Summary Page
| Repair Roof & HVAC Navy Facility Building 1560 | |
| Work Location: | Joint Base Andrews, MD |
| Project Name: | Repair Roof & HVAC Navy Facility Building 1560 |
| TOTALS | |
| Base Bid | $ - |
| Alternates | $ - |
| GRAND TOTAL | $ - |
| Base Bid | Renovation Add Alternate (inclusive of both options) | ||
| TOTAL MATERIAL COSTS | $ - 0 | TOTAL MATERIAL COSTS | $ - 0 |
TOTAL LABOR COSTS $ - 0 TOTAL LABOR COSTS $ - 0
TOTAL OTHER DIRECT COSTS $ - 0 TOTAL OTHER DIRECT COSTS $ - 0
TOTAL DIRECT COSTS $ - 0 TOTAL DIRECT COSTS $ - 0
| SUB OH+P | 20.00% | $ - 0 | SUB OH+P | 20.00% | $ - 0 | ||||
| SUBTOTAL | $ - 0 | SUBTOTAL | $ - 0 | ||||||
| MATOC - Removed | 0.00% | $ - 0 | MATOC - Removed | 0.00% | $ - 0 | ||||
| SUBTOTAL | $ - 0 | SUBTOTAL | $ - 0 | ||||||
| SALES Tax | 6.00% | $ - 0 | SALES Tax | 6.00% | $ - 0 | ||||
| SUBTOTAL | $ - 0 | SUBTOTAL | $ - 0 | ||||||
| Prime JOOH - DIV 1 | 0.00% | $ - 0 | Prime JOOH - GC's in Estimate | 0.00% | $ - 0 | ||||
| SUBTOTAL | $ - 0 | SUBTOTAL | $ - 0 | ||||||
| Prime HOOH (Overhead) | 4.00% | $ - 0 | Prime HOOH (Overhead) | 4.00% | $ - 0 | ||||
| SUBTOTAL | $ - 0 | SUBTOTAL | $ - 0 | ||||||
| Prime Profit | 6.00% | $ - 0 | Prime Profit | 6.00% | $ - 0 | ||||
| SUBTOTAL | $ - 0 | SUBTOTAL | $ - 0 | ||||||
| Design/Estimating Contingency | 5.00% | $ - 0 | Design/Estimating Contingency | 5.00% | $ - 0 | ||||
| SUBTOTAL | $ - 0 | SUBTOTAL | $ - 0 | ||||||
| Prime Bond | 1.50% | $ - 0 | Prime Bond | 1.50% | $ - 0 | ||||
| SUBTOTAL | $ - 0 | SUBTOTAL | $ - 0 | ||||||
| Escalation | 3.36% | $ - 0 | Escalation | 3.36% | $ - 0 | ||||
| SUBTOTAL | $ - 0 | SUBTOTAL | $ - 0 | ||||||
| Owner Project Contingency | 5.00% | $ - 0 | Owner Project Contingency | 5.00% | $ - 0 | ||||
| SUBTOTAL | $ - 0 | SUBTOTAL | $ - 0 | ||||||
| Owner SIOH | 5.60% | $ - 0 | Owner SIOH | 5.60% | $ - 0 | ||||
| TOTAL | $ - 0 | TOTAL | $ - 0 | ||||||
| Design Build Design Cost | 6% | $ - 0 | Design Build Design Cost | 6% | $ - 0 | ||||
| $ - 0 | $ - 0 |
CSI Summary
| Repair Roof & HVAC Navy Facility Building 1560 | |
| ESTIMATOR | ADDRESS |
| CONTRACT FOR | PROPOSED TOTAL CONTRACT PRICE | PROPOSED TOTAL CONTRACT PRICE | ||||
| $ - 0 | ||||||
| PROJECT | PROJECT NUMBER | WORK LOCATION | ||||
| Repair Roof & HVAC Navy Facility Building 1560 | Joint Base Andrews, MD | |||||
| MATERIAL COST | LABOR COST | OTHER DIRECT COSTS | LINE TOTAL | |||
| CSI NO. | DIVISION |
| 1 | General Requirements | $ - 0 | $ - 0 | $ - 0 | $ - 0 |
| 2 | Existing Conditions | $ - 0 | $ - 0 | $ - 0 | $ - 0 |
| 3 | Concrete | $ - 0 | $ - 0 | $ - 0 | $ - 0 |
| 4 | Masonry | $ - 0 | $ - 0 | $ - 0 | $ - 0 |
| 5 | Metals | $ - 0 | $ - 0 | $ - 0 | $ - 0 |
| 6 | Wood, Plastics, Composites | $ - 0 | $ - 0 | $ - 0 | $ - 0 |
| 7 | Thermal and Moisture Protection | $ - 0 | $ - 0 | $ - 0 | $ - 0 |
| 8 | Openings | $ - 0 | $ - 0 | $ - 0 | $ - 0 |
| 9 | Finishes | $ - 0 | $ - 0 | $ - 0 | $ - 0 |
| 10 | Specialties | $ - 0 | $ - 0 | $ - 0 | $ - 0 |
| 11 | Equipment | $ - 0 | $ - 0 | $ - 0 | $ - 0 |
| 12 | Furnishings | $ - 0 | $ - 0 | $ - 0 | $ - 0 |
| 13 | Special Construction | $ - 0 | $ - 0 | $ - 0 | $ - 0 |
| 14 | Conveying Equipment | $ - 0 | $ - 0 | $ - 0 | $ - 0 |
| 21 | Fire Suppression | $ - 0 | $ - 0 | $ - 0 | $ - 0 |
| 22 | Plumbing | $ - 0 | $ - 0 | $ - 0 | $ - 0 |
| 23 | HVAC | $ - 0 | $ - 0 | $ - 0 | $ - 0 |
| 26 | Electrical | $ - 0 | $ - 0 | $ - 0 | $ - 0 |
| 27 | Communications | $ - 0 | $ - 0 | $ - 0 | $ - 0 |
| 28 | Electronic Safety and Security | $ - 0 | $ - 0 | $ - 0 | $ - 0 |
| 31 | Earthwork | $ - 0 | $ - 0 | $ - 0 | $ - 0 |
| 32 | Exterior Improvements | $ - 0 | $ - 0 | $ - 0 | $ - 0 |
| 33 | Utilities | $ - 0 | $ - 0 | $ - 0 | $ - 0 |
Subtotal: $ - 0 $ - $ - $ - $ -
AF Form 3052
DIV 1
| Repair Roof & HVAC Navy Facility Building 1560 | |
| ESTIMATOR | ADDRESS |
| CONTRACT FOR | PROPOSED TOTAL CONTRACT PRICE | |||||||||||
| $ - 0 | ||||||||||||
| PROJECT | PROJECT NUMBER | WORK LOCATION | ||||||||||
| Repair Roof & HVAC Navy Facility Building 1560 | 0 | Joint Base Andrews, MD | ||||||||||
| MATERIAL COST | LABOR COST | |||||||||||
| LINE NO. | RS Means ID | ITEM | UNIT OF MEASURE | QUANTITY | UNIT | TOTAL | UNIT OF MEASURE | QUANTITY | UNIT | TOTAL | OTHER DIRECT COSTS | LINE TOTAL |
| (1) | (2) | (3) | (4) | (5) | (6) | (7) | (8) | (9) | (10) |
| Division 1 | General Conditions | ||||||||
| 1 | 013113200180 | Project Management | WK | 52 | $ - 0 | WK | 52 | $ - 0 | $ - 0 |
| 2 | 013113200280 | Project Superintendent | WK | 52 | $ - 0 | WK | 52 | $ - 0 | $ - 0 |
| 3 | 013113200020 | Project Safety Engineer | WK | 52 | $ - 0 | WK | 52 | $ - 0 | $ - 0 |
| 4 | 017613200020 | Temporary Protection | SF | 5,000 | $ - 0 | SF | 5,000 | $ - 0 | $ - 0 |
| 5 | 015523500100 | Staging Area/Office Trailers | WK | 52 | $ - 0 | WK | 52 | $ - 0 | $ - 0 |
| 6 | 013113200640 | Surveying | LS | 0 | $ - 0 | LS | 0 | $ - 0 | $ - 0 |
| 7 | 015213400100 | Mobilization | LS | 1 | $ - 0 | LS | 1 | $ - 0 | $ - 0 |
| 8 | 013113200290 | Submittals | LS | 1 | $ - 0 | LS | 1 | $ - 0 | $ - 0 |
| 9 | 013213500400 | Shop Drawings | LS | 1 | $ - 0 | LS | 1 | $ - 0 | $ - 0 |
| 10 | 014523500150 | Testing | LS | 1 | $ - 0 | LS | 1 | $ - 0 | $ - 0 |
| 11 | 014523500100 | QA/QC | WK | 8 | $ - 0 | WK | 8 | $ - 0 | $ - 0 |
| 12 | 017413200050 | Clean Up - Daily | WK | 52 | $ - 0 | WK | 52 | $ - 0 | $ - 0 |
| 13 | 017413200100 | Clean Up - Final | EA | 1 | $ - 0 | EA | 1 | $ - 0 | $ - 0 |
| 14 | 014523505550 | Punch List | WK | 2 | $ - 0 | WK | 2 | $ - 0 | $ - 0 |
| 15 | 015213400100 | Demobilization | LS | 1 | $ - 0 | LS | 1 | $ - 0 | $ - 0 |
| 16 | 01536502300 | Dumpsters | WK | 52 | $ - 0 | WK | 52 | $ - 0 | $ - 0 |
| 17 | 015213201400 | Temporary Toilets | WK | 52 | $ - 0 | WK | 52 | $ - 0 | $ - 0 |
Subtotal $ - $ - $ - $ -
AF Form 3052 Costs based on RS Means Cost Database 2018
DIV 2
| Repair Roof & HVAC Navy Facility Building 1560 | |
| ESTIMATOR | ADDRESS |
| CONTRACT FOR | PROPOSED TOTAL CONTRACT PRICE | |||||||||||
| $ - 0 | ||||||||||||
| PROJECT | PROJECT NUMBER | WORK LOCATION | ||||||||||
| Repair Roof & HVAC Navy Facility Building 1560 | 0 | Joint Base Andrews, MD | ||||||||||
| MATERIAL COST | LABOR COST | |||||||||||
| LINE NO. | RS Means ID | ITEM | UNIT OF MEASURE | QUANTITY | UNIT | TOTAL | UNIT OF MEASURE | QUANTITY | UNIT | TOTAL | OTHER DIRECT COSTS | LINE TOTAL |
| (1) | (2) | (3) | (4) | (5) | (6) | (7) | (8) | (9) | (10) |
| Division 2 | Existing Conditions | |||||||||
| 1 | 230505102120 | Fans, up thru 1 H.P. or 2000 CFM, selective demolition | each | 1 | $ - 0 | each | 1 | $ - 0 | $ - 0 | $ - 0 |
| 2 | 220505102000 | Pipe, metal pipe, to 1-1/2" diam., selective demolition | lnft | 2,000 | $ - 0 | lnft | 2,000 | $ - 0 | $ - 0 | $ - 0 |
| 3 | 220505102050 | Pipe, metal pipe, 2" to 3-1/2" diam., selective demolition | lnft | 520 | $ - 0 | lnft | 520 | $ - 0 | $ - 0 | $ - 0 |
| 4 | 220505102100 | Pipe, metal pipe, 4" to 6" diam., selective demolition | lnft | 500 | $ - 0 | lnft | 500 | $ - 0 | $ - 0 | $ - 0 |
| 5 | 230505108020 | Water chiller, 110 thru 500 ton, selective demolition | each | 1 | $ - 0 | each | 1 | $ - 0 | $ - 0 | $ - 0 |
| 6 | 230505109214 | Remove Rooftop Air Handling Unit/Air Conditioner/Heating Unit to 2 MCFM | each | 1 | $ - 0 | each | 1 | $ - 0 | $ - 0 | $ - 0 |
