Attch 1a - SF30_FA286020R00440001.pdf

PDF 649 KB Posted

Attached to
Repair Roof and HVAC in Navy Facility (Bldg 1560)
Solicitation number
FA286020R0044
Issued by

View the file

Other files

File Type Posted
Attch 1g - SF30_Amendment_FA286020R00440007.pdf PDF
Attch 6 - AF Form 3052_Rev.1.xlsx XLSX spreadsheet
Attch 9 - Site Visit (15 Oct 20) Questions and Answers_Rev.1.pdf PDF
Attch 12 - Site Visit Photos.pdf PDF
Attch 3 - 2019_1211 Design-Build RFP B1560 (28 Oct 20).pdf PDF
Attch 1 - SF1442 Solicitation_FA286020R00440007.pdf PDF
Attch 1f - SF30_Amendment_FA286020R00440006.pdf PDF
Attch 11 - B1560 Phasing.pdf PDF
Attch 9 - Site Visit (15 Oct 20) Questions and Answers.pdf PDF
Attch 10 - B1560 Original Drawings.pdf PDF
Attch 1 - SF1442 Solicitation_FA286020R00440006.pdf PDF
1e - SF30_FA286020R00440005.pdf PDF
Attch 1d - SF30_Amendment_FA286020R00440004.pdf PDF
Attch 5 - Contractor Access Information Sheet.xlsx XLSX spreadsheet
Attch 7 - Site Visit (17 Sep 20) Questions and Answers.pdf PDF
Attch 1c - SF30_Amendment_FA286020R00440003.pdf PDF
Attch 1 - SF1442 Solicitation_FA286020R0044.pdf PDF
Attch 8 - 2004 Renovation Drawings_B1560.pdf PDF
Attch 1b - SF30_FA286020R00440002.pdf PDF
Attch 1 - Solicitation_FA286020R0044.pdf PDF
Attch 4 - WD MD20200044 (11Sep20).pdf PDF
Attch 6 - AF Form 3052.xlsx XLSX spreadsheet
Attch 1 - Solicitation Amendment_FA286020R00440001.pdf PDF
Attch 5 - Contractor Access Information Sheet.xlsx XLSX spreadsheet
Attch 5 - Contractor Access Request Form.pdf PDF
Attch 3 - 2019_1211 Design-Build RFP B1560.pdf PDF
Attch 4 - WD MD20200044 (06262020).pdf PDF
Attch 1 - Solicitation_FA286020R0044.pdf PDF
Attch 2 - 2019_1211 Design Analysis B1560.pdf PDF
Show all 29

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

R

11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS

The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offers is extended. is not extended.

Offers must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended, by one of the following methods:

(a) By completing items 8 and 15, and returning copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted;

or (c) By separate letter or electronic communication which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by letter or electronic communication, provided each letter or electronic communication makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.

12. ACCOUNTING AND APPROPRIATION DATA (If required)

13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS.

IT MODIFIES THE CONTRACT/ORDER NUMBER AS DESCRIBED IN ITEM 14.

CHECK ONE A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE CONTRACT ORDER

NUMBER IN ITEM 10A.

B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation data, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(b).

C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:

D. OTHER (Specify type of modification and authority)

E. IMPORTANT: Contractor is not is required to sign this document and return copies to the issuing office.

14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)

Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.

15A. NAME AND TITLE OF SIGNER (Type or print) 16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)

15B. CONTRACTOR/OFFEROR

(Signature of person authorized to sign)

15C. DATE SIGNED 16B. UNITED STATES OF AMERICA

(Signature of Contracting Officer)

16C. DATE SIGNED

Previous edition unusable STANDARD FORM 30 (REV. 11/2016) Prescribed by GSA FAR (48 CFR) 53.243

AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT 1. CONTRACT ID CODE PAGE OF PAGES

