Attch 6 - AF Form 3052_Rev.1.xlsx

Air Force Form Rev. 1 XLSX spreadsheet 153 KB Posted

Download XLSX, 153 KB

Attached to
Repair Roof and HVAC in Navy Facility (Bldg 1560)
Solicitation number
FA286020R0044
Issued by

View the file

Other versions and copies of AF Form 3052

File Revision Posted Attached to
Attachment E - Blank Sample AF Form 3052.xls Revision not stated Robins AFB Paving Multi-Award IDIQ
Attachment 5 - PNQS 24-4829 Airfield Improvements AF Form 3052 - Amendment 0002.xlsx Revision not stated Maxwell AFB - Airfield Repairs - Amendment 0006
31 - AF Form 3052 Cost Estimate Template.xlsx Revision not stated SABER IDIQ
31 - AF Form 3052 Cost Estimate Template.xlsx Revision not stated SABER IDIQ
B6 AF Form 3052 - Construction Cost Estimate.pdf Revision not stated Emergent Requirements Construction IDIQ (Single-Award)
AF Form 3052 (Blank) ReplCath Prot 240026 at Multi Facs -- .xlsx Revision not stated FBNV240026 Replace Cathodic Protection Test Points DMAFB
FBNV240017 - AF Form 3052 Blank.xlsx Revision not stated FA487724R0020 - Upgrade PGS Fire System
Attachment 4 - JUBJ 22 1016 Construct RIC - AF Form 3052.xlsx Revision not stated Construct Research Information Center (Solicitation Amendment 0002)
Attachment 4 - PNQS 24-3992 Replace Localizer Pad - AF Form 3052.xlsx Revision not stated PNQS 24-3992 Replace Localizer Pad (Solicitation Amendment 0001)
05. FBNV230009_AF Form 3052 (Blank).xlsx Revision not stated Solicitation - Repair Command Post Bldg 2300 - DMAFB
B941 Replace AHU AF Form 3052 - Construction Cost Estimate.xlsx Revision not stated Bldg 941 Replace Air Handling Unit 1
AF Form 3052.xlsx Revision not stated BLDG 4868 Additional Electrical Panel for DMAFB
Atch 7 AF Form 3052.xlsx Revision not stated B324 Add Sewer Line, FE Warren AFB, WY
AF Form 3052-Construction Cost Estimate Breakdown (3).xlsx Revision not stated Barnes Center Command Suite Modification Bldg. 832 Gunter Annex (Amendment 0003)
5. AF Form 3052-BLANK.xlsx Revision not stated Replace Swamp Cooler B5045
Copy of Attachment 3 - AF Form 3052-Construction Cost Estimate Breakdown.xlsx Revision not stated Repair Battery Room - Maxwell AFB, AL (Solicitation)
Attachment 4 - PNQS 23-0379 Connect Fire Mains - AF Form 3052.xlsx Revision not stated PNQS 23-0379 Connect Fire Mains Bldgs. 849 & 1143, MAFB & Gunter Annex
17. AF Form 3052 (Blank) - FBNV190002.xlsx Revision not stated Repair and Construct Primary Electric Distribution
Attachment 2.12 - AF Form 3052 Construction Cost Estimate Breakdown Template.xlsx Revision not stated Multiple Award Basic Ordering Agreement for Construction Services at Cannon AFB, NM
Attachment 3 - AF Form 3052-Construction Cost Estimate Breakdown.xlsx Revision not stated Repair Rooms, Building 1410 Gunter
Show all 20

Who attaches AF Form 3052

Other files

File Type Posted
Attch 1g - SF30_Amendment_FA286020R00440007.pdf PDF
Attch 9 - Site Visit (15 Oct 20) Questions and Answers_Rev.1.pdf PDF
Attch 12 - Site Visit Photos.pdf PDF
Attch 3 - 2019_1211 Design-Build RFP B1560 (28 Oct 20).pdf PDF
Attch 1 - SF1442 Solicitation_FA286020R00440007.pdf PDF
Attch 1f - SF30_Amendment_FA286020R00440006.pdf PDF
Attch 11 - B1560 Phasing.pdf PDF
Attch 9 - Site Visit (15 Oct 20) Questions and Answers.pdf PDF
Attch 10 - B1560 Original Drawings.pdf PDF
Attch 1 - SF1442 Solicitation_FA286020R00440006.pdf PDF
1e - SF30_FA286020R00440005.pdf PDF
Attch 1d - SF30_Amendment_FA286020R00440004.pdf PDF
Attch 5 - Contractor Access Information Sheet.xlsx XLSX spreadsheet
Attch 7 - Site Visit (17 Sep 20) Questions and Answers.pdf PDF
Attch 1c - SF30_Amendment_FA286020R00440003.pdf PDF
Attch 1 - SF1442 Solicitation_FA286020R0044.pdf PDF
Attch 8 - 2004 Renovation Drawings_B1560.pdf PDF
Attch 1b - SF30_FA286020R00440002.pdf PDF
Attch 1a - SF30_FA286020R00440001.pdf PDF
Attch 1 - Solicitation_FA286020R0044.pdf PDF
Attch 4 - WD MD20200044 (11Sep20).pdf PDF
Attch 6 - AF Form 3052.xlsx XLSX spreadsheet
Attch 1 - Solicitation Amendment_FA286020R00440001.pdf PDF
Attch 5 - Contractor Access Information Sheet.xlsx XLSX spreadsheet
Attch 5 - Contractor Access Request Form.pdf PDF
Attch 3 - 2019_1211 Design-Build RFP B1560.pdf PDF
Attch 4 - WD MD20200044 (06262020).pdf PDF
Attch 1 - Solicitation_FA286020R0044.pdf PDF
Attch 2 - 2019_1211 Design Analysis B1560.pdf PDF
Show all 29

On GovTribe

Work with this file

  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Summary Page

Repair Roof & HVAC Navy Facility Building 1560
Work Location:Joint Base Andrews, MD
Project Name:Repair Roof & HVAC Navy Facility Building 1560
TOTALS
Base Bid$ -
Alternates$ -
GRAND TOTAL$ -
Base BidRenovation Add Alternate (inclusive of both options)
TOTAL MATERIAL COSTS$ - 0TOTAL MATERIAL COSTS$ - 0

TOTAL LABOR COSTS $ - 0 TOTAL LABOR COSTS $ - 0

TOTAL OTHER DIRECT COSTS $ - 0 TOTAL OTHER DIRECT COSTS $ - 0

TOTAL DIRECT COSTS $ - 0 TOTAL DIRECT COSTS $ - 0

SUB OH+P20.00%$ - 0SUB OH+P20.00%$ - 0
SUBTOTAL$ - 0SUBTOTAL$ - 0
MATOC - Removed0.00%$ - 0MATOC - Removed0.00%$ - 0
SUBTOTAL$ - 0SUBTOTAL$ - 0
SALES Tax6.00%$ - 0SALES Tax6.00%$ - 0
SUBTOTAL$ - 0SUBTOTAL$ - 0
Prime JOOH - DIV 10.00%$ - 0Prime JOOH - GC's in Estimate0.00%$ - 0
SUBTOTAL$ - 0SUBTOTAL$ - 0
Prime HOOH (Overhead)4.00%$ - 0Prime HOOH (Overhead)4.00%$ - 0
SUBTOTAL$ - 0SUBTOTAL$ - 0
Prime Profit6.00%$ - 0Prime Profit6.00%$ - 0
SUBTOTAL$ - 0SUBTOTAL$ - 0
Design/Estimating Contingency5.00%$ - 0Design/Estimating Contingency5.00%$ - 0
SUBTOTAL$ - 0SUBTOTAL$ - 0
Prime Bond1.50%$ - 0Prime Bond1.50%$ - 0
SUBTOTAL$ - 0SUBTOTAL$ - 0
Escalation3.36%$ - 0Escalation3.36%$ - 0
SUBTOTAL$ - 0SUBTOTAL$ - 0
Owner Project Contingency5.00%$ - 0Owner Project Contingency5.00%$ - 0
SUBTOTAL$ - 0SUBTOTAL$ - 0
Owner SIOH5.60%$ - 0Owner SIOH5.60%$ - 0
TOTAL$ - 0TOTAL$ - 0
Design Build Design Cost6%$ - 0Design Build Design Cost6%$ - 0
$ - 0$ - 0

