Revised_Attachment_5 _AF_Form_3052 _Estimate_Breakdown_for_Sample_Projects _11Sep15.pdf
PDF 266 KB Posted
- Attached to
- Multiple Award Painting IDIQ Federal contract opportunity
- Solicitation number
- FA5270-15-R-0005
About this file
Revised Attachment 5 AF Form 3052 Estimate Breakdown for Sample Projects dated 11Sep15
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| Amendment_3.pdf | ||
| Revised_Attachment_3a _Sample_Project_Exterior_Paint_Drawings _by_adding_B400_Floor_Plan _11Sep15.pdf | ||
| Revised_Attachment_1 _Specification_01_01_00__1.6_-_Subcontractor_Revised31Aug15.pdf | ||
| Revised_Attachment_2 _Sample_Project_Statement_of_Work _8Sep15.pdf | ||
| Revised_Attachment_1 _Specification_09_90_00_3.1.1_-_Landscaping_Revised11Sep15.pdf | ||
| Exterior_Color_Guidance_11Sep15.pdf | ||
| Request_for_Information_02.pdf | ||
| 1.1_SPEC_01_01_00_-_General_Requirements_2.3.1.pdf | ||
| Amendment_2.pdf | ||
| Request_for_Information_01.pdf | ||
| Amendment_1.pdf | ||
| Attachment_3b.pdf | ||
| Attachment_7.pdf | ||
| Solicitation.pdf | ||
| Attachment_3a.pdf | ||
| Attachment_5.pdf | ||
| Attachment_1.pdf | ||
| Attachment_2.pdf | ||
| Attachment_8.pdf | ||
| Attachment_6.pdf | ||
| Attachment_4.pdf |
Show all 21
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
20 Apr 2015
OMB No. 0704-0193
CONSTRUCTION COST ESTIMATE BREAKDOWN (CONTRACTOR) Expires 31 October 1989
CONTRACTOR ADDRESS
CONTRACT FOR (Work to be performed) PROPOSED TOTAL CONTRACT PRICE
Paint Interior Floor, Walls, B266
PURCHASE REQUEST NUMBER PROJECT NUMBER WORK LOCATION
LXEZ 10-1595 Kadena Air Base, Okinawa, Japan
MATERIAL COST LABOR COSTS
UNIT OTHER
LINE ITEM OF QUANTITY MANHOURS AVERAGE DIRECT LINE
NO. MEASURE UNIT TOTAL MANDAYS RATE TOTAL COSTS TOTAL
(1) (2) (3) (4) ¥ (5) ¥ (6) (7) ¥ (8) ¥ (9) ¥ (10) ¥
I LOT
II LOT
OVERHEAD
SUBTOTAL
PROFIT
$0.00
SUMMARY
ARCHITECTURAL
LBP & ACM SAMPLING
TOTAL DIRECT COST
TOTAL CONSTRUCTION COST
AF FORM 3052, JAN 88 PREVIOUS EDITION IS OBSOLETE. FOR OFFICIAL USE ONLY Page 1 of 3
1277814460U Line
1277814460U Typewritten Text (Revised 11 Sep 15)
CONSTRUCTION COST ESTIMATE BREAKDOWN (CONTRACTOR) Expires 31 October 1989
CONTRACTOR ADDRESS
CONTRACT FOR (Work to be performed) PROPOSED TOTAL CONTRACT PRICE
Paint Interior Floor, Walls, B266
PURCHASE REQUEST NUMBER PROJECT NUMBER WORK LOCATION
LXEZ 10-1595 Kadena Air Base, Okinawa, Japan
MATERIAL COST LABOR COSTS
UNIT OTHER
LINE ITEM OF QUANTITY MANHOURS AVERAGE DIRECT LINE
NO. MEASURE UNIT TOTAL MANDAYS RATE TOTAL COSTS TOTAL
(1) (2) (3) (4) ¥ (5) ¥ (6) (7) ¥ (8) ¥ (9) ¥ (10) ¥
