This document is a Bridge Inspection Report for the Big Byway Creek Bridge on the Natchez Trace Parkway. The bridge, structure number 5570-098P, was inspected on 3/9/2022 and found to be in generally good condition, but with some deficiencies requiring rehabilitation or reconstruction within the next 5 years.

The report provides recommendations and estimated costs for maintenance, rehabilitation, and reconstruction activities. Key issues include installing engineered riprap, cleaning and painting bearings, sealing cracks in the wearing surface, and cleaning and resealing expansion joints. The structure's load rating and inventory details are also provided. The report notes that the bridge is eligible for the National Park Service's Federal Lands Highway Program. Estimated costs for the recommended work total approximately $XXX,XXX.

View the file

Other files

File Type Posted
Tabulation of Bids - MS NP NATR 3N18 3H27 ETC - Signed.pdf PDF
Bid Opening Slides- MS NP NATR 3N18 3H27 etc.pdf PDF
Amendment 0003 - MS NP NATR 3N18 3H27 Etc.pdf PDF
Amendment 0002 - MS NP NATR 3N18 3H27 etc.pdf PDF
Amendment 0001 - MS NP NATR 3N18 3H27 etc.pdf PDF
5570-121P.pdf PDF
5570-100P.pdf PDF
5570-110P.pdf PDF
5570-496P.pdf PDF
5570-112P.pdf PDF
5570-101P.pdf PDF
5570-108P.pdf PDF
5570-114P.pdf PDF
5570-203P.pdf PDF
5570-117P.pdf PDF
5570-321P.pdf PDF
5570-113P.pdf PDF
5570-105P.pdf PDF
5570-122P.pdf PDF
5570-111P.pdf PDF
5570-103P.pdf PDF
5570-116P.pdf PDF
5570-109P.pdf PDF
5570-355P.pdf PDF
5570-102P.pdf PDF
5570-107P.pdf PDF
5570-099P.pdf PDF
5570-123P.pdf PDF
5570-106P.pdf PDF
5570-104P.pdf PDF
5570-118P.pdf PDF
5570-314P.pdf PDF
5570-119P.pdf PDF
5570-204P.pdf PDF
5570-120P.pdf PDF
5570-383P.pdf PDF
NATR 3n18_3h27 Categorical Exclusion Form (NEPA).pdf PDF
FP14_Eng.pdf PDF
IFB Solicitation - MS NP NATR 3N18 3H27 ETC.pdf PDF
Subcontracting Plan - MS NP NATR 3N18 3H27 ETC.doc DOC document
5570-093P.pdf PDF
5570-096P.pdf PDF
MS NP NATR 3N18 3H27 ETC_GEO_Memo_adv.pdf PDF
5570-094P.pdf PDF
5570-091P.pdf PDF
5570-097P.pdf PDF
5570-090P.pdf PDF
VETS-4212 Form.pdf PDF
5570-095P.pdf PDF
ADV Bidders Qualifications Form.doc DOC document
Show 40 more

Latest 50 of 53 listed here. See the rest on GovTribe.

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

BRIDGE INSPECTION REPORT

BIG BYWAY CREEK BRIDGE

NATCHEZ TRACE PARKWAY OVER BIG BYWAY CREEK

NATCHEZ TRACE PARKWAY

LN

STRUCTURE NO. 5570-098P

INSPECTION TYPE: ROUTINE

INSPECTION DATE: 3/9/2022

EU

Report prepared by:

Federal Highway Administration Federal Lands Bridge Office Bridge Inspection and Management Program 21400 Ridgetop Circle Sterling, Virginia 20166 https://bridge.flhd.fhwa.dot.gov

MILE POINT: 196.20

KILOMETER POINT: 59.8

RECOMMENDATIONS AND ESTIMATED COSTS STRUCTURE NO. 5570-098P

BIG BYWAY CREEK BRIDGE INSPECTION DATE : 03/09/2022

226 PRIORITY OF IMPROVEMENT C

A (Critical) - Structure is closed, in immediate damage of collapse, or presents a critical safety danger.

B (Major) - Structure is seriously deficient or presents a safety hazard, but can remain open at reduced loads or with frequent inspections.

C (Moderate) - Structure is deficient, functionally obsolete, or requires substantial repairs to prevent a serious deficiency or unsafe condition.

D (Minor) - Structure is generally in good condition. Preventive maintenance may be required.

