This document contains a request for information (RFI) and related questions and answers regarding a federal contract opportunity for LED lighting replacement at Davis-Monthan Air Force Base.

The RFI outlines a requirement to replace fluorescent troffer and high bay lighting fixtures with LED fixtures across 55 buildings on the base. Bidders are asked questions to clarify the scope of work, including fixture types, quantities, locations requiring hazardous ratings or special access, emergency lighting needs, and responsibilities for repairs. The government provides limited responses regarding meeting lighting standards and codes, assuming no hazardous materials, and requiring coordination for access. Bidders are directed to base estimates and proposals on information in the solicitation.

The related federal contract opportunity synopsis announces a forthcoming solicitation for the multi-facility LED installation project at Davis-Monthan AFB. The work includes installing varying numbers and types of LED lights across facilities to comply with codes and standards. The NAICS code is 238210 and small businesses are eligible. The estimated value is between $1-5 million. The solicitation is expected to issue on October 15th, with evaluation based on price, technical acceptability, and past performance.

View the file

Other files for this federal contract opportunity

Other files attached to Multi-Facility LED Install, newest first.
File Type Posted
2 Section L 13 Dec 19.pdf PDF
13 Audit 2.pdf PDF
12 Acceptance Period MFR.pdf PDF
Solicitation - FA487720R00030003.pdf PDF
Solicitation - FA487720R00030002.pdf PDF
5 Specification LED Fixture Replacment 6 Dec 19.pdf PDF
8 AF Form 3052 FBNV18008 10 Dec 19.xlsx XLSX spreadsheet
10 Audit.pdf PDF
9 Contractor Environmental Guide (31 May 2018).pdf PDF
Solicitation - FA487720R00030001.pdf PDF
3 Section M 20 Nov 19.pdf PDF
2 Section L 20 Nov 19.pdf PDF
4 Davis-Bacon Act WD AZ20190032.pdf PDF
2 Section L.pdf PDF
8 AF Form 3052 FBNV18008.xlsx XLSX spreadsheet
Solicitation - FA487720R0003.pdf PDF
5 Specification LED Fixture Replacment 2 Jul 19.pdf PDF
6 List of Existing Fixtures.xls XLS spreadsheet
3 Section M.pdf PDF
1 - Template of Contractor EAL.xls XLS spreadsheet
7 Past Performance Questionnaire.docx DOCX document
Show all 21

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Sheet1

NumberRFIAnwers
1Can you provide the existing fixture brand/models?Requested information is not available.
2Are there any fixture requirements for Lumens and/or kelvin?The Contractor shall proposes LED fixtures that comply with UFC 3-530-01, latest version. The contractor shall comply with ASHRAE Standard 90.1-2016.
3(1.1.1.b) Will the adjustments to the quantities be via Change Order?Upon final count by the contractor an adjustment will be made to either the number of fixtures replaced or the funding. This will happen post-award.
4(1.1.3) How many fixtures require the emergency battery back-up?Information not available; new installation shall meet code requirements for emergency lighting.
5(1.1.8) How much prior notification will be provided if an interruption is expected?Outage request must be submitted 15 days prior / be prepared for mission changes
6If there is any damage to walls or ceilings, is the contractor expected to do the repairs?Contractor is not responsible for pre-existing damage, however the Contractor is responsible for repairing any damage caused in the process of executing work under this contract.
7If ceiling tiles are damaged or need replacement during the installation, will the customer provide the replacements?No; Contractor is required to supply all material & labor to complete repairs due to contractor-caused damage. Repairs shall match the existing finishes and restore the damaged area to pre-damage conditions as a minimum standard.
8Does the base require any special permits for this project?No special permits are required, but Contractor must coordinate with the building occupants through the facility manager(s) prior to starting work on each building.
9(2.9) Is a conex allowed in the storage area?Yes
10Is there a deadline for the project completion?Yes, refer to contract documents.
11Are there floorplans available of the existing buildings?Floorplans are available but may not reflect existing conditions.
12Will we be able to perform work during daytime schedules?Yes, refer to contract documents.
