This document contains a cost estimate form and description for a federal contract opportunity to install LED lighting at various facilities at Davis-Monthan Air Force Base in Tucson, Arizona. The cost estimate form provides unit pricing for various materials, labor, equipment, testing, and other costs associated with the repair of an aircraft apron and installation of interior and exterior LED lighting. The related federal contract opportunity is a small business set-aside for a firm fixed price contract between $1 million and $5 million to install LED lighting at multiple facilities across Davis-Monthan AFB in compliance with requirements such as the Buy American Act. Offerors must be registered in SAM and provide evidence of bonding capacity. The solicitation is expected to be issued on October 15, 2019 with proposals due as specified in the solicitation. The work must comply with base design guidelines and codes and provide necessary supervision. Evaluation criteria will include price, technical acceptability, and past performance.

View the file

Other files for this federal contract opportunity

Other files attached to Multi-Facility LED Install, newest first.
File Type Posted
2 Section L 13 Dec 19.pdf PDF
13 Audit 2.pdf PDF
Solicitation - FA487720R00030003.pdf PDF
12 Acceptance Period MFR.pdf PDF
10 Audit.pdf PDF
9 Contractor Environmental Guide (31 May 2018).pdf PDF
11 RFIs 12 Dec 19.xlsx XLSX spreadsheet
Solicitation - FA487720R00030002.pdf PDF
5 Specification LED Fixture Replacment 6 Dec 19.pdf PDF
8 AF Form 3052 FBNV18008 10 Dec 19.xlsx XLSX spreadsheet
2 Section L 20 Nov 19.pdf PDF
3 Section M 20 Nov 19.pdf PDF
Solicitation - FA487720R00030001.pdf PDF
7 Past Performance Questionnaire.docx DOCX document
4 Davis-Bacon Act WD AZ20190032.pdf PDF
2 Section L.pdf PDF
Solicitation - FA487720R0003.pdf PDF
5 Specification LED Fixture Replacment 2 Jul 19.pdf PDF
6 List of Existing Fixtures.xls XLS spreadsheet
3 Section M.pdf PDF
1 - Template of Contractor EAL.xls XLS spreadsheet
Show all 21

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

AF Form 3052

CONSTRUCTION COST ESTIMATE BREAKDOWN
CONTRACTORADDRESS
CONTRACT FOR(WORK TO BE PERFORMED)Repair Alert Aircraft ApronPROPOSED TOTAL CONTRACT PRICE0
PURCHASE REQUEST NUMBERPROJECT NUMBERFBNV180008WORK LOCATIONDAVIS-MONTHAN AFB, AZ 85707
LINEUNIT OFMATERIAL COSTLABOR COSTDIRECTLINE
NO.ITEMMEASUREQUANTITYUNITTOTALMANHOURSRATETOTALCOSTSTOTAL
SUMMARY
1Interior LED, including lamps, mounting hardware and connections, troffer, recess mounted0.000.000.00
2Labor adjustment factors, add to labor for elevated installation, above floor level, 10' to 14.5' high0.000.000.00
3Interior LED fixtures, including lamps, mounting hardware, and connections, high bay, surface0.000.000.00
4Interior LED fixtures, including lamps, mounting hardware, and connections, high bay elevated elevation0.000.000.00
0.000.000.00
LINE TOTALS OVERALL0.000.000.000.00
OVERHEAD TOTAL OVERALL (15.00%)0.00
SUBTOTAL OVERALL W/ OVERHEAD0.00
PROFIT TOTAL OVERALL (10%)0.00
SUBTOTAL OVERALL W/ OVERHEAD AND PROFIT0.00
TAX OVERALL ____%0.00
BOND OVERALL (2.5%)0.00
TOTAL OVERALL PROJECT PRICE0.00
DATE:FIRM NAME:
TITLE:BY:
DIVISION 01 GENERAL CONDITIONS
1DesignLS0.00.00
2Swan Gate Search RequirementsLS0.00.00
3Project ManagerWk0.00.00
4SuperintendentWk0.00.00
5PermitsLS0.00.00
6Concrete compressive testEA0.00.00
7Testing, Density & ClassificationEA0.00.00
8Testing, Soil density, nuclear method, ASTM D 2922EA0.00.00
9Testing, Moisture Content, ASTM D 2216EA0.00.00
10Testing, Proctor Compaction, 6" Modified Mold, ASTM D 698EA0.00.00
11Testing Technician for earthworkEA0.00.00
12Testing Technician for concreteEA0.00.00
13Water TruckWk0.00.00
14Mobilization/Demobilization - Equipment placed in rear of pickup truckEA0.00.00
15Mobilization/Demobilization - Equipment hauled on 3-ton capacity towed trailerEA0.00.00
16Mobilization/Demobilization - Equipment hauled on 20-ton capacity towed trailerEA0.00.00
17Mobilization/Demobilization - Equipment hauled on 40-ton capacity towed trailerEA0.00.00
18Mobilization/Demobilization - Equipment hauled on 50-ton capacity towed trailerEA0.00.00
19Portable barricadeEA0.00.00
20Surveyor, 2 person crewDay0.00.00
21Surveyor Stakes, 2" x 2" x 18" longC0.00.00
22Jobsite cleanupLS0.00.00

SUBTOTAL DIVISION 01 GENERAL CONDITIONS 0.00 0.00 0.00 0.00 0.00

DIVISION 02 EXISTING CONDITIONS
1Remove asphaltSY0.00.00
2Remove concreteCY0.00.00
3Dumpster (1 dump/week)Wk0.00.00
4Loading & Trucking RubbishCY0.00.00
5Dump charges (Construction materials)Ton0.00.00

SUBTOTAL DIVISION 02 EXISTING CONDITIONS 0.00 0.00 0.00 0.00 0.00

DIVISION 03 CONCRETE
1Concrete FormsSFCA0.00.00
2Sawcut new control jointsLF0.00.00
3Sawcut new control joints, reservoirLF0.00.00
4Air blast joint to cleanLF0.00.00
5Joint backer rodsLF0.00.00
6Joint sealantLF0.00.00
7Dowel SleevesEa0.00.00
8Epoxy, dowelsEa0.00.00
9Sawcut concreteLF0.00.00
10Drill dowelsEa0.00.00

SUBTOTAL DIVISION 03 CONCRETE 0.00 0.00 0.00 0.00 0.00

DIVISION 31 EARTHWORK
1Finish GradeSY0.00.00
2Excavating, excavatorBCY0.00.00
3Excavating, front end loaderBCY0.00.00
4Spread materialLCY0.00.00
5Hauling, 12 CY Truck, 30 MPH avg, cycle 6 milesLCY0.00.00
6Compaction (vibrating roller)ECY0.00.00
7Compaction (vibrating plate)ECY0.00.00

SUBTOTAL DIVISION 31 EARTHWORK 0.00 0.00 0.00 0.00 0.00

DIVISION 32 EXTERIOR IMPROVEMENTS
1Aggregate base course, compactedSY0.00.00
2Asphalt patchSY0.00.00
3Tack coatSY0.00.00
4Portland cement concrete, 650 psi flexuralSY0.00.00
5DowelsEa0.00.00
6Pavement markings, with beadsLF0.00.00
7Airport pavement paint mob/demobEa0.00.00

SUBTOTAL DIVISION 32 EXTERIOR IMPROVEMENTS 0.00 0.00 0.00 0.00 0.00