| 7 | 230505109216 | Remove Rooftop Air Handling Unit/Air Conditioner/Heating Unit to 8 MCFM | each | 1 | $ - 0 | each | 1 | $ - 0 | $ - 0 | $ - 0 |
| 8 | 230505100100 | Air conditioner, split unit air conditioner, 3 ton, selective demolition | each | 4 | $ - 0 | each | 4 | $ - 0 | $ - 0 | $ - 0 |
| 9 | 220505102186 | Pump, 7-1/2 H.P. thru 15 H.P., selective demolition | each | 2 | $ - 0 | each | 2 | $ - 0 | $ - 0 | $ - 0 |
| 10 | 230505102150 | Fan coil air conditioner, chilled water, up thru 7-1/2 ton, selective demolition | each | 88 | $ - 0 | each | 88 | $ - 0 | $ - 0 | $ - 0 |
| 11 | 230505101570 | Ductwork, metal; steel and stainless steel, fabricated, selective demolition | lbs | 2,000 | $ - 0 | lbs | 2,000 | $ - 0 | $ - 0 | $ - 0 |
| 12 | 230505102120 | Fans, up thru 1 H.P. or 2000 CFM, selective demolition | each | 2 | $ - 0 | each | 2 | $ - 0 | $ - 0 | $ - 0 |
| 13 | 220505100732 | Grinder pump or sewage ejector system, simplex, selective demolition | each | 2 | $ - 0 | each | 2 | $ - 0 | $ - 0 | $ - 0 |
| 14 | 220505101600 | Fixture, water fountain, free standing, remove, includes 10' piping | each | 6 | $ - 0 | each | 6 | $ - 0 | $ - 0 | $ - 0 |
| 15 | 220505101520 | Fixture, urinal, wall mounted, selective demolition, includes 10' piping | each | 3 | $ - 0 | each | 3 | $ - 0 | $ - 0 | $ - 0 |
| 211313503740.001 | Selective demolition, sprinkler heads | each | 64 | $ - 0 | each | 64 | $ - 0 | $ - 0 | ||
| 16 | 260505101285 | Panelboards, 4 wire, 120/208 V, 600 amp, to 42 circuits, electrical demolition, remove, including removal of all breakers, conduit terminations & wire connections | each | 1 | $ - 0 | each | 1 | $ - 0 | $ - 0 | $ - 0 |
| 17 | 260505101970 | Wire, THW-THWN-THHN, 350 kcmil, electrical demolition, removed from in place conduit, to 15' high | lnft | 400 | $ - 0 | lnft | 400 | $ - 0 | $ - 0 | $ - 0 |
| 18 | 260505101900 | Wire, THW-THWN-THHN, #1, electrical demolition, removed from in place conduit, to 15' high | lnft | 100 | $ - 0 | lnft | 100 | $ - 0 | $ - 0 | $ - 0 |
| 19 | 260505100240 | Conduit, electric metallic tubing (EMT), 2" to 3" diameter, electrical demolition, remove conduit to 15' high, including fittings & hangers | lnft | 225 | $ - 0 | lnft | 225 | $ - 0 | $ - 0 | $ - 0 |
| 20 | 260505351162 | Remove Main Switchboard 800-1,200 Amps | each | 1 | $ - 0 | each | 1 | $ - 0 | $ - 0 | $ - 0 |
| 21 | 260505101990 | Wire, THW-THWN-THHN, 500 kcmil, electrical demolition, removed from in place conduit, to 15' high | lnft | 500 | $ - 0 | lnft | 500 | $ - 0 | $ - 0 | $ - 0 |
| 22 | 260505101910 | Wire, THW-THWN-THHN, 1/0, electrical demolition, removed from in place conduit, to 15' high | lnft | 90 | $ - 0 | lnft | 90 | $ - 0 | $ - 0 | $ - 0 |
| 23 | 260505101280 | Panelboards, 4 wire, 120/208 V, 400 amp, to 42 circuits, electrical demolition, remove, including removal of all breakers, conduit terminations & wire connections | each | 1 | $ - 0 | each | 1 | $ - 0 | $ - 0 | $ - 0 |
| 24 | 260505101890 | Wire, THW-THWN-THHN, #3, electrical demolition, removed from in place conduit, to 15' high | lnft | 35 | $ - 0 | lnft | 35 | $ - 0 | $ - 0 | $ - 0 |
| 25 | 260519901550.01 | Disconnect Existing Mechanical Equipment | each | 1 | $ - 0 | each | 1 | $ - 0 | $ - 0 | $ - 0 |
| 26 | 260505102140 | Fluorescent fixtures, interior, 4 lamp, 2' x 4', electrical demolition, remove, recessed drop-in, to 15' high, including supports & whips | each | 23 | $ - 0 | each | 23 | $ - 0 | $ - 0 | $ - 0 |
| 27 | 260505505310 | Exit light, electrical demolition, remove | each | 3 | $ - 0 | each | 3 | $ - 0 | $ - 0 | $ - 0 |
| 28 | 280505101210 | Beacon light, electrical demolition, remove | each | 5 | $ - 0 | each | 5 | $ - 0 | $ - 0 | $ - 0 |
| 29 | 260505102720 | Mercury vapor wall pack, exterior, 250 Watt, electrical demolition, remove | each | 4 | $ - 0 | each | 4 | $ - 0 | $ - 0 | $ - 0 |
| 30 | 260505100160 | Conduit, rigid galvanized steel, 4" to 6" diameter, electrical demolition, remove conduit to 15' high, including fittings & hangers | lnft | 30 | $ - 0 | lnft | 30 | $ - 0 | $ - 0 | $ - 0 |
| 31 | 260505101790 | Receptacle & switches, 15 to 30 amp, electrical demolition, remove | each | 1 | $ - 0 | each | 1 | $ - 0 | $ - 0 | $ - 0 |
| 32 | Selective demolition, masonry, veneers, brick, hard mortar, to 12" thick | sqft | 330 | $ - 0 | sqft | 330 | $ - 0 | $ - 0 | ||
| 33 | 230505102992 | Louver, selective demolition | sqft | 100 | $ - 0 | sqft | 100 | $ - 0 | $ - 0 | |
| 34 | 050505100605 | Remove Miscellaneous Metals | lbs | 150 | $ - 0 | lbs | 150 | $ - 0 | $ - 0 | |
| 35 | 070505104420 | Selective demolition, thermal and moisture protection, roofing, single ply membrane, fully adhered | sq (roofing) | 5 | $ - 0 | sq (roofing) | 5 | $ - 0 | $ - 0 | |
| 36 | 070505100220 | Selective demolition, thermal and moisture protection, flashing, sheet metal | sqft | 420 | $ - 0 | sqft | 420 | $ - 0 | $ - 0 | |
| 37 | Remove Built-Up Roofing & Accessories To Existing Deck | sqft | 420 | $ - 0 | sqft | 420 | $ - 0 | $ - 0 | ||
| 38 | 090505200900 | Flooring demolition, vinyl composition tile, 12" x 12" | sqft | 442 | $ - 0 | sqft | 442 | $ - 0 | $ - 0 | |
| 39 | 090505202000 | Flooring demolition, tile, ceramic, thin set | sqft | 21 | $ - 0 | sqft | 21 | $ - 0 | $ - 0 | |
| 40 | 100505101930 | Urinal screen, remove | each | 4 | $ - 0 | each | 4 | $ - 0 | $ - 0 | |
| 41 | 090505101200 | Ceiling demolition, suspended ceiling, mineral fiber, 2 x 2 or 2 x 4, remove | sqft | 6,368 | $ - 0 | sqft | 6,368 | $ - 0 | $ - 0 | |
| 42 | 090505302800 | Walls and partitions demolition, paneling, 4' x 8' sheets | sqft | 4,239 | $ - 0 | sqft | 4,239 | $ - 0 | $ - 0 | |
| 43 | 090505200800 | Flooring demolition, resilient, sheet goods | sqft | 1,381 | $ - 0 | sqft | 1,381 | $ - 0 | $ - 0 | |
| 44 | 060505106300 | Selective demolition, wood framing, stair components, tread | each | 28 | $ - 0 | each | 28 | $ - 0 | $ - 0 | |
| 45 | 090505302300 | Walls and partitions demolition, metal or wood studs, finish two sides, plasterboard (drywall) | sqft | 62 | $ - 0 | sqft | 62 | $ - 0 | $ - 0 | |
| 46 | 060505201500 | Selective demolition, millwork and trim, counter top, straight runs | lnft | 17 | $ - 0 | lnft | 17 | $ - 0 | $ - 0 | |
| 47 | 090505200850 | Flooring demolition, vinyl or rubber cove base, straight section | lnft | 4,261 | $ - 0 | lnft | 4,261 | $ - 0 | $ - 0 | |
| 48 | 028213435000 | Bulk asbestos removal, remove VAT and mastic from floor by hand, includes disposable tools & 2 suits & 1 respirator filter/day/worker | sqft | 15,500 | $ - 0 | sqft | 15,500 | $ - 0 | $ - 0 | |
| 49 | 028213430610 | Bulk asbestos removal, pipe insulation, air cell type, 4" to 8" diameter pipe, includes disposable tools & 2 suits & 1 respirator filter/day/worker | lnft | 3 | $ - 0 | lnft | 3 | $ - 0 | $ - 0 | |
| 50 | 028213450110 | OSHA testing, certified technician, max | days | 2 | $ - 0 | days | 2 | $ - 0 | $ - 0 | |
| 51 | 028213420030 | Asbestos Abatement Work Area, equipment mobilization fees & truck decontamination | lsum | 1 | $ - 0 | lsum | 1 | $ - 0 | $ - 0 | |
| 52 | 028213390100 | Asbestos remediation, plans and methods, building survey, commercial | each | 1 | $ - 0 | each | 1 | $ - 0 | $ - 0 | |
| 53 | 028213420470 | Asbestos Abatement Work Area, decontamination chamber, portable, custom facility, interior areas, two chambers @ 10' x 10', cost amortized over 10 jobs | each | 1 | $ - 0 | each | 1 | $ - 0 | $ - 0 |
