOUS

(216B) ABUTMENT #2 FDN:........... 3 - SPREAD FOOTING ON PILES B) TYPE MEMBRANE:................. 0 - NONE

(217A) PREDOM. PIER FDN:.......... 3 - SPREAD FOOTING ON PILES C) TYPE PROTECTION:.............. 0 - NONE

(217B) SECOND. PIER FDN:.......... 3 - SPREAD FOOTING ON PILES (218) IS SALT USED?.......................... NO

(107) DECK TYPE:.......................... 1 - CONCRETE CAST-IN-PLACE

LOAD RATING AND POSTING

(31) DESIGN LOAD:.........................2 - H 15 (41) LOAD RESTRICTION:.................. R - POSTED FOR OTHER LOAD-

CAPACITY RESTRICTION

(66) INVENTORY RATING:..............36 TONS ( 32.7 METRIC TONS) (70) BRIDGE POSTING:...................... 5 - EQUAL TO OR ABOVE LEGAL

LOADS

(64) OPERATING RATING:..............61 TONS ( 55.3 METRIC TONS)

INSPECTION DATES

(90) INSPECTION DATE: 03/08/2022 (91) FREQ. OF INSP: 24 MONTHS (92 / 93) CRITICAL FEATURE INSPECTION (CFI):

(219) ADD. STUDIES NEEDED: N - 0 - NONE (A) FRACTURE CRITICAL:.......... N

(220) SPECIAL STUDY TYPE: 0 - NONE INSP. EVERY MONTHS - LAST INSP:

(221) SPECIAL STUDY DATE: (B) UNDERWATER:..................... N

INSP. EVERY MONTHS - LAST INSP:

(C) SPECIAL INSPECTION:........ N

INSP. EVERY MONTHS - LAST INSP:

STRUCTURE INVENTORY AND APPRAISAL STRUCTURE NO. 5570-090P

GEOMETRY, TRAFFIC, AND NAVIGATIONAL DATA

(16) LATITUDE:................................ 33° 31'41 00" (51) CURB TO CURB WIDTH:............ 28.0 FT ( 8.5 M)

(17) LONGITUDE:............................ 89°09 '32.40" (52) DECK WIDTH:.......................... 32.4 FT ( 9.9 M)

(19) DETOUR LENGTH:.................. 15 MI ( 24 KM) (32) APPR. ROADWAY WIDTH:...... 32.0 FT ( 9.8 M)

(28A) LANES ON STRUCT:.............02 (213) APPR. PAVEMENT WIDTH:... 22.0 FT ( 6.7 M)

(28B) LANES UNDER STRUCT:......00 LEFT SHOULDER:............... 5 0 FT ( 1.5 M)

(42A) SERVICE ON:.........................1 - HIGHWAY RIGHT SHOULDER:.......... 5 0 FT ( 1.5 M)

(42B) SERVICE UNDER:................. 5 - WATERWAY (33) BRIDGE MEDIAN:.................... 0 - NO MEDIAN

(29) AVG DAILY TRAFFIC:..............1075 (34) SKEW ANGLE:......................... 40 °

(30) YEAR OF ADT:......................... 2012 (35) STRUCTURE FLARED:............ 0 - NO FLARE

(114) FUTURE ADT:.........................1183 (47) TOTAL HORIZ. CLEARANCE:.. 28 FT ( 8.5 M)

(115) YEAR OF FUTURE ADT:........2032 (50) SIDEWALKS

(101) PARALLEL STRUCTURE:......N - NO PARALLEL STRUCTURE LEFT:.................................... 0 0 FT ( 0 M)

(38) NAVIGATION CONTROL:.........0 - NO NAVIGATION CONTROL ON RIGHT:.................................. 0 0 FT ( 0 M)

WATERWAY (BRIDGE PERMIT NOT

REQUIRED)

(39) VERTICAL CLEARANCE:.........0 FT ( 0 M) (214) BRIDGE RAIL TYPE

1 - FULL HEIGHT (NO PARAPET)(40) HORIZ. CLEARANCE:..............0 FT ( 0 M) RAIL CONFIGURATION:

(111) ABUT OR PIER PROT:........... MATERIAL:........................... 1 - CONCRETE

LATERAL UNDERCLEARANCE: DESIGN TYPE:..................... 1 - CONTINUOUS RAIL

(55) RIGHT:...............................00 FT ( 0 M) (215) BRIDGE RAIL HEIGHT:.......... 2.42 FT ( 0.74 M)

(56) LEFT:................................ 0 FT ( 0 M) (53) MIN. VRT. CLR. OVER DECK: 99.99 FT ( 99.99 M)

(54) MIN. VRT. UNDRCLRANCE:... .00 FT ( 0 M)

CONDITION AND APPRAISAL DATA, PROPOSED IMPROVEMENTS, AND COST

(58) DECK:....................................... 6 (67) STRUCTURAL EVALUATION:

(59) SUPERSTRUCTURE:...............6 (68) DECK GEOMETRY:

