6._AF_Form_3052_template_for_SABER.xlsx

Air Force Form XLSX spreadsheet 571 KB Posted

Attached to
Simplified Acquisition Base Engineering Requirement (SABER)
Solicitation number
FA4801-12-R-0005
Issued by

About this file

Attached is the AF Form 3052 Template. (Supporting document to Q A.)

View the file

Other versions and copies of AF Form 3052

File Revision Posted Attached to
Attachment E - Blank Sample AF Form 3052.xls Revision not stated Robins AFB Paving Multi-Award IDIQ
Attachment 5 - PNQS 24-4829 Airfield Improvements AF Form 3052 - Amendment 0002.xlsx Revision not stated Maxwell AFB - Airfield Repairs - Amendment 0006
31 - AF Form 3052 Cost Estimate Template.xlsx Revision not stated SABER IDIQ
31 - AF Form 3052 Cost Estimate Template.xlsx Revision not stated SABER IDIQ
B6 AF Form 3052 - Construction Cost Estimate.pdf Revision not stated Emergent Requirements Construction IDIQ (Single-Award)
AF Form 3052 (Blank) ReplCath Prot 240026 at Multi Facs -- .xlsx Revision not stated FBNV240026 Replace Cathodic Protection Test Points DMAFB
FBNV240017 - AF Form 3052 Blank.xlsx Revision not stated FA487724R0020 - Upgrade PGS Fire System
Attachment 4 - JUBJ 22 1016 Construct RIC - AF Form 3052.xlsx Revision not stated Construct Research Information Center (Solicitation Amendment 0002)
Attachment 4 - PNQS 24-3992 Replace Localizer Pad - AF Form 3052.xlsx Revision not stated PNQS 24-3992 Replace Localizer Pad (Solicitation Amendment 0001)
05. FBNV230009_AF Form 3052 (Blank).xlsx Revision not stated Solicitation - Repair Command Post Bldg 2300 - DMAFB
B941 Replace AHU AF Form 3052 - Construction Cost Estimate.xlsx Revision not stated Bldg 941 Replace Air Handling Unit 1
AF Form 3052.xlsx Revision not stated BLDG 4868 Additional Electrical Panel for DMAFB
Atch 7 AF Form 3052.xlsx Revision not stated B324 Add Sewer Line, FE Warren AFB, WY
AF Form 3052-Construction Cost Estimate Breakdown (3).xlsx Revision not stated Barnes Center Command Suite Modification Bldg. 832 Gunter Annex (Amendment 0003)
5. AF Form 3052-BLANK.xlsx Revision not stated Replace Swamp Cooler B5045
Copy of Attachment 3 - AF Form 3052-Construction Cost Estimate Breakdown.xlsx Revision not stated Repair Battery Room - Maxwell AFB, AL (Solicitation)
Attachment 4 - PNQS 23-0379 Connect Fire Mains - AF Form 3052.xlsx Revision not stated PNQS 23-0379 Connect Fire Mains Bldgs. 849 & 1143, MAFB & Gunter Annex
17. AF Form 3052 (Blank) - FBNV190002.xlsx Revision not stated Repair and Construct Primary Electric Distribution
Attachment 2.12 - AF Form 3052 Construction Cost Estimate Breakdown Template.xlsx Revision not stated Multiple Award Basic Ordering Agreement for Construction Services at Cannon AFB, NM
Attachment 3 - AF Form 3052-Construction Cost Estimate Breakdown.xlsx Revision not stated Repair Rooms, Building 1410 Gunter
Show all 20