Subtotal $ - $ - $ - $ -
AF Form 3052 Costs based on RS Means Cost Database 2018
DIV 3
| Repair Roof & HVAC Navy Facility Building 1560 | |
| ESTIMATOR | ADDRESS |
| CONTRACT FOR | PROPOSED TOTAL CONTRACT PRICE | |||||||||||
| $ - 0 | ||||||||||||
| PROJECT | PROJECT NUMBER | WORK LOCATION | ||||||||||
| Repair Roof & HVAC Navy Facility Building 1560 | 0 | Joint Base Andrews, MD | ||||||||||
| MATERIAL COST | LABOR COST | |||||||||||
| LINE NO. | RS Means ID | ITEM | UNIT OF MEASURE | QUANTITY | UNIT | TOTAL | UNIT OF MEASURE | QUANTITY | UNIT | TOTAL | OTHER DIRECT COSTS | LINE TOTAL |
| (1) | (2) | (3) | (4) | (5) | (6) | (7) | (8) | (9) | (10) |
| Division 3 | Concrete | |||||||||
| 1 | 042210141150 | Concrete block, back-up, normal weight, tooled joint one side, 2000 psi, 8" x 8" x 16", includes mortar and horizontal joint reinforcing every other course, excludes scaffolding, vertical reinforcing and grout | sqft | 100 | $ - 0 | sqft | 100 | $ - 0 | $ - 0 | $ - 0 |
| 2 | 038216100100 | Drill Weep Holes | each | 50 | $ - 0 | each | 50 | $ - 0 | $ - 0 | $ - 0 |
| 3 | 030130622200 | Patching concrete, walls, epoxy grout, 3/4" deep, including chipping, cleaning and epoxy grout | sqft | 25 | $ - 0 | sqft | 25 | $ - 0 | $ - 0 | $ - 0 |
| 4 | 030130711020 | Concrete crack repair, structural repair by epoxy injection (ACI RAP-1), suitable for horizontal, vertical and overhead repairs, blow out crack with oil-free dry compressed air (1 pass) | lnft | 40 | $ - 0 | lnft | 40 | $ - 0 | $ - 0 | $ - 0 |
| 5 | 030130711010 | Concrete crack repair, structural repair by epoxy injection (ACI RAP-1), suitable for horizontal, vertical and overhead repairs, clean/grind surface(s) free of contaminants | lnft | 40 | $ - 0 | lnft | 40 | $ - 0 | $ - 0 | $ - 0 |
Subtotal $ - $ - $ - $ -
AF Form 3052 Costs based on RS Means Cost Database 2018
DIV 4
| Repair Roof & HVAC Navy Facility Building 1560 | |
| ESTIMATOR | ADDRESS |
| CONTRACT FOR | PROPOSED TOTAL CONTRACT PRICE | |||||||||||
| $ - 0 | ||||||||||||
| PROJECT | PROJECT NUMBER | WORK LOCATION | ||||||||||
| Repair Roof & HVAC Navy Facility Building 1560 | 0 | Joint Base Andrews, MD | ||||||||||
| MATERIAL COST | LABOR COST | |||||||||||
| LINE NO. | RS Means ID | ITEM | UNIT OF MEASURE | QUANTITY | UNIT | TOTAL | UNIT OF MEASURE | QUANTITY | UNIT | TOTAL | OTHER DIRECT COSTS | LINE TOTAL |
| (1) | (2) | (3) | (4) | (5) | (6) | (7) | (8) | (9) | (10) |
| Division 4 | Masonry | |||||||||
| 1 | 040120201020 | Pointing masonry, re-point, mask and grout method, common bond | sqft | 300 | $ - 0 | sqft | 300 | $ - 0 | $ - 0 | $ - 0 |
| 2 | 040120410110 | Unit masonry stabilization, structural repointing method, cut/grind mortar joint | lnft | 1,800 | $ - 0 | lnft | 1,800 | $ - 0 | $ - 0 | $ - 0 |
| 3 | Brick Veneer, Standard Size | sqft | 55 | $ - 0 | sqft | 55 | $ - 0 | $ - 0 | $ - 0 | |
| 4 | 040120400050 | Sawing masonry, brick or block, by hand, per inch depth | lnft | 784 | $ - 0 | lnft | 784 | $ - 0 | $ - 0 | |
| 5 | 079213101150 | Masonry joint sealants, silicone, 1/2" x 1/2" joint, includes cut-out and re-caulk, excludes scaffolding | lnft | 784 | $ - 0 | lnft | 784 | $ - 0 | $ - 0 | $ - 0 |
| 6 | 042113132000 | Brick veneer masonry, standard brick, select common, running bond, truckload lots, 6.75/SF, 4" x 2-2/3" x 8", includes 3% brick and 25% mortar waste, excludes scaffolding, grout and reinforcing | sqft | 100 | $ - 0 | sqft | 100 | $ - 0 | $ - 0 | $ - 0 |
Subtotal $ - $ - $ - $ -
AF Form 3052 Costs based on RS Means Cost Database 2018
DIV 5
| Repair Roof & HVAC Navy Facility Building 1560 | ||||||||||||
| ESTIMATOR | ADDRESS | |||||||||||
| Crawford Consulting Services | 239 Highland Ave Suite 100, East Pittsburgh PA, 15112 | |||||||||||
| CONTRACT FOR | PROPOSED TOTAL CONTRACT PRICE | |||||||||||
| $ - 0 | ||||||||||||
| PROJECT | PROJECT NUMBER | WORK LOCATION | ||||||||||
| Repair Roof & HVAC Navy Facility Building 1560 | 0 | Joint Base Andrews, MD | ||||||||||
| MATERIAL COST | LABOR COST | |||||||||||
| LINE NO. | RS Means ID | ITEM | UNIT OF MEASURE | QUANTITY | UNIT | TOTAL | UNIT OF MEASURE | QUANTITY | UNIT | TOTAL | OTHER DIRECT COSTS | LINE TOTAL |
| (1) | (2) | (3) | (4) | (5) | (6) | (7) | (8) | (9) | (10) |
| Division 5 | Metals | |||||||||
| 1 | 015423700090 | Scaffolding, steel tubular, regular, labor only to erect & dismantle, building exterior, wall face, 6'-4" x 5' frames, 1 to 5 stories, excludes planks | csf | 224 | $ - 0 | csf | 224 | $ - 0 | $ - 0 | $ - 0 |
| 2 | 077126100020 | Reglet, aluminum, in parapet, .025" thick | lnft | 98 | $ - 0 | lnft | 98 | $ - 0 | $ - 0 | $ - 0 |
| 3 | 076510100100 | Sheet metal flashing, aluminum, flexible, mill finish, .032" thick, including up to 4 bends | sqft | 60 | $ - 0 | sqft | 60 | $ - 0 | $ - 0 | $ - 0 |
Subtotal $ - $ - $ - $ -
AF Form 3052 Costs based on RS Means Cost Database 2018
DIV 6
| Repair Roof & HVAC Navy Facility Building 1560 | |
| ESTIMATOR | ADDRESS |
| CONTRACT FOR | PROPOSED TOTAL CONTRACT PRICE | |||||||||||
| $ - 0 | ||||||||||||
| PROJECT | PROJECT NUMBER | WORK LOCATION | ||||||||||
| Repair Roof & HVAC Navy Facility Building 1560 | 0 | Joint Base Andrews, MD | ||||||||||
| MATERIAL COST | LABOR COST | |||||||||||
| LINE NO. | RS Means ID | ITEM | UNIT OF MEASURE | QUANTITY | UNIT | TOTAL | UNIT OF MEASURE | QUANTITY | UNIT | TOTAL | OTHER DIRECT COSTS | LINE TOTAL |
| (1) | (2) | (3) | (4) | (5) | (6) | (7) | (8) | (9) | (10) |
| Division 6 | Wood, Plastics, Composites | |||||||||
| 1 | 075216101625 | SBS modified bituminous membrane, heavyweight base sheet, 87 to 120 mil thick | sqft | 420 | $ - 0 | sqft | 420 | $ - 0 | $ - 0 | |
| 2 | 075216100750 | SBS modified bituminous membrane, granule surface cap sheet, polyester reinforced, 150 to 160 mils | sqft | 420 | $ - 0 | sqft | 420 | $ - 0 | $ - 0 | |
| 3 | 075216102010 | SBS modified bituminous membrane, elastomeric asphalt primer | sqft | 420 | $ - 0 | sqft | 420 | $ - 0 | $ - 0 | $ - 0 |
| 4 | 075216102050 | SBS modified bituminous membrane, seam heat welding | lnft | 63 | $ - 0 | lnft | 63 | $ - 0 | $ - 0 | $ - 0 |
| 5 | 061643100040 | Gypsum sheathing, with embedded glass mats, 1/2" thick | sqft | 270 | $ - 0 | sqft | 270 | $ - 0 | $ - 0 | $ - 0 |
| 6 | 073219104170 | Roof tiles, flashing tile w/rubber boot, 100% recycled aluminum, for 4-1/2" pipe | each | 1 | $ - 0 | each | 1 | $ - 0 | $ - 0 | $ - 0 |
| 7 | 061110245100 | Wood framing, miscellaneous, nailers, treated, wood construction, 2" x 6" | lnft | 120 | $ - 0 | lnft | 120 | $ - 0 | $ - 0 | $ - 0 |
| 8 | 075113300012 | Cants, treated lumber, cut diagonally, 4" x 4" | lnft | 60 | $ - 0 | lnft | 60 | $ - 0 | $ - 0 | $ - 0 |
| 9 | 061110305980 | Wood framing, roof curbs, untreated, 2" x 12" | lnft | 60 | $ - 0 | lnft | 60 | $ - 0 | $ - 0 | $ - 0 |
Subtotal $ - $ - $ - $ -
AF Form 3052 Costs based on RS Means Cost Database 2018
DIV 7
| Repair Roof & HVAC Navy Facility Building 1560 | |
| ESTIMATOR | ADDRESS |
| CONTRACT FOR | PROPOSED TOTAL CONTRACT PRICE | |||||||||||
| $ - 0 | ||||||||||||
| PROJECT | PROJECT NUMBER | WORK LOCATION | ||||||||||
| Repair Roof & HVAC Navy Facility Building 1560 | 0 | Joint Base Andrews, MD | ||||||||||
| MATERIAL COST | LABOR COST | |||||||||||