13Will we be able to work during night time schedules if need be?Possibly, but must be requested by the Contractor and approved by Contracting Officer.
14Will we be able to work on weekends if need be?Possibly, but must be requested by the Contractor and approved by Contracting Officer.
15Will we have access to all areas during normal business hours?depends on mission, security and approval from facility manager and contacting
16Will there be lock down areas with minimal access per day or per week?Yes there are secure areas, which will require scheduling through project manger and facility manager(s) for escorts.
17Will the Voltages for the existing fixture types be disclosed, because 480-volt fixtures cost substantially more?Information is not available
18Are there any specialized lighting requirements for different building uses, e.g. highly detailed work areas?Yes, refer to contract documents.
19Are any of the fixtures going to be installed in HAZLOC for hazardous locations?Not available
20Are there any lighting control requirements?There may be areas where lightng control/occupancy sensors currently exist, however the Contractor is not required to install lighting controls where none currently exist.
21What are the existing lighting controls for each building?Primarily switches, but some dimmers and occupancy sensors.
22Do you use dimmers and occupancy sensors?In some cases you will find dimmers and/or occupancy sensors.
23The provided Lighting audit table indicates troffers however we do not know quantities of 1'x4', 2'x4', recessed vs. surface mount. So forth. Can copies of the 2016 and 2018 audits be made available?Yes - per contracting approval
24For bidding purposes are we to assume a percentage of emergency fixtures? Or will a quantity be provided?Assume or estimate
25Is there any asbestos abatement required?Assume no abatement is required
26Could you provide # of EM fixtures because there are significant # of EM fixtures identified during site visit and significant impact on the bid price?Assume or estimate
27How frequently we can invoice for the work done during the construction period, such as building by building or monthly?A: recommended biweekly or monthly.
28During site visit, there are a significant number of fixtures that require flat panel LED fixture. Do you permit to use flat panel LED instead of Troffer LED for the entire project?No, Government will not provide blanket approval of substituting flat panel LED for trouffers.
29Please confirm that we are to bid the fixture types and quantities as shown on Table 1 in the summary of work only.A: Yes
30Per 1.1.3 in the Summary of Work, All fixtures that incorporate a battery backup shall be replaced with the equivalent LED fixtures that include a battery backup. Due to site visit being only a sample of the types of installations we were unable determine quantities and locations of existing Emergency battery packs. Please advise how to provide pricing for the EM packs.Assume or estimate
31Will the new fixtures need to comply with BAA requirements or will TAA manufactured fixtures also be acceptable?Only Buy American Act
32During the site walk we only surveyed a third of the buildings in the solicitation. a. In order to price based on the counts of the site walk we would need to see each building, shall we just price to the counts provided in solicitation and list line items cost for fixtures and scenarios encountered on the site walk?A: Please submit proposal base on the numbers provided in solicitation.
33Please confirm controls of any sort are not required, fixture for fixture swap out only.Correct; no lighting controls are required.
34Specification 1.1.13 states, "Fixtures must meet AF lighting for the work task of the area, UFC 3-530-01 and ASHRAE 90.1 latest versions". In order to meet this, it requires building management controls along with diming, switching, daylighting, etc. Please confirm we will only be providing a fixture swap out.Correct; contractor is only providing fixture replacement with new LED fixtures.
35Can the most current as-builts (as provided for the site walk buildings) be provided for the remaining buildings? a. Ceiling heights, room dimensions, work task space requirements, if available reflected ceiling plans for each building.As-builts will be provided to the winning bidder
36If any cad drawings are available can they also be provided?As-builts will be provided to the winning bidder
37Please provide a list of the buildings that require escorts and any special access.Not available; buildings requiring special access/escorts will be identified to the winning bidder. Contractor will be required to coordinate scheduling of those buildings with project manager and facility managers to ensure escorts are available.