Who attaches AF Form 3052

Other files

File Type Posted
FA4801-12-R-0005_Amendment.pdf PDF
4._HAFB_Building_883-As-Builts.pdf PDF
5._Utilities_883_Area.pdf PDF
3._BLDG_883_ANSI_D_Sheet.pdf PDF
7._AF_IMT_3064_Contract_Progress_Schedule.pdf PDF
1._SABER_Q A_Round_2_-_Post-Site_Visit.xlsx XLSX spreadsheet
2._Drawing_Sheets_ANSI_D_Cover.pdf PDF
4._Task_Orders_ _Amounts.xlsx XLSX spreadsheet
3._Financial_Information_Request.docx DOCX document
2._SABER_Q A_Round_1_-_Pre-Site_Visit.xlsx XLSX spreadsheet
1._Solicitation_Amendment_FA4801-12-R-0005-0001.doc DOC document
HAFB_010.docx DOCX document
ATTCH_8_HAFB_VAR-1.doc DOC document
Solicitation_FA4801-12-R-0005_-_Holloman_SABER.doc DOC document
ATTCH_9_HAFB_Design_Compatibility_Standards.doc DOC document
Client_Authorization_Ltr.doc DOC document
ATTCH_3_Building_General_Decision___NM130032.doc DOC document
Past_Performance_Information_Sheet_PPIS.docx DOCX document
ATTCH_7_Base_Access.pdf PDF
SABER_2_May_-_Attachment_1_SOW.doc DOC document
ATTCH_4_Heavy_General_Decision___NM130008.doc DOC document
AF66.xlsx XLSX spreadsheet
ATTCH_5_Highway_General_Decision_NM_130050.doc DOC document
Consent_Ltr.doc DOC document
SABER_10_May_Attachment_2_Demonstration_Project_SOW.doc DOC document
ATTCH_6_Residential_General_Decision_NM_130005.doc DOC document
Show all 26

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

UNIT PRICE COST ESTIMATE

UNIT PRICE CONSTRUCTION COST ESTIMATE BREAKDOWN
ORGANIZATIONADDRESSTYPE OF ESTIMATE
Contractor NameConstruction and Repair
PROJECT TITLEPURCHASE REQUEST #PROJECT #PROJECT LOCATIONCOST ESTIMATE PREPARER
xxxxxxxxxxxxxxxxxxxxxxxxxxxxx
MATERIAL COSTLABOR COSTOTHER DIRECT COST
LINE #ITEM DESCRIPTION (1)CSI / MEANS REFERENCE #UNIT OF MEASURE (UOM) (2)QUANTITY (3)not usedmat'l cost per unitTOTAL (5)labor cost per unit (6)TOTALmatl + labor (8)ODC cost per unitTOTAL (9)LINE COST (10)
1LF00$ - 00$ - 0$ - 00$ - 0$ - 0
2LF00$ - 00$ - 0$ - 00$ - 0$ - 0
3Existing Conditions, deconstruction of components02-42-10-20-0730EA2450$ 1,200.0026.25$ 630.00$ 1,830.000$ - 0$ 1,830.00
4LF00$ - 00$ - 0$ - 00$ - 0$ - 0
5Thermal and Moisture Protection07-44-73-10-1350S.F.1926.78$ 1,301.765$ 960.00$ 2,261.760$ - 0$ 2,261.76
6LF00$ - 00$ - 0$ - 00$ - 0$ - 0
7Aluminum Windows08-51-13-20-5700EA24700$ 16,800.00298.5$ 7,164.00$ 23,964.000$ - 0$ 23,964.00
8Aluminum Windows, bronze finish08-51-13-20-5700-6000EA14100$ 1,400.0035$ 490.00$ 1,890.000$ - 0$ 1,890.00
9LF00$ - 00$ - 0$ - 00$ - 0$ - 0
10LF00$ - 00$ - 0$ - 00$ - 0$ - 0
11LF00$ - 00$ - 0$ - 00$ - 0$ - 0
12LF00$ - 00$ - 0$ - 00$ - 0$ - 0
13LF00$ - 00$ - 0$ - 00$ - 0$ - 0
14LF00$ - 00$ - 0$ - 00$ - 0$ - 0
15LF00$ - 00$ - 0$ - 00$ - 0$ - 0
16LF00$ - 00$ - 0$ - 00$ - 0$ - 0
17For additional detail, see attached sheets from 4 clicksLF00$ - 00$ - 0$ - 00$ - 0$ - 0
18LF00$ - 00$ - 0$ - 00$ - 0$ - 0
19LF00$ - 00$ - 0$ - 00$ - 0$ - 0
20LF00$ - 00$ - 0$ - 00$ - 0$ - 0
21LF00$ - 00$ - 0$ - 00$ - 0$ - 0
22LF00$ - 00$ - 0$ - 00$ - 0$ - 0
23LF00$ - 00$ - 0$ - 00$ - 0$ - 0
24LF00$ - 00$ - 0$ - 00$ - 0$ - 0
25LF00$ - 00$ - 0$ - 00$ - 0$ - 0
26LF00$ - 00$ - 0$ - 00$ - 0$ - 0
27LF00$ - 00$ - 0$ - 00$ - 0$ - 0