$0.00
I ARCHITECTURAL
1 SF
2 SF
3 SF
4 EA
5 LOTMisc
Rolling Tower Scaffolding
TOTAL ARCHITECTURAL
Epoxy Flooring (Rm102,103 & 108)
Surface Preparation
Paint Walls & Ceiling
AF FORM 3052, JAN 88 PREVIOUS EDITION IS OBSOLETE. FOR OFFICIAL USE ONLY Page 2 of 3
1277814460U Cross-Out
1277814460U
CONSTRUCTION COST ESTIMATE BREAKDOWN (CONTRACTOR) Expires 31 October 1989
CONTRACTOR ADDRESS
CONTRACT FOR (Work to be performed) PROPOSED TOTAL CONTRACT PRICE
Paint Interior Floor, Walls, B266
PURCHASE REQUEST NUMBER PROJECT NUMBER WORK LOCATION
LXEZ 10-1595 Kadena Air Base, Okinawa, Japan
MATERIAL COST LABOR COSTS
UNIT OTHER
LINE ITEM OF QUANTITY MANHOURS AVERAGE DIRECT LINE
NO. MEASURE UNIT TOTAL MANDAYS RATE TOTAL COSTS TOTAL
(1) (2) (3) (4) ¥ (5) ¥ (6) (7) ¥ (8) ¥ (9) ¥ (10) ¥
$0.00
II
1 EA
2 EA
3 DAY
ACM Test
LBP & ACM Sampling
LBP Test
Site Survey
TOTAL LBP & ACM SAMPLING
AF FORM 3052, JAN 88 PREVIOUS EDITION IS OBSOLETE. FOR OFFICIAL USE ONLY Page 3 of 3
1277814460U Cross-Out
1277814460U
1 6
CONSTRUCTION COST ESTIMATE BREAKDOWN (CONTRACTOR) SHEET 1 OF 1
CONTRACT FOR (Work to be performed) PROPOSED TOTAL CONTRACT PRICE
PURCHASE REQUEST NUMBER PROJECT NUMBER WORK LOCATION
KADENA AIR BASE
MATERIAL COST LABOR COSTS
UNIT
LINE ITEM OF QUANTITY AVERAGE USD YEN
NO. MEASURE UNIT TOTAL MANDAYS RATE TOTAL TOTAL TOTAL
(1) (2) (3) (4) (5) (6) (7) (8) (9) (10)
A B 300 a SCAFFOLDING CSF d SURFACE PREP/ PRESSURE WASH SF c PAINT, ROLLER (2 COATS) SF
B B 302 a SCAFFOLDING CSF b SURFACE PREP SF c PAINT, ROLLER (2 COATS) SF
C B 306 a SCAFFOLDING CSF b SURFACE PREP SF c PAINT, ROLLER (2 COATS) SF
D B 310 a SCAFFOLDING CSF b SURFACE PREP SF
PAINT EXTERIOR, AREA 4
LXEZ 1226592
FOR OFFICIAL USE ONLY ( 27 May 2010 )
1277814460U Cross-Out
1277814460U
2 6
CONTRACT FOR (Work to be performed) PROPOSED TOTAL CONTRACT PRICE
PURCHASE REQUEST NUMBER PROJECT NUMBER WORK LOCATION
KADENA AIR BASE
MATERIAL COST LABOR COSTS
UNIT
LINE ITEM OF QUANTITY AVERAGE USD YEN
NO. MEASURE UNIT TOTAL MANDAYS RATE TOTAL TOTAL TOTAL
(1) (2) (3) (4) (5) (6) (7) (8) (9) (10)
PAINT EXTERIOR, AREA 4
LXEZ 1226592
c PAINT. ROLLER (2 COATS) SF
E B 313 a SCAFFOLDING SF b SURFACE PREP SF c PAINT, ROLLER (2 COATS) SF
F B 325 a SCAFFOLDING CSF b SURFACE PREP SF c PAINT, ROLLER (2 COATS) SF
G B328 a SCAFFOLDING CSF b SURFACE PREP SF c PAINT, ROLLER (2 COATS) SF
H B 329
FOR OFFICIAL USE ONLY ( 27 May 2010 )
1277814460U Cross-Out
1277814460U
3 6
CONTRACT FOR (Work to be performed) PROPOSED TOTAL CONTRACT PRICE
PURCHASE REQUEST NUMBER PROJECT NUMBER WORK LOCATION
KADENA AIR BASE
MATERIAL COST LABOR COSTS
UNIT
LINE ITEM OF QUANTITY AVERAGE USD YEN
NO. MEASURE UNIT TOTAL MANDAYS RATE TOTAL TOTAL TOTAL
(1) (2) (3) (4) (5) (6) (7) (8) (9) (10)
PAINT EXTERIOR, AREA 4
LXEZ 1226592
a SCAFFOLDING CSF b SURFACE PREP SF c PAINT, ROLLER (2 COATS) SF
I B 331 a SCAFFOLDING CSF b SURFACE PREP SF c PAINT, ROLLER (2 COATS) SF
J B 334 a SCAFFOLDING CSF b SURFACE PREP SF c PAINT, ROLLER (2 COATS) SF
K B 335 a SCAFFOLDING CSF b SURFACE PREP SF c PAINT, ROLLER (2 COATS) SF
FOR OFFICIAL USE ONLY ( 27 May 2010 )
1277814460U Cross-Out
1277814460U
4 6
CONTRACT FOR (Work to be performed) PROPOSED TOTAL CONTRACT PRICE
PURCHASE REQUEST NUMBER PROJECT NUMBER WORK LOCATION
KADENA AIR BASE
MATERIAL COST LABOR COSTS
UNIT
LINE ITEM OF QUANTITY AVERAGE USD YEN
NO. MEASURE UNIT TOTAL MANDAYS RATE TOTAL TOTAL TOTAL
(1) (2) (3) (4) (5) (6) (7) (8) (9) (10)
PAINT EXTERIOR, AREA 4
LXEZ 1226592
L B 400 a SCAFFOLDING CSF b SURFACE PREP SF c PAINT, ROLLER (2 COATS) SF
M B 428 a SCAFFOLDING CSF b SURFACE PREP SF c PAINT, ROLLER (2 COATS) SF
N B 435 a SCAFFOLDING CSF b SURFACE PREP SF c PAINT, ROLLER (2 COATS) SF
O B 451 a SCAFFOLDING CSF
FOR OFFICIAL USE ONLY ( 27 May 2010 )
1277814460U Cross-Out
1277814460U
5 6
CONTRACT FOR (Work to be performed) PROPOSED TOTAL CONTRACT PRICE
PURCHASE REQUEST NUMBER PROJECT NUMBER WORK LOCATION
KADENA AIR BASE
MATERIAL COST LABOR COSTS
UNIT
LINE ITEM OF QUANTITY AVERAGE USD YEN
NO. MEASURE UNIT TOTAL MANDAYS RATE TOTAL TOTAL TOTAL
(1) (2) (3) (4) (5) (6) (7) (8) (9) (10)
PAINT EXTERIOR, AREA 4
LXEZ 1226592
b SURFACE PREP SF c PAINT, ROLLER (2 COATS) SF
P B 455 a SCAFFOLDING CSF b SURFACE PREP SF c PAINT, ROLLER (2 COATS) SF
Q B 80402 a SCAFFOLDING CSF b SURFACE PREP SF c PAINT, ROLLER (2 COATS) SF
R B 80403 a SCAFFOLDING CSF b SURFACE PREP SF c PAINT, ROLLER (2 COATS) SF
FOR OFFICIAL USE ONLY ( 27 May 2010 )
1277814460U Cross-Out
1277814460U
6 6
CONTRACT FOR (Work to be performed) PROPOSED TOTAL CONTRACT PRICE
PURCHASE REQUEST NUMBER PROJECT NUMBER WORK LOCATION
KADENA AIR BASE
MATERIAL COST LABOR COSTS
UNIT
LINE ITEM OF QUANTITY AVERAGE USD YEN
NO. MEASURE UNIT TOTAL MANDAYS RATE TOTAL TOTAL TOTAL
(1) (2) (3) (4) (5) (6) (7) (8) (9) (10)
PAINT EXTERIOR, AREA 4
LXEZ 1226592
S B 80446 a SCAFFOLDING CSF b SURFACE PREP SF c PAINT, ROLLER (2 COATS) SF
Base Total
OVERHEAD
PROFIT
AF Form 3052, AUG 85 PREVIOUS EDITION IS OBSOLETE
FOR OFFICIAL USE ONLY ( 27 May 2010 )
1277814460U Cross-Out
1277814460U
| LXEZ 10-1595 PAINT INTR, FLOOR, WALLS, B266 KTR(revised 11Sep15) |
| LXEZ 12-1226592 PAINT AREA 4 BLANK KTR AF Form 3052(Revised 11Sep15) |