This document is a Bridge Inspection Report for the Drainage Canal Bridge at Mile Point 161.20 on the Natchez Trace Parkway. The bridge is owned and maintained by the National Park Service. The report provides details on the condition of the bridge, including structural evaluations, recommended maintenance and rehabilitation actions, and estimated costs. Key findings include longitudinal and transverse cracking of the deck, deterioration of the bridge joints, and exposure of the abutment footings. The report recommends cleaning and sealing the deck joints, placing riprap along the abutments and channel banks, and re-striping the pavement markings. Preliminary cost estimates for the recommended rehabilitation work total approximately $140,000. The bridge is currently load-rated to carry standard legal loads.

The related federal contract opportunity is for a project to perform geotechnical, pavement rehabilitation, and structural repairs on various sections of the Natchez Trace Parkway in Mississippi, including the bridge inspected in this report. The solicitation number is 693C73-25-B-000003 and is being issued by the Federal Highway Administration.

View the file

Other files

File Type Posted
Tabulation of Bids - MS NP NATR 3N18 3H27 ETC - Signed.pdf PDF
Bid Opening Slides- MS NP NATR 3N18 3H27 etc.pdf PDF
Amendment 0003 - MS NP NATR 3N18 3H27 Etc.pdf PDF
Amendment 0002 - MS NP NATR 3N18 3H27 etc.pdf PDF
Amendment 0001 - MS NP NATR 3N18 3H27 etc.pdf PDF
5570-121P.pdf PDF
5570-100P.pdf PDF
5570-110P.pdf PDF
5570-496P.pdf PDF
5570-112P.pdf PDF
5570-101P.pdf PDF
5570-108P.pdf PDF
5570-203P.pdf PDF
5570-117P.pdf PDF
5570-321P.pdf PDF
5570-113P.pdf PDF
5570-105P.pdf PDF
5570-122P.pdf PDF
5570-111P.pdf PDF
5570-103P.pdf PDF
5570-116P.pdf PDF
5570-109P.pdf PDF
5570-355P.pdf PDF
5570-102P.pdf PDF
5570-107P.pdf PDF
5570-099P.pdf PDF
5570-123P.pdf PDF
5570-106P.pdf PDF
5570-104P.pdf PDF
5570-118P.pdf PDF
5570-314P.pdf PDF
5570-119P.pdf PDF
5570-204P.pdf PDF
5570-120P.pdf PDF
5570-383P.pdf PDF
5570-098P.pdf PDF
NATR 3n18_3h27 Categorical Exclusion Form (NEPA).pdf PDF
FP14_Eng.pdf PDF
IFB Solicitation - MS NP NATR 3N18 3H27 ETC.pdf PDF
Subcontracting Plan - MS NP NATR 3N18 3H27 ETC.doc DOC document
5570-093P.pdf PDF
5570-096P.pdf PDF
MS NP NATR 3N18 3H27 ETC_GEO_Memo_adv.pdf PDF
5570-094P.pdf PDF
5570-091P.pdf PDF
5570-097P.pdf PDF
5570-090P.pdf PDF
VETS-4212 Form.pdf PDF
5570-095P.pdf PDF
ADV Bidders Qualifications Form.doc DOC document
Show 40 more

Latest 50 of 53 listed here. See the rest on GovTribe.

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

BRIDGE INSPECTION REPORT

DRAINAGE CANAL BRIDGE AT MP 161.20

NATCHEZ TRACE PARKWAY OVER DRAINAGE CANAL

NATCHEZ TRACE PARKWAY

LN

STRUCTURE NO. 5570-114P

INSPECTION TYPE: ROUTINE

INSPECTION DATE: 3/14/2022

WU

Report prepared by:

Federal Highway Administration Federal Lands Bridge Office Bridge Inspection and Management Program 21400 Ridgetop Circle Sterling, Virginia 20166 https://bridge.flhd.fhwa.dot.gov

MILE POINT: 161.20

KILOMETER POINT: 49.13

RECOMMENDATIONS AND ESTIMATED COSTS STRUCTURE NO. 5570-114P

DRAINAGE CANAL BRIDGE AT MP 161.20 INSPECTION DATE : 03/14/2022

PRIORITY OF IMPROVEMENT226

A (Critical) - Structure is closed, in immediate damage of collapse, or presents a critical safety danger.