CSI Summary

Repair Roof & HVAC Navy Facility Building 1560
ESTIMATORADDRESS
CONTRACT FORPROPOSED TOTAL CONTRACT PRICEPROPOSED TOTAL CONTRACT PRICE
$ - 0
PROJECTPROJECT NUMBERWORK LOCATION
Repair Roof & HVAC Navy Facility Building 1560Joint Base Andrews, MD
MATERIAL COSTLABOR COSTOTHER DIRECT COSTSLINE TOTAL
CSI NO.DIVISION
1General Requirements$ - 0$ - 0$ - 0$ - 0
2Existing Conditions$ - 0$ - 0$ - 0$ - 0
3Concrete$ - 0$ - 0$ - 0$ - 0
4Masonry$ - 0$ - 0$ - 0$ - 0
5Metals$ - 0$ - 0$ - 0$ - 0
6Wood, Plastics, Composites$ - 0$ - 0$ - 0$ - 0
7Thermal and Moisture Protection$ - 0$ - 0$ - 0$ - 0
8Openings$ - 0$ - 0$ - 0$ - 0
9Finishes$ - 0$ - 0$ - 0$ - 0
10Specialties$ - 0$ - 0$ - 0$ - 0
11Equipment$ - 0$ - 0$ - 0$ - 0
12Furnishings$ - 0$ - 0$ - 0$ - 0
13Special Construction$ - 0$ - 0$ - 0$ - 0
14Conveying Equipment$ - 0$ - 0$ - 0$ - 0
21Fire Suppression$ - 0$ - 0$ - 0$ - 0
22Plumbing$ - 0$ - 0$ - 0$ - 0
23HVAC$ - 0$ - 0$ - 0$ - 0
26Electrical$ - 0$ - 0$ - 0$ - 0
27Communications$ - 0$ - 0$ - 0$ - 0
28Electronic Safety and Security$ - 0$ - 0$ - 0$ - 0
31Earthwork$ - 0$ - 0$ - 0$ - 0
32Exterior Improvements$ - 0$ - 0$ - 0$ - 0
33Utilities$ - 0$ - 0$ - 0$ - 0

Subtotal: $ - 0 $ - $ - $ - $ -

AF Form 3052

DIV 1

Repair Roof & HVAC Navy Facility Building 1560
ESTIMATORADDRESS
CONTRACT FORPROPOSED TOTAL CONTRACT PRICE
$ - 0
PROJECTPROJECT NUMBERWORK LOCATION
Repair Roof & HVAC Navy Facility Building 15600Joint Base Andrews, MD
MATERIAL COSTLABOR COST
LINE NO.RS Means IDITEMUNIT OF MEASUREQUANTITYUNITTOTALUNIT OF MEASUREQUANTITYUNITTOTALOTHER DIRECT COSTSLINE TOTAL
(1)(2)(3)(4)(5)(6)(7)(8)(9)(10)
Division 1General Conditions
1013113200180Project ManagementWK52$ - 0WK52$ - 0$ - 0
2013113200280Project SuperintendentWK52$ - 0WK52$ - 0$ - 0
3013113200020Project Safety EngineerWK52$ - 0WK52$ - 0$ - 0
4017613200020Temporary ProtectionSF5,000$ - 0SF5,000$ - 0$ - 0
5015523500100Staging Area/Office TrailersWK52$ - 0WK52$ - 0$ - 0
6013113200640SurveyingLS0$ - 0LS0$ - 0$ - 0
7015213400100MobilizationLS1$ - 0LS1$ - 0$ - 0
8013113200290SubmittalsLS1$ - 0LS1$ - 0$ - 0
9013213500400Shop DrawingsLS1$ - 0LS1$ - 0$ - 0
10014523500150TestingLS1$ - 0LS1$ - 0$ - 0
11014523500100QA/QCWK8$ - 0WK8$ - 0$ - 0
12017413200050Clean Up - DailyWK52$ - 0WK52$ - 0$ - 0
13017413200100Clean Up - FinalEA1$ - 0EA1$ - 0$ - 0
14014523505550Punch ListWK2$ - 0WK2$ - 0$ - 0
15015213400100DemobilizationLS1$ - 0LS1$ - 0$ - 0
1601536502300DumpstersWK52$ - 0WK52$ - 0$ - 0
17015213201400Temporary ToiletsWK52$ - 0WK52$ - 0$ - 0
18015000, para. 3.3.8Temporary HVAC, each floor, set-up+3 weeksLS1$ - 0LS1$ - 0$ - 0$ - 0

Subtotal $ - $ - $ - $ -

AF Form 3052 Costs based on RS Means Cost Database 2018

DIV 2

Repair Roof & HVAC Navy Facility Building 1560
ESTIMATORADDRESS
CONTRACT FORPROPOSED TOTAL CONTRACT PRICE
$ - 0
PROJECTPROJECT NUMBERWORK LOCATION
Repair Roof & HVAC Navy Facility Building 15600Joint Base Andrews, MD
MATERIAL COSTLABOR COST
LINE NO.RS Means IDITEMUNIT OF MEASUREQUANTITYUNITTOTALUNIT OF MEASUREQUANTITYUNITTOTALOTHER DIRECT COSTSLINE TOTAL
(1)(2)(3)(4)(5)(6)(7)(8)(9)(10)
Division 2Existing Conditions
1230505102120Fans, up thru 1 H.P. or 2000 CFM, selective demolitioneach1$ - 0each1$ - 0$ - 0$ - 0
2220505102000Pipe, metal pipe, to 1-1/2" diam., selective demolitionlnft2,000$ - 0lnft2,000$ - 0$ - 0$ - 0
3220505102050Pipe, metal pipe, 2" to 3-1/2" diam., selective demolitionlnft520$ - 0lnft520$ - 0$ - 0$ - 0
4220505102100Pipe, metal pipe, 4" to 6" diam., selective demolitionlnft500$ - 0lnft500$ - 0$ - 0$ - 0
5230505108020Water chiller, 110 thru 500 ton, selective demolitioneach1$ - 0each1$ - 0$ - 0$ - 0
6230505109214Remove Rooftop Air Handling Unit/Air Conditioner/Heating Unit to 2 MCFMeach1$ - 0each1$ - 0$ - 0$ - 0
7230505109216Remove Rooftop Air Handling Unit/Air Conditioner/Heating Unit to 8 MCFMeach1$ - 0each1$ - 0$ - 0$ - 0
8230505100100Air conditioner, split unit air conditioner, 3 ton, selective demolitioneach4$ - 0each4$ - 0$ - 0$ - 0
9220505102186Pump, 7-1/2 H.P. thru 15 H.P., selective demolitioneach2$ - 0each2$ - 0$ - 0$ - 0
10230505102150Fan coil air conditioner, chilled water, up thru 7-1/2 ton, selective demolitioneach88$ - 0each88$ - 0$ - 0$ - 0
11230505101570Ductwork, metal; steel and stainless steel, fabricated, selective demolitionlbs2,000$ - 0lbs2,000$ - 0$ - 0$ - 0
12230505102120Fans, up thru 1 H.P. or 2000 CFM, selective demolitioneach2$ - 0each2$ - 0$ - 0$ - 0
13220505100732Grinder pump or sewage ejector system, simplex, selective demolitioneach2$ - 0each2$ - 0$ - 0$ - 0
14220505101600Fixture, water fountain, free standing, remove, includes 10' pipingeach6$ - 0each6$ - 0$ - 0$ - 0
15220505101520Fixture, urinal, wall mounted, selective demolition, includes 10' pipingeach3$ - 0each3$ - 0$ - 0$ - 0
211313503740.001Selective demolition, sprinkler headseach64$ - 0each64$ - 0$ - 0
16260505101285Panelboards, 4 wire, 120/208 V, 600 amp, to 42 circuits, electrical demolition, remove, including removal of all breakers, conduit terminations & wire connectionseach1$ - 0each1$ - 0$ - 0$ - 0
17260505101970Wire, THW-THWN-THHN, 350 kcmil, electrical demolition, removed from in place conduit, to 15' highlnft400$ - 0lnft400$ - 0$ - 0$ - 0
18260505101900Wire, THW-THWN-THHN, #1, electrical demolition, removed from in place conduit, to 15' highlnft100$ - 0lnft100$ - 0$ - 0$ - 0
19260505100240Conduit, electric metallic tubing (EMT), 2" to 3" diameter, electrical demolition, remove conduit to 15' high, including fittings & hangerslnft225$ - 0lnft225$ - 0$ - 0$ - 0
20260505351162Remove Main Switchboard 800-1,200 Ampseach1$ - 0each1$ - 0$ - 0$ - 0
21260505101990Wire, THW-THWN-THHN, 500 kcmil, electrical demolition, removed from in place conduit, to 15' highlnft500$ - 0lnft500$ - 0$ - 0$ - 0
22260505101910Wire, THW-THWN-THHN, 1/0, electrical demolition, removed from in place conduit, to 15' highlnft90$ - 0lnft90$ - 0$ - 0$ - 0
23260505101280Panelboards, 4 wire, 120/208 V, 400 amp, to 42 circuits, electrical demolition, remove, including removal of all breakers, conduit terminations & wire connectionseach1$ - 0each1$ - 0$ - 0$ - 0
24260505101890Wire, THW-THWN-THHN, #3, electrical demolition, removed from in place conduit, to 15' highlnft35$ - 0lnft35$ - 0$ - 0$ - 0
25260519901550.01Disconnect Existing Mechanical Equipmenteach1$ - 0each1$ - 0$ - 0$ - 0
26260505102140Fluorescent fixtures, interior, 4 lamp, 2' x 4', electrical demolition, remove, recessed drop-in, to 15' high, including supports & whipseach23$ - 0each23$ - 0$ - 0$ - 0
27260505505310Exit light, electrical demolition, removeeach3$ - 0each3$ - 0$ - 0$ - 0
28280505101210Beacon light, electrical demolition, removeeach5$ - 0each5$ - 0$ - 0$ - 0
29260505102720Mercury vapor wall pack, exterior, 250 Watt, electrical demolition, removeeach4$ - 0each4$ - 0$ - 0$ - 0
30260505100160Conduit, rigid galvanized steel, 4" to 6" diameter, electrical demolition, remove conduit to 15' high, including fittings & hangerslnft30$ - 0lnft30$ - 0$ - 0$ - 0
31260505101790Receptacle & switches, 15 to 30 amp, electrical demolition, removeeach1$ - 0each1$ - 0$ - 0$ - 0
32Selective demolition, masonry, veneers, brick, hard mortar, to 12" thicksqft330$ - 0sqft330$ - 0$ - 0
33230505102992Louver, selective demolitionsqft100$ - 0sqft100$ - 0$ - 0
34050505100605Remove Miscellaneous Metalslbs150$ - 0lbs150$ - 0$ - 0
35070505104420Selective demolition, thermal and moisture protection, roofing, single ply membrane, fully adheredsq (roofing)5$ - 0sq (roofing)5$ - 0$ - 0
36070505100220Selective demolition, thermal and moisture protection, flashing, sheet metalsqft420$ - 0sqft420$ - 0$ - 0
37Remove Built-Up Roofing & Accessories To Existing Decksqft420$ - 0sqft420$ - 0$ - 0
38090505200900Flooring demolition, vinyl composition tile, 12" x 12"sqft442$ - 0sqft442$ - 0$ - 0
39090505202000Flooring demolition, tile, ceramic, thin setsqft21$ - 0sqft21$ - 0$ - 0
40100505101930Urinal screen, removeeach4$ - 0each4$ - 0$ - 0
41090505101200Ceiling demolition, suspended ceiling, mineral fiber, 2 x 2 or 2 x 4, removesqft6,368$ - 0sqft6,368$ - 0$ - 0
42090505302800Walls and partitions demolition, paneling, 4' x 8' sheetssqft4,239$ - 0sqft4,239$ - 0$ - 0
43090505200800Flooring demolition, resilient, sheet goodssqft1,381$ - 0sqft1,381$ - 0$ - 0
44060505106300Selective demolition, wood framing, stair components, treadeach28$ - 0each28$ - 0$ - 0
45090505302300Walls and partitions demolition, metal or wood studs, finish two sides, plasterboard (drywall)sqft62$ - 0sqft62$ - 0$ - 0
46060505201500Selective demolition, millwork and trim, counter top, straight runslnft17$ - 0lnft17$ - 0$ - 0
47090505200850Flooring demolition, vinyl or rubber cove base, straight sectionlnft4,261$ - 0lnft4,261$ - 0$ - 0
48028213435000Bulk asbestos removal, remove VAT and mastic from floor by hand, includes disposable tools & 2 suits & 1 respirator filter/day/workersqft15,500$ - 0sqft15,500$ - 0$ - 0
49028213430610Bulk asbestos removal, pipe insulation, air cell type, 4" to 8" diameter pipe, includes disposable tools & 2 suits & 1 respirator filter/day/workerlnft3$ - 0lnft3$ - 0$ - 0
50028213450110OSHA testing, certified technician, maxdays2$ - 0days2$ - 0$ - 0
51028213420030Asbestos Abatement Work Area, equipment mobilization fees & truck decontaminationlsum1$ - 0lsum1$ - 0$ - 0
52028213390100Asbestos remediation, plans and methods, building survey, commercialeach1$ - 0each1$ - 0$ - 0
53028213420470Asbestos Abatement Work Area, decontamination chamber, portable, custom facility, interior areas, two chambers @ 10' x 10', cost amortized over 10 jobseach1$ - 0each1$ - 0$ - 0