2. AMENDMENT/MODIFICATION NUMBER 3. EFFECTIVE DATE 4. REQUISITION/PURCHASE REQUISITION NUMBER 5. PROJECT NUMBER (If applicable)

6. ISSUED BY CODE 7. ADMINISTERED BY (If other than Item 6) CODE

8. NAME AND ADDRESS OF CONTRACTOR (Number, street, county, State and ZIP Code) (X) 9A. AMENDMENT OF SOLICITATION NUMBER

9B. DATED (SEE ITEM 11)

10A. MODIFICATION OF CONTRACT/ORDER NUMBE

10B. DATED (SEE ITEM 13)

CODE FACILITY CODE

SECTION SF 30 BLOCK 14 CONTINUATION PAGE

SUMMARY OF CHANGES

The purpose of this amendment is to make administrative/clerical edits to the SF 1442 Solicitation The Purpose of This Amendment Is:

Document FA286020R0044 as follows:

1. Update Block 10 details

2. Update Block 13 from ten (10) to sixty (60) days

3. Remove non-applicable clauses: 52.211-11; and 252.215-7009

4. Add LPO DoDAAC to WAWF clause 252.232-7006

5. Update CLIN 0001 and add CLIN 0002.

All other terms and conditions remain unchanged and in full force and effect.

Section A - Solicitation/Contract Form

The following changes have been made:

INFORMATION FROM TO

Construction Project Title

Repair Roof & HVAC Navy Fac 1560

Repair Roof & HVAC of Navy Facility 1560

Contract Description

The Contractor shall provide design-build construction to repair the roof and HVAC in Navy Facility, B1560 at Joint Base Andrews MD in accordance with the attached SOW.

PROJECT AJXF 16-1563, REPAIR ROOF AND HVAC IN NAVAL FACILITY (BLDG 1560)

\n\nTHIS ACQUISITION IS A WOMEN-OWNED SMALL BUSINESS (WOSB) SET- ASIDE\n\nTHE MAGNITUDE OF THIS PROJECT IS BETWEEN $1,000,000 AND $5,000,000.

\n\nA NOTICE TO PROCEED WILL BE ISSUED WITHIN TEN (10) CALENDAR DAYS OF AWARD. \n\nFUNDS ARE NOT PRESENTLY AVAILABLE FOR THIS EFFORT. NO AWARD

WILL BE MADE UNDER THIS SOLICITATION UNTIL FUNDS BECOME AVAILABLE. THE

GOVERNMENT RESERVES THE RIGHT TO CANCEL THIS SOLICITATION, EITHER

BEFORE OR AFTER THE CLOSING DATE. IN THE EVENT THE GOVERNMENT CANCELS

THIS SOLICITATION, THE GOVERNMENT HAS NO OBLIGATION TO REIMBURSE THE

CONTRACTOR FOR ANY COSTS.

Accept Within Days

10 60

Section B - Supplies or Services & Prices or Costs

The following CLIN(s) / SLIN(s) were added:

INFORMATION VALUE

Description Project # AJXF 16-1563. The Contractor shall repair the roof and HVAC in Navy Facility (B1560) at Joint Base Andrews MD in strict accordance with the attached contractual documents.

Product/Service Services Quantity 1 Unit of Measure Job Option No

The following CLIN(s) / SLIN(s) were modified:

FA286020R00440001

0001 - Project # AJXF 16-1563. The Contractor shall provide a 100% design utilizing Government provided preliminary design documents to complete the repair the roof and HVAC in Navy Facility (B1560) at Joint Base Andrews MD in strict accordance with the attached contractual documents.

INFORMATION FROM TO

CIN 00000000000005434337

Description

Project # AJXF 16-1563. The Contractor shall provide design-build construction services to repair the roof and HVAC in Navy Facility (B1560) at Joint Base Andrews MD in strict accordance with the attached contractual documents.

Project # AJXF 16-1563. The Contractor shall provide a 100% design utilizing Government provided preliminary design documents to complete the repair the roof and HVAC in Navy Facility (B1560) at Joint Base Andrews MD in strict accordance with the attached contractual documents.