| LINE NO. | RS Means ID | ITEM | UNIT OF MEASURE | QUANTITY | UNIT | TOTAL | UNIT OF MEASURE | QUANTITY | UNIT | TOTAL | OTHER DIRECT COSTS | LINE TOTAL |
| (1) | (2) | (3) | (4) | (5) | (6) | (7) | (8) | (9) | (10) |
| Division 7 | Thermal and Moisture Protection | |||||||||
| 1 | 072726100100 | Fluid applied membrane air barrier, 25 S.F./Gallon, spray | sqft | 100 | $ - 0 | sqft | 100 | $ - 0 | $ - 0 | $ - 0 |
| 2 | 072113101960 | Wall insulation, rigid, extruded polystyrene, 25 PSI compressive strength, 3" thick, R15 | sqft | 100 | $ - 0 | sqft | 100 | $ - 0 | $ - 0 | $ - 0 |
| 3 | 079213101150 | Masonry joint sealants, silicone, 1/2" x 1/2" joint, includes cut-out and re-caulk, excludes scaffolding | lnft | 785 | $ - 0 | lnft | 785 | $ - 0 | $ - 0 | $ - 0 |
| 4 | 079213101150 | Masonry joint sealants, silicone, 1/2" x 1/2" joint, includes cut-out and re-caulk, excludes scaffolding | lnft | 6,848 | $ - 0 | lnft | 6,848 | $ - 0 | $ - 0 | $ - 0 |
| 5 | 072216101765 | Roof deck insulation, polyisocyanurate, tapered for drainage, fastening excluded | bf(board feet) | 540 | $ - 0 | bf(board feet) | 540 | $ - 0 | $ - 0 | $ - 0 |
| 6 | 072216103110 | Roof deck insulation, fastening alternatives, 12" OC beads, low-rise polyurethane | sq(roofing) | 3 | $ - 0 | sq(roofing) | 3 | $ - 0 | $ - 0 | $ - 0 |
| 7 | 072610101200 | Vapor Retarders, building paper, polyethylene vapor barrier, standard, .010" thick | sq(roofing) | 5 | $ - 0 | sq(roofing) | 5 | $ - 0 | $ - 0 | $ - 0 |
| 8 | 072216101745 | Polyisocyanurate Insulation, for roof decks, 3" thick, 2#/CF density | sqft | 420 | $ - 0 | sqft | 420 | $ - 0 | $ - 0 | $ - 0 |
Subtotal $ - $ - $ - $ -
AF Form 3052 Costs based on RS Means Cost Database 2018
DIV 8
| Repair Roof & HVAC Navy Facility Building 1560 | |
| ESTIMATOR | ADDRESS |
| CONTRACT FOR | PROPOSED TOTAL CONTRACT PRICE | |||||||||||
| $ - 0 | ||||||||||||
| PROJECT | PROJECT NUMBER | WORK LOCATION | ||||||||||
| Repair Roof & HVAC Navy Facility Building 1560 | 0 | Joint Base Andrews, MD | ||||||||||
| MATERIAL COST | LABOR COST | |||||||||||
| LINE NO. | RS Means ID | ITEM | UNIT OF MEASURE | QUANTITY | UNIT | TOTAL | UNIT OF MEASURE | QUANTITY | UNIT | TOTAL | OTHER DIRECT COSTS | LINE TOTAL |
| (1) | (2) | (3) | (4) | (5) | (6) | (7) | (8) | (9) | (10) |
| Division 8 | Openings | |||||||||
| 1 | 085113206520 | Windows, aluminum, commercial grade, stock units, standard brush finish, casement, fixed, incl. frame and glazing. | sqft | 3,707 | $ - 0 | sqft | 3,707 | $ - 0 | $ - 0 | $ - 0 |
| 2 | 040130204000 | Cleaning Windows | sqft | 7,414 | $ - 0 | sqft | 7,414 | $ - 0 | $ - 0 | $ - 0 |
| 3 | Repair Loose Metal Window Trim | lsum | 1 | $ - 0 | lsum | 1 | $ - 0 | $ - 0 | ||
| 4 | 099123390140 | Paints & coatings, interior latex, zero voc, doors, flush, both sides, roll & brush, primer + 2 coats, incl. frame & trim | each | 94 | $ - 0 | each | 94 | $ - 0 | $ - 0 | $ - 0 |
Subtotal $ - $ - $ - $ -
AF Form 3052 Costs based on RS Means Cost Database 2018
DIV 9
| Repair Roof & HVAC Navy Facility Building 1560 | |
| ESTIMATOR | ADDRESS |
| CONTRACT FOR | PROPOSED TOTAL CONTRACT PRICE | |||||||||||
| $ - 0 | ||||||||||||
| PROJECT | PROJECT NUMBER | WORK LOCATION | ||||||||||
| Repair Roof & HVAC Navy Facility Building 1560 | 0 | Joint Base Andrews, MD | ||||||||||
| MATERIAL COST | LABOR COST | |||||||||||
| LINE NO. | RS Means ID | ITEM | UNIT OF MEASURE | QUANTITY | UNIT | TOTAL | UNIT OF MEASURE | QUANTITY | UNIT | TOTAL | OTHER DIRECT COSTS | LINE TOTAL |
| (1) | (2) | (3) | (4) | (5) | (6) | (7) | (8) | (9) | (10) |
| Division 9 | Finishes | |||||||||
| 1 | 099113900600 | Paints & coatings, walls, concrete masonry units (CMU), porous, first coat, waterproof sealer, spray | sqft | 15,680 | $ - 0 | sqft | 15,680 | $ - 0 | $ - 0 | $ - 0 |
| 2 | 099113900610 | Paints & coatings, walls, concrete masonry units (CMU), porous, second coat, waterproof sealer, spray | sqft | 15,680 | $ - 0 | sqft | 15,680 | $ - 0 | $ - 0 | $ - 0 |
| 3 | Prep/Paint Single Door | each | 1 | $ - 0 | each | 1 | $ - 0 | $ - 0 | $ - 0 | |
| 4 | 093013105800 | Ceramic tile, walls, interior, thin set, 6" x 6" | sqft | 42 | $ - 0 | sqft | 42 | $ - 0 | $ - 0 | $ - 0 |
| 5 | 092813100200 | Cementitious backerboard, on wall, 3' x 6' x 5/8" sheet | sqft | 42 | $ - 0 | sqft | 42 | $ - 0 | $ - 0 | $ - 0 |
| 6 | 099123720240 | Paints & coatings, walls & ceilings, interior, concrete, drywall or plaster, latex paint, primer or sealer coat, smooth finish, roller | sqft | 73,848 | $ - 0 | sqft | 73,848 | $ - 0 | $ - 0 | $ - 0 |
| 7 | 099123720840 | Paints & coatings, walls & ceilings, interior, concrete, drywall or plaster, latex paint, 2 coats, smooth finish, roller | sqft | 73,848 | $ - 0 | sqft | 73,848 | $ - 0 | $ - 0 | $ - 0 |
| 8 | 093013103255 | Ceramic tile, floors, glazed, thin set, color group 1, 6" x 6" | sqft | 21 | $ - 0 | sqft | 21 | $ - 0 | $ - 0 | $ - 0 |
| 9 | 096516105900 | Resilient flooring, rubber, sheet goods, 3' w, 1/8" thick | sqft | 214 | $ - 0 | sqft | 214 | $ - 0 | $ - 0 | $ - 0 |
| 10 | 096519237800 | Flooring, vinyl tile, max, premium colors/jpatterns, 12" x 12"x 1/8" | sqft | 442 | $ - 0 | sqft | 442 | $ - 0 | $ - 0 | $ - 0 |
| 11 | 096519237650 | Flooring, vinyl tile, solid colors, 12" x 12"x 1/8" | sqft | 1,167 | $ - 0 | sqft | 1,167 | $ - 0 | $ - 0 | $ - 0 |
| 12 | 096813101100 | Carpet tile, tufted nylon, 24 oz., 18" x 18" or 24" x 24" | sqyd | 1,812 | $ - 0 | sqyd | 1,812 | $ - 0 | $ - 0 | $ - 0 |
| 13 | 093013100700 | Ceramic tile, cove base, thin set, 4-1/4" x 4-1/4" | lnft | 7 | $ - 0 | lnft | 7 | $ - 0 | $ - 0 | $ - 0 |
| 14 | 096513131100 | Wall base, rubber, straight or cove, standard colors, 4" high, 1/8" thick | lnft | 4,261 | $ - 0 | lnft | 4,261 | $ - 0 | $ - 0 | $ - 0 |
| 15 | 095123300820 | Complete suspended ceilings, mineral fiber, Tegular, 2' x 2' x 5/8", on 9/16" grid, include standard suspension system, excl. 1-1/2" carrier channels | sqft | 6,368 | $ - 0 | sqft | 6,368 | $ - 0 | $ - 0 | $ - 0 |
| 16 | 092910302050 | Gypsum wallboard, on walls, standard, taped & finished (level 4 finish), 5/8" thick | sqft | 4,230 | $ - 0 | sqft | 4,230 | $ - 0 | $ - 0 | $ - 0 |
| 17 | 096513230600 | Stair treads & risers, rubber, molded tread, black, 12" w, 1/4" thick | lnft | 101 | $ - 0 | lnft | 101 | $ - 0 | $ - 0 | $ - 0 |
Subtotal $ - $ - $ - $ -
AF Form 3052 Costs based on RS Means Cost Database 2018
DIV 10
| Repair Roof & HVAC Navy Facility Building 1560 | ||||||||||||
| ESTIMATOR | ADDRESS | |||||||||||
| Crawford Consulting Services | 239 Highland Ave Suite 100, East Pittsburgh PA, 15112 | |||||||||||
| CONTRACT FOR | PROPOSED TOTAL CONTRACT PRICE | |||||||||||
| $ - 0 | ||||||||||||
| PROJECT | PROJECT NUMBER | WORK LOCATION | ||||||||||
| Repair Roof & HVAC Navy Facility Building 1560 | 0 | Joint Base Andrews, MD | ||||||||||
| MATERIAL COST | LABOR COST | |||||||||||
| LINE NO. | RS Means ID | ITEM | UNIT OF MEASURE | QUANTITY | UNIT | TOTAL | UNIT OF MEASURE | QUANTITY | UNIT | TOTAL | OTHER DIRECT COSTS | LINE TOTAL |
| (1) | (2) | (3) | (4) | (5) | (6) | (7) | (8) | (9) | (10) |
| Division 10 | Specialties | ||||||
| 1 | $ - 0 | 0 | 0 | $ - 0 | $ - 0 | ||
| 2 | $ - 0 | 0 | 0 | $ - 0 | $ - 0 | ||
| 3 | $ - 0 | 0 | 0 | $ - 0 | $ - 0 | ||
| 4 | $ - 0 | 0 | 0 | $ - 0 | $ - 0 | ||
| 5 | $ - 0 | 0 | 0 | $ - 0 | $ - 0 | ||