Subtotal $ - $ - $ - $ -

AF Form 3052 Costs based on RS Means Cost Database 2018

DIV 3

Repair Roof & HVAC Navy Facility Building 1560
ESTIMATORADDRESS
CONTRACT FORPROPOSED TOTAL CONTRACT PRICE
$ - 0
PROJECTPROJECT NUMBERWORK LOCATION
Repair Roof & HVAC Navy Facility Building 15600Joint Base Andrews, MD
MATERIAL COSTLABOR COST
LINE NO.RS Means IDITEMUNIT OF MEASUREQUANTITYUNITTOTALUNIT OF MEASUREQUANTITYUNITTOTALOTHER DIRECT COSTSLINE TOTAL
(1)(2)(3)(4)(5)(6)(7)(8)(9)(10)
Division 3Concrete
1042210141150Concrete block, back-up, normal weight, tooled joint one side, 2000 psi, 8" x 8" x 16", includes mortar and horizontal joint reinforcing every other course, excludes scaffolding, vertical reinforcing and groutsqft100$ - 0sqft100$ - 0$ - 0$ - 0
2038216100100Drill Weep Holeseach50$ - 0each50$ - 0$ - 0$ - 0
3030130622200Patching concrete, walls, epoxy grout, 3/4" deep, including chipping, cleaning and epoxy groutsqft25$ - 0sqft25$ - 0$ - 0$ - 0
4030130711020Concrete crack repair, structural repair by epoxy injection (ACI RAP-1), suitable for horizontal, vertical and overhead repairs, blow out crack with oil-free dry compressed air (1 pass)lnft40$ - 0lnft40$ - 0$ - 0$ - 0
5030130711010Concrete crack repair, structural repair by epoxy injection (ACI RAP-1), suitable for horizontal, vertical and overhead repairs, clean/grind surface(s) free of contaminantslnft40$ - 0lnft40$ - 0$ - 0$ - 0

Subtotal $ - $ - $ - $ -

AF Form 3052 Costs based on RS Means Cost Database 2018

DIV 4

Repair Roof & HVAC Navy Facility Building 1560
ESTIMATORADDRESS
CONTRACT FORPROPOSED TOTAL CONTRACT PRICE
$ - 0
PROJECTPROJECT NUMBERWORK LOCATION
Repair Roof & HVAC Navy Facility Building 15600Joint Base Andrews, MD
MATERIAL COSTLABOR COST
LINE NO.RS Means IDITEMUNIT OF MEASUREQUANTITYUNITTOTALUNIT OF MEASUREQUANTITYUNITTOTALOTHER DIRECT COSTSLINE TOTAL
(1)(2)(3)(4)(5)(6)(7)(8)(9)(10)
Division 4Masonry
1040120201020Pointing masonry, re-point, mask and grout method, common bondsqft300$ - 0sqft300$ - 0$ - 0$ - 0
2040120410110Unit masonry stabilization, structural repointing method, cut/grind mortar jointlnft1,800$ - 0lnft1,800$ - 0$ - 0$ - 0
3Brick Veneer, Standard Sizesqft55$ - 0sqft55$ - 0$ - 0$ - 0
4040120400050Sawing masonry, brick or block, by hand, per inch depthlnft784$ - 0lnft784$ - 0$ - 0
5079213101150Masonry joint sealants, silicone, 1/2" x 1/2" joint, includes cut-out and re-caulk, excludes scaffoldinglnft784$ - 0lnft784$ - 0$ - 0$ - 0
6042113132000Brick veneer masonry, standard brick, select common, running bond, truckload lots, 6.75/SF, 4" x 2-2/3" x 8", includes 3% brick and 25% mortar waste, excludes scaffolding, grout and reinforcingsqft100$ - 0sqft100$ - 0$ - 0$ - 0

Subtotal $ - $ - $ - $ -

AF Form 3052 Costs based on RS Means Cost Database 2018

DIV 5

Repair Roof & HVAC Navy Facility Building 1560
ESTIMATORADDRESS
Crawford Consulting Services239 Highland Ave Suite 100, East Pittsburgh PA, 15112
CONTRACT FORPROPOSED TOTAL CONTRACT PRICE
$ - 0
PROJECTPROJECT NUMBERWORK LOCATION
Repair Roof & HVAC Navy Facility Building 15600Joint Base Andrews, MD
MATERIAL COSTLABOR COST
LINE NO.RS Means IDITEMUNIT OF MEASUREQUANTITYUNITTOTALUNIT OF MEASUREQUANTITYUNITTOTALOTHER DIRECT COSTSLINE TOTAL
(1)(2)(3)(4)(5)(6)(7)(8)(9)(10)
Division 5Metals
1015423700090Scaffolding, steel tubular, regular, labor only to erect & dismantle, building exterior, wall face, 6'-4" x 5' frames, 1 to 5 stories, excludes plankscsf224$ - 0csf224$ - 0$ - 0$ - 0
2077126100020Reglet, aluminum, in parapet, .025" thicklnft98$ - 0lnft98$ - 0$ - 0$ - 0
3076510100100Sheet metal flashing, aluminum, flexible, mill finish, .032" thick, including up to 4 bendssqft60$ - 0sqft60$ - 0$ - 0$ - 0