Section C - Specification/SOW/SOO/ORD

The Requirements text has been modified to:

Provide design-build construction services to repair of the roof and HVAC for Navy Facility (Bldg 1560) utilizing a 30% preliminary design (design-build RFP) and other contractual documents.

Section F - Deliveries or Performance

The delivery information for the following CLIN(s) / SLIN(s) were added:

0002 - Project # AJXF 16-1563. The Contractor shall repair the roof and HVAC in Navy Facility (B1560) at Joint Base Andrews MD in strict accordance with the attached contractual documents.

INFORMATION VALUE

Period of Performance 09/30/2020 to 09/25/2021

Ship To - F1D326 - F1D326 316 CES CEP

INFORMATION VALUE

Address

Ship To - F1D326 - F1D326 316 CES CEP F1D326

F1D326 316 CES CEP

3710 FETCHET AVE

AF NO MILSBILLS PROCESSES

ANDREWS AFB, MD 20762-4803

UNITED STATES

Cage Code :

DUNS Number :

DUNS+4 :

Point of Contact (POC) Name David Doyle POC Phone Number 240-612-5667 Delivery Delivery On Or Before 09/25/2021

The delivery information for the following CLIN(s) / SLIN(s) were modified:

0001 - Project # AJXF 16-1563. The Contractor shall provide a 100% design utilizing Government provided preliminary design documents to complete the repair the roof and HVAC in Navy Facility (B1560) at Joint Base Andrews MD in strict accordance with the attached contractual documents.

Ship To - F1D326 - F1D326 316 CES CEP

INFORMATION FROM TO

POC Phone Number 818-266-0873 240-612-5667 POC Email david.doyle.4@us.af.mil

Section G - Contract Administration Data

Additional Information/Notes

The following clauses were modified:

252.232-7006 - Wide Area WorkFlow Payment Instructions. Nov 2018 hereby reads as follows:

As prescribed in 232.7004(b), use the following clause:

WIDE AREA WORKFLOW PAYMENT INSTRUCTIONS (DEC 2018)

(a) Definitions. As used in this clause-

"Department of Defense Activity Address Code (DoDAAC)" is a six position code that uniquely identifies a unit, activity, or organization.

"Document type" means the type of payment request or receiving report available for creation in Wide Area WorkFlow (WAWF).

"Local processing office (LPO)" is the office responsible for payment certification when payment certification is done external to the entitlement system.

"Payment request" and "receiving report" are defined in the clause at 252.232-7003, Electronic Submission of Payment Requests and Receiving Reports.

(b) Electronic invoicing. The WAWF system provides the method to electronically process vendor payment requests and receiving reports, as authorized by Defense Federal Acquisition Regulation Supplement (DFARS) 252.232-7003, Electronic Submission of Payment Requests and Receiving Reports.

(c) WAWF access. To access WAWF, the Contractor shall-

(1) Have a designated electronic business point of contact in the System for Award Management at https://www.

sam.gov; and

(2) Be registered to use WAWF at https://wawf.eb.mil/ following the step-by-step procedures for self-registration available at this web site.

(d) WAWF training. The Contractor should follow the training instructions of the WAWF Web-Based Training Course and use the Practice Training Site before submitting payment requests through WAWF. Both can be accessed by selecting the "Web Based Training" link on the WAWF home page at https://wawf.eb.mil/

(e) WAWF methods of document submission. Document submissions may be via web entry, Electronic Data Interchange, or File Transfer Protocol.

(f) WAWF payment instructions. The Contractor shall use the following information when submitting payment requests and receiving reports in WAWF for this contract or task or delivery order:

(1) Document type. The Contractor shall submit payment requests using the following document type(s):

(i) For cost-type line items, including labor-hour or time-and-materials, submit a cost voucher.