E (Special) - Structure is under construction or reconstruction.

Item No.

Maintenance Recommendations

(GENERALLY NOT FLHP ELIGIBLE)

QTY. UNIT UNIT

COST

PRELIM.

COST

ESTIMATE

60.3

REMOVE DEBRIS FROM BEARING SEATS AT BOTH

ABUTMENTS.

PRELIM. MAINTENANCE TOTAL :

Item No.

REHABILITATION/RECONSTRUCTION

(TYPICALLY NEEDED WITHIN 5 YEARS)

QTY. UNIT

UNIT

COST

PRELIM. COST ESTIMATES

REHAB RECONSTR

61.2,60.

INSTALL ENGINEERED RIPRAP ON CHANNEL

BANKS AROUND PIERS.

60.9 INSTALL ENGINEERED RIPRAP FOR SCUPPER

AND WEEP HOLE DRAINAGE IN NORTH AND

SOUTH SPANS AS NEEDED.

59.1,59.7 CLEAN AND PAINT BEARINGS.

58.2 CLEAN AND RESEAL EXPANSION JOINTS IN

WEARING SURFACE.

222.4 SEAL CRACKS IN WEARING SURFACE OVER

STRUCTURE.

CONTRACT COSTS FOR MOBILIZATION,

TRAFFIC CONTROL, AND CONTINGENCIES.

PRELIM. REHABILITATION/RECONSTRUCTION TOTAL :

RECOMMENDATIONS AND ESTIMATED COSTS STRUCTURE NO. 5570-098P

BIG BYWAY CREEK BRIDGE INSPECTION DATE : 03/09/2022

226 PRIORITY OF IMPROVEMENT C

A (Critical) - Structure is closed, in immediate damage of collapse, or presents a critical safety danger.

B (Major) - Structure is seriously deficient or presents a safety hazard, but can remain open at reduced loads or with frequent inspections.

C (Moderate) - Structure is deficient, functionally obsolete, or requires substantial repairs to prevent a serious deficiency or unsafe condition.

D (Minor) - Structure is generally in good condition. Preventive maintenance may be required.

E (Special) - Structure is under construction or reconstruction.

COST ESTIMATE SUMMARY

PRELIM. MAINTENANCE TOTAL :

PRELIM. REHABILITATION TOTAL :

PRELIM. RECONSTRUCTION TOTAL : .

TOTAL ITEMIZED COSTS:

PRELIMINARY ESTIMATE TOTAL * :

(*Includes typical contract costs for mobilization, traffic control and design/construction engineering: but does not include detour bridges, work beyond the bridge limits, or work not listed above. Estimates are approximate and are for planning purposes only; they should not be used as a complete or final engineers estimate.)

Remarks : Cost estimates assume that recommended actions will be combined with similar work being performed on other structures.

STRUCTURE LOAD RATING STRUCTURE NO. 5570-098P

BIG BYWAY CREEK BRIDGE INSPECTION DATE: 03/08/2022

TRUCK TYPE

INVENTORY RATING (NORMAL TRAFFIC) OPERATING RATING (MAXIMUM LOAD)

TONS METRIC TONS TONS METRIC TONS

H 16 15 27 24

HS 29 26 48 44

TYPE 3 34 31 57 52

TYPE 3S2 40 36 67 61

TYPE 3-3 41 37 69 63

DESIGN LOADING: 0 - UNKNOWN

X CAPACITY MEETS OR EXCEEDS DESIGN LOAD

CAPACITY IS LESS THAN DESIGN LOAD

ORIGINAL LOAD RATING CALCULATION APPLICABLE

ORIGINAL LOAD RATING CALCULATION REVISED

DATE OF LOAD RATING CALCULATION: 05/19/2016

LOAD RATING CONTROLLED BY: EXTERIOR GIRDER - MOMENT

REMARKS: SEE BRIDGE FILE FOR LOAD RATING CALCULATIONS.