Subtotal $ - $ - $ - $ -

AF Form 3052 Costs based on RS Means Cost Database 2018

DIV 6

Repair Roof & HVAC Navy Facility Building 1560
ESTIMATORADDRESS
CONTRACT FORPROPOSED TOTAL CONTRACT PRICE
$ - 0
PROJECTPROJECT NUMBERWORK LOCATION
Repair Roof & HVAC Navy Facility Building 15600Joint Base Andrews, MD
MATERIAL COSTLABOR COST
LINE NO.RS Means IDITEMUNIT OF MEASUREQUANTITYUNITTOTALUNIT OF MEASUREQUANTITYUNITTOTALOTHER DIRECT COSTSLINE TOTAL
(1)(2)(3)(4)(5)(6)(7)(8)(9)(10)
Division 6Wood, Plastics, Composites
1075216101625SBS modified bituminous membrane, heavyweight base sheet, 87 to 120 mil thicksqft420$ - 0sqft420$ - 0$ - 0
2075216100750SBS modified bituminous membrane, granule surface cap sheet, polyester reinforced, 150 to 160 milssqft420$ - 0sqft420$ - 0$ - 0
3075216102010SBS modified bituminous membrane, elastomeric asphalt primersqft420$ - 0sqft420$ - 0$ - 0$ - 0
4075216102050SBS modified bituminous membrane, seam heat weldinglnft63$ - 0lnft63$ - 0$ - 0$ - 0
5061643100040Gypsum sheathing, with embedded glass mats, 1/2" thicksqft270$ - 0sqft270$ - 0$ - 0$ - 0
6073219104170Roof tiles, flashing tile w/rubber boot, 100% recycled aluminum, for 4-1/2" pipeeach1$ - 0each1$ - 0$ - 0$ - 0
7061110245100Wood framing, miscellaneous, nailers, treated, wood construction, 2" x 6"lnft120$ - 0lnft120$ - 0$ - 0$ - 0
8075113300012Cants, treated lumber, cut diagonally, 4" x 4"lnft60$ - 0lnft60$ - 0$ - 0$ - 0
9061110305980Wood framing, roof curbs, untreated, 2" x 12"lnft60$ - 0lnft60$ - 0$ - 0$ - 0

Subtotal $ - $ - $ - $ -

AF Form 3052 Costs based on RS Means Cost Database 2018

DIV 7

Repair Roof & HVAC Navy Facility Building 1560
ESTIMATORADDRESS
CONTRACT FORPROPOSED TOTAL CONTRACT PRICE
$ - 0
PROJECTPROJECT NUMBERWORK LOCATION
Repair Roof & HVAC Navy Facility Building 15600Joint Base Andrews, MD
MATERIAL COSTLABOR COST
LINE NO.RS Means IDITEMUNIT OF MEASUREQUANTITYUNITTOTALUNIT OF MEASUREQUANTITYUNITTOTALOTHER DIRECT COSTSLINE TOTAL
(1)(2)(3)(4)(5)(6)(7)(8)(9)(10)
Division 7Thermal and Moisture Protection
1072726100100Fluid applied membrane air barrier, 25 S.F./Gallon, spraysqft100$ - 0sqft100$ - 0$ - 0$ - 0
2072113101960Wall insulation, rigid, extruded polystyrene, 25 PSI compressive strength, 3" thick, R15sqft100$ - 0sqft100$ - 0$ - 0$ - 0
3079213101150Masonry joint sealants, silicone, 1/2" x 1/2" joint, includes cut-out and re-caulk, excludes scaffoldinglnft785$ - 0lnft785$ - 0$ - 0$ - 0
4079213101150Masonry joint sealants, silicone, 1/2" x 1/2" joint, includes cut-out and re-caulk, excludes scaffoldinglnft6,848$ - 0lnft6,848$ - 0$ - 0$ - 0
5072216101765Roof deck insulation, polyisocyanurate, tapered for drainage, fastening excludedbf(board feet)540$ - 0bf(board feet)540$ - 0$ - 0$ - 0
6072216103110Roof deck insulation, fastening alternatives, 12" OC beads, low-rise polyurethanesq(roofing)3$ - 0sq(roofing)3$ - 0$ - 0$ - 0
7072610101200Vapor Retarders, building paper, polyethylene vapor barrier, standard, .010" thicksq(roofing)5$ - 0sq(roofing)5$ - 0$ - 0$ - 0
8072216101745Polyisocyanurate Insulation, for roof decks, 3" thick, 2#/CF densitysqft420$ - 0sqft420$ - 0$ - 0$ - 0

Subtotal $ - $ - $ - $ -

AF Form 3052 Costs based on RS Means Cost Database 2018

DIV 8

Repair Roof & HVAC Navy Facility Building 1560
ESTIMATORADDRESS
CONTRACT FORPROPOSED TOTAL CONTRACT PRICE
$ - 0
PROJECTPROJECT NUMBERWORK LOCATION
Repair Roof & HVAC Navy Facility Building 15600Joint Base Andrews, MD
MATERIAL COSTLABOR COST
LINE NO.RS Means IDITEMUNIT OF MEASUREQUANTITYUNITTOTALUNIT OF MEASUREQUANTITYUNITTOTALOTHER DIRECT COSTSLINE TOTAL
(1)(2)(3)(4)(5)(6)(7)(8)(9)(10)
Division 8Openings
1085113206520Windows, aluminum, commercial grade, stock units, standard brush finish, casement, fixed, incl. frame and glazing.sqft3,707$ - 0sqft3,707$ - 0$ - 0$ - 0
2040130204000Cleaning Windowssqft7,414$ - 0sqft7,414$ - 0$ - 0$ - 0
3Repair Loose Metal Window Trimlsum1$ - 0lsum1$ - 0$ - 0
4099123390140Paints & coatings, interior latex, zero voc, doors, flush, both sides, roll & brush, primer + 2 coats, incl. frame & trimeach94$ - 0each94$ - 0$ - 0$ - 0

Subtotal $ - $ - $ - $ -

AF Form 3052 Costs based on RS Means Cost Database 2018

DIV 9

Repair Roof & HVAC Navy Facility Building 1560
ESTIMATORADDRESS
CONTRACT FORPROPOSED TOTAL CONTRACT PRICE
$ - 0
PROJECTPROJECT NUMBERWORK LOCATION
Repair Roof & HVAC Navy Facility Building 15600Joint Base Andrews, MD
MATERIAL COSTLABOR COST
LINE NO.RS Means IDITEMUNIT OF MEASUREQUANTITYUNITTOTALUNIT OF MEASUREQUANTITYUNITTOTALOTHER DIRECT COSTSLINE TOTAL
(1)(2)(3)(4)(5)(6)(7)(8)(9)(10)
Division 9Finishes
1099113900600Paints & coatings, walls, concrete masonry units (CMU), porous, first coat, waterproof sealer, spraysqft15,680$ - 0sqft15,680$ - 0$ - 0$ - 0
2099113900610Paints & coatings, walls, concrete masonry units (CMU), porous, second coat, waterproof sealer, spraysqft15,680$ - 0sqft15,680$ - 0$ - 0$ - 0
3Prep/Paint Single Dooreach1$ - 0each1$ - 0$ - 0$ - 0
4093013105800Ceramic tile, walls, interior, thin set, 6" x 6"sqft42$ - 0sqft42$ - 0$ - 0$ - 0
5092813100200Cementitious backerboard, on wall, 3' x 6' x 5/8" sheetsqft42$ - 0sqft42$ - 0$ - 0$ - 0
6099123720240Paints & coatings, walls & ceilings, interior, concrete, drywall or plaster, latex paint, primer or sealer coat, smooth finish, rollersqft73,848$ - 0sqft73,848$ - 0$ - 0$ - 0
7099123720840Paints & coatings, walls & ceilings, interior, concrete, drywall or plaster, latex paint, 2 coats, smooth finish, rollersqft73,848$ - 0sqft73,848$ - 0$ - 0$ - 0
8093013103255Ceramic tile, floors, glazed, thin set, color group 1, 6" x 6"sqft21$ - 0sqft21$ - 0$ - 0$ - 0
9096516105900Resilient flooring, rubber, sheet goods, 3' w, 1/8" thicksqft214$ - 0sqft214$ - 0$ - 0$ - 0
10096519237800Flooring, vinyl tile, max, premium colors/jpatterns, 12" x 12"x 1/8"sqft442$ - 0sqft442$ - 0$ - 0$ - 0
11096519237650Flooring, vinyl tile, solid colors, 12" x 12"x 1/8"sqft1,167$ - 0sqft1,167$ - 0$ - 0$ - 0
12096813101100Carpet tile, tufted nylon, 24 oz., 18" x 18" or 24" x 24"sqyd1,812$ - 0sqyd1,812$ - 0$ - 0$ - 0
13093013100700Ceramic tile, cove base, thin set, 4-1/4" x 4-1/4"lnft7$ - 0lnft7$ - 0$ - 0$ - 0
14096513131100Wall base, rubber, straight or cove, standard colors, 4" high, 1/8" thicklnft4,261$ - 0lnft4,261$ - 0$ - 0$ - 0
15095123300820Complete suspended ceilings, mineral fiber, Tegular, 2' x 2' x 5/8", on 9/16" grid, include standard suspension system, excl. 1-1/2" carrier channelssqft6,368$ - 0sqft6,368$ - 0$ - 0$ - 0
16092910302050Gypsum wallboard, on walls, standard, taped & finished (level 4 finish), 5/8" thicksqft4,230$ - 0sqft4,230$ - 0$ - 0$ - 0
17096513230600Stair treads & risers, rubber, molded tread, black, 12" w, 1/4" thicklnft101$ - 0lnft101$ - 0$ - 0$ - 0