(ii) For fixed price line items-

(A) That require shipment of a deliverable, submit the invoice and receiving report specified by the Contracting Officer.

(Contracting Officer: Insert applicable invoice and receiving report document type(s) for fixed price line items that require shipment of a deliverable.)

(B) For services that do not require shipment of a deliverable, submit either the Invoice 2in1, which meets the requirements for the invoice and receiving report, or the applicable invoice and receiving report, as specified by the Contracting Officer.

Construction

(iii) For customary progress payments based on costs incurred, submit a progress payment request.

(iv) For performance based payments, submit a performance based payment request.

(v) For commercial item financing, submit a commercial item financing request.

(2) ) Fast Pay requests are only permitted when Federal Acquisition Regulation (FAR) 52.213-1 is included in the contract.

(f) [Note: The Contractor may use a WAWF "combo" document type to create some combinations of invoice and receiving report in one step.]

(3) Document routing. The Contractor shall use the information in the Routing Data Table below only to fill in applicable fields in WAWF when creating payment requests and receiving reports in the system.

Routing Data Table*

Field Name in WAWF Data to be entered in WAWF Pay Official DoDAAC F87700 Issue By DoDAAC FA2860 Admin DoDAAC FA2860 Inspect By DoDAAC F1D326 Ship To Code F1D326 Ship From Code ____ Mark For Code ____ Service Approver (DoDAAC) ____ Service Acceptor (DoDAAC) F1D326 Accept at Other DoDAAC ____ LPO DoDAAC F1D290 DCAA Auditor DoDAAC ____ Other DoDAAC(s) ____

(4) Payment request. The Contractor shall ensure a payment request includes documentation appropriate to the type of payment request in accordance with the payment clause, contract financing clause, or Federal Acquisition Regulation 52.216-7, Allowable Cost and Payment, as applicable.

(5) Receiving report. The Contractor shall ensure a receiving report meets the requirements of DFARS Appendix F.

(g) WAWF point of contact.

(1) The Contractor may obtain clarification regarding invoicing in WAWF from the following contracting activity's WAWF point of contact.

Contracting Officer Ms. Sara Strange; sara.strange@us.af.mil

(2) Contact the WAWF helpdesk at 866-618-5988, if assistance is needed.

(End of clause)

Section I - Contract Clauses

Additional Information/Notes

The following clauses were deleted:

FAR Clauses Incorporated by Full Text

52.211-11 - Liquidated Damages-Supplies, Services, or Research and Development. Aug 2000

As prescribed in , insert the following clause in solicitations and contracts:11.503(a)

LIQUIDATED DAMAGES-SUPPLIES, SERVICES, OR RESEARCH AND DEVELOPMENT (SEPT 2000)

(a) If the Contractor fails to deliver the supplies or perform the services within the time specified in this contract, the Contractor shall, in place of actual damages, pay to the Government liquidated damages of $$344.28 per calendar day of delay [Contracting Officer insert amount].

(b) If the Government terminates this contract in whole or in part under the Default-Fixed-Price Supply and Service clause, the Contractor is liable for liquidated damages accruing until the Government reasonably obtains delivery or performance of similar supplies or services. These liquidated damages are in addition to excess costs of repurchase under the Termination clause.

(c) The Contractor will not be charged with liquidated damages when the delay in delivery or performance is beyond the control and without the fault or negligence of the Contractor as defined in the Default-Fixed-Price Supply and Service clause in this contract.

(End of clause)

Section J - List of Attachments

Miscellaneous text in this section has been modified to:

1. 2019_1211 Design Analysis B1560

2. 2019_1211 Design-Build RFP B1560

3. WD MD20200044 (11 Sep 2020)

Section L - Instructions, Conditions, & Notices to Offerors or Quoters

The following clauses were deleted:

DFARS Clauses Incorporated by Full Text

252.215-7009 - Proposal Adequacy Checklist. Dec 2014

As prescribed in 215.408(4), use the following provision:

PROPOSAL ADEQUACY CHECKLIST (JAN 2014)

The offeror shall complete the following checklist, providing location of requested information, or an explanation of why the requested information is not provided. In preparation of the offeror's checklist, offerors may elect to have their prospective subcontractors use the same or similar checklist as appropriate.