(60) SUBSTRUCTURE:.......... 7 (69) UNDERCLEARANCES:................ N

(61) CHANNEL:................................6 (71) WATERWAY ADEQUACY:

(62) CULVERT:.................................N (72) APPROACH ALIGNMENT:

(222) APPROACHES:...................... 7 (113) SCOUR CRITICAL:.................... 4 - ACTION IS REQUIRED TO

PROTECT EXPOSED FOUNDATIONS

(223) RETAINING WALL:.................N (225) PURPOSE OF IMPROVEMENT: 2 - REHAB/RECONSTRUCTION

(36) TRAFFIC SAFETY FEAT: 1 N N N (226) PRIORITY OF IMPROVEMENT: C - MODERATE

(75A) TYPE OF WORK:................... (227) MAINTENANCE COST:.............$

(75B) WORK DONE BY:.................. (228) REHAB / RECNSTR COST:..... $

(76) IMPROVEMENT LENGTH:....... FT ( 0 M) (229) CONSTRUCTION COST:.......... $

ADDITIONAL INFORMATION

(230) STRUCTURE HISTORY:

1982-JOINT REPAIR. 2003-APPROACHES RESURFACED. 2014-STRUCTURE REPAVED, PAVEMENT SAWCUT AND SEALED OVER ENDS OF STRUCTURE.

2019-REPAIRED SPALL AT CURB, JOINT SEALS INSTALLED AT CURBS.

(231) ADDITIONAL CONSIDERATIONS:

(330) ADDITIONAL CONFIGURATION INFORMATION:

Inspector: Killian Baptiste Structure Number: 5570090P0000000

Inspection Date: 03/08/2022 Facility Carried: NATCHEZ TRACE PAR

Bridge Inspection Report

Pictures

PHOTO 3

Description LOOKING NORTH TOWARD TUPELO

PHOTO 4

Description WEST (DOWNSTREAM) SIDE

Bridge Inspection Report

Pictures

PHOTO 5

Description GENERAL TOPSIDE VIEW LOOKING NORTH

PHOTO 6

Description GENERAL UNDERSIDE VIEW OF SOUTH SPAN LOOKING NORTH

Bridge Inspection Report

Pictures

PHOTO 7

Description GENERAL UNDERSIDE VIEW OF CENTER SPAN LOOKING NORTH; NOTE LONGITUDINAL

CRACKS WITH EFFLORESCENCE

PHOTO 8

Description VERTICAL CRACKING OF WEST RAILING AND RAIL POST OVER NORTH ABUTMENT; NOTE

TYPICAL CURB JOINT SEALANT REPAIR

Bridge Inspection Report

Pictures

PHOTO 9

Description TYPICAL TRANSVERSE CRACKING IN RAILINGS, WEST RAILING OVER NORTH SPAN

SHOWN

PHOTO 10

Description CRACKING WITH EFFLORESCENCE AND DELAMINATION ON EAST CURB OVER SOUTH

PIER

Bridge Inspection Report

Pictures

PHOTO 11

Description SPALL ON BOTTOM OF WEST RAILING OVER SOUTH SPAN

PHOTO 12

Description TYPICAL DIAGONAL AND LONGITUDINAL CRACKS WITH EFFLORESCENCE ON DECK

UNDERSIDE, WEST END OF SOUTH SPAN SHOWN

Bridge Inspection Report

Pictures

PHOTO 13

Description LONGITUDINAL CRACKS WITH EFFLORESCENCE ON DECK UNDERSIDE, EAST SIDE OF

SOUTH SPAN SHOWN

PHOTO 14

Description EFFLORESCENCE ON DECK UNDERSIDE ON EAST SIDE BY NORTH PIER

Bridge Inspection Report

Pictures

PHOTO 15

Description GENERAL VIEW OF NORTH ABUTMENT

PHOTO 16

Description CRACK IN NORTH ABUTMENT NEAR CENTERLINE

Bridge Inspection Report

Pictures

PHOTO 17

Description GENERAL VIEW OF NORTH PIER

PHOTO 18

Description EROSION AT EAST END OF NORTH PIER

Bridge Inspection Report

Pictures

PHOTO 19

Description GENERAL VIEW OF SOUTH PIER

PHOTO 20

Description EFFLORESCENCE ON NORTH FACE OF SOUTH PIER

Bridge Inspection Report

Pictures

PHOTO 21

Description EROSION AT EAST END OF SOUTH PIER

PHOTO 22

Description GENERAL VIEW OF SOUTH ABUTMENT

Bridge Inspection Report

Pictures

PHOTO 23

Description SOUTHWEST WINGWALL; NOTE TYPICAL LAWN MOWER SCRAPES

PHOTO 24

Description NORTHWEST WINGWALL; NOTE VEGETATION GROWTH AND CRACKING WITH

EFFLORESCENCE

Bridge Inspection Report

Pictures

PHOTO 25

Description LOOKING UPSTREAM

PHOTO 26

Description LOOKING DOWNSTREAM