38The provided AF3052 form, does not match scope of work. Section M3.3.3. Completeness, states, "Price will be considered complete when the offeror has proposed a Firm-Fixed Price for all applicable items in the AF Form 3052. Price will be evaluated to determine whether the offeror provided complete data. Complete data means the offeror provided a proposal that contains a fully completed AF Form 3052. Incomplete offers may be deemed non-responsive and will be determined to be "Unacceptable"". a. Can a new AF3052 that matches scope of work be provided or are we to modify currently issued AF3052?A: Yes, AF3502 will be revised. Please see new AF3052
39Please confirm electronic submitted (emailed) proposals will be acceptable.A: Yes, per solicitation.
40Please provide a complete building map of the base, with the buildings in this requirement and the base's contractor's yard area marked.Will be provided to the winning bidder
41Will a single authority be required for each position, Site Superintendent, SSHO and CQCM or will one person be able to perform the requirements?Please see question #152
42Will the new fixtures need to follow existing form, style and mounting or can other types be provided?The new fixtures need to follow existing form, style and mounting
43Shall we assume all single switched fixture types, since we don't know which existing condition occurs throughout each building; A/B switching, Dimming, daylight, etc.?Estimate a mixture
44Will we be required to meet the existing lighting levels, or will we need to satisfy the current UFC lighting requirements. If we must satisfy the current UFC requirements, then a full building audit, and design will need to be provided prior to construction.Lighting levels must meet UFC requirement
44.11 ) Section "C" in the Solicitation states "Base wide LED renovation for roughly 55 buildings. Includes replacement of the light and the light fixture for various types of lights"
44.22) Specification "LED" 1.1 States "Work Included in this Contract: The following descriptions are for general reference only, and shall not be construed as a complete list of all operations to be performed."
44.33) Specification "LED" 1.1.1a Only states Troffers and High Bay Lights.
44.44) Specification "LED" 1.1.13 All fixtures must meet the AF lighting requirements for the work task being performed in each area of the building where fixtures are being replaced as required in UFC 3-530-01 and ASHRAE 90.1, 2016. A computer printout of that proves the lighting requirements are being meet in each work space in each building shall be provided.
45Please clarify what lighting fixtures are to be replaced in this scope of work? As stated above 1-3 there is lot more type fixtures than "Troffers and High Bay" Stated in 1.1.4?Only troffer and high bay fixtures. No wall sconces. No outside lighting
46Please Clarify Specification "LED" Section 1.1.13 about 1) Will all requirements in 3-350-01 and ASHRAE 90.1 2019 Version be required to be incorporated in the design and installation of NEW lighting Controls and including Plug loads?use ASHRAE 90.1 2016
47Please Clarify Specification "LED" Section 1.1.13 Computer Printout of each room means to perform an Energy Analysis and Lighting Density Calculation for each working space in each building?use ASHRAE 90.1 2016 / provide an lighting study for each work area to show the lighting requirements are being meet for the work being done in the area
48Specification "LED" Section 1.3 Digging Please clarify if their will be any exterior/interior lighting work that will require digging?no digging in the scope of the project
49Specification "LED Section 2.5 Environmental is there any Lead Based Paint or Asbestos area that Contractor should be made ware of?Assume no abatement is required
50Please clarify the scope of work for each building on what type of light(s) that shall be part of the scope of work ie High Bay, 2 x 4 Troffers, 2 x 4 Fluorescent, 1 x 4 Shop Lights, Can Lights, 3 x 3 Fluorescent Surface, Wall Packs, etc.Only troffer and high bay fixtures. No wall sconces. No outside lighting
51AF form 3052 FBNV18008 is labeled "Repair Alert Aircraft Apron" and includes Division 01 General Conditions, Division 02 Existing Conditions, Division 03 Concrete, Division 31 Earthwork, And Division 32 Exterior improvements. Page one of the AF3052 includes Lighting requirements. Please confirm that Reference to Alert Aircraft Apron and Pages of 2-5 of AF form 3052 in not applicable to this solicitation and is referenced in error.A: AF 3052 is going to be modified. Please see new AF3052.
52Divisions 01, 02, 03, 31, and 32 are not included in specifications. Please confirm that any references to the divisions as described on the AF Form 3052 are not part of this solicitation.A: AF 3052 is going to be modified. Please see new AF3052.