Subtotal $ - $ - $ - $ -

AF Form 3052 Costs based on RS Means Cost Database 2018

DIV 10

Repair Roof & HVAC Navy Facility Building 1560
ESTIMATORADDRESS
Crawford Consulting Services239 Highland Ave Suite 100, East Pittsburgh PA, 15112
CONTRACT FORPROPOSED TOTAL CONTRACT PRICE
$ - 0
PROJECTPROJECT NUMBERWORK LOCATION
Repair Roof & HVAC Navy Facility Building 15600Joint Base Andrews, MD
MATERIAL COSTLABOR COST
LINE NO.RS Means IDITEMUNIT OF MEASUREQUANTITYUNITTOTALUNIT OF MEASUREQUANTITYUNITTOTALOTHER DIRECT COSTSLINE TOTAL
(1)(2)(3)(4)(5)(6)(7)(8)(9)(10)
Division 10Specialties
1$ - 000$ - 0$ - 0
2$ - 000$ - 0$ - 0
3$ - 000$ - 0$ - 0
4$ - 000$ - 0$ - 0
5$ - 000$ - 0$ - 0
6$ - 000$ - 0$ - 0
7$ - 000$ - 0$ - 0
8$ - 000$ - 0$ - 0
9$ - 000$ - 0$ - 0
10$ - 000$ - 0$ - 0
11$ - 000$ - 0$ - 0
12$ - 000$ - 0$ - 0
13$ - 000$ - 0$ - 0
14$ - 000$ - 0$ - 0

Subtotal $ - $ - $ - $ -

AF Form 3052 Costs based on RS Means Cost Database 2018

DIV 11

Repair Roof & HVAC Navy Facility Building 1560
ESTIMATORADDRESS
Crawford Consulting Services239 Highland Ave Suite 100, East Pittsburgh PA, 15112
CONTRACT FORPROPOSED TOTAL CONTRACT PRICE
$ - 0
PROJECTPROJECT NUMBERWORK LOCATION
Repair Roof & HVAC Navy Facility Building 15600Joint Base Andrews, MD
MATERIAL COSTLABOR COST
LINE NO.RS Means IDITEMUNIT OF MEASUREQUANTITYUNITTOTALUNIT OF MEASUREQUANTITYUNITTOTALOTHER DIRECT COSTSLINE TOTAL
(1)(2)(3)(4)(5)(6)(7)(8)(9)(10)
Division 11Equipment
1$ - 000$ - 0$ - 0
2$ - 000$ - 0$ - 0
3$ - 000$ - 0$ - 0
4$ - 000$ - 0$ - 0
5$ - 000$ - 0$ - 0
6$ - 000$ - 0$ - 0
7$ - 000$ - 0$ - 0
8$ - 000$ - 0$ - 0
9$ - 000$ - 0$ - 0
10$ - 000$ - 0$ - 0
11$ - 000$ - 0$ - 0
12$ - 000$ - 0$ - 0
13$ - 000$ - 0$ - 0
14$ - 000$ - 0$ - 0

Subtotal $ - $ - $ - $ -

AF Form 3052 Costs based on RS Means Cost Database 2018

DIV 12

Repair Roof & HVAC Navy Facility Building 1560
ESTIMATORADDRESS
CONTRACT FORPROPOSED TOTAL CONTRACT PRICE
$ - 0
PROJECTPROJECT NUMBERWORK LOCATION
Repair Roof & HVAC Navy Facility Building 15600Joint Base Andrews, MD
MATERIAL COSTLABOR COST
LINE NO.RS Means IDITEMUNIT OF MEASUREQUANTITYUNITTOTALUNIT OF MEASUREQUANTITYUNITTOTALOTHER DIRECT COSTSLINE TOTAL
(1)(2)(3)(4)(5)(6)(7)(8)(9)(10)
Division 12Furnishings
1123661162700Solid surface countertop, acrylic polymer, solid colors, with hard seam attached 4" backsplash, pricing for orders of 1 - 50 LF, 25" widelnft17$ - 0lnft17$ - 0$ - 0$ - 0

Subtotal $ - $ - $ - $ -

AF Form 3052 Costs based on RS Means Cost Database 2018

DIV 13

Repair Roof & HVAC Navy Facility Building 1560
ESTIMATORADDRESS
Crawford Consulting Services239 Highland Ave Suite 100, East Pittsburgh PA, 15112
CONTRACT FORPROPOSED TOTAL CONTRACT PRICE
$ - 0
PROJECTPROJECT NUMBERWORK LOCATION
Repair Roof & HVAC Navy Facility Building 15600Joint Base Andrews, MD
MATERIAL COSTLABOR COST
LINE NO.RS Means IDITEMUNIT OF MEASUREQUANTITYUNITTOTALUNIT OF MEASUREQUANTITYUNITTOTALOTHER DIRECT COSTSLINE TOTAL
(1)(2)(3)(4)(5)(6)(7)(8)(9)(10)
Division 13Special Construction
1$ - 000$ - 0$ - 0
2$ - 000$ - 0$ - 0
3$ - 000$ - 0$ - 0
4$ - 000$ - 0$ - 0
5$ - 000$ - 0$ - 0
6$ - 000$ - 0$ - 0
7$ - 000$ - 0$ - 0
8$ - 000$ - 0$ - 0
9$ - 000$ - 0$ - 0
10$ - 000$ - 0$ - 0
11$ - 000$ - 0$ - 0
12$ - 000$ - 0$ - 0
13$ - 000$ - 0$ - 0
14$ - 000$ - 0$ - 0

Subtotal $ - $ - $ - $ -

AF Form 3052 Costs based on RS Means Cost Database 2018

DIV 14

Repair Roof & HVAC Navy Facility Building 1560
ESTIMATORADDRESS
Crawford Consulting Services239 Highland Ave Suite 100, East Pittsburgh PA, 15112
CONTRACT FORPROPOSED TOTAL CONTRACT PRICE
$ - 0
PROJECTPROJECT NUMBERWORK LOCATION
Repair Roof & HVAC Navy Facility Building 15600Joint Base Andrews, MD
MATERIAL COSTLABOR COST
LINE NO.RS Means IDITEMUNIT OF MEASUREQUANTITYUNITTOTALUNIT OF MEASUREQUANTITYUNITTOTALOTHER DIRECT COSTSLINE TOTAL
(1)(2)(3)(4)(5)(6)(7)(8)(9)(10)
Division 14Conveying Equipment
1$ - 000$ - 0$ - 0
2$ - 000$ - 0$ - 0
3$ - 000$ - 0$ - 0
4$ - 000$ - 0$ - 0
5$ - 000$ - 0$ - 0
6$ - 000$ - 0$ - 0
7$ - 000$ - 0$ - 0
8$ - 000$ - 0$ - 0
9$ - 000$ - 0$ - 0
10$ - 000$ - 0$ - 0
11$ - 000$ - 0$ - 0
12$ - 000$ - 0$ - 0
13$ - 000$ - 0$ - 0
14$ - 000$ - 0$ - 0

Subtotal $ - $ - $ - $ -

AF Form 3052 Costs based on RS Means Cost Database 2018

DIV 21

Repair Roof & HVAC Navy Facility Building 1560
ESTIMATORADDRESS
CONTRACT FORPROPOSED TOTAL CONTRACT PRICE
$ - 0
PROJECTPROJECT NUMBERWORK LOCATION
Repair Roof & HVAC Navy Facility Building 15600Joint Base Andrews, MD
MATERIAL COSTLABOR COST
LINE NO.RS Means IDITEMUNIT OF MEASUREQUANTITYUNITTOTALUNIT OF MEASUREQUANTITYUNITTOTALOTHER DIRECT COSTSLINE TOTAL
(1)(2)(3)(4)(5)(6)(7)(8)(9)(10)
Division 21Fire Suppression
1211313503740Sprinkler system components, sprinkler heads, standard spray, pendent or upright, brass, 135 to 286 degrees F, 1/2" NPT, 1/2" orifice, excludes supply pipingeach64$ - 0each64$ - 0$ - 0

