Revised_Attachment_5 _AF_Form_3052 _Estimate_Breakdown_for_Sample_Projects _11Sep15.pdf

PDF 266 KB Posted

Attached to
Multiple Award Painting IDIQ Federal contract opportunity
Solicitation number
FA5270-15-R-0005
Issued by
Department of the Air Force Pacific Air Forces

About this file

Revised Attachment 5 AF Form 3052 Estimate Breakdown for Sample Projects dated 11Sep15

View the file

Other files for this federal contract opportunity

Other files attached to Multiple Award Painting IDIQ, newest first.
File Type Posted
Amendment_3.pdf PDF
Revised_Attachment_3a _Sample_Project_Exterior_Paint_Drawings _by_adding_B400_Floor_Plan _11Sep15.pdf PDF
Revised_Attachment_1 _Specification_01_01_00__1.6_-_Subcontractor_Revised31Aug15.pdf PDF
Revised_Attachment_2 _Sample_Project_Statement_of_Work _8Sep15.pdf PDF
Revised_Attachment_1 _Specification_09_90_00_3.1.1_-_Landscaping_Revised11Sep15.pdf PDF
Exterior_Color_Guidance_11Sep15.pdf PDF
Request_for_Information_02.pdf PDF
1.1_SPEC_01_01_00_-_General_Requirements_2.3.1.pdf PDF
Amendment_2.pdf PDF
Request_for_Information_01.pdf PDF
Amendment_1.pdf PDF
Attachment_3b.pdf PDF
Attachment_7.pdf PDF
Solicitation.pdf PDF
Attachment_3a.pdf PDF
Attachment_5.pdf PDF
Attachment_1.pdf PDF
Attachment_2.pdf PDF
Attachment_8.pdf PDF
Attachment_6.pdf PDF
Attachment_4.pdf PDF
Show all 21

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

20 Apr 2015

OMB No. 0704-0193

CONSTRUCTION COST ESTIMATE BREAKDOWN (CONTRACTOR) Expires 31 October 1989

CONTRACTOR ADDRESS

CONTRACT FOR (Work to be performed) PROPOSED TOTAL CONTRACT PRICE

Paint Interior Floor, Walls, B266

PURCHASE REQUEST NUMBER PROJECT NUMBER WORK LOCATION

LXEZ 10-1595 Kadena Air Base, Okinawa, Japan

MATERIAL COST LABOR COSTS

UNIT OTHER

LINE ITEM OF QUANTITY MANHOURS AVERAGE DIRECT LINE

NO. MEASURE UNIT TOTAL MANDAYS RATE TOTAL COSTS TOTAL

(1) (2) (3) (4) ¥ (5) ¥ (6) (7) ¥ (8) ¥ (9) ¥ (10) ¥

I LOT

II LOT

OVERHEAD

SUBTOTAL

PROFIT

$0.00

SUMMARY

ARCHITECTURAL

LBP & ACM SAMPLING

TOTAL DIRECT COST

TOTAL CONSTRUCTION COST

AF FORM 3052, JAN 88 PREVIOUS EDITION IS OBSOLETE. FOR OFFICIAL USE ONLY Page 1 of 3

1277814460U Line

1277814460U Typewritten Text (Revised 11 Sep 15)

CONSTRUCTION COST ESTIMATE BREAKDOWN (CONTRACTOR) Expires 31 October 1989

CONTRACTOR ADDRESS

CONTRACT FOR (Work to be performed) PROPOSED TOTAL CONTRACT PRICE

Paint Interior Floor, Walls, B266

PURCHASE REQUEST NUMBER PROJECT NUMBER WORK LOCATION

LXEZ 10-1595 Kadena Air Base, Okinawa, Japan

MATERIAL COST LABOR COSTS

UNIT OTHER

LINE ITEM OF QUANTITY MANHOURS AVERAGE DIRECT LINE

NO. MEASURE UNIT TOTAL MANDAYS RATE TOTAL COSTS TOTAL

(1) (2) (3) (4) ¥ (5) ¥ (6) (7) ¥ (8) ¥ (9) ¥ (10) ¥

$0.00

I ARCHITECTURAL

1 SF

2 SF

3 SF

4 EA

5 LOTMisc

Rolling Tower Scaffolding

TOTAL ARCHITECTURAL

Epoxy Flooring (Rm102,103 & 108)