53AF form 3052 has the correct Project number but describes the work as Repair Alert Aircraft Apron. The description of the work as described in the specifications is LED Fixture Replacement for Offices and High Bay Areas. Which is correct?LED Fixture Replacement for Offices and High Bay Areas.
54Specifications, 01010-Summary of work: 1.1.1a, This request for proposal (RFP) calls for removal of the existing Fluorescent T-5/T-8/T-12 troffer fixtures and replace them with new LED troffer fixtures at various buildings…Are you defining a troffer light fixture as a 2X4 lay-in ceiling grid type of fixture?not just a 2x4 fixture but any t12/8/5 troffer fixture
55Specifications, 01010-Summary of work: 1.1.13, Will before and after light meter readings be required to verify performance of the IES computer Printouts?yes
56Specifications, 01010-Summary of work: 1.1.15, any fixture located in damp, wet or hazardous spaces ……Please identify locations and quantify the number of these fixtures in each location.not available
57Specifications, 01010-Summary of work: 1.1.15, any fixture located in damp, wet or hazardous spaces……Are there any hazardous fixtures required? (Explosion proof, gasket enclosed lens, technical glass, etc.…)depends on area, if required they will be removed from the scope of the project
58If hazardous fixtures are required, please identify locations and quantify the number of hazardous fixtures in each location.depends on area, if required they will be removed from the scope of the project
59Specifications, 01010-Summary of work: 1.1.15, any fixture located in damp, wet or hazardous spaces…..Are there any specialty lights required? (hospital headwall units, exam and surgery lights, spot or track lighting, low voltage cabinet task or desk lighting, display case lighting, recessed can lighting, etc…) If any specialty lights are required, please identify locations and quantify the number of hazardous fixtures in each location.depends on area, if required they will be removed from the scope of the project
60Can you issue a simple site map of the DMAFB that shows the locations of the 55 buildings?Will be provided to the winning bidder
61Are any of these 55 buildings more than one story?Yes
62Will contractor have accessibility to use elevators within buildings?depends on availability and obtaining permission from the facility manager
63252.236-7001 Contract Drawings and Specifications. 2000-08 Will the government provide to the contractor, a DWG formatted CAD drawing for the project and all buildings?No; information is not available for all buildings
64Will the contractor be required to produce from scratch, a set of CAD drawings for as-built records?No
65SF 1442 has one CLIN in Section B. Is the contractor to use this CLIN for pricing of the project?A: Yes
66Specification Section 1.3 refers to base outages and digging permits. As this project is to change out existing fixtures to LED fixtures is this this specification included in error?This applies if a complete power outage at a building is needed to swap out fixtures
67To allow time for questions to be answered and incorporated into the technical proposal can the due date for submission of proposals be extended to January 8, 2020.A: No.
68What is the Mounting Height for all lights?not available
69What is the voltage of the exterior fixtures?not available
70Accessibility, how hard will be to get in to work on all fixtures?depends on building and mission
71Would the Government provide an area map or drawing identifying area(s) that are approved for staging?Yes
72A schedule for 365 days duration can consume several pages. Since the schedule is not explicitly excluded from the page limits, would the Government extend the page limits for this volume from 12 to 15, or exclude the schedule from the page limits?A: Section L is revised. There will be no page limits.
73Will more 'weight' be put on a bid for utilizing versus cheaper fixtures? Some of the "knockoff" brands are harder to install.No; this is not a "best value" contract; contract will be awarded to the lowest bid that meets all technical contract requirements.
74Are there any power requirements above 277V?not available
75Sometimes drop ceilings are real close to actual ceilings and make it hard to remove ballasts and accomplish wiring. What is the distance between drop ceilings and actual ceilings?distance not available; note this project requires total fixture replacement
76Obstacles make transition times challenging. Are there any obstacles that should be compensated for or will there be clear pathways between lamp refits?contractor should factor in obstacles and changes due to circumstance/see question 75
77Ballast access - not all ballasts are next to the fixtures. Some are hard to get too. Can these be identified ahead of time?Information is not available.
78Would the Government issue a revised AF Form 3052 that is directly relevant for this LED Lighting effort (since we are explicitly not allowed to alter the 3052)?A: Please see new AF3052.