Subtotal $ - $ - $ - $ -

AF Form 3052 Costs based on RS Means Cost Database 2018

DIV 22

Repair Roof & HVAC Navy Facility Building 1560
ESTIMATORADDRESS
CONTRACT FORPROPOSED TOTAL CONTRACT PRICE
$ - 0
PROJECTPROJECT NUMBERWORK LOCATION
Repair Roof & HVAC Navy Facility Building 15600Joint Base Andrews, MD
MATERIAL COSTLABOR COST
LINE NO.RS Means IDITEMUNIT OF MEASUREQUANTITYUNITTOTALUNIT OF MEASUREQUANTITYUNITTOTALOTHER DIRECT COSTSLINE TOTAL
(1)(2)(3)(4)(5)(6)(7)(8)(9)(10)
Division 22Plumbing
1224213133100Water closet, bowl only, wall hung, includes flush valve and seateach3$ - 0each3$ - 0$ - 0$ - 0
2224213133200Water closet, bowl only, wall hung, rough-in, supply, waste and venteach3$ - 0each3$ - 0$ - 0$ - 0
3224716101000Water cooler, wall mounted, non-recessed, dual height, 8.2 GPHeach4$ - 0each4$ - 0$ - 0$ - 0
4224716101240Water cooler, wall mounted, non-recessed, dual height, for stainless steel cabinet, addeach4$ - 0each4$ - 0$ - 0$ - 0
5224716103200Water cooler, wall mounted, simulated recessed, for glass filler, addeach4$ - 0each4$ - 0$ - 0$ - 0
6224716109800Water cooler, for supply, waste and vent, all coolerseach4$ - 0each4$ - 0$ - 0$ - 0
7CPVC Pipe - 2"lnft60$ - 0lnft60$ - 0$ - 0$ - 0
8026610101633H.D. polyethylene sumps, sump base, 48"each1$ - 0each1$ - 0$ - 0$ - 0
9221429132040Pump, pedestal sump, single stage, 150 GPM, 3 H.P., 3" dischargeeach1$ - 0each1$ - 0$ - 0$ - 0
10223313100160Hot water dispenser, commercial, 100 cup, 11.3 ampeach2$ - 0each2$ - 0$ - 0$ - 0
11220576100140.001Snake out floor drainseach2$ - 0each2$ - 0$ - 0$ - 0
12232129100120Pump, condensate removal system, pump with 1 Gal. ABS tank, 115 V, 1/50 HP, 200 GPHeach1$ - 0each1$ - 0$ - 0$ - 0

Subtotal $ - $ - $ - $ -

AF Form 3052 Costs based on RS Means Cost Database 2018

DIV 23

Repair Roof & HVAC Navy Facility Building 1560
ESTIMATORADDRESS
CONTRACT FORPROPOSED TOTAL CONTRACT PRICE
$ - 0
PROJECTPROJECT NUMBERWORK LOCATION
Repair Roof & HVAC Navy Facility Building 15600Joint Base Andrews, MD
MATERIAL COSTLABOR COST
LINE NO.RS Means IDITEMUNIT OF MEASUREQUANTITYUNITTOTALUNIT OF MEASUREQUANTITYUNITTOTALOTHER DIRECT COSTSLINE TOTAL
(1)(2)(3)(4)(5)(6)(7)(8)(9)(10)
Division 23HVAC
1236419100546Water chiller, liquid chiller, packaged unit with integral air cooled condenser, 70 ton cooling, includes standard controlseach1$ - 0each1$ - 0$ - 0$ - 0
2238126100150Split ductless system, cooling only, single zone, wall mount, 2 ton coolingeach5$ - 0each5$ - 0$ - 0$ - 0
3238126107050Split ductless system, accessories for all split ductless systems, for tube / wiring kit, 50' kiteach5$ - 0each5$ - 0$ - 0$ - 0
4233113130570.01Metal Ductwork, fabricated rectangular, galvanized steel, 2000 to 5000 lb., includes fittings, joints, supports and allowance for a flexible connection, excludes insulationlbs4,700$ - 0lbs4,700$ - 0$ - 0$ - 0
5233353103970Insulation, duct, board type, non-fibrous foam, temperature, bacteria and fungi resistant, 1-1/2" thicksqft1,200$ - 0sqft1,200$ - 0$ - 0$ - 0
6233113130140Metal Ductwork, fabricated rectangular, 1000 to 2000 lb., aluminum alloy 3003-H14, includes fittings, joints, supports and allowance for a flexible connection, excludes insulationlbs1,200$ - 0lbs1,200$ - 0$ - 0$ - 0
7230713103170.001Duct thermal insulation, blanket type, fiberglass, flexible, FSK vapor barrier wrap, .75 lb. density, 1-1/2" thicksqft2,600$ - 0sqft2,600$ - 0$ - 0$ - 0
8Grilles, Registers, Diffuserseach36$ - 0each36$ - 0$ - 0$ - 0
9.75" Copper Pipe - Type Llnft500$ - 0lnft500$ - 0$ - 0$ - 0
101.0" Copper Pipe - Type Llnft1,280$ - 0lnft1,280$ - 0$ - 0$ - 0
111.25" Copper Pipe - Type Llnft960$ - 0lnft960$ - 0$ - 0$ - 0
121.5" Copper Pipe - Type Llnft300$ - 0lnft300$ - 0$ - 0$ - 0
132.0" Copper Pipe - Type Llnft250$ - 0lnft250$ - 0$ - 0$ - 0
142.5 sch 40 BWlnft220$ - 0lnft220$ - 0$ - 0
153.0 sch 40 BW, no valveslnft400$ - 0lnft400$ - 0$ - 0
164.0 sch 40 BW, no valveslnft180$ - 0lnft180$ - 0$ - 0
176.0 sch 40 BW, no valveslnft120$ - 0lnft120$ - 0$ - 0
18220719106860Insulation, pipe covering (price copper tube one size less than I.P.S.), fiberglass with all service jacket, 1" wall, 3/4" iron pipe sizelnft500$ - 0lnft500$ - 0$ - 0
19220719106870Insulation, pipe covering (price copper tube one size less than I.P.S.), fiberglass with all service jacket, 1" wall, 1" iron pipe sizelnft1,280$ - 0lnft1,280$ - 0$ - 0
20220719106880Insulation, pipe covering (price copper tube one size less than I.P.S.), fiberglass with all service jacket, 1" wall, 1-1/4" iron pipe sizelnft960$ - 0lnft960$ - 0$ - 0
21220719107130Insulation, pipe covering (price copper tube one size less than I.P.S.), fiberglass with all service jacket, 1-1/2" wall, 1-1/2" iron pipe sizelnft300$ - 0lnft300$ - 0$ - 0
22220719107140Insulation, pipe covering (price copper tube one size less than I.P.S.), fiberglass with all service jacket, 1-1/2" wall, 2" iron pipe sizelnft250$ - 0lnft250$ - 0$ - 0
23220719107150Insulation, pipe covering (price copper tube one size less than I.P.S.), fiberglass with all service jacket, 1-1/2" wall, 2-1/2" iron pipe sizelnft220$ - 0lnft220$ - 0$ - 0
24220719107160Insulation, pipe covering (price copper tube one size less than I.P.S.), fiberglass with all service jacket, 1-1/2" wall, 3" iron pipe sizelnft400$ - 0lnft400$ - 0$ - 0
25220719107180Insulation, pipe covering (price copper tube one size less than I.P.S.), fiberglass with all service jacket, 1-1/2" wall, 4" iron pipe sizelnft180$ - 0lnft180$ - 0$ - 0
26220719107200Insulation, pipe covering (price copper tube one size less than I.P.S.), fiberglass with all service jacket, 1-1/2" wall, 6" iron pipe sizelnft120$ - 0lnft120$ - 0$ - 0
27221123104050Pump, general utility, centrifugal, end suction, horizontal base mounted, vertical split case, rated @ 100' head, single stage, 200 GPM, 10 H.P., 2" discharge, includes drip proof motoreach2$ - 0each2$ - 0$ - 0
282.0" Pump hook upeach2$ - 0each2$ - 0$ - 0
29230523300810Valves, iron body, butterfly, lug type, gear operated, 200 lb., 3"each2$ - 0each2$ - 0$ - 0
30221123104060Pump, general utility, centrifugal, end suction, horizontal base mounted, vertical split case, rated @ 100' head, single stage, 250 GPM, 10 H.P., 3" discharge, includes drip proof motoreach2$ - 0each2$ - 0$ - 0
313" Pump hook upeach2$ - 0each2$ - 0$ - 0
32233413100522Fans, air conditioning and process air handling, axial flow, constant speed, direct drive, 1/8" S.P., 4130 CFM, 3/4 H.P., 20"each1$ - 0each1$ - 0$ - 0
33ERV/DOAS - Greenheck ERCH, per CFMcfm4,300$ - 0cfm4,300$ - 0$ - 0
34238239135420Hydronic heating, unit heater, cabinet, hot water, horizontal, blower type, 20 MBHeach12$ - 0each12$ - 0$ - 0
35238219100282Fan coil A.C., cabinet mounted, chilled water, vertical unit with hot water heating, 4 pipe, 2 ton cooling, includes filters and controlseach88$ - 0each88$ - 0$ - 0
360.75" AHU Hook Upeach176$ - 0each88$ - 0$ - 0
37Control, Energy Recovery Unit - Water Coilseach1$ - 0each1$ - 0$ - 0
38Control, Fan Coil Uniteach88$ - 0each88$ - 0$ - 0
39Control, Chillereach1$ - 0each1$ - 0$ - 0
40Control, Pumpeach4$ - 0each4$ - 0$ - 0
41Control, Zone Controllereach3$ - 0each3$ - 0$ - 0
42230593200200Balancing, water, chiller, (Subcontractor's quote including material & labor)each1$ - 0each1$ - 0$ - 0
43230593200600Balancing, water, fan coil unit, unit ventilator, (Subcontractor's quote including material & labor)each88$ - 0each88$ - 0$ - 0
44230593200800Balancing, water, main and duct re-heat coils, (Subcontractor's quote including material & labor)each2$ - 0each2$ - 0$ - 0
45230593201000Balancing, water, pumps, (Subcontractor's quote including material & labor)each4$ - 0each4$ - 0$ - 0
46230593200100Balancing, water, cabinet unit heater, (Subcontractor's quote including material & labor)each12$ - 0each12$ - 0$ - 0
47230593102801Balancing, air conditioning equipment, rooftop heating and cooling unit, (Subcontractor's quote including material & labor)each1$ - 0each1$ - 0$ - 0
48230593103000Balancing, air conditioning equipment, supply, return, exhaust, registers and diffusers, average ceiling height, (Subcontractor's quote including material & labor)each36$ - 0each36$ - 0$ - 0
49230593101100.002Commissioninghours160$ - 0hours160$ - 0$ - 0$ - 0