Surface Preparation

Paint Walls & Ceiling

AF FORM 3052, JAN 88 PREVIOUS EDITION IS OBSOLETE. FOR OFFICIAL USE ONLY Page 2 of 3

1277814460U Cross-Out

1277814460U

CONSTRUCTION COST ESTIMATE BREAKDOWN (CONTRACTOR) Expires 31 October 1989

CONTRACTOR ADDRESS

CONTRACT FOR (Work to be performed) PROPOSED TOTAL CONTRACT PRICE

Paint Interior Floor, Walls, B266

PURCHASE REQUEST NUMBER PROJECT NUMBER WORK LOCATION

LXEZ 10-1595 Kadena Air Base, Okinawa, Japan

MATERIAL COST LABOR COSTS

UNIT OTHER

LINE ITEM OF QUANTITY MANHOURS AVERAGE DIRECT LINE

NO. MEASURE UNIT TOTAL MANDAYS RATE TOTAL COSTS TOTAL

(1) (2) (3) (4) ¥ (5) ¥ (6) (7) ¥ (8) ¥ (9) ¥ (10) ¥

$0.00

II

1 EA

2 EA

3 DAY

ACM Test

LBP & ACM Sampling

LBP Test

Site Survey

TOTAL LBP & ACM SAMPLING

AF FORM 3052, JAN 88 PREVIOUS EDITION IS OBSOLETE. FOR OFFICIAL USE ONLY Page 3 of 3

1277814460U Cross-Out

1277814460U

1 6

CONSTRUCTION COST ESTIMATE BREAKDOWN (CONTRACTOR) SHEET 1 OF 1

CONTRACT FOR (Work to be performed) PROPOSED TOTAL CONTRACT PRICE

PURCHASE REQUEST NUMBER PROJECT NUMBER WORK LOCATION

KADENA AIR BASE

MATERIAL COST LABOR COSTS

UNIT

LINE ITEM OF QUANTITY AVERAGE USD YEN

NO. MEASURE UNIT TOTAL MANDAYS RATE TOTAL TOTAL TOTAL

(1) (2) (3) (4) (5) (6) (7) (8) (9) (10)

A B 300 a SCAFFOLDING CSF d SURFACE PREP/ PRESSURE WASH SF c PAINT, ROLLER (2 COATS) SF

B B 302 a SCAFFOLDING CSF b SURFACE PREP SF c PAINT, ROLLER (2 COATS) SF

C B 306 a SCAFFOLDING CSF b SURFACE PREP SF c PAINT, ROLLER (2 COATS) SF

D B 310 a SCAFFOLDING CSF b SURFACE PREP SF

PAINT EXTERIOR, AREA 4

LXEZ 1226592

FOR OFFICIAL USE ONLY ( 27 May 2010 )

1277814460U Cross-Out

1277814460U

2 6

CONTRACT FOR (Work to be performed) PROPOSED TOTAL CONTRACT PRICE

PURCHASE REQUEST NUMBER PROJECT NUMBER WORK LOCATION

KADENA AIR BASE

MATERIAL COST LABOR COSTS

UNIT

LINE ITEM OF QUANTITY AVERAGE USD YEN

NO. MEASURE UNIT TOTAL MANDAYS RATE TOTAL TOTAL TOTAL

(1) (2) (3) (4) (5) (6) (7) (8) (9) (10)

PAINT EXTERIOR, AREA 4

LXEZ 1226592

c PAINT. ROLLER (2 COATS) SF

E B 313 a SCAFFOLDING SF b SURFACE PREP SF c PAINT, ROLLER (2 COATS) SF

F B 325 a SCAFFOLDING CSF b SURFACE PREP SF c PAINT, ROLLER (2 COATS) SF

G B328 a SCAFFOLDING CSF b SURFACE PREP SF c PAINT, ROLLER (2 COATS) SF

H B 329

FOR OFFICIAL USE ONLY ( 27 May 2010 )

1277814460U Cross-Out

1277814460U

3 6

CONTRACT FOR (Work to be performed) PROPOSED TOTAL CONTRACT PRICE

PURCHASE REQUEST NUMBER PROJECT NUMBER WORK LOCATION

KADENA AIR BASE

MATERIAL COST LABOR COSTS

UNIT

LINE ITEM OF QUANTITY AVERAGE USD YEN

NO. MEASURE UNIT TOTAL MANDAYS RATE TOTAL TOTAL TOTAL

(1) (2) (3) (4) (5) (6) (7) (8) (9) (10)