PROPOSAL ADEQUACY CHECKLIST

REFERENCES

SUBMISSION

ITEM

PROPOSAL PAGE

No.

If not provided EXPLAIN (may use continuation pages)

GENERAL INSTRUCTIONS

1. FAR 15.408, Table 15-2, Section I Paragraph A

Is there a properly completed first page of the proposal per FAR 15.408 Table 15-2 I.A or as specified in the solicitation?

2. FAR 15.408, Table 15-2, Section I Paragraph A(7)

Does the proposal identify the need for Government-furnished material/tooling/test equipment? Include the accountable contract number and contracting officer contact information if known.

3. FAR 15.408, Table 15-2, Section I Paragraph A(8)

Does the proposal identify and explain notifications of noncompliance with Cost Accounting Standards Board or Cost Accounting Standards (CAS); any proposal inconsistencies with your disclosed practices or applicable CAS;

and inconsistencies with your established estimating and accounting principles and procedures?

4. FAR 15.408, Table 15-2, Section I, Paragraph C(1)

FAR 2.101, Cost or pricing data

Does the proposal disclose any other known activity that could materially impact the costs?

This may include, but is not limited to, such factors as: (1) Vendor quotations;

(2) Nonrecurring costs;

(3) Information on changes in production methods and in production or purchasing volume;

(4) Data supporting projections of business prospects and objectives and related operations costs;

(5) Unit-cost trends such as those associated with labor efficiency;

(6) Make-or-buy decisions;

(7) Estimated resources to attain business goals;

and

(8) Information on management decisions that could have a significant bearing on costs.

5. FAR 15.408, Table 15-2, Section I Paragraph B

Is an Index of all certified cost or pricing data and information accompanying or identified in the proposal provided and appropriately referenced?

6. FAR 15.403-1(b) Are there any exceptions to submission of certified cost or pricing data pursuant to FAR 15.403-1(b)? If so, is supporting documentation included in the proposal? (Note questions 18-20.)

7. FAR 15.408, Table 15-2, Section I Paragraph C(2)(i)

Does the proposal disclose the judgmental factors applied and the mathematical or other methods used in the estimate, including those used in projecting from known data?

8. FAR 15.408, Table 15-2, Section I Paragraph C(2) (ii)

Does the proposal disclose the nature and amount of any contingencies included in the proposed price?

9. FAR 15.408 Table 15-2, Section II, Paragraph A or B

Does the proposal explain the basis of all cost estimating relationships (labor hours or material) proposed on other than a discrete basis?

10. FAR 15.408, Table 15-2, Section I Paragraphs D and E

Is there a summary of total cost by element of cost and are the elements of cost cross-referenced to the supporting cost or pricing data? (Breakdowns for each cost element must be consistent with your cost accounting system, including breakdown by year.)

11. FAR 15.408, Table 15-2, Section I Paragraphs D and E

If more than one Contract Line Item Number (CLIN) or sub Contract Line Item Number (sub- CLIN) is proposed as required by the RFP, are there summary total amounts covering all line items for each element of cost and is it cross-referenced to the supporting cost or pricing data?

12. FAR 15.408, Table 15-2, Section I Paragraph F

Does the proposal identify any incurred costs for work performed before the submission of the proposal?

13. FAR 15.408, Table 15-2, Section I Paragraph G

Is there a Government forward pricing rate agreement (FPRA)? If so, the offeror shall identify the official submittal of such rate and factor data.

If not, does the proposal include all rates and factors by year that are utilized in the development of the proposal and the basis for those rates and factors?