| 6 | $ - 0 | 0 | 0 | $ - 0 | $ - 0 | ||
| 7 | $ - 0 | 0 | 0 | $ - 0 | $ - 0 | ||
| 8 | $ - 0 | 0 | 0 | $ - 0 | $ - 0 | ||
| 9 | $ - 0 | 0 | 0 | $ - 0 | $ - 0 | ||
| 10 | $ - 0 | 0 | 0 | $ - 0 | $ - 0 | ||
| 11 | $ - 0 | 0 | 0 | $ - 0 | $ - 0 | ||
| 12 | $ - 0 | 0 | 0 | $ - 0 | $ - 0 | ||
| 13 | $ - 0 | 0 | 0 | $ - 0 | $ - 0 | ||
| 14 | $ - 0 | 0 | 0 | $ - 0 | $ - 0 |
Subtotal $ - $ - $ - $ -
AF Form 3052 Costs based on RS Means Cost Database 2018
DIV 11
| Repair Roof & HVAC Navy Facility Building 1560 | ||||||||||||
| ESTIMATOR | ADDRESS | |||||||||||
| Crawford Consulting Services | 239 Highland Ave Suite 100, East Pittsburgh PA, 15112 | |||||||||||
| CONTRACT FOR | PROPOSED TOTAL CONTRACT PRICE | |||||||||||
| $ - 0 | ||||||||||||
| PROJECT | PROJECT NUMBER | WORK LOCATION | ||||||||||
| Repair Roof & HVAC Navy Facility Building 1560 | 0 | Joint Base Andrews, MD | ||||||||||
| MATERIAL COST | LABOR COST | |||||||||||
| LINE NO. | RS Means ID | ITEM | UNIT OF MEASURE | QUANTITY | UNIT | TOTAL | UNIT OF MEASURE | QUANTITY | UNIT | TOTAL | OTHER DIRECT COSTS | LINE TOTAL |
| (1) | (2) | (3) | (4) | (5) | (6) | (7) | (8) | (9) | (10) |
| Division 11 | Equipment | ||||||
| 1 | $ - 0 | 0 | 0 | $ - 0 | $ - 0 | ||
| 2 | $ - 0 | 0 | 0 | $ - 0 | $ - 0 | ||
| 3 | $ - 0 | 0 | 0 | $ - 0 | $ - 0 | ||
| 4 | $ - 0 | 0 | 0 | $ - 0 | $ - 0 | ||
| 5 | $ - 0 | 0 | 0 | $ - 0 | $ - 0 | ||
| 6 | $ - 0 | 0 | 0 | $ - 0 | $ - 0 | ||
| 7 | $ - 0 | 0 | 0 | $ - 0 | $ - 0 | ||
| 8 | $ - 0 | 0 | 0 | $ - 0 | $ - 0 | ||
| 9 | $ - 0 | 0 | 0 | $ - 0 | $ - 0 | ||
| 10 | $ - 0 | 0 | 0 | $ - 0 | $ - 0 | ||
| 11 | $ - 0 | 0 | 0 | $ - 0 | $ - 0 | ||
| 12 | $ - 0 | 0 | 0 | $ - 0 | $ - 0 | ||
| 13 | $ - 0 | 0 | 0 | $ - 0 | $ - 0 | ||
| 14 | $ - 0 | 0 | 0 | $ - 0 | $ - 0 |
Subtotal $ - $ - $ - $ -
AF Form 3052 Costs based on RS Means Cost Database 2018
DIV 12
| Repair Roof & HVAC Navy Facility Building 1560 | |
| ESTIMATOR | ADDRESS |
| CONTRACT FOR | PROPOSED TOTAL CONTRACT PRICE | |||||||||||
| $ - 0 | ||||||||||||
| PROJECT | PROJECT NUMBER | WORK LOCATION | ||||||||||
| Repair Roof & HVAC Navy Facility Building 1560 | 0 | Joint Base Andrews, MD | ||||||||||
| MATERIAL COST | LABOR COST | |||||||||||
| LINE NO. | RS Means ID | ITEM | UNIT OF MEASURE | QUANTITY | UNIT | TOTAL | UNIT OF MEASURE | QUANTITY | UNIT | TOTAL | OTHER DIRECT COSTS | LINE TOTAL |
| (1) | (2) | (3) | (4) | (5) | (6) | (7) | (8) | (9) | (10) |
| Division 12 | Furnishings | |||||||||
| 1 | 123661162700 | Solid surface countertop, acrylic polymer, solid colors, with hard seam attached 4" backsplash, pricing for orders of 1 - 50 LF, 25" wide | lnft | 17 | $ - 0 | lnft | 17 | $ - 0 | $ - 0 | $ - 0 |
Subtotal $ - $ - $ - $ -
AF Form 3052 Costs based on RS Means Cost Database 2018
DIV 13
| Repair Roof & HVAC Navy Facility Building 1560 | ||||||||||||
| ESTIMATOR | ADDRESS | |||||||||||
| Crawford Consulting Services | 239 Highland Ave Suite 100, East Pittsburgh PA, 15112 | |||||||||||
| CONTRACT FOR | PROPOSED TOTAL CONTRACT PRICE | |||||||||||
| $ - 0 | ||||||||||||
| PROJECT | PROJECT NUMBER | WORK LOCATION | ||||||||||
| Repair Roof & HVAC Navy Facility Building 1560 | 0 | Joint Base Andrews, MD | ||||||||||
| MATERIAL COST | LABOR COST | |||||||||||
| LINE NO. | RS Means ID | ITEM | UNIT OF MEASURE | QUANTITY | UNIT | TOTAL | UNIT OF MEASURE | QUANTITY | UNIT | TOTAL | OTHER DIRECT COSTS | LINE TOTAL |
| (1) | (2) | (3) | (4) | (5) | (6) | (7) | (8) | (9) | (10) |
| Division 13 | Special Construction | ||||||
| 1 | $ - 0 | 0 | 0 | $ - 0 | $ - 0 | ||
| 2 | $ - 0 | 0 | 0 | $ - 0 | $ - 0 | ||
| 3 | $ - 0 | 0 | 0 | $ - 0 | $ - 0 | ||
| 4 | $ - 0 | 0 | 0 | $ - 0 | $ - 0 | ||
| 5 | $ - 0 | 0 | 0 | $ - 0 | $ - 0 | ||
| 6 | $ - 0 | 0 | 0 | $ - 0 | $ - 0 | ||
| 7 | $ - 0 | 0 | 0 | $ - 0 | $ - 0 | ||
| 8 | $ - 0 | 0 | 0 | $ - 0 | $ - 0 | ||
| 9 | $ - 0 | 0 | 0 | $ - 0 | $ - 0 | ||
| 10 | $ - 0 | 0 | 0 | $ - 0 | $ - 0 | ||
| 11 | $ - 0 | 0 | 0 | $ - 0 | $ - 0 | ||
| 12 | $ - 0 | 0 | 0 | $ - 0 | $ - 0 | ||
| 13 | $ - 0 | 0 | 0 | $ - 0 | $ - 0 | ||
| 14 | $ - 0 | 0 | 0 | $ - 0 | $ - 0 |
Subtotal $ - $ - $ - $ -
AF Form 3052 Costs based on RS Means Cost Database 2018
DIV 14
| Repair Roof & HVAC Navy Facility Building 1560 | ||||||||||||
| ESTIMATOR | ADDRESS | |||||||||||
| Crawford Consulting Services | 239 Highland Ave Suite 100, East Pittsburgh PA, 15112 | |||||||||||
| CONTRACT FOR | PROPOSED TOTAL CONTRACT PRICE | |||||||||||
| $ - 0 | ||||||||||||
| PROJECT | PROJECT NUMBER | WORK LOCATION | ||||||||||
| Repair Roof & HVAC Navy Facility Building 1560 | 0 | Joint Base Andrews, MD | ||||||||||
| MATERIAL COST | LABOR COST | |||||||||||
| LINE NO. | RS Means ID | ITEM | UNIT OF MEASURE | QUANTITY | UNIT | TOTAL | UNIT OF MEASURE | QUANTITY | UNIT | TOTAL | OTHER DIRECT COSTS | LINE TOTAL |
| (1) | (2) | (3) | (4) | (5) | (6) | (7) | (8) | (9) | (10) |
| Division 14 | Conveying Equipment | ||||||
| 1 | $ - 0 | 0 | 0 | $ - 0 | $ - 0 | ||
| 2 | $ - 0 | 0 | 0 | $ - 0 | $ - 0 | ||
| 3 | $ - 0 | 0 | 0 | $ - 0 | $ - 0 | ||
| 4 | $ - 0 | 0 | 0 | $ - 0 | $ - 0 | ||
| 5 | $ - 0 | 0 | 0 | $ - 0 | $ - 0 | ||
| 6 | $ - 0 | 0 | 0 | $ - 0 | $ - 0 | ||
| 7 | $ - 0 | 0 | 0 | $ - 0 | $ - 0 | ||
| 8 | $ - 0 | 0 | 0 | $ - 0 | $ - 0 | ||
| 9 | $ - 0 | 0 | 0 | $ - 0 | $ - 0 | ||
| 10 | $ - 0 | 0 | 0 | $ - 0 | $ - 0 | ||
| 11 | $ - 0 | 0 | 0 | $ - 0 | $ - 0 | ||
| 12 | $ - 0 | 0 | 0 | $ - 0 | $ - 0 | ||
| 13 | $ - 0 | 0 | 0 | $ - 0 | $ - 0 | ||
| 14 | $ - 0 | 0 | 0 | $ - 0 | $ - 0 |
Subtotal $ - $ - $ - $ -
AF Form 3052 Costs based on RS Means Cost Database 2018
DIV 21
| Repair Roof & HVAC Navy Facility Building 1560 | |
| ESTIMATOR | ADDRESS |
| CONTRACT FOR | PROPOSED TOTAL CONTRACT PRICE | |||||||||||
| $ - 0 | ||||||||||||
| PROJECT | PROJECT NUMBER | WORK LOCATION | ||||||||||
| Repair Roof & HVAC Navy Facility Building 1560 | 0 | Joint Base Andrews, MD | ||||||||||
| MATERIAL COST | LABOR COST | |||||||||||
| LINE NO. | RS Means ID | ITEM | UNIT OF MEASURE | QUANTITY | UNIT | TOTAL | UNIT OF MEASURE | QUANTITY | UNIT | TOTAL | OTHER DIRECT COSTS | LINE TOTAL |
| (1) | (2) | (3) | (4) | (5) | (6) | (7) | (8) | (9) | (10) |
| Division 21 | Fire Suppression | ||||||||
| 1 | 211313503740 | Sprinkler system components, sprinkler heads, standard spray, pendent or upright, brass, 135 to 286 degrees F, 1/2" NPT, 1/2" orifice, excludes supply piping | each | 64 | $ - 0 | each | 64 | $ - 0 | $ - 0 |
Subtotal $ - $ - $ - $ -
AF Form 3052 Costs based on RS Means Cost Database 2018
DIV 22
| Repair Roof & HVAC Navy Facility Building 1560 | |
| ESTIMATOR | ADDRESS |
| CONTRACT FOR | PROPOSED TOTAL CONTRACT PRICE | |||||||||||
| $ - 0 | ||||||||||||
| PROJECT | PROJECT NUMBER | WORK LOCATION | ||||||||||
| Repair Roof & HVAC Navy Facility Building 1560 | 0 | Joint Base Andrews, MD | ||||||||||
| MATERIAL COST | LABOR COST | |||||||||||
| LINE NO. | RS Means ID | ITEM | UNIT OF MEASURE | QUANTITY | UNIT | TOTAL | UNIT OF MEASURE | QUANTITY | UNIT | TOTAL | OTHER DIRECT COSTS | LINE TOTAL |
| (1) | (2) | (3) | (4) | (5) | (6) | (7) | (8) | (9) | (10) |
| Division 22 | Plumbing | |||||||||
| 1 | 224213133100 | Water closet, bowl only, wall hung, includes flush valve and seat | each | 3 | $ - 0 | each | 3 | $ - 0 | $ - 0 | $ - 0 |
| 2 | 224213133200 | Water closet, bowl only, wall hung, rough-in, supply, waste and vent | each | 3 | $ - 0 | each | 3 | $ - 0 | $ - 0 | $ - 0 |