Subtotal $ - $ - $ - $ -

AF Form 3052 Costs based on RS Means Cost Database 2018

DIV 26

Repair Roof & HVAC Navy Facility Building 1560
ESTIMATORADDRESS
CONTRACT FORPROPOSED TOTAL CONTRACT PRICE
$ - 0
PROJECTPROJECT NUMBERWORK LOCATION
Repair Roof & HVAC Navy Facility Building 15600Joint Base Andrews, MD
MATERIAL COSTLABOR COST
LINE NO.RS Means IDITEMUNIT OF MEASUREQUANTITYUNITTOTALUNIT OF MEASUREQUANTITYUNITTOTALOTHER DIRECT COSTSLINE TOTAL
(1)(2)(3)(4)(5)(6)(7)(8)(9)(10)
Division 26Electrical
1260519902600Wire, copper, stranded, 600 volt, 350 kcmil, type THWN-THHN, in racewaylnft400$ - 0lnft400$ - 0$ - 0$ - 0
2260519901550Wire, copper, stranded, 600 volt, #1, type THWN-THHN, in racewaylnft700$ - 0lnft700$ - 0$ - 0$ - 0
3260519902800Wire, copper, stranded, 600 volt, 500 kcmil, type THWN-THHN, in racewaylnft360$ - 0lnft360$ - 0$ - 0$ - 0
4260519901600Wire, copper, stranded, 600 volt, 1/0, type THWN-THHN, in racewaylnft90$ - 0lnft90$ - 0$ - 0$ - 0
5260533135140Electric metallic tubing (EMT), 3" diameter, to 15' high, incl 2 terminations, 2 elbows, 11 beam clamps, and 11 couplings per 100 LFlnft130$ - 0lnft130$ - 0$ - 0$ - 0
6260519902800Wire, copper, stranded, 600 volt, 500 kcmil, type THWN-THHN, in racewaylnft160$ - 0lnft160$ - 0$ - 0$ - 0
7260519901450Wire, copper, stranded, 600 volt, #3, type THWN-THHN, in racewaylnft40$ - 0lnft40$ - 0$ - 0$ - 0
8260519901300Wire, copper, stranded, 600 volt, #8, type THWN-THHN, in racewaylnft150$ - 0lnft150$ - 0$ - 0$ - 0
9260533135060Electric metallic tubing (EMT), 1-1/4" diameter, to 15' high, incl 2 terminations, 2 elbows, 11 beam clamps, and 11 couplings per 100 LFlnft250$ - 0lnft250$ - 0$ - 0$ - 0
10260519901400Wire, copper, stranded, 600 volt, #4, type THWN-THHN, in racewaylnft600$ - 0lnft600$ - 0$ - 0$ - 0
11260519901250Wire, copper, stranded, 600 volt, #10, type THWN-THHN, in racewaylnft2,400$ - 0lnft2,400$ - 0$ - 0$ - 0
12260533135040Electric metallic tubing (EMT), 1" diameter, to 15' high, incl 2 terminations, 2 elbows, 11 beam clamps, and 11 couplings per 100 LFlnft400$ - 0lnft400$ - 0$ - 0$ - 0
13337119179960Electrical underground ducts and manholes, nylon polyethylene pull rope, 1/4"lnft75$ - 0lnft75$ - 0$ - 0$ - 0
14Feeder (2-#10 and 1-#12G in 3/4" EMT)lnft300$ - 0lnft300$ - 0$ - 0$ - 0
15262416302350Panelboards, 3 phase 4 wire, main circuit breaker, 120/208 V, 600 amp, 42 circuits, NQOD, incl 20 A 1 pole plug-in breakerseach1$ - 0each1$ - 0$ - 0$ - 0
16262416302300Panelboards, 3 phase 4 wire, main circuit breaker, 120/208 V, 400 amp, 42 circuits, NQOD, incl 20 A 1 pole plug-in breakerseach1$ - 0each1$ - 0$ - 0$ - 0
17262413104800Switchboards, circuit breaker, mold case, 3 pole, 4 wire, 800 ampeach1$ - 0each1$ - 0$ - 0$ - 0
18262413105000Switchboards, circuit breaker, mold case, 3 pole, 4 wire, 1200 ampeach1$ - 0each1$ - 0$ - 0$ - 0
19262726202470Duplex receptacle, grounded, 120 volt, 20 ampeach1$ - 0each1$ - 0$ - 0$ - 0
20Interior LED fixtures, troffer, recess mounted, 6400 Lumens, 2' x 4', replaces four T8 lamp, incl lamps, mounting hardware and connectionseach23$ - 0each23$ - 0$ - 0$ - 0
21265313100200Exit lighting, LED standard, single face, ceiling or wall mounteach3$ - 0each3$ - 0$ - 0$ - 0
22265623101280LED fixture, exterior, wall pack, poly lens, 110 watt, incl lampseach4$ - 0each4$ - 0$ - 0$ - 0
23265213100500Emergency lighting units, lead battery operated, twin sealed beam light, 25 W, 6 V eacheach2$ - 0each2$ - 0$ - 0$ - 0
24265113556000Interior LED fixtures, surface mounted, 103 wattseach1$ - 0each1$ - 0$ - 0$ - 0
25260533135120Electric metallic tubing (EMT), 2-1/2" diameter, to 15' high, incl 2 terminations, 2 elbows, 11 beam clamps, and 11 couplings per 100 LFlnft150$ - 0lnft150$ - 0$ - 0$ - 0
26Grounding Equipmentsqft9,000$ - 0sqft9,000$ - 0$ - 0$ - 0
27Lightning Protectionsqft9,000$ - 0sqft9,000$ - 0$ - 0$ - 0

Subtotal $ - $ - $ - $ -

AF Form 3052 Costs based on RS Means Cost Database 2018

DIV 27

Repair Roof & HVAC Navy Facility Building 1560
ESTIMATORADDRESS
CONTRACT FORPROPOSED TOTAL CONTRACT PRICE
$ - 0
PROJECTPROJECT NUMBERWORK LOCATION
Repair Roof & HVAC Navy Facility Building 15600Joint Base Andrews, MD
MATERIAL COSTLABOR COST
LINE NO.RS Means IDITEMUNIT OF MEASUREQUANTITYUNITTOTALUNIT OF MEASUREQUANTITYUNITTOTALOTHER DIRECT COSTSLINE TOTAL
(1)(2)(3)(4)(5)(6)(7)(8)(9)(10)
Division 27Communications
1270529100140Cable support, J-Hook, Single Tier, Single Sided, 4" diaeach80$ - 0each80$ - 0$ - 0$ - 0