STRUCTURE INVENTORY AND APPRAISAL STRUCTURE NO. 5570-098P

STRUCTURE IDENTIFICATION

(201) PARK: NATCHEZ TRACE PARKWAY

(202) STRUCTURE NAME:..............BIG BYWAY CREEK BRIDGE

(203) STRUCTURE KIND:............... 1 - BRIDGE

(204) STRUCTURE NUMBER:.........5570-098 P

4 - SOUTHEAST(205) NPS REGION:

(206) ROUTE CODE NUMBER:

(207) ROAD SECTION NO:............. 098P

(208) NPS ROAD CLASS:............... 1 - PRINCIPAL PARK ROAD

(209) WITHIN NPS BNDRY?:.......... Yes

(210) OPERATING UNIT:.................DANCY

(211) PROJECT NO(S):................... 3H7

(212) DRAWING NUMBERS:...........2353A

(21) MAINTAINED BY:......................66 - NATIONAL PARK SERVICE

(22) OWNER:................................... 66 - NATIONAL PARK SERVICE

(1) STATE:

(2) STATE HWY. AGENCY DIST:

(3) COUNTY CODE:

(4) CITY / PLACE CODE:

(5) INVENTORY ROUTE:

(6) FEATURES INTERSECTED:

(7) FACILITY CARRIED:

(8) STATE STRUCTURE NO:

(9) LOCATION:

(10) INV. RTE. - MIN. VERT. CLR:

(11) MILE POINT:

(27) YEAR BUILT:

(106) YEAR RECONSTRUCTED:

(20) TOLL:

(37) HISTORIC DESIGNATION:

284 - MISSISSIPPI

28019 CHOCTAW

00000

1 6 1 00001 0

BIG BYWAY CREEK

NATCHEZ TRACE PARKWAY

5570098P0000000

8 2 MILES SOUTH OF U.S. ROUTE 82

99.99 FT ( 99.99 M)

196.2 (KM PT: 59.8 )

3 - ON FREE ROAD

5 - NOT ELIGIBLE

STRUCTURE DESCRIPTION, FOUNDATION, AND DECK TYPE

(43A) MAIN STR. MATERIAL:..........4 - STEEL CONTINUOUS (44A) APPR. STR. MATERIAL:............ 0 - Other

(43B) MAIN STR. TYPE:.................. 02 - STRINGER/MULTI-BEAM OR (44B) APPR. STR. TYPE:.................... 00 - OTHER

GIRDER

(45) NO. OF MAIN SPANS:..............003 (46) NO OF APPROACH SPANS:

(48) MAX. SPAN LENGTH:..............65 FT ( 19.8 M)

(49) STRUCTURE LENGTH:........... 171. FT ( 52.1 M) (108) WEAR SURFACE/PROTECT SYSTEM:

(216A) ABUTMENT #1 FDN:........... 3 - SPREAD FOOTING ON PILES A) TYPE WEARING SURFACE:.. 6 - BITUMINOUS

(216B) ABUTMENT #2 FDN:........... 3 - SPREAD FOOTING ON PILES B) TYPE MEMBRANE:................. 0 - NONE

(217A) PREDOM. PIER FDN:.......... 3 - SPREAD FOOTING ON PILES C) TYPE PROTECTION:.............. 0 - NONE

(217B) SECOND. PIER FDN:.......... 3 - SPREAD FOOTING ON PILES (218) IS SALT USED?.......................... NO

(107) DECK TYPE:.......................... 1 - CONCRETE CAST-IN-PLACE

LOAD RATING AND POSTING

(31) DESIGN LOAD:.........................0 - UNKNOWN (41) LOAD RESTRICTION:.................. R - POSTED FOR OTHER LOAD-

CAPACITY RESTRICTION

(66) INVENTORY RATING:..............29 TONS ( 26.3 METRIC TONS) (70) BRIDGE POSTING:...................... 5 - EQUAL TO OR ABOVE LEGAL

LOADS

(64) OPERATING RATING:..............48 TONS ( 43.5 METRIC TONS)

INSPECTION DATES

(90) INSPECTION DATE: 03/09/2022 (91) FREQ. OF INSP: 24 MONTHS (92 / 93) CRITICAL FEATURE INSPECTION (CFI):

(219) ADD. STUDIES NEEDED: N - 0 - NONE (A) FRACTURE CRITICAL:.......... N

(220) SPECIAL STUDY TYPE: 0 - NONE INSP. EVERY MONTHS - LAST INSP:

(221) SPECIAL STUDY DATE: (B) UNDERWATER:..................... N

INSP. EVERY MONTHS - LAST INSP:

(C) SPECIAL INSPECTION:........ N

INSP. EVERY MONTHS - LAST INSP:

STRUCTURE INVENTORY AND APPRAISAL STRUCTURE NO. 5570-098P

GEOMETRY, TRAFFIC, AND NAVIGATIONAL DATA

(16) LATITUDE:................................ 33° 26'53 80" (51) CURB TO CURB WIDTH:............ 28.0 FT ( 8.5 M)

(17) LONGITUDE:............................ 89°13 '56.70" (52) DECK WIDTH:.......................... 32.4 FT ( 9.9 M)

(19) DETOUR LENGTH:.................. 15 MI ( 24 KM) (32) APPR. ROADWAY WIDTH:...... 32.0 FT ( 9.8 M)

(28A) LANES ON STRUCT:.............02 (213) APPR. PAVEMENT WIDTH:... 22.0 FT ( 6.7 M)

(28B) LANES UNDER STRUCT:......00 LEFT SHOULDER:............... 5 0 FT ( 1.5 M)

(42A) SERVICE ON:.........................1 - HIGHWAY RIGHT SHOULDER:.......... 5 0 FT ( 1.5 M)

(42B) SERVICE UNDER:................. 5 - WATERWAY (33) BRIDGE MEDIAN:.................... 0 - NO MEDIAN

(29) AVG DAILY TRAFFIC:..............1075 (34) SKEW ANGLE:......................... 25 °

(30) YEAR OF ADT:......................... 2012 (35) STRUCTURE FLARED:............ 0 - NO FLARE

(114) FUTURE ADT:.........................1183 (47) TOTAL HORIZ. CLEARANCE:.. 28 FT ( 8.5 M)

(115) YEAR OF FUTURE ADT:........2032 (50) SIDEWALKS

(101) PARALLEL STRUCTURE:......N - NO PARALLEL STRUCTURE LEFT:.................................... 0 0 FT ( 0 M)

(38) NAVIGATION CONTROL:.........0 - NO NAVIGATION CONTROL ON RIGHT:.................................. 0 0 FT ( 0 M)

WATERWAY (BRIDGE PERMIT NOT

REQUIRED)

(39) VERTICAL CLEARANCE:.........0 FT ( 0 M) (214) BRIDGE RAIL TYPE

1 - FULL HEIGHT (NO PARAPET)(40) HORIZ. CLEARANCE:..............0 FT ( 0 M) RAIL CONFIGURATION:

(111) ABUT OR PIER PROT:........... MATERIAL:........................... 1 - CONCRETE

LATERAL UNDERCLEARANCE: DESIGN TYPE:..................... 1 - CONTINUOUS RAIL

(55) RIGHT:...............................00 FT ( 0 M) (215) BRIDGE RAIL HEIGHT:.......... 2 33 FT ( 0.71 M)

(56) LEFT:................................ 0 FT ( 0 M) (53) MIN. VRT. CLR. OVER DECK: 99.99 FT ( 99.99 M)

(54) MIN. VRT. UNDRCLRANCE:... .00 FT ( 0 M)

CONDITION AND APPRAISAL DATA, PROPOSED IMPROVEMENTS, AND COST

(58) DECK:....................................... 6 (67) STRUCTURAL EVALUATION:

(59) SUPERSTRUCTURE:...............6 (68) DECK GEOMETRY:

(60) SUBSTRUCTURE:.......... 6 (69) UNDERCLEARANCES:................ N

(61) CHANNEL:................................6 (71) WATERWAY ADEQUACY:

(62) CULVERT:.................................N (72) APPROACH ALIGNMENT:

(222) APPROACHES:...................... 7 (113) SCOUR CRITICAL:.................... 4 - ACTION IS REQUIRED TO

PROTECT EXPOSED FOUNDATIONS

(223) RETAINING WALL:.................N (225) PURPOSE OF IMPROVEMENT: 2 - REHAB/RECONSTRUCTION

(36) TRAFFIC SAFETY FEAT: 1 N N N (226) PRIORITY OF IMPROVEMENT: C - MODERATE

(75A) TYPE OF WORK:................... (227) MAINTENANCE COST:

(75B) WORK DONE BY:.................. (228) REHAB / RECNSTR COST:

(76) IMPROVEMENT LENGTH:....... FT ( 0 M) (229) CONSTRUCTION COST:

ADDITIONAL INFORMATION

(230) STRUCTURE HISTORY:

1985-SUPERSTRUCTURE PAINTED. 2007-NEW PAVEMENT. 2012-STRUCTURE AND APPROACHES REPAVED.