| 3 | 224716101000 | Water cooler, wall mounted, non-recessed, dual height, 8.2 GPH | each | 4 | $ - 0 | each | 4 | $ - 0 | $ - 0 | $ - 0 |
| 4 | 224716101240 | Water cooler, wall mounted, non-recessed, dual height, for stainless steel cabinet, add | each | 4 | $ - 0 | each | 4 | $ - 0 | $ - 0 | $ - 0 |
| 5 | 224716103200 | Water cooler, wall mounted, simulated recessed, for glass filler, add | each | 4 | $ - 0 | each | 4 | $ - 0 | $ - 0 | $ - 0 |
| 6 | 224716109800 | Water cooler, for supply, waste and vent, all coolers | each | 4 | $ - 0 | each | 4 | $ - 0 | $ - 0 | $ - 0 |
| 7 | CPVC Pipe - 2" | lnft | 60 | $ - 0 | lnft | 60 | $ - 0 | $ - 0 | $ - 0 | |
| 8 | 026610101633 | H.D. polyethylene sumps, sump base, 48" | each | 1 | $ - 0 | each | 1 | $ - 0 | $ - 0 | $ - 0 |
| 9 | 221429132040 | Pump, pedestal sump, single stage, 150 GPM, 3 H.P., 3" discharge | each | 1 | $ - 0 | each | 1 | $ - 0 | $ - 0 | $ - 0 |
| 10 | 223313100160 | Hot water dispenser, commercial, 100 cup, 11.3 amp | each | 2 | $ - 0 | each | 2 | $ - 0 | $ - 0 | $ - 0 |
| 11 | 220576100140.001 | Snake out floor drains | each | 2 | $ - 0 | each | 2 | $ - 0 | $ - 0 | $ - 0 |
| 12 | 232129100120 | Pump, condensate removal system, pump with 1 Gal. ABS tank, 115 V, 1/50 HP, 200 GPH | each | 1 | $ - 0 | each | 1 | $ - 0 | $ - 0 | $ - 0 |
Subtotal $ - $ - $ - $ -
AF Form 3052 Costs based on RS Means Cost Database 2018
DIV 23
| Repair Roof & HVAC Navy Facility Building 1560 | |
| ESTIMATOR | ADDRESS |
| CONTRACT FOR | PROPOSED TOTAL CONTRACT PRICE | |||||||||||
| $ - 0 | ||||||||||||
| PROJECT | PROJECT NUMBER | WORK LOCATION | ||||||||||
| Repair Roof & HVAC Navy Facility Building 1560 | 0 | Joint Base Andrews, MD | ||||||||||
| MATERIAL COST | LABOR COST | |||||||||||
| LINE NO. | RS Means ID | ITEM | UNIT OF MEASURE | QUANTITY | UNIT | TOTAL | UNIT OF MEASURE | QUANTITY | UNIT | TOTAL | OTHER DIRECT COSTS | LINE TOTAL |
| (1) | (2) | (3) | (4) | (5) | (6) | (7) | (8) | (9) | (10) |
| Division 23 | HVAC | |||||||||
| 1 | 236419100546 | Water chiller, liquid chiller, packaged unit with integral air cooled condenser, 70 ton cooling, includes standard controls | each | 1 | $ - 0 | each | 1 | $ - 0 | $ - 0 | $ - 0 |
| 2 | 238126100150 | Split ductless system, cooling only, single zone, wall mount, 2 ton cooling | each | 5 | $ - 0 | each | 5 | $ - 0 | $ - 0 | $ - 0 |
| 3 | 238126107050 | Split ductless system, accessories for all split ductless systems, for tube / wiring kit, 50' kit | each | 5 | $ - 0 | each | 5 | $ - 0 | $ - 0 | $ - 0 |
| 4 | 233113130570.01 | Metal Ductwork, fabricated rectangular, galvanized steel, 2000 to 5000 lb., includes fittings, joints, supports and allowance for a flexible connection, excludes insulation | lbs | 4,700 | $ - 0 | lbs | 4,700 | $ - 0 | $ - 0 | $ - 0 |
| 5 | 233353103970 | Insulation, duct, board type, non-fibrous foam, temperature, bacteria and fungi resistant, 1-1/2" thick | sqft | 1,200 | $ - 0 | sqft | 1,200 | $ - 0 | $ - 0 | $ - 0 |
| 6 | 233113130140 | Metal Ductwork, fabricated rectangular, 1000 to 2000 lb., aluminum alloy 3003-H14, includes fittings, joints, supports and allowance for a flexible connection, excludes insulation | lbs | 1,200 | $ - 0 | lbs | 1,200 | $ - 0 | $ - 0 | $ - 0 |
| 7 | 230713103170.001 | Duct thermal insulation, blanket type, fiberglass, flexible, FSK vapor barrier wrap, .75 lb. density, 1-1/2" thick | sqft | 2,600 | $ - 0 | sqft | 2,600 | $ - 0 | $ - 0 | $ - 0 |
| 8 | Grilles, Registers, Diffusers | each | 36 | $ - 0 | each | 36 | $ - 0 | $ - 0 | $ - 0 | |
| 9 | .75" Copper Pipe - Type L | lnft | 500 | $ - 0 | lnft | 500 | $ - 0 | $ - 0 | $ - 0 | |
| 10 | 1.0" Copper Pipe - Type L | lnft | 1,280 | $ - 0 | lnft | 1,280 | $ - 0 | $ - 0 | $ - 0 | |
| 11 | 1.25" Copper Pipe - Type L | lnft | 960 | $ - 0 | lnft | 960 | $ - 0 | $ - 0 | $ - 0 | |
| 12 | 1.5" Copper Pipe - Type L | lnft | 300 | $ - 0 | lnft | 300 | $ - 0 | $ - 0 | $ - 0 | |
| 13 | 2.0" Copper Pipe - Type L | lnft | 250 | $ - 0 | lnft | 250 | $ - 0 | $ - 0 | $ - 0 | |
| 14 | 2.5 sch 40 BW | lnft | 220 | $ - 0 | lnft | 220 | $ - 0 | $ - 0 | ||
| 15 | 3.0 sch 40 BW, no valves | lnft | 400 | $ - 0 | lnft | 400 | $ - 0 | $ - 0 | ||
| 16 | 4.0 sch 40 BW, no valves | lnft | 180 | $ - 0 | lnft | 180 | $ - 0 | $ - 0 | ||
| 17 | 6.0 sch 40 BW, no valves | lnft | 120 | $ - 0 | lnft | 120 | $ - 0 | $ - 0 | ||
| 18 | 220719106860 | Insulation, pipe covering (price copper tube one size less than I.P.S.), fiberglass with all service jacket, 1" wall, 3/4" iron pipe size | lnft | 500 | $ - 0 | lnft | 500 | $ - 0 | $ - 0 | |
| 19 | 220719106870 | Insulation, pipe covering (price copper tube one size less than I.P.S.), fiberglass with all service jacket, 1" wall, 1" iron pipe size | lnft | 1,280 | $ - 0 | lnft | 1,280 | $ - 0 | $ - 0 | |
| 20 | 220719106880 | Insulation, pipe covering (price copper tube one size less than I.P.S.), fiberglass with all service jacket, 1" wall, 1-1/4" iron pipe size | lnft | 960 | $ - 0 | lnft | 960 | $ - 0 | $ - 0 | |
| 21 | 220719107130 | Insulation, pipe covering (price copper tube one size less than I.P.S.), fiberglass with all service jacket, 1-1/2" wall, 1-1/2" iron pipe size | lnft | 300 | $ - 0 | lnft | 300 | $ - 0 | $ - 0 | |
| 22 | 220719107140 | Insulation, pipe covering (price copper tube one size less than I.P.S.), fiberglass with all service jacket, 1-1/2" wall, 2" iron pipe size | lnft | 250 | $ - 0 | lnft | 250 | $ - 0 | $ - 0 | |
| 23 | 220719107150 | Insulation, pipe covering (price copper tube one size less than I.P.S.), fiberglass with all service jacket, 1-1/2" wall, 2-1/2" iron pipe size | lnft | 220 | $ - 0 | lnft | 220 | $ - 0 | $ - 0 | |
| 24 | 220719107160 | Insulation, pipe covering (price copper tube one size less than I.P.S.), fiberglass with all service jacket, 1-1/2" wall, 3" iron pipe size | lnft | 400 | $ - 0 | lnft | 400 | $ - 0 | $ - 0 | |
| 25 | 220719107180 | Insulation, pipe covering (price copper tube one size less than I.P.S.), fiberglass with all service jacket, 1-1/2" wall, 4" iron pipe size | lnft | 180 | $ - 0 | lnft | 180 | $ - 0 | $ - 0 | |
| 26 | 220719107200 | Insulation, pipe covering (price copper tube one size less than I.P.S.), fiberglass with all service jacket, 1-1/2" wall, 6" iron pipe size | lnft | 120 | $ - 0 | lnft | 120 | $ - 0 | $ - 0 | |
| 27 | 221123104050 | Pump, general utility, centrifugal, end suction, horizontal base mounted, vertical split case, rated @ 100' head, single stage, 200 GPM, 10 H.P., 2" discharge, includes drip proof motor | each | 2 | $ - 0 | each | 2 | $ - 0 | $ - 0 | |
| 28 | 2.0" Pump hook up | each | 2 | $ - 0 | each | 2 | $ - 0 | $ - 0 | ||
| 29 | 230523300810 | Valves, iron body, butterfly, lug type, gear operated, 200 lb., 3" | each | 2 | $ - 0 | each | 2 | $ - 0 | $ - 0 | |
| 30 | 221123104060 | Pump, general utility, centrifugal, end suction, horizontal base mounted, vertical split case, rated @ 100' head, single stage, 250 GPM, 10 H.P., 3" discharge, includes drip proof motor | each | 2 | $ - 0 | each | 2 | $ - 0 | $ - 0 | |
| 31 | 3" Pump hook up | each | 2 | $ - 0 | each | 2 | $ - 0 | $ - 0 | ||
| 32 | 233413100522 | Fans, air conditioning and process air handling, axial flow, constant speed, direct drive, 1/8" S.P., 4130 CFM, 3/4 H.P., 20" | each | 1 | $ - 0 | each | 1 | $ - 0 | $ - 0 | |