COST ELEMENTS

MATERIALS AND SERVICES

14. FAR 15.408, Table 15-2, Section II Paragraph A

Does the proposal include a consolidated summary of individual material and services, frequently referred to as a Consolidated Bill of Material (CBOM), to include the basis for pricing? The offeror's consolidated summary shall include raw materials, parts, components, assemblies, subcontracts and services to be produced or performed by others, identifying as a minimum the item, source, quantity, and price.

SUBCONTRACTS (Purchased materials or services)

15. DFARS 215.404-3 Has the offeror identified in the proposal those subcontractor proposals, for which the contracting officer has initiated or may need to request field pricing analysis?

16. FAR 15.404-3(c)

FAR 52.244-2

Per the thresholds of FAR 15.404-3(c), Subcontract Pricing Considerations, does the proposal include a copy of the applicable subcontractor's certified cost or pricing data?

17. FAR 15.408, Table 15-2, Note 1; Section II Paragraph A

Is there a price/cost analysis establishing the reasonableness of each of the proposed subcontracts included with the proposal? If the offeror's price/cost analyses are not provided with the proposal, does the proposal include a matrix identifying dates for receipt of subcontractor proposal, completion of fact finding for purposes of price/cost analysis, and submission of the price /cost analysis?

EXCEPTIONS TO CERTIFIED COST OR PRICING DATA

18. FAR 52.215-20

FAR 2.101, "commercial item"

Has the offeror submitted an exception to the submission of certified cost or pricing data for commercial items proposed either at the prime or subcontractor level, in accordance with provision 52.215-20?

a. Has the offeror specifically identified the type of commercial item claim (FAR 2.101 commercial item definition, paragraphs (1) through (8)), and the basis on which the item meets the definition?

b. For modified commercial items (FAR 2.101 commercial item definition paragraph (3)); did the offeror classify the modification(s) as either:

i. A modification of a type customarily available in the commercial marketplace (paragraph (3)(i)); or

ii. A minor modification (paragraph (3)(ii)) of a type not customarily available in the commercial marketplace made to meet Federal Government requirements not exceeding the thresholds in FAR 15.403-1(c)(3)(iii)(B)?

c. For proposed commercial items "of a type", or

"evolved" or modified (FAR 2.101 commercial item definition paragraphs (1) through (3)), did the contractor provide a technical description of the differences between the proposed item and the comparison item(s)?

19. [Reserved]

20. FAR 15.408, Table 15-2, Section II Paragraph A(1)

Does the proposal support the degree of competition and the basis for establishing the source and reasonableness of price for each subcontract or purchase order priced on a competitive basis exceeding the threshold for certified cost or pricing data?

INTERORGANIZATIONAL TRANSFERS

21. FAR 15.408, Table 15-2, Section II Paragraph A.(2)

For inter-organizational transfers proposed at cost, does the proposal include a complete cost proposal in compliance with Table 15-2?

22. FAR 15.408, Table 15-2, Section II Paragraph A(1)

For inter-organizational transfers proposed at price in accordance with FAR 31.205-26(e), does the proposal provide an analysis by the prime that supports the exception from certified cost or pricing data in accordance with FAR 15.403-1?

DIRECT LABOR

23. FAR 15.408, Table 15-2, Section II Paragraph B

Does the proposal include a time phased (i.e.;

monthly, quarterly) breakdown of labor hours, rates and costs by category or skill level? If labor is the allocation base for indirect costs, the labor cost must be summarized in order that the applicable overhead rate can be applied.

24. FAR 15.408, Table 15-2, Section II Paragraph B

For labor Basis of Estimates (BOEs), does the proposal include labor categories, labor hours, and task descriptions, (e.g.; Statement of Work reference, applicable CLIN, Work Breakdown Structure, rationale for estimate, applicable history, and time-phasing)?

25. FAR subpart 22.10 If covered by the Service Contract Labor Standards statute (41 U.S.C. chapter 67), are the rates in the proposal in compliance with the minimum rates specified in the statute?