B (Major) - Structure is seriously deficient or presents a safety hazard, but can remain open at reduced loads or with frequent inspections.

C (Moderate) - Structure is deficient, functionally obsolete, or requires substantial repairs to prevent a serious deficiency or unsafe condition.

D (Minor) - Structure is generally in good condition. Preventive maintenance may be required.

E (Special) - Structure is under construction or reconstruction.

D

Item No.

Maintenance Recommendations

(GENERALLY NOT FLHP ELIGIBLE)

QTY. UNIT UNIT

COST

PRELIM.

COST

ESTIMATE

PRELIM. MAINTENANCE TOTAL :

Item No.

REHABILITATION/RECONSTRUCTION

(TYPICALLY NEEDED WITHIN 5 YEARS)

QTY. UNIT

UNIT

COST

PRELIM. COST ESTIMATES

REHAB RECONSTR

58.2 CLEAN AND SEAL SAWCUT DECK JOINTS.

60.9,60.

17,61.2

PLACE ENGINEERED RIPRAP AS NEEDED

ALONG ABUTMENTS AND ABUTMENT SLOPES,

NORTH PIER, AND CHANNEL BANKS.

58.10, 222.9

RE-STRIPE PAVEMENT MARKINGS.

CONTRACT COSTS FOR MOBILIZATION,

TRAFFIC CONTROL, AND CONTINGENCIES.

PRELIM. REHABILITATION/RECONSTRUCTION TOTAL :

COST ESTIMATE SUMMARY

PRELIM. MAINTENANCE TOTAL :

PRELIM. REHABILITATION TOTAL :

PRELIM. RECONSTRUCTION TOTAL :

TOTAL ITEMIZED COSTS:

PRELIMINARY ESTIMATE TOTAL * :

(*Includes typical contract costs for mobilization, traffic control and design/construction engineering: but does not include detour bridges, work beyond the bridge limits, or work not listed above. Estimates are approximate and are for planning purposes only; they should not be used as a complete or final engineers estimate.)

Remarks : Cost estimates assume that recommended actions will be combined with similar work being performed on other structures.

STRUCTURE LOAD RATING STRUCTURE NO. 5570-114P

DRAINAGE CANAL BRIDGE AT MP 161.20 INSPECTION DATE: 03/13/2022

TRUCK TYPE

INVENTORY RATING (NORMAL TRAFFIC) OPERATING RATING (MAXIMUM LOAD)

TONS METRIC TONS TONS METRIC TONS

H 19 17 32 29

HS 26 24 43 39

TYPE 3 26 24 44 40

TYPE 3S2 27 24 45 41

TYPE 3-3 36 33 60 54

DESIGN LOADING: 2 - H 15

X CAPACITY MEETS OR EXCEEDS DESIGN LOAD

CAPACITY IS LESS THAN DESIGN LOAD

ORIGINAL LOAD RATING CALCULATION APPLICABLE

ORIGINAL LOAD RATING CALCULATION REVISED

DATE OF LOAD RATING CALCULATION: 06/19/2015

LOAD RATING CONTROLLED BY: END SPAN - POSITIVE MOMENT

REMARKS: SEE BRIDGE FILE FOR LOAD RATING CALCULATIONS.

STRUCTURE INVENTORY AND APPRAISAL STRUCTURE NO. 5570-114P

STRUCTURE IDENTIFICATION

(201) PARK: NATCHEZ TRACE PARKWAY

(202) STRUCTURE NAME:..............DRAINAGE CANAL BRIDGE AT MP

161.20

(203) STRUCTURE KIND:............... 1 - BRIDGE

(204) STRUCTURE NUMBER:.........5570-114 P

4 - SOUTHEAST(205) NPS REGION:

(206) ROUTE CODE NUMBER:

(207) ROAD SECTION NO:............. 114P

(208) NPS ROAD CLASS:............... 1 - PRINCIPAL PARK ROAD

(209) WITHIN NPS BNDRY?:.......... Yes

(210) OPERATING UNIT:.................KOSCIUSKO

(211) PROJECT NO(S):................... 3L5A

(212) DRAWING NUMBERS:...........2205A

(21) MAINTAINED BY:......................66 - NATIONAL PARK SERVICE

(22) OWNER:................................... 66 - NATIONAL PARK SERVICE

(1) STATE:

(2) STATE HWY. AGENCY DIST:

(3) COUNTY CODE:

(4) CITY / PLACE CODE:

(5) INVENTORY ROUTE:

(6) FEATURES INTERSECTED:

(7) FACILITY CARRIED:

(8) STATE STRUCTURE NO:

(9) LOCATION:

(10) INV. RTE. - MIN. VERT. CLR:

(11) MILE POINT:

(27) YEAR BUILT:

(106) YEAR RECONSTRUCTED:

(20) TOLL:

(37) HISTORIC DESIGNATION:

284 - MISSISSIPPI

28007 ATTALA

00000

1 6 1 00001 0

DRAINAGE CANAL

NATCHEZ TRACE PARKWAY

5570114P0000000

4 5 MILES SOUTH OF MS ROUTE 12

99.99 FT ( 99.99 M)

161.2 (KM PT: 49.13)

3 - ON FREE ROAD

5 - NOT ELIGIBLE

STRUCTURE DESCRIPTION, FOUNDATION, AND DECK TYPE

(43A) MAIN STR. MATERIAL:..........2 - CONCRETE CONTINUOUS (44A) APPR. STR. MATERIAL:............ 0 - Other

(43B) MAIN STR. TYPE:.................. 01 - SLAB (44B) APPR. STR. TYPE:.................... 00 - OTHER

(45) NO. OF MAIN SPANS:..............003 (46) NO OF APPROACH SPANS:

(48) MAX. SPAN LENGTH:..............33.5 FT ( 10.2 M)

(49) STRUCTURE LENGTH:........... 87.5 FT ( 26.7 M) (108) WEAR SURFACE/PROTECT SYSTEM:

(216A) ABUTMENT #1 FDN:........... 3 - SPREAD FOOTING ON PILES A) TYPE WEARING SURFACE:.. 6 - BITUMINOUS

(216B) ABUTMENT #2 FDN:........... 3 - SPREAD FOOTING ON PILES B) TYPE MEMBRANE:................. 0 - NONE

(217A) PREDOM. PIER FDN:.......... 3 - SPREAD FOOTING ON PILES C) TYPE PROTECTION:.............. 0 - NONE

(217B) SECOND. PIER FDN:.......... 3 - SPREAD FOOTING ON PILES (218) IS SALT USED?.......................... NO

(107) DECK TYPE:.......................... 1 - CONCRETE CAST-IN-PLACE

LOAD RATING AND POSTING

(31) DESIGN LOAD:.........................2 - H 15 (41) LOAD RESTRICTION:.................. R - POSTED FOR OTHER LOAD-

CAPACITY RESTRICTION

(66) INVENTORY RATING:..............26 TONS ( 23.6 METRIC TONS) (70) BRIDGE POSTING:...................... 5 - EQUAL TO OR ABOVE LEGAL

LOADS

(64) OPERATING RATING:..............43 TONS ( 39 METRIC TONS)

INSPECTION DATES

(90) INSPECTION DATE: 03/14/2022 (91) FREQ. OF INSP: 48 MONTHS (92 / 93) CRITICAL FEATURE INSPECTION (CFI):

(219) ADD. STUDIES NEEDED: N - 0 - NONE (A) FRACTURE CRITICAL:.......... N

(220) SPECIAL STUDY TYPE: 0 - NONE INSP. EVERY MONTHS - LAST INSP:

(221) SPECIAL STUDY DATE: (B) UNDERWATER:..................... N

INSP. EVERY MONTHS - LAST INSP:

(C) SPECIAL INSPECTION:........ N

INSP. EVERY MONTHS - LAST INSP:

STRUCTURE INVENTORY AND APPRAISAL STRUCTURE NO. 5570-114P

GEOMETRY, TRAFFIC, AND NAVIGATIONAL DATA

(16) LATITUDE:................................ 33° 03'09 50" (51) CURB TO CURB WIDTH:............ 28.8 FT ( 8.8 M)

(17) LONGITUDE:............................ 89°33 '54 90" (52) DECK WIDTH:.......................... 32.3 FT ( 9.8 M)

(19) DETOUR LENGTH:.................. 8 MI ( 13 KM) (32) APPR. ROADWAY WIDTH:...... 32.0 FT ( 9.8 M)

(28A) LANES ON STRUCT:.............02 (213) APPR. PAVEMENT WIDTH:... 22.0 FT ( 6.7 M)

(28B) LANES UNDER STRUCT:......00 LEFT SHOULDER:............... 5 0 FT ( 1.5 M)

(42A) SERVICE ON:.........................1 - HIGHWAY RIGHT SHOULDER:.......... 5 0 FT ( 1.5 M)

(42B) SERVICE UNDER:................. 5 - WATERWAY (33) BRIDGE MEDIAN:.................... 0 - NO MEDIAN

(29) AVG DAILY TRAFFIC:..............1430 (34) SKEW ANGLE:......................... 27 °

(30) YEAR OF ADT:......................... 2012 (35) STRUCTURE FLARED:............ 0 - NO FLARE

(114) FUTURE ADT:.........................1573 (47) TOTAL HORIZ. CLEARANCE:.. 28.8 FT ( 8.8 M)

(115) YEAR OF FUTURE ADT:........2032 (50) SIDEWALKS

(101) PARALLEL STRUCTURE:......N - NO PARALLEL STRUCTURE LEFT:.................................... 0 0 FT ( 0 M)

(38) NAVIGATION CONTROL:.........0 - NO NAVIGATION CONTROL ON RIGHT:.................................. 0 0 FT ( 0 M)

WATERWAY (BRIDGE PERMIT NOT

REQUIRED)

(39) VERTICAL CLEARANCE:.........0 FT ( 0 M) (214) BRIDGE RAIL TYPE

3 - PARAPET ONLY(40) HORIZ. CLEARANCE:..............0 FT ( 0 M) RAIL CONFIGURATION:

(111) ABUT OR PIER PROT:........... MATERIAL:........................... 1 - CONCRETE

LATERAL UNDERCLEARANCE: DESIGN TYPE:..................... 1 - CONTINUOUS RAIL

(55) RIGHT:...............................00 FT ( 0 M) (215) BRIDGE RAIL HEIGHT:.......... 1.63 FT ( 0.5 M)

(56) LEFT:................................ 0 FT ( 0 M) (53) MIN. VRT. CLR. OVER DECK: 99.99 FT ( 99.99 M)

(54) MIN. VRT. UNDRCLRANCE:... .00 FT ( 0 M)

CONDITION AND APPRAISAL DATA, PROPOSED IMPROVEMENTS, AND COST

(58) DECK:....................................... 7 (67) STRUCTURAL EVALUATION:

(59) SUPERSTRUCTURE:...............7 (68) DECK GEOMETRY:

(60) SUBSTRUCTURE:.......... 6 (69) UNDERCLEARANCES:................ N

(61) CHANNEL:................................6 (71) WATERWAY ADEQUACY:

(62) CULVERT:.................................N (72) APPROACH ALIGNMENT:

(222) APPROACHES:...................... 7 (113) SCOUR CRITICAL:.................... 4 - ACTION IS REQUIRED TO

PROTECT EXPOSED FOUNDATIONS

(223) RETAINING WALL:.................N (225) PURPOSE OF IMPROVEMENT: 2 - REHAB/RECONSTRUCTION

(36) TRAFFIC SAFETY FEAT: 0 N N N (226) PRIORITY OF IMPROVEMENT: D - MINOR

(75A) TYPE OF WORK:................... (227) MAINTENANCE COST:

(75B) WORK DONE BY:.................. (228) REHAB / RECNSTR COST:

(76) IMPROVEMENT LENGTH:....... FT ( 0 M) (229) CONSTRUCTION COST:

ADDITIONAL INFORMATION

(230) STRUCTURE HISTORY:

2012 - ROADWAY RESURFACED.

(231) ADDITIONAL CONSIDERATIONS:

(330) ADDITIONAL CONFIGURATION INFORMATION:

Inspector: Killian Baptiste Structure Number: 5570114P0000000

Inspection Date: 03/14/2022 Facility Carried: NATCHEZ TRACE PAR

Bridge Inspection Report

Pictures

PHOTO 3

Description LOOKING SOUTH TOWARD JACKSON

PHOTO 4

Description EAST (DOWNSTREAM) SIDE

Bridge Inspection Report

Pictures

PHOTO 5

Description GENERAL TOPSIDE VIEW LOOKING SOUTH

PHOTO 6

Description GENERAL UNDERSIDE VIEW OF NORTH SPAN LOOKING SOUTH; NOTE TYPICAL

LONGITUDINAL CRACKS WITH EFFLORESCENCE ALONG COLD JOINTS

Bridge Inspection Report

Pictures

PHOTO 7

Description GENERAL UNDERSIDE VIEW OF CENTER SPAN LOOKING NORTH

PHOTO 8

Description GENERAL UNDERSIDE VIEW OF SOUTH SPAN LOOKING SOUTH

Bridge Inspection Report

Pictures

PHOTO 9

Description TYPICAL ADHESION FAILURE OF SAWCUT JOINT MATERIAL, NORTH DECK JOINT SHOWN

PHOTO 10

Description TYPICAL LONGITUDINAL CRACKING OF WEARING SURFACE ALONG CENTERLINE AND

TRANSVERSE CRACKING

Bridge Inspection Report

Pictures

PHOTO 11

Description TYPICAL GRAVEL AND DEBRIS ACCUMULATION ALONG CURBLINES, WEST CURBLINE

SHOWN

PHOTO 12

Description TYPICAL DETERIORATION OF SHOULDER LANE STRIPING, EAST SHOULDER SHOWN

Bridge Inspection Report

Pictures

PHOTO 13

Description TYPICAL CONDITION OF CURB AND PARAPET EXPANSION JOINTS; NOTE DETERIORATION

OF FILLER MATERIAL

PHOTO 14

Description TYPICAL EDGE SPALLING AND VEHICULAR SCRAPES ON PARAPETS, NORTHWEST

PARAPET SHOWN; NOTE UNDERMINING OF PAVEMENT

Bridge Inspection Report

Pictures

PHOTO 15

Description TYPICAL VERTICAL CRACK, EAST SIDE OF NORTH SPAN NEAR MIDSPAN SHOWN

PHOTO 16

Description TYPICAL SCALING AT SCUPPERS, EAST SIDE OF NORTH SPAN SHOWN

Bridge Inspection Report

Pictures

PHOTO 17

Description TYPICAL CRACK IN EXTERIOR BEAMS, EASTERNMOST BEAM AT MIDSPAN OF SOUTH

SPAN SHOWN

PHOTO 18

Description GENERAL VIEW OF NORTH ABUTMENT

Bridge Inspection Report

Pictures

PHOTO 19

Description SPALL ON NORTH ABUTMENT DIAPHRAGM 7' FROM EAST END

PHOTO 20

Description NORTH ABUTMENT FOOTING EXPOSED

Bridge Inspection Report

Pictures

PHOTO 21

Description GENERAL VIEW OF SOUTH FACE OF NORTH PIER

PHOTO 22

Description GENERAL VIEW OF NORTH FACE OF SOUTH PIER

Bridge Inspection Report

Pictures

PHOTO 23

Description TYPICAL VERTICAL CRACKS WITH EFFLORESCENCE ON ENDS OF SOUTH FACE OF

SOUTH PIER, EAST END SHOWN

PHOTO 24

Description GENERAL VIEW OF SOUTH ABUTMENT

Bridge Inspection Report

Pictures

PHOTO 25

Description SOUTH ABUTMENT FOOTING EXPOSURE UNDER CENTER AND WEST WEEP HOLES

PHOTO 26

Description SPALL AT CENTER OF SOUTH ABUTMENT DIAPHRAGM

Bridge Inspection Report

Pictures

PHOTO 27

Description DIAGONAL CRACKING ON EAST END OF SOUTH ABUTMENT

PHOTO 28

Description TYPICAL MOWER SCRAPES ON WINGWALLS, NORTHWEST WINGWALL SHOWN

Bridge Inspection Report

Pictures

PHOTO 29

Description LOOKING UPSTREAM

PHOTO 30

Description LOOKING DOWNSTREAM