79Waste - lots or cardboard and old fixtures and lamps. Where will they go and how do we get it there?Contractor is responsible for legal disposal of all waste, including removed fixtures, bulbs, etc. off the base.
80Are there any photos of each type of typical installation that may be required?Not available
81How far will the staging area be from the actual work sites?Maximum 2 miles
82Are there any high security areas that need controlled access?Yes
83Will access be granted at 'all times' to the installation teams or will certain SECURE areas require to be scheduled access? If so then how many days of advance notice must be given?Scheduled access required; contractor shall schedule all work with the facility manager. Facility manager will provide escort during work, if required.
84When do you expect to award?A: When fund is available.
85Can we provide an alternate for materials?Not unless they meet all requirements
86Is there a KW saving goal or threshold?No
87In SPECIFICATIONS FOR FBNV 180008 the following was stated "Note: used max from 2016 survey and survey in 2018". Can copies of these reports be provided?if acceptable by contracting
88What are the voltages of fixtures in all areas?not available
89Is ASHRAE 90.1 2019 going to be the required standard? If so what are the requirements regarding egress lighting, dimming, motion sensors, daylight harvesting foot candle requirements, etc., that are required per this standard?ASHRAE 90.1 2016 is required
90What are the lumen / foot candle requirements in all areas?The Contractor shall proposes LED fixtures that comply with UFC 3-530-01, latest version. The contractor shall comply with ASHRAE Standard 90.1-2016.
91If LED upgraded lighting fixtures produce equal or greater lumen / foot candle levels as the current lighting systems in functional conditions, would this be an acceptable standard if ASHRAE isn't required?High lumen levels over 50% would have to be approved on a case by case bases
92Is disposal of tubes on site allowed utilizing an EPA approved florescent bulb disposal system (bulb eater)?Contractor must dispose of tubes off base
93Confirm that emergency lighting will only be required at the fixtures currently equipped and circuited/wired to accommodate emergency lighting? If additional emergency lighting is required by standard or increase of scope what areas will apply and will additional emergency circuit be included in the scope of work requirement?emergency lighting is required in the SOW for only existing emergency lights, if more are required this would require a change order
94Many of the non-standard and standard replacement LED lights have smaller form factors or footprints, is rehabilitation of newly exposed surfaces included in this RFP? And to what extent?Yes, ceiling repair is required
95Is an energy savings assessment include in the work scope?No, but see contract documents for the required fixture specifications
96Per section 1.1.6 of the Summary of Work document titled Specifications for FBNV 180008, there is a requirement of compatibility with applicable DOD, Air Force and base design standards, can these applicable standards be specifically identified and made available to interested vendors electronically or by other means?they can be download from the internet
97In the absence of the specifics per 1.1.6 of the Summary of Work document titled Specifications for FBNV 180008 is there another specific standard or portion of such standard that would be applicable?The Contractor shall proposes LED fixtures that comply with UFC 3-530-01, latest version. The contractor shall comply with ASHRAE Standard 90.1-2016.
98Are there any know areas that contain hazardous pre-existing conditions such as asbestos, lead paint, or other hazardous contaminants that would require remediation? Is remediation of know or unidentified hazardous areas part of the work scope for this project?See previous answers on this subject
99Are there any wet, damp or hazardous spaces that would require approval by the agency in the scope of the project?See previous answers on this subject
100Identify specifically which Agency is referred to in section 1.1.15 of the Summary of Work document titled Specifications for FBNV 180008?Must be approved by the Government Project Manager
101Will working fluorescent tubes be considered salvageable?no
102Will ballasts be considered salvageable?no
103Can you provide the DMAFB Contractor Environmental Guide per section 2.5 (a)?A: Yes. Please see attachment " Environment Guide 2018"
104During the site visit on 3-4 DEC 2019, only a portion of the buildings were visited. There was a variance in regard to the fixture count compared to the Summary of Work document titled Specifications for FBNV 180008. As the RFP requests a fixed, how does the contracting officer intend to handle these Variances? Will the change order process be applicable? If not, what methodology will be utilized?A: Please submit proposal base off of provided solicitation.
105What are the specifications regarding light color?The Contractor shall propose LED fixtures that comply with UFC 3-530-01, latest version. The Contractor shall comply with ASHRAE Standard 90.1-2016.
106Are there any requirements to change the heights of any of the high bay fixtures due to obstructions such as HVAC ducting or other obstructions?No, not included in the scope of this project
107During the site visit verbal differentials of the work scope were discussed in regard to buildings 130, 131, 136, 253, 254, 1540, 1550, 2441, 3500, 3610, 4430, 4859, 7401, 7431, 7440, 7819, 7823, 269, 4844, 4845, 5029, 5045, 7391 and 7328, what are the specifics regarding these changes?A: Please submit proposal base off of provided solicitation.
108Are buildings 132 and 133 included in the scope of work?A: Yes. Please submit proposal base off of provided solicitation.
109Explain Performance Bond being converted from Bid Bond.A: They are two separate bonds.
110How far in advance does the Made in America determination need to happen?There is no Made in America Determination
111Does a domestic alternative need to be submitted for the evaluation comparison?No
112What is the wattage and time requirement for the EM?not available, depends the requirement in each building
113Is building 2527 definitely included in the project?no
114Is there a count of Em's being required in each building?not available
115In building 269 the spreadsheet count is 8 and during the site survey inspection we were told that all of them would need to be replaced. Based on that directive there would be 66 total fixtures. Which count is correct?A: Please submit proposal base off of provided solicitation.
116What is the expectation for project length of time? Is there a desired start time?A: 365 Days per solicitation. The project will be awarded after funds are available.
117Please provide Lighting Audit referenced during site visit.Please see 10 Audit
118Please provide reflective ceiling plans and/or flooring plans provided during site visit.reflective plans not available / all floor plans will be provided to the contractor awarded the bid
119Confirm: Buildings not seen during site visit should be quoted as stated in SOW 1.1.1. Table and the List of Existing Fixtures (excel).A: Please submit proposal base off of provided solicitation.
120Please provide building Voltage information (120-277V versus 347-480V) as this will affect part and labor pricing.not available
121Does form factor need to be maintained? For example: Existing is a combination of parabolic and flat lens; do you want a 1 for 1 exchange or do you want to willing to standardize 1 type of lens to lower costs.not necessarily; as long as the lighting requirements are being meet and no gaps are left by smaller fixtures
122Do any of the ceilings have internal construction issues that will impede installation of new lighting fixtures (beams, poles, pipes, etc.)?may exist and have to figure in work around
123Does the existing wiring meet code?not available
124Will any circuits need to be replaced/updated?only fixture replacements; if circuits are found in need of replacement that would be a change order
125Where troffers are specified will surface mount fixtures meet the requirement? The Air Force defines a troffer as a fixture that is mounted within a grid or drop-down ceiling.if there is an existing surface mount, replace with a surface mount
126Will any emergency ballasts be required?There are emergency lights
127Are switches, occupancy sensors, and dimmers in scope?No; lighting controls are not included in the scope of work.
128Is there a disposal criterion for materials?All material should be legally disposed of off base and at the contractors expense
129Has there been a PR plan for energy savings?Final bid must meet the government BLCC >= 1
130Are rebates being sought? Tax Credits? Local utility (TEP)?Government cannot provide information regards to the subject.
131Section L. Proposal preparation o Section L5.3 calls out "typed" Microsoft Word Times New Roman font. Does this mean that we must submit one copy in PDF format and One copy in Word?A:One copy in PDF with Times New Roman font
132Proposal submittal outlines typical mail delivery for materials. o Should emails be marked as defined in section L5.8 with a subject line of DO NOT OPEN IN MAILROOM?If submitioan is done through email, please refer solicitation FA487720QR0003
132.1o Are there requirements for the Subject Line of the proposal email?please refer solicitation FA487720QR0003
132.2o Are there size (MB) or any other restrictions on receipt of email(s)?No
133Section 8.3.1. Past performance o Are there any requirements for references returning Past Performance Questionnaires?Yes, please see solicitation SECTION L8.3.1.
134Building 1550
134.1Is Hanger Bay (#49) in scope? Is this quantity included in building fixture count provided in SOW?
yes
134.2Are the restrooms (#2) in scope? Is this quantity included in building fixture count provided in SOW?yes, assume they are not included in the numbers provide in the scope
135Building 1540
135.1o Are ceiling can fixtures in scope? Is this quantity included in building fixture count provided in SOW?no
135.2o Are wall sconces scope? Recommend making a consistent color temperature.no
136Building 3500
136.1o Are round cloud fixtures in bathrooms in scope? Is this quantity included in building fixture count provided in SOW?no
136.2o Are stairwell fixtures in scope? Is this quantity included in building fixture count provided in SOW? Do exit signs need to be brought up to federal & local code (LED/emergency powered)yes, assume they are not included in the numbers provided in the scope; exit signs not included in the scope of this project
137Building 4430 - Floor Plan provided during site visit indicates ceiling - suspended gypsum board or acoustical tile. Has testing for asbestos been conducted? Are there any impediments to new installation?Yes, assume non asbestos.
138Building 4859 - Are ceiling cans in restrooms in scope? Is this quantity included in building fixture count provided in SOW?no
139Building 4844 - Confirm: High Bay install only. Rooms on perimeter of hangar contain troffers.Bldg 4844: Yes
140Building 136 - Is Hanger Bay (#40) in scope? Is this quantity included in building fixture count provided in SOW?Bldg 136: Yes, 136 is in scope for troffer fixtures and high bay.
141Building 253 - Are ceiling can fixtures (lobby) in scope? Is this quantity included in building fixture count provided in SOW?Bldg 253: No; not included in fixture count.
142Building 254
142.1o Are ceiling can fixtures (lobby) in scope? Is this quantity included in building fixture count provided in SOW?no
142.2o Is back storage area of room 147 in scope? Is this quantity included in building fixture count provided in SOW?yes
143Building 7401 - Confirm: Troffer install only. High Bays out of scope.yes
144Building 7431 - Are low bays in scope? Should they be added to troffer quote?yes
145Building 7440 - Are low bays in scope? Should they be added to troffer quote?yes
146Building 7391 - Are linear emergency backup fixtures (#14) in scope? Should they be added to high bay quote?yes
147Building 7328 - Confirm: High Bay install only. Offices inside hanger contain troffers.yes
148How old are the structures, is there any abatement?Assume no abatement is required
149Are TAA compliant materials acceptable in lieu of BAA?No, only Buy American Act
150Will flat panel or volumetric retrofit kits be considered for linear recessed fixtures?yes
151Do any of the "in scope" areas require escorts or special clearance?yes
152Do the SSHO, QC, and Superintendent need to be "non-working"?Yes. In the meantime, they will perform all superintendent duties and act on behalf of the contractor.
153Will CAD drawings be provided to use as a baseline for project closeout as-builts?no
154Can you please provide the ceiling heights for the following buildings: 5029, 4859, 4844, 7391, 7328, 269?Information is not available
155Are all the fixtures 120-277V OR are there any that need to be 480v rated?Information is not available
156Does any "High Bay" lighting need to be rated for Hazardous Conditions or Shatter proof?Yes, but locations/quantities are unknown. Assume 10% will require Haz Conditions rating/shatter proof.
157For building 4330 is the contractor responsible for bring the electrical up to code prior to changing the fixtures to LED?if out of code, that would be a change order
158Can you provide the previous 2 audits that were completed and referenced in the Solicitation.Yes
159Are there any foot-candle requirements needed for the hangers or warehouses? Are there any specific standards the contractor is required to meet in terms of lighting levels?The Contractor shall proposes LED fixtures that comply with UFC 3-530-01, latest version. The contractor shall comply with ASHRAE Standard 90.1-2016.
160Where fixtures are to meet specific ratings of the work area, will those ratings be provided to the contract prior to bidding as mentioned in 1.1.13?The Contractor shall proposes LED fixtures that comply with UFC 3-530-01, latest version. The contractor shall comply with ASHRAE Standard 90.1-2016.