INDIRECT COSTS

26. FAR 15.408, Table 15-2, Section II Paragraph C

Does the proposal indicate the basis of estimate for proposed indirect costs and how they are applied? (Support for the indirect rates could consist of cost breakdowns, trends, and budgetary data.)

OTHER COSTS

27. FAR 15.408, Table 15-2, Section II Paragraph D

Does the proposal include other direct costs and the basis for pricing? If travel is included does the proposal include number of trips, number of people, number of days per trip, locations, and rates (e.g. airfare, per diem, hotel, car rental, etc)?

28. FAR 15.408, Table 15-2, Section II Paragraph E

If royalties exceed $1,500 does the proposal provide the information/data identified by Table 15-2?

29. FAR 15.408, Table 15-2, Section II Paragraph F

When facilities capital cost of money is proposed, does the proposal include submission of Form CASB-CMF or reference to an FPRA/FPRP and show the calculation of the proposed amount?

FORMATS FOR SUBMISSION OF LINE ITEM SUMMARIES

30. FAR 15.408, Table 15-2, Section III

Are all cost element breakdowns provided using the applicable format prescribed in FAR 15.408, Table 15-2 III? (or alternative format if specified in the request for proposal)

31. FAR 15.408, Table 15-2, Section III Paragraph B

If the proposal is for a modification or change order, have cost of work deleted (credits) and cost of work added (debits) been provided in the format described in FAR 15.408, Table 15-2.III.B?

32. FAR 15.408, Table 15-2, Section III Paragraph C

For price revisions/redeterminations, does the proposal follow the format in FAR 15.408, Table

15-2.III.C?

OTHER

33. FAR 16.4 If an incentive contract type, does the proposal include offeror proposed target cost, target profit or fee, share ratio, and, when applicable, minimum /maximum fee, ceiling price?

34. FAR 16.203-4 and FAR

15.408 Table 15-2, Section

II, Paragraphs A, B, C, and D

If Economic Price Adjustments are being proposed, does the proposal show the rationale and application for the economic price adjustment?

35. FAR 52.232-28 If the offeror is proposing Performance-Based Payments did the offeror comply with FAR 52.232-28?

36. FAR 15.408(n)

FAR 52.215-22

FAR 52.215-23

Excessive Pass-through Charges: Identification of Subcontract Effort: If the offeror intends to subcontract more than 70% of the total cost of work to be performed, does the proposal identify:

(i) the amount of the offeror's indirect costs and profit applicable to the work to be performed by the proposed subcontractor(s); and (ii) a description of the added value provided by the offeror as related to the work to be performed by the proposed subcontractor(s)?

(End of provision)

IDCode:
Page: 1
Pages: 11
AmendNo: 0001
EffDate: 9/17/2020
ReqNo:
ProjNo: AJXF 16-1563
IssCode: FA2860
AdmCode:
IssuedBy: FA2860 316 CONS PK

CP 240 612 5676

1349 LUTMAN DR

JB ANDREWS, MD 20762-7001

United States Tarha Mazyck, Email: tarha.mazyck.2@us.af.mil Telephone: 240-612-5667

AdminBy:
ContractorNameAdd:
Code:
FacCode:
SolChg: 1
SolNo: FA286020R0044
SolDate: 9/11/2020
AwardChg:
AwardNo:
AwardDate:
Amended: 1
OffrExt:
OffrNoEx: 1
NoCopies: 1
ApprData: See Section G
ChgeOrd:
ChgeOrder:
Modify:
SuppAgre:
SuppAuth:
ModOthr:
OthrSpec:
NoReq: 1
Require:
Copies:
Descript:

SEE CONTINUATION PAGE

ContNameTitle:
CoNameTitle: Tarha A. Mazyck

Email: tarha.mazyck.2@us.af.mil Telephone: 240-612-5667

ContDate:
CODate: 17-Sep-20

File details come from the government source that posted it. Updated .