SUBTOTAL BEFORE MARK-UP $ 20,701.76 $ 9,244.00 $ 29,945.76 $ - 0 $ 29,945.76

Coefficient 1.01234 $ 369.53

TABLE

$ 30,315.29
TOTAL ESTIMATED COST
INSTRUCTIONS FOR COMPLETING AF FORM 3052
Col 1 Item Description of materials required, work to be done, special equipment needed, etc. Breakdown should be in sufficient detail to permit itemizing of all direct costs
Col 2 Unit of Measure. Description of the unit in which each item is to be estimated (examples – square yards - SY. Cubic yards - CY, square feet-SF, - linear feet - LF. Board Feet - BF each - EA, pound - LB).
Col 3 Quantity Contractor's estimate of quantity is required in terms of unit of measure (column 2). Items and units of measure will be furnished by the Government. Quantity estimates will be furnished by the Government only when it is anticipated that
Col 4 and 5 Material Costs. Enter unit cost (col 4) of material to be supplied and total cost (col 5) for item listed in column 1.
Col 6, 7 and 8 Labor Costs. Enter in col 6 the estimated number of man-hours or man-days needed to perform the work listed in column 1. Enter in col 7 the average rate per man-hour (man-day) and in col 8 the total labor cost.
Col 9 Other Direct Costs. Enter estimated costs of special equipment and other items (listed in column 1) which are special to the contract and of significant dollar value.
Col 10 Line Total. Self-explanatory.
NOTE: In addition to other totals entered on various pages, the grand total of column 10, plus overhead and profit will be shown on the last page as follows.
TOTAL MATERIAL COSTS (5)$ 20,701.76
TOTAL LABOR COSTS (8)$ 9,244.00Bond1st 500K$ - 0
TOTAL OTHER DIRECT COSTS (9)$ - 08.70/1000Next 2M$ (4,350.00)
SUBTOTAL NO TAX$ 29,945.766.901/1000 next 2.5MRemaining$ - 0
MAT'L & EQUIP SALES TAX$ - 0$ (4,350.00)
LABOR BURDEN$ - 0
SUBTOTAL$ 29,945.76
G&A (incl in coefficient)0.0%$ - 0
OVERHEAD (incl in coefficient)0.0%$ - 0
SUBTOTAL$ 29,945.76
Coefficient0.0%$ 369.53
SUBTOTAL$ 30,315.29
BONDS (incl in coefficient)TABLE$ - 0
TOTAL PRICE$ 30,315.29
DATE:FIRM NAMEredacted
TITLE:BY:
(Signature)
INSTRUCTION TO OFFERORS
1. The purpose of this form is to provide a standard fommat by which the offeror submits to the Govemment a summary of incurred and estimated costs (and attached supporting infommation) suitable for detailed review and analysis. Prior to the award of a c
2. In addition to the specific information required by this form, the offeror is expected, in good faith, to incorporate in and submit with this form any additional data, supporting schedules, or substantiation which are reasonably required for the condu
3. When attachment of supporting cost or pricing data to this form is impracticable, the data will described (with schedules as appropriate), and make available to the contracting officer or his authorized representative upon request.
4. By submission of this proposal the offeror grants to the contracting officer, or his authorized representative, the right to examine, for the purpose of verifying the cost or pricing data submitted, those books, records, documents and other supporting
(Reverse of AF Form 3052, Jun 88)