Subtotal $ - $ - $ - $ -

AF Form 3052 Costs based on RS Means Cost Database 2018

DIV 28

Repair Roof & HVAC Navy Facility Building 1560
ESTIMATORADDRESS
CONTRACT FORPROPOSED TOTAL CONTRACT PRICE
$ - 0
PROJECTPROJECT NUMBERWORK LOCATION
Repair Roof & HVAC Navy Facility Building 15600Joint Base Andrews, MD
MATERIAL COSTLABOR COST
LINE NO.RS Means IDITEMUNIT OF MEASUREQUANTITYUNITTOTALUNIT OF MEASUREQUANTITYUNITTOTALOTHER DIRECT COSTSLINE TOTAL
(1)(2)(3)(4)(5)(6)(7)(8)(9)(10)
Division 28Electronic Safety and Security
1283146505420Detection system, smoke detector, duct type, addressable, excl. wires & conduiteach4$ - 0each4$ - 0$ - 0$ - 0
2283123504175Detection system, fire alarm control panel, addressable interface device, excluding wires & conduitseach2$ - 0each2$ - 0$ - 0$ - 0
3280513231600Fire alarm cable, FEP teflon, 150 volt, to 200 Deg.C, #22, 2 pairclf240$ - 0clf240$ - 0$ - 0$ - 0
4260533135020Electric metallic tubing (EMT), 3/4" diameter, to 15' high, incl 2 terminations, 2 field bend elbows, 11 beam clamps, and 11 couplings per 100 LFlnft200$ - 0lnft200$ - 0$ - 0$ - 0
5265533100310Flashing beacon, 120V, 40 watt halogen, surface mount, with colored or clear lenseach5$ - 0each5$ - 0$ - 0$ - 0

Subtotal $ - $ - $ - $ -

AF Form 3052 Costs based on RS Means Cost Database 2018

DIV 31

Repair Roof & HVAC Navy Facility Building 1560
ESTIMATORADDRESS
CONTRACT FORPROPOSED TOTAL CONTRACT PRICE
$ - 0
PROJECTPROJECT NUMBERWORK LOCATION
Repair Roof & HVAC Navy Facility Building 15600Joint Base Andrews, MD
MATERIAL COSTLABOR COST
LINE NO.RS Means IDITEMUNIT OF MEASUREQUANTITYUNITTOTALUNIT OF MEASUREQUANTITYUNITTOTALOTHER DIRECT COSTSLINE TOTAL
(1)(2)(3)(4)(5)(6)(7)(8)(9)(10)
Division 31Earthwork
1311313202050Selective clearing and grubbing, 1-1/2 C.Y. excavator, 8" to 12" diameter, stump removal on site by grinding.sqft20$ - 0sqft20$ - 0$ - 0
2329223100300Sodding, bluegrass sod, on level ground, 1000 S.F.msf1$ - 0msf1$ - 0$ - 0
3329119130700Topsoil placement and grading, loam or topsoil, screened, 4" deep, furnish and place, truck dumpedsqyd1$ - 0sqyd1$ - 0$ - 0

Subtotal $ - $ - $ - $ -

AF Form 3052 Costs based on RS Means Cost Database 2018

DIV 33

Repair Roof & HVAC Navy Facility Building 1560
ESTIMATORADDRESS
Crawford Consulting Services239 Highland Ave Suite 100, East Pittsburgh PA, 15112
CONTRACT FORPROPOSED TOTAL CONTRACT PRICE
$ - 0
PROJECTPROJECT NUMBERWORK LOCATION
Repair Roof & HVAC Navy Facility Building 15600Joint Base Andrews, MD
MATERIAL COSTLABOR COST
LINE NO.RS Means IDITEMUNIT OF MEASUREQUANTITYUNITTOTALUNIT OF MEASUREQUANTITYUNITTOTALOTHER DIRECT COSTSLINE TOTAL
(1)(2)(3)(4)(5)(6)(7)(8)(9)(10)
Division 33Utilities
1$ - 000$ - 0$ - 0
2$ - 000$ - 0$ - 0
3$ - 000$ - 0$ - 0
4$ - 000$ - 0$ - 0
5$ - 000$ - 0$ - 0
6$ - 000$ - 0$ - 0
7$ - 000$ - 0$ - 0
8$ - 000$ - 0$ - 0
9$ - 000$ - 0$ - 0
10$ - 000$ - 0$ - 0
11$ - 000$ - 0$ - 0
12$ - 000$ - 0$ - 0
13$ - 000$ - 0$ - 0
13$ - 000$ - 0$ - 0

Subtotal $ - $ - $ - $ -

AF Form 3052 Costs based on RS Means Cost Database 2018

DIV 32

Repair Roof & HVAC Navy Facility Building 1560
ESTIMATORADDRESS
CONTRACT FORPROPOSED TOTAL CONTRACT PRICE
$ - 0
PROJECTPROJECT NUMBERWORK LOCATION
Repair Roof & HVAC Navy Facility Building 15600Joint Base Andrews, MD
MATERIAL COSTLABOR COST
LINE NO.RS Means IDITEMUNIT OF MEASUREQUANTITYUNITTOTALUNIT OF MEASUREQUANTITYUNITTOTALOTHER DIRECT COSTSLINE TOTAL
(1)(2)(3)(4)(5)(6)(7)(8)(9)(10)
Division 32Exterior Improvements
18" Slab On Grade, w/ Rebar Reinforcingsqft100$ - 0sqft100$ - 0$ - 0
2323113205060.01Fence, chain link industrial, double swing gates, 6' high, 10' opening, includes excavation, posts & hardware in concreteopen1$ - 0open1$ - 0$ - 0
3042210232700Concrete block, decorative, ground face, 2000 psi, 8" x 8" x 16", includes mortar and horizontal joint reinforcing every other course, excludes scaffolding, grout and vertical reinforcingsqft280$ - 0sqft280$ - 0$ - 0$ - 0
4040516300200Grout, concrete masonry unit (CMU) cores, 4" thick, 0.067 CF/SF, by hand, excludes blockworksqft280$ - 0sqft280$ - 0$ - 0$ - 0

Subtotal $ - $ - $ - $ -

AF Form 3052 Costs based on RS Means Cost Database 2018

Alternates

Repair Roof & HVAC Navy Facility Building 1560
ESTIMATORADDRESS

CONTRACT FOR

PROJECTPROJECT NUMBERWORK LOCATION
Repair Roof & HVAC Navy Facility Building 15600Joint Base Andrews, MD
MATERIAL COSTLABOR COSTS
LINE NO.ITEMUNIT OF MEASUREQUANTITYUNITTOTALUNIT OF MEASUREQUANTITYUNITTOTALOTHER DIRECT COSTSLINE TOTAL
(1)(2)(3)(4)(5)(6)(7)(8)(9)(10)
Renovation Alternates
BO1Cleaning/Waterproofing Masonry
Cleaning masonry, light restoration, heavy soil, biological and mineral staining, paint, by chemical, low pressure wash, brush and rinse, excludes scaffoldingsqft12,736$ - 0sqft12,736$ - 0$ - 0$ - 0
Paints & coatings, walls, concrete masonry units (CMU), smooth surface, first coat, waterproof sealer, spraysqft12,736$ - 0sqft12,736$ - 0$ - 0$ - 0
Paints & coatings, walls, concrete masonry units (CMU), smooth surface, first coat, waterproof sealer, spraysqft12,736$ - 0sqft12,736$ - 0$ - 0$ - 0
Cleaning masonry, add for masking doors and windowssqft12,736$ - 0sqft12,736$ - 0$ - 0$ - 0
BO1$ - 0$ - 0$ - 0$ - 0
BO 2
$ - 0

BO 2 $ - 0

BO 3
$ - 0

BO 3 $ - 0

BO 4
$ - 0

BO 4 $ - 0

BO 5

BO 5 $ - 0

BO 6

BO 6$ - 0
BO2New Canopy
Structural steel member, W-shapes, 0 to 30 plf, A992 steel, shop fabricated, incl shop primer, bolted connectionston1$ - 0ton1$ - 0$ - 0
$ - 000$ - 0$ - 0
Light Gauge Metal Roof Truss Systemsqft510$ - 0sqft510$ - 0$ - 0
Metal Roofing Panels, Standing Seamssqft510$ - 0sqft510$ - 0$ - 0
Mansard panels, colored aluminum roofing, accessories, soffits, .032" thick, to 1' widesqft510$ - 0sqft510$ - 0$ - 0
Fascia, steel, galv. & enameled, stock, long panels, excl. furringsqft100$ - 0sqft100$ - 0$ - 0
Furring, ceilings, on steel, galvanized, 1-5/8" channels, 24" O.C.sqft510$ - 0sqft510$ - 0$ - 0
Concrete Column Pier/Pedestalcuyd1.25$ - 0cuyd1.25$ - 0$ - 0
Concrete Column Footingcuyd11$ - 0cuyd11$ - 0$ - 0
BO2$ - 0$ - 0$ - 0$ - 0
BO3
$ - 000$ - 0$ - 0
$ - 000$ - 0$ - 0

This is the start of the file's text. The full file is on GovTribe.

File details come from the government source that posted it. Updated .