| 33 | ERV/DOAS - Greenheck ERCH, per CFM | cfm | 4,300 | $ - 0 | cfm | 4,300 | $ - 0 | $ - 0 | ||
| 34 | 238239135420 | Hydronic heating, unit heater, cabinet, hot water, horizontal, blower type, 20 MBH | each | 12 | $ - 0 | each | 12 | $ - 0 | $ - 0 | |
| 35 | 238219100282 | Fan coil A.C., cabinet mounted, chilled water, vertical unit with hot water heating, 4 pipe, 2 ton cooling, includes filters and controls | each | 88 | $ - 0 | each | 88 | $ - 0 | $ - 0 | |
| 36 | 0.75" AHU Hook Up | each | 176 | $ - 0 | each | 88 | $ - 0 | $ - 0 | ||
| 37 | Control, Energy Recovery Unit - Water Coils | each | 1 | $ - 0 | each | 1 | $ - 0 | $ - 0 | ||
| 38 | Control, Fan Coil Unit | each | 88 | $ - 0 | each | 88 | $ - 0 | $ - 0 | ||
| 39 | Control, Chiller | each | 1 | $ - 0 | each | 1 | $ - 0 | $ - 0 | ||
| 40 | Control, Pump | each | 4 | $ - 0 | each | 4 | $ - 0 | $ - 0 | ||
| 41 | Control, Zone Controller | each | 3 | $ - 0 | each | 3 | $ - 0 | $ - 0 | ||
| 42 | 230593200200 | Balancing, water, chiller, (Subcontractor's quote including material & labor) | each | 1 | $ - 0 | each | 1 | $ - 0 | $ - 0 | |
| 43 | 230593200600 | Balancing, water, fan coil unit, unit ventilator, (Subcontractor's quote including material & labor) | each | 88 | $ - 0 | each | 88 | $ - 0 | $ - 0 | |
| 44 | 230593200800 | Balancing, water, main and duct re-heat coils, (Subcontractor's quote including material & labor) | each | 2 | $ - 0 | each | 2 | $ - 0 | $ - 0 | |
| 45 | 230593201000 | Balancing, water, pumps, (Subcontractor's quote including material & labor) | each | 4 | $ - 0 | each | 4 | $ - 0 | $ - 0 | |
| 46 | 230593200100 | Balancing, water, cabinet unit heater, (Subcontractor's quote including material & labor) | each | 12 | $ - 0 | each | 12 | $ - 0 | $ - 0 | |
| 47 | 230593102801 | Balancing, air conditioning equipment, rooftop heating and cooling unit, (Subcontractor's quote including material & labor) | each | 1 | $ - 0 | each | 1 | $ - 0 | $ - 0 | |
| 48 | 230593103000 | Balancing, air conditioning equipment, supply, return, exhaust, registers and diffusers, average ceiling height, (Subcontractor's quote including material & labor) | each | 36 | $ - 0 | each | 36 | $ - 0 | $ - 0 | |
| 49 | 230593101100.002 | Commissioning | hours | 160 | $ - 0 | hours | 160 | $ - 0 | $ - 0 | $ - 0 |
Subtotal $ - $ - $ - $ -
AF Form 3052 Costs based on RS Means Cost Database 2018
DIV 26
| Repair Roof & HVAC Navy Facility Building 1560 | |
| ESTIMATOR | ADDRESS |
| CONTRACT FOR | PROPOSED TOTAL CONTRACT PRICE | |||||||||||
| $ - 0 | ||||||||||||
| PROJECT | PROJECT NUMBER | WORK LOCATION | ||||||||||
| Repair Roof & HVAC Navy Facility Building 1560 | 0 | Joint Base Andrews, MD | ||||||||||
| MATERIAL COST | LABOR COST | |||||||||||
| LINE NO. | RS Means ID | ITEM | UNIT OF MEASURE | QUANTITY | UNIT | TOTAL | UNIT OF MEASURE | QUANTITY | UNIT | TOTAL | OTHER DIRECT COSTS | LINE TOTAL |
| (1) | (2) | (3) | (4) | (5) | (6) | (7) | (8) | (9) | (10) |
| Division 26 | Electrical | |||||||||
| 1 | 260519902600 | Wire, copper, stranded, 600 volt, 350 kcmil, type THWN-THHN, in raceway | lnft | 400 | $ - 0 | lnft | 400 | $ - 0 | $ - 0 | $ - 0 |
| 2 | 260519901550 | Wire, copper, stranded, 600 volt, #1, type THWN-THHN, in raceway | lnft | 700 | $ - 0 | lnft | 700 | $ - 0 | $ - 0 | $ - 0 |
| 3 | 260519902800 | Wire, copper, stranded, 600 volt, 500 kcmil, type THWN-THHN, in raceway | lnft | 360 | $ - 0 | lnft | 360 | $ - 0 | $ - 0 | $ - 0 |
| 4 | 260519901600 | Wire, copper, stranded, 600 volt, 1/0, type THWN-THHN, in raceway | lnft | 90 | $ - 0 | lnft | 90 | $ - 0 | $ - 0 | $ - 0 |
| 5 | 260533135140 | Electric metallic tubing (EMT), 3" diameter, to 15' high, incl 2 terminations, 2 elbows, 11 beam clamps, and 11 couplings per 100 LF | lnft | 130 | $ - 0 | lnft | 130 | $ - 0 | $ - 0 | $ - 0 |
| 6 | 260519902800 | Wire, copper, stranded, 600 volt, 500 kcmil, type THWN-THHN, in raceway | lnft | 160 | $ - 0 | lnft | 160 | $ - 0 | $ - 0 | $ - 0 |
| 7 | 260519901450 | Wire, copper, stranded, 600 volt, #3, type THWN-THHN, in raceway | lnft | 40 | $ - 0 | lnft | 40 | $ - 0 | $ - 0 | $ - 0 |
| 8 | 260519901300 | Wire, copper, stranded, 600 volt, #8, type THWN-THHN, in raceway | lnft | 150 | $ - 0 | lnft | 150 | $ - 0 | $ - 0 | $ - 0 |
| 9 | 260533135060 | Electric metallic tubing (EMT), 1-1/4" diameter, to 15' high, incl 2 terminations, 2 elbows, 11 beam clamps, and 11 couplings per 100 LF | lnft | 250 | $ - 0 | lnft | 250 | $ - 0 | $ - 0 | $ - 0 |
| 10 | 260519901400 | Wire, copper, stranded, 600 volt, #4, type THWN-THHN, in raceway | lnft | 600 | $ - 0 | lnft | 600 | $ - 0 | $ - 0 | $ - 0 |
| 11 | 260519901250 | Wire, copper, stranded, 600 volt, #10, type THWN-THHN, in raceway | lnft | 2,400 | $ - 0 | lnft | 2,400 | $ - 0 | $ - 0 | $ - 0 |
| 12 | 260533135040 | Electric metallic tubing (EMT), 1" diameter, to 15' high, incl 2 terminations, 2 elbows, 11 beam clamps, and 11 couplings per 100 LF | lnft | 400 | $ - 0 | lnft | 400 | $ - 0 | $ - 0 | $ - 0 |
| 13 | 337119179960 | Electrical underground ducts and manholes, nylon polyethylene pull rope, 1/4" | lnft | 75 | $ - 0 | lnft | 75 | $ - 0 | $ - 0 | $ - 0 |
| 14 | Feeder (2-#10 and 1-#12G in 3/4" EMT) | lnft | 300 | $ - 0 | lnft | 300 | $ - 0 | $ - 0 | $ - 0 | |
| 15 | 262416302350 | Panelboards, 3 phase 4 wire, main circuit breaker, 120/208 V, 600 amp, 42 circuits, NQOD, incl 20 A 1 pole plug-in breakers | each | 1 | $ - 0 | each | 1 | $ - 0 | $ - 0 | $ - 0 |
| 16 | 262416302300 | Panelboards, 3 phase 4 wire, main circuit breaker, 120/208 V, 400 amp, 42 circuits, NQOD, incl 20 A 1 pole plug-in breakers | each | 1 | $ - 0 | each | 1 | $ - 0 | $ - 0 | $ - 0 |
| 17 | 262413104800 | Switchboards, circuit breaker, mold case, 3 pole, 4 wire, 800 amp | each | 1 | $ - 0 | each | 1 | $ - 0 | $ - 0 | $ - 0 |
| 18 | 262413105000 | Switchboards, circuit breaker, mold case, 3 pole, 4 wire, 1200 amp | each | 1 | $ - 0 | each | 1 | $ - 0 | $ - 0 | $ - 0 |
| 19 | 262726202470 | Duplex receptacle, grounded, 120 volt, 20 amp | each | 1 | $ - 0 | each | 1 | $ - 0 | $ - 0 | $ - 0 |
| 20 | Interior LED fixtures, troffer, recess mounted, 6400 Lumens, 2' x 4', replaces four T8 lamp, incl lamps, mounting hardware and connections | each | 23 | $ - 0 | each | 23 | $ - 0 | $ - 0 | $ - 0 | |
| 21 | 265313100200 | Exit lighting, LED standard, single face, ceiling or wall mount | each | 3 | $ - 0 | each | 3 | $ - 0 | $ - 0 | $ - 0 |
| 22 | 265623101280 | LED fixture, exterior, wall pack, poly lens, 110 watt, incl lamps | each | 4 | $ - 0 | each | 4 | $ - 0 | $ - 0 | $ - 0 |
| 23 | 265213100500 | Emergency lighting units, lead battery operated, twin sealed beam light, 25 W, 6 V each | each | 2 | $ - 0 | each | 2 | $ - 0 | $ - 0 | $ - 0 |
| 24 | 265113556000 | Interior LED fixtures, surface mounted, 103 watts | each | 1 | $ - 0 | each | 1 | $ - 0 | $ - 0 | $ - 0 |
| 25 | 260533135120 | Electric metallic tubing (EMT), 2-1/2" diameter, to 15' high, incl 2 terminations, 2 elbows, 11 beam clamps, and 11 couplings per 100 LF | lnft | 150 | $ - 0 | lnft | 150 | $ - 0 | $ - 0 | $ - 0 |
| 26 | Grounding Equipment | sqft | 9,000 | $ - 0 | sqft | 9,000 | $ - 0 | $ - 0 | $ - 0 | |
| 27 | Lightning Protection | sqft | 9,000 | $ - 0 | sqft | 9,000 | $ - 0 | $ - 0 | $ - 0 |
Subtotal $ - $ - $ - $ -
AF Form 3052 Costs based on RS Means Cost Database 2018