PAINT EXTERIOR, AREA 4

LXEZ 1226592

a SCAFFOLDING CSF b SURFACE PREP SF c PAINT, ROLLER (2 COATS) SF

I B 331 a SCAFFOLDING CSF b SURFACE PREP SF c PAINT, ROLLER (2 COATS) SF

J B 334 a SCAFFOLDING CSF b SURFACE PREP SF c PAINT, ROLLER (2 COATS) SF

K B 335 a SCAFFOLDING CSF b SURFACE PREP SF c PAINT, ROLLER (2 COATS) SF

FOR OFFICIAL USE ONLY ( 27 May 2010 )

1277814460U Cross-Out

1277814460U

4 6

CONTRACT FOR (Work to be performed) PROPOSED TOTAL CONTRACT PRICE

PURCHASE REQUEST NUMBER PROJECT NUMBER WORK LOCATION

KADENA AIR BASE

MATERIAL COST LABOR COSTS

UNIT

LINE ITEM OF QUANTITY AVERAGE USD YEN

NO. MEASURE UNIT TOTAL MANDAYS RATE TOTAL TOTAL TOTAL

(1) (2) (3) (4) (5) (6) (7) (8) (9) (10)

PAINT EXTERIOR, AREA 4

LXEZ 1226592

L B 400 a SCAFFOLDING CSF b SURFACE PREP SF c PAINT, ROLLER (2 COATS) SF

M B 428 a SCAFFOLDING CSF b SURFACE PREP SF c PAINT, ROLLER (2 COATS) SF

N B 435 a SCAFFOLDING CSF b SURFACE PREP SF c PAINT, ROLLER (2 COATS) SF

O B 451 a SCAFFOLDING CSF

FOR OFFICIAL USE ONLY ( 27 May 2010 )

1277814460U Cross-Out

1277814460U

5 6

CONTRACT FOR (Work to be performed) PROPOSED TOTAL CONTRACT PRICE

PURCHASE REQUEST NUMBER PROJECT NUMBER WORK LOCATION

KADENA AIR BASE

MATERIAL COST LABOR COSTS

UNIT

LINE ITEM OF QUANTITY AVERAGE USD YEN

NO. MEASURE UNIT TOTAL MANDAYS RATE TOTAL TOTAL TOTAL

(1) (2) (3) (4) (5) (6) (7) (8) (9) (10)

PAINT EXTERIOR, AREA 4

LXEZ 1226592

b SURFACE PREP SF c PAINT, ROLLER (2 COATS) SF

P B 455 a SCAFFOLDING CSF b SURFACE PREP SF c PAINT, ROLLER (2 COATS) SF

Q B 80402 a SCAFFOLDING CSF b SURFACE PREP SF c PAINT, ROLLER (2 COATS) SF

R B 80403 a SCAFFOLDING CSF b SURFACE PREP SF c PAINT, ROLLER (2 COATS) SF

FOR OFFICIAL USE ONLY ( 27 May 2010 )

1277814460U Cross-Out

1277814460U

6 6

CONTRACT FOR (Work to be performed) PROPOSED TOTAL CONTRACT PRICE

PURCHASE REQUEST NUMBER PROJECT NUMBER WORK LOCATION

KADENA AIR BASE

MATERIAL COST LABOR COSTS

UNIT

LINE ITEM OF QUANTITY AVERAGE USD YEN

NO. MEASURE UNIT TOTAL MANDAYS RATE TOTAL TOTAL TOTAL

(1) (2) (3) (4) (5) (6) (7) (8) (9) (10)

PAINT EXTERIOR, AREA 4

LXEZ 1226592

S B 80446 a SCAFFOLDING CSF b SURFACE PREP SF c PAINT, ROLLER (2 COATS) SF

Base Total

OVERHEAD

PROFIT

AF Form 3052, AUG 85 PREVIOUS EDITION IS OBSOLETE

FOR OFFICIAL USE ONLY ( 27 May 2010 )

1277814460U Cross-Out

1277814460U

LXEZ 10-1595 PAINT INTR, FLOOR, WALLS, B266 KTR(revised 11Sep15)
LXEZ 12-1226592 PAINT AREA 4 BLANK KTR AF Form 3052(Revised 11Sep15)

File details come from the government source that posted it. Updated .