FOR OFFICIAL USE ONLY &D

&8AF FORM 3052 FOR OFFICIAL USE ONLY &P OF &N

INSTRUCTIONS

INSTRUCTIONS FOR COMPLETING AF FORM 3052
Col 1 Item Description of materials required, work to be done, special equipment needed, etc. Breakdown should be in sufficient detail to permit itemizing of all direct costs
Col 2 Unit of Measure. Description of the unit in which each item is to be estimated (examples – square yards - SY. Cubic yards - CY, square feet-SF, - linear feet - LF. Board Feet - BF each - EA, pound - LB).
Col 3 Quantity Contractor's estimate of quantity is required in terms of unit of measure (column 2). Items and units of measure will be furnished by the Government. Quantity estimates will be furnished by the Government only when it is anticipated that a unit price contract will be issued. Otherwise, the contractor is responsible for determining quantity estimates.
Col 4 and 5 Material Costs. Enter unit cost (col 4) of material to be supplied and total cost (col 5) for item listed in column 1.
Col 6, 7 and 8 Labor Costs. Enter in col 6 the estimated number of man-hours or man-days needed to perform the work listed in column 1. Enter in col 7 the average rate per man-hour (man-day) and in col 8 the total labor cost.
Col 9 Other Direct Costs. Enter estimated costs of special equipment and other items (listed in column 1) which are special to the contract and of significant dollar value.
Col 10 Line Total. Self-explanatory.
NOTE: In addition to other totals entered on various pages, the grand total of column 10, plus overhead and profit will be shown on the last page as follows.
TOTAL MATERIAL COSTS (5)$ 20,701.76
TOTAL LABOR COSTS (8)$ 9,244.00
TOTAL OTHER DIRECT COSTS (9)$ - 0
SUBTOTAL NO TAX$ 29,945.76
MAT'L & EQUIP SALES TAX0.00%$ - 0
OVERHEAD0.00%$ - 0
PROFIT0.00%$ 369.53
LABOR BURDEN0.00%$ - 0
SUBTOTAL$ 30,315.29
DESIGN FEESTABLE$ - 0
TOTAL PRICE$ 30,315.29
DATE:FIRM NAME
TITLE:BY:
(Signature)
INSTRUCTION TO OFFERORS
1. The purpose of this form is to provide a standard fommat by which the offeror submits to the Govemment a summary of incurred and estimated costs (and attached supporting infommation) suitable for detailed review and analysis. Prior to the award of a contract resulting from this proposal the offeror shall, under the conditions staled in ASPR 3-807.3, be required to submit a certificate of current cost or pricing data (see ASPR 3-807.3 9 ( c ) and 3-807.4).
2. In addition to the specific information required by this form, the offeror is expected, in good faith, to incorporate in and submit with this form any additional data, supporting schedules, or substantiation which are reasonably required for the conduct of an appropriate review and analysis in the light of the specific facts of this procurement For effective negotiations, it is essential that there be a clear understanding of:

a. The existing, verifiable data.

b. The judgmental factors applied in projecting from known data to the estimate, and

c. The contingencies used by the offeror in his/her proposed price.

In short, the offeror's estimating process itself needs to be disclosed.

3. When attachment of supporting cost or pricing data to this form is impracticable, the data will described (with schedules as appropriate), and make available to the contracting officer or his authorized representative upon request.
4. By submission of this proposal the offeror grants to the contracting officer, or his authorized representative, the right to examine, for the purpose of verifying the cost or pricing data submitted, those books, records, documents and other supporting data which will permit adequate evaluation of such cost or pricing data, along with the computations and projections used therein. This right may be exercised in connection with any negotiations prior to contract award.
(Reverse of AF Form 3052, Jun 88)

FOR OFFICIAL USE ONLY &D

&8AF FORM 3052 FOR OFFICIAL USE ONLY &P OF &N

File details come from the government source that posted it. Updated .