DIV 27
| Repair Roof & HVAC Navy Facility Building 1560 | |
| ESTIMATOR | ADDRESS |
| CONTRACT FOR | PROPOSED TOTAL CONTRACT PRICE | |||||||||||
| $ - 0 | ||||||||||||
| PROJECT | PROJECT NUMBER | WORK LOCATION | ||||||||||
| Repair Roof & HVAC Navy Facility Building 1560 | 0 | Joint Base Andrews, MD | ||||||||||
| MATERIAL COST | LABOR COST | |||||||||||
| LINE NO. | RS Means ID | ITEM | UNIT OF MEASURE | QUANTITY | UNIT | TOTAL | UNIT OF MEASURE | QUANTITY | UNIT | TOTAL | OTHER DIRECT COSTS | LINE TOTAL |
| (1) | (2) | (3) | (4) | (5) | (6) | (7) | (8) | (9) | (10) |
| Division 27 | Communications | |||||||||
| 1 | 270529100140 | Cable support, J-Hook, Single Tier, Single Sided, 4" dia | each | 80 | $ - 0 | each | 80 | $ - 0 | $ - 0 | $ - 0 |
Subtotal $ - $ - $ - $ -
AF Form 3052 Costs based on RS Means Cost Database 2018
DIV 28
| Repair Roof & HVAC Navy Facility Building 1560 | |
| ESTIMATOR | ADDRESS |
| CONTRACT FOR | PROPOSED TOTAL CONTRACT PRICE | |||||||||||
| $ - 0 | ||||||||||||
| PROJECT | PROJECT NUMBER | WORK LOCATION | ||||||||||
| Repair Roof & HVAC Navy Facility Building 1560 | 0 | Joint Base Andrews, MD | ||||||||||
| MATERIAL COST | LABOR COST | |||||||||||
| LINE NO. | RS Means ID | ITEM | UNIT OF MEASURE | QUANTITY | UNIT | TOTAL | UNIT OF MEASURE | QUANTITY | UNIT | TOTAL | OTHER DIRECT COSTS | LINE TOTAL |
| (1) | (2) | (3) | (4) | (5) | (6) | (7) | (8) | (9) | (10) |
| Division 28 | Electronic Safety and Security | |||||||||
| 1 | 283146505420 | Detection system, smoke detector, duct type, addressable, excl. wires & conduit | each | 4 | $ - 0 | each | 4 | $ - 0 | $ - 0 | $ - 0 |
| 2 | 283123504175 | Detection system, fire alarm control panel, addressable interface device, excluding wires & conduits | each | 2 | $ - 0 | each | 2 | $ - 0 | $ - 0 | $ - 0 |
| 3 | 280513231600 | Fire alarm cable, FEP teflon, 150 volt, to 200 Deg.C, #22, 2 pair | clf | 240 | $ - 0 | clf | 240 | $ - 0 | $ - 0 | $ - 0 |
| 4 | 260533135020 | Electric metallic tubing (EMT), 3/4" diameter, to 15' high, incl 2 terminations, 2 field bend elbows, 11 beam clamps, and 11 couplings per 100 LF | lnft | 200 | $ - 0 | lnft | 200 | $ - 0 | $ - 0 | $ - 0 |
| 5 | 265533100310 | Flashing beacon, 120V, 40 watt halogen, surface mount, with colored or clear lens | each | 5 | $ - 0 | each | 5 | $ - 0 | $ - 0 | $ - 0 |
Subtotal $ - $ - $ - $ -
AF Form 3052 Costs based on RS Means Cost Database 2018
DIV 31
| Repair Roof & HVAC Navy Facility Building 1560 | |
| ESTIMATOR | ADDRESS |
| CONTRACT FOR | PROPOSED TOTAL CONTRACT PRICE | |||||||||||
| $ - 0 | ||||||||||||
| PROJECT | PROJECT NUMBER | WORK LOCATION | ||||||||||
| Repair Roof & HVAC Navy Facility Building 1560 | 0 | Joint Base Andrews, MD | ||||||||||
| MATERIAL COST | LABOR COST | |||||||||||
| LINE NO. | RS Means ID | ITEM | UNIT OF MEASURE | QUANTITY | UNIT | TOTAL | UNIT OF MEASURE | QUANTITY | UNIT | TOTAL | OTHER DIRECT COSTS | LINE TOTAL |
| (1) | (2) | (3) | (4) | (5) | (6) | (7) | (8) | (9) | (10) |
| Division 31 | Earthwork | ||||||||
| 1 | 311313202050 | Selective clearing and grubbing, 1-1/2 C.Y. excavator, 8" to 12" diameter, stump removal on site by grinding. | sqft | 20 | $ - 0 | sqft | 20 | $ - 0 | $ - 0 |
| 2 | 329223100300 | Sodding, bluegrass sod, on level ground, 1000 S.F. | msf | 1 | $ - 0 | msf | 1 | $ - 0 | $ - 0 |
| 3 | 329119130700 | Topsoil placement and grading, loam or topsoil, screened, 4" deep, furnish and place, truck dumped | sqyd | 1 | $ - 0 | sqyd | 1 | $ - 0 | $ - 0 |
Subtotal $ - $ - $ - $ -
AF Form 3052 Costs based on RS Means Cost Database 2018
DIV 33
| Repair Roof & HVAC Navy Facility Building 1560 | ||||||||||||
| ESTIMATOR | ADDRESS | |||||||||||
| Crawford Consulting Services | 239 Highland Ave Suite 100, East Pittsburgh PA, 15112 | |||||||||||
| CONTRACT FOR | PROPOSED TOTAL CONTRACT PRICE | |||||||||||
| $ - 0 | ||||||||||||
| PROJECT | PROJECT NUMBER | WORK LOCATION | ||||||||||
| Repair Roof & HVAC Navy Facility Building 1560 | 0 | Joint Base Andrews, MD | ||||||||||
| MATERIAL COST | LABOR COST | |||||||||||
| LINE NO. | RS Means ID | ITEM | UNIT OF MEASURE | QUANTITY | UNIT | TOTAL | UNIT OF MEASURE | QUANTITY | UNIT | TOTAL | OTHER DIRECT COSTS | LINE TOTAL |
| (1) | (2) | (3) | (4) | (5) | (6) | (7) | (8) | (9) | (10) |
| Division 33 | Utilities | ||||||
| 1 | $ - 0 | 0 | 0 | $ - 0 | $ - 0 | ||
| 2 | $ - 0 | 0 | 0 | $ - 0 | $ - 0 | ||
| 3 | $ - 0 | 0 | 0 | $ - 0 | $ - 0 | ||
| 4 | $ - 0 | 0 | 0 | $ - 0 | $ - 0 | ||
| 5 | $ - 0 | 0 | 0 | $ - 0 | $ - 0 | ||
| 6 | $ - 0 | 0 | 0 | $ - 0 | $ - 0 | ||
| 7 | $ - 0 | 0 | 0 | $ - 0 | $ - 0 | ||
| 8 | $ - 0 | 0 | 0 | $ - 0 | $ - 0 | ||
| 9 | $ - 0 | 0 | 0 | $ - 0 | $ - 0 | ||
| 10 | $ - 0 | 0 | 0 | $ - 0 | $ - 0 | ||
| 11 | $ - 0 | 0 | 0 | $ - 0 | $ - 0 | ||
| 12 | $ - 0 | 0 | 0 | $ - 0 | $ - 0 | ||
| 13 | $ - 0 | 0 | 0 | $ - 0 | $ - 0 | ||
| 13 | $ - 0 | 0 | 0 | $ - 0 | $ - 0 |
Subtotal $ - $ - $ - $ -
AF Form 3052 Costs based on RS Means Cost Database 2018
DIV 32
| Repair Roof & HVAC Navy Facility Building 1560 | |
| ESTIMATOR | ADDRESS |
| CONTRACT FOR | PROPOSED TOTAL CONTRACT PRICE | |||||||||||
| $ - 0 | ||||||||||||
| PROJECT | PROJECT NUMBER | WORK LOCATION | ||||||||||
| Repair Roof & HVAC Navy Facility Building 1560 | 0 | Joint Base Andrews, MD | ||||||||||
| MATERIAL COST | LABOR COST | |||||||||||
| LINE NO. | RS Means ID | ITEM | UNIT OF MEASURE | QUANTITY | UNIT | TOTAL | UNIT OF MEASURE | QUANTITY | UNIT | TOTAL | OTHER DIRECT COSTS | LINE TOTAL |
| (1) | (2) | (3) | (4) | (5) | (6) | (7) | (8) | (9) | (10) |
| Division 32 | Exterior Improvements | |||||||||
| 1 | 8" Slab On Grade, w/ Rebar Reinforcing | sqft | 100 | $ - 0 | sqft | 100 | $ - 0 | $ - 0 | ||
| 2 | 323113205060.01 | Fence, chain link industrial, double swing gates, 6' high, 10' opening, includes excavation, posts & hardware in concrete | open | 1 | $ - 0 | open | 1 | $ - 0 | $ - 0 | |
| 3 | 042210232700 | Concrete block, decorative, ground face, 2000 psi, 8" x 8" x 16", includes mortar and horizontal joint reinforcing every other course, excludes scaffolding, grout and vertical reinforcing | sqft | 280 | $ - 0 | sqft | 280 | $ - 0 | $ - 0 | $ - 0 |
| 4 | 040516300200 | Grout, concrete masonry unit (CMU) cores, 4" thick, 0.067 CF/SF, by hand, excludes blockwork | sqft | 280 | $ - 0 | sqft | 280 | $ - 0 | $ - 0 | $ - 0 |
Subtotal $ - $ - $ - $ -
AF Form 3052 Costs based on RS Means Cost Database 2018
Alternates
| Repair Roof & HVAC Navy Facility Building 1560 | |
| ESTIMATOR | ADDRESS |
CONTRACT FOR
| PROJECT | PROJECT NUMBER | WORK LOCATION | ||||||||||
| Repair Roof & HVAC Navy Facility Building 1560 | 0 | Joint Base Andrews, MD | ||||||||||
| MATERIAL COST | LABOR COSTS | |||||||||||
| LINE NO. | ITEM | UNIT OF MEASURE | QUANTITY | UNIT | TOTAL | UNIT OF MEASURE | QUANTITY | UNIT | TOTAL | OTHER DIRECT COSTS | LINE TOTAL | |
| (1) | (2) | (3) | (4) | (5) | (6) | (7) | (8) | (9) | (10) | |||
| Renovation Alternates |
| BO1 | Cleaning/Waterproofing Masonry | ||||||||
| Cleaning masonry, light restoration, heavy soil, biological and mineral staining, paint, by chemical, low pressure wash, brush and rinse, excludes scaffolding | sqft | 12,736 | $ - 0 | sqft | 12,736 | $ - 0 | $ - 0 | $ - 0 | |
| Paints & coatings, walls, concrete masonry units (CMU), smooth surface, first coat, