8 AF Form 3052 FBNV18008.xlsx
XLSX spreadsheet 33 KB Posted
- Attached to
- Multi-Facility LED Install Federal contract opportunity
- Solicitation number
- FA487720Q0041
About this file
This document contains a cost estimate form and description for a federal contract opportunity to install LED lighting at various facilities at Davis-Monthan Air Force Base in Tucson, Arizona. The cost estimate form provides unit pricing for various materials, labor, equipment, testing, and other costs associated with the repair of an aircraft apron and installation of interior and exterior LED lighting. The related federal contract opportunity is a small business set-aside for a firm fixed price contract between $1 million and $5 million to install LED lighting at multiple facilities across Davis-Monthan AFB in compliance with requirements such as the Buy American Act. Offerors must be registered in SAM and provide evidence of bonding capacity. The solicitation is expected to be issued on October 15, 2019 with proposals due as specified in the solicitation. The work must comply with base design guidelines and codes and provide necessary supervision. Evaluation criteria will include price, technical acceptability, and past performance.
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| 2 Section L 13 Dec 19.pdf | ||
| 13 Audit 2.pdf | ||
| Solicitation - FA487720R00030003.pdf | ||
| 12 Acceptance Period MFR.pdf | ||
| 10 Audit.pdf | ||
| 9 Contractor Environmental Guide (31 May 2018).pdf | ||
| 11 RFIs 12 Dec 19.xlsx | XLSX spreadsheet | |
| Solicitation - FA487720R00030002.pdf | ||
| 5 Specification LED Fixture Replacment 6 Dec 19.pdf | ||
| 8 AF Form 3052 FBNV18008 10 Dec 19.xlsx | XLSX spreadsheet | |
| 2 Section L 20 Nov 19.pdf | ||
| 3 Section M 20 Nov 19.pdf | ||
| Solicitation - FA487720R00030001.pdf | ||
| 7 Past Performance Questionnaire.docx | DOCX document | |
| 4 Davis-Bacon Act WD AZ20190032.pdf | ||
| 2 Section L.pdf | ||
| Solicitation - FA487720R0003.pdf | ||
| 5 Specification LED Fixture Replacment 2 Jul 19.pdf | ||
| 6 List of Existing Fixtures.xls | XLS spreadsheet | |
| 3 Section M.pdf | ||
| 1 - Template of Contractor EAL.xls | XLS spreadsheet |
Show all 21
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
AF Form 3052
| CONSTRUCTION COST ESTIMATE BREAKDOWN | ||||||||||
| CONTRACTOR | ADDRESS | |||||||||
| CONTRACT FOR(WORK TO BE PERFORMED) | Repair Alert Aircraft Apron | PROPOSED TOTAL CONTRACT PRICE | 0 | |||||||
| PURCHASE REQUEST NUMBER | PROJECT NUMBER | FBNV180008 | WORK LOCATION | DAVIS-MONTHAN AFB, AZ 85707 | ||||||
| LINE | UNIT OF | MATERIAL COST | LABOR COST | DIRECT | LINE | |||||
| NO. | ITEM | MEASURE | QUANTITY | UNIT | TOTAL | MANHOURS | RATE | TOTAL | COSTS | TOTAL |
| SUMMARY | ||||||||||
| 1 | Interior LED, including lamps, mounting hardware and connections, troffer, recess mounted | 0.00 | 0.00 | 0.00 | ||||||
| 2 | Labor adjustment factors, add to labor for elevated installation, above floor level, 10' to 14.5' high | 0.00 | 0.00 | 0.00 | ||||||
| 3 | Interior LED fixtures, including lamps, mounting hardware, and connections, high bay, surface | 0.00 | 0.00 | 0.00 | ||||||
| 4 | Interior LED fixtures, including lamps, mounting hardware, and connections, high bay elevated elevation | 0.00 | 0.00 | 0.00 | ||||||
| 0.00 | 0.00 | 0.00 |
| LINE TOTALS OVERALL | 0.00 | 0.00 | 0.00 | 0.00 |
| OVERHEAD TOTAL OVERALL (15.00%) | 0.00 | |||
| SUBTOTAL OVERALL W/ OVERHEAD | 0.00 | |||
| PROFIT TOTAL OVERALL (10%) | 0.00 | |||
| SUBTOTAL OVERALL W/ OVERHEAD AND PROFIT | 0.00 | |||
| TAX OVERALL ____% | 0.00 | |||
| BOND OVERALL (2.5%) | 0.00 | |||
| TOTAL OVERALL PROJECT PRICE | 0.00 |
| DATE: | FIRM NAME: |
| TITLE: | BY: |
| DIVISION 01 GENERAL CONDITIONS | ||||
| 1 | Design | LS | 0.0 | 0.00 |
| 2 | Swan Gate Search Requirements | LS | 0.0 | 0.00 |
| 3 | Project Manager | Wk | 0.0 | 0.00 |
| 4 | Superintendent | Wk | 0.0 | 0.00 |
| 5 | Permits | LS | 0.0 | 0.00 |
| 6 | Concrete compressive test | EA | 0.0 | 0.00 |
| 7 | Testing, Density & Classification | EA | 0.0 | 0.00 |
| 8 | Testing, Soil density, nuclear method, ASTM D 2922 | EA | 0.0 | 0.00 |
| 9 | Testing, Moisture Content, ASTM D 2216 | EA | 0.0 | 0.00 |
| 10 | Testing, Proctor Compaction, 6" Modified Mold, ASTM D 698 | EA | 0.0 | 0.00 |
| 11 | Testing Technician for earthwork | EA | 0.0 | 0.00 |
| 12 | Testing Technician for concrete | EA | 0.0 | 0.00 |
| 13 | Water Truck | Wk | 0.0 | 0.00 |
| 14 | Mobilization/Demobilization - Equipment placed in rear of pickup truck | EA | 0.0 | 0.00 |
| 15 | Mobilization/Demobilization - Equipment hauled on 3-ton capacity towed trailer | EA | 0.0 | 0.00 |
| 16 | Mobilization/Demobilization - Equipment hauled on 20-ton capacity towed trailer | EA | 0.0 | 0.00 |
| 17 | Mobilization/Demobilization - Equipment hauled on 40-ton capacity towed trailer | EA | 0.0 | 0.00 |
| 18 | Mobilization/Demobilization - Equipment hauled on 50-ton capacity towed trailer | EA | 0.0 | 0.00 |
| 19 | Portable barricade | EA | 0.0 | 0.00 |
| 20 | Surveyor, 2 person crew | Day | 0.0 | 0.00 |
| 21 | Surveyor Stakes, 2" x 2" x 18" long | C | 0.0 | 0.00 |
| 22 | Jobsite cleanup | LS | 0.0 | 0.00 |
SUBTOTAL DIVISION 01 GENERAL CONDITIONS 0.00 0.00 0.00 0.00 0.00
| DIVISION 02 EXISTING CONDITIONS | ||||
| 1 | Remove asphalt | SY | 0.0 | 0.00 |
| 2 | Remove concrete | CY | 0.0 | 0.00 |
| 3 | Dumpster (1 dump/week) | Wk | 0.0 | 0.00 |
| 4 | Loading & Trucking Rubbish | CY | 0.0 | 0.00 |
| 5 | Dump charges (Construction materials) | Ton | 0.0 | 0.00 |
SUBTOTAL DIVISION 02 EXISTING CONDITIONS 0.00 0.00 0.00 0.00 0.00
| DIVISION 03 CONCRETE | ||||
| 1 | Concrete Forms | SFCA | 0.0 | 0.00 |
| 2 | Sawcut new control joints | LF | 0.0 | 0.00 |
| 3 | Sawcut new control joints, reservoir | LF | 0.0 | 0.00 |
| 4 | Air blast joint to clean | LF | 0.0 | 0.00 |
| 5 | Joint backer rods | LF | 0.0 | 0.00 |
| 6 | Joint sealant | LF | 0.0 | 0.00 |
| 7 | Dowel Sleeves | Ea | 0.0 | 0.00 |
| 8 | Epoxy, dowels | Ea | 0.0 | 0.00 |
| 9 | Sawcut concrete | LF | 0.0 | 0.00 |
| 10 | Drill dowels | Ea | 0.0 | 0.00 |
SUBTOTAL DIVISION 03 CONCRETE 0.00 0.00 0.00 0.00 0.00
| DIVISION 31 EARTHWORK | ||||
| 1 | Finish Grade | SY | 0.0 | 0.00 |
| 2 | Excavating, excavator | BCY | 0.0 | 0.00 |
| 3 | Excavating, front end loader | BCY | 0.0 | 0.00 |
| 4 | Spread material | LCY | 0.0 | 0.00 |
| 5 | Hauling, 12 CY Truck, 30 MPH avg, cycle 6 miles | LCY | 0.0 | 0.00 |
| 6 | Compaction (vibrating roller) | ECY | 0.0 | 0.00 |
| 7 | Compaction (vibrating plate) | ECY | 0.0 | 0.00 |
SUBTOTAL DIVISION 31 EARTHWORK 0.00 0.00 0.00 0.00 0.00
| DIVISION 32 EXTERIOR IMPROVEMENTS | ||||
| 1 | Aggregate base course, compacted | SY | 0.0 | 0.00 |
| 2 | Asphalt patch | SY | 0.0 | 0.00 |
| 3 | Tack coat | SY | 0.0 | 0.00 |
| 4 | Portland cement concrete, 650 psi flexural | SY | 0.0 | 0.00 |
| 5 | Dowels | Ea | 0.0 | 0.00 |
| 6 | Pavement markings, with beads | LF | 0.0 | 0.00 |
| 7 | Airport pavement paint mob/demob | Ea | 0.0 | 0.00 |
SUBTOTAL DIVISION 32 EXTERIOR IMPROVEMENTS 0.00 0.00 0.00 0.00 0.00