(231) ADDITIONAL CONSIDERATIONS:

(330) ADDITIONAL CONFIGURATION INFORMATION:

Inspector: Killian Baptiste Structure Number: 5570098P0000000

Inspection Date: 03/09/2022 Facility Carried: NATCHEZ TRACE PAR

Bridge Inspection Report

Pictures

PHOTO 3

Description LOOKING SOUTH TOWARD JACKSON

PHOTO 4

Description WEST (DOWNSTREAM) SIDE

Bridge Inspection Report

Pictures

PHOTO 5

Description GENERAL TOPSIDE VIEW LOOKING NORTH

PHOTO 6

Description GENERAL UNDERSIDE VIEW OF SOUTH SPAN LOOKING SOUTH

Bridge Inspection Report

Pictures

PHOTO 7

Description GENERAL UNDERSIDE VIEW OF CENTER SPAN LOOKING NORTH

PHOTO 8

Description GENERAL UNDERSIDE VIEW OF NORTH SPAN LOOKING NORTH

Bridge Inspection Report

Pictures

PHOTO 9

Description TYPICAL LONGITUDINAL CRACKING ALONG CENTERLINE OF DECK WEARING SURFACE

PHOTO 10

Description SPALL WITH EXPOSED REBAR ON EXTERIOR FACE OF EAST RAILING OVER NORTH

ABUTMENT

Bridge Inspection Report

Pictures

PHOTO 11

Description TYPICAL TRANSVERSE CRACKING OF RAILINGS, SOUTH END OF EAST RAILING SHOWN

PHOTO 12

Description DETERIORATION OF WEST SHOULDER LANE STRIPING

Bridge Inspection Report

Pictures

PHOTO 13

Description TYPICAL VEGETATION GROWTH ALONG CURBLINES, EAST CURBLINE SHOWN

PHOTO 14

Description EDGE SPALLING OF SOUTHEAST PARAPET

Bridge Inspection Report

Pictures

PHOTO 15

Description EDGE SPALLING ON EAST FASCIA OVER SOUTH SPAN

PHOTO 16

Description SPALL IN EAST FASCIA AT NORTH ABUTMENT INTERFACE

Bridge Inspection Report

Pictures

PHOTO 17

Description TYPICAL BEARING CONDITION, SOUTH ABUTMENT BEARING #2 SHOWN

PHOTO 18

Description TYPICAL BEARING CONDITION, SOUTH PIER BEARINGS SHOWN

Bridge Inspection Report

Pictures

PHOTO 19

Description TYPICAL CORROSION OF BEARINGS, SECOND BEARING FROM EAST END OF NORTH

ABUTMENT SHOWN

PHOTO 20

Description GENERAL VIEW OF NORTH ABUTMENT

Bridge Inspection Report

Pictures

PHOTO 21

Description GENERAL VIEW OF NORTH FACE OF NORTH PIER

PHOTO 22

Description GENERAL VIEW OF NORTH FACE OF SOUTH PIER

Bridge Inspection Report

Pictures

PHOTO 23

Description TYPICAL VERTICAL CRACKS IN PIER CAPS, SOUTH FACE OF SOUTH PIER SHOWN

PHOTO 24

Description EROSION/ SCOUR AT EAST END OF SOUTH PIER

Bridge Inspection Report

Pictures

PHOTO 25

Description TYPICAL TRANSVERSE CRACKING WITH EFFLORESCENCE ON DECK UNDERSIDE, BAY #1

NEAR SOUTH ABUTMENT SHOWN

PHOTO 26

Description GENERAL VIEW OF SOUTH ABUTMENT

Bridge Inspection Report

Pictures

PHOTO 27

Description PONDING IN FRONT OF SOUTH ABUTMENT; NOTE WATER STAINING

PHOTO 28

Description TYPICAL DEBRIS BUILD UP ON SIDES OF ABUTMENT BEARING SEATS, EAST END OF

NORTH ABUTMENT SHOWN

Bridge Inspection Report

Pictures

PHOTO 29

Description WATER PONDING AT SOUTH BEARING SEAT

PHOTO 30

Description LOOKING UPSTREAM FROM DECK

Bridge Inspection Report

Pictures

PHOTO 31

Description LOOKING DOWNSTREAM FROM DECK

File details come from the government source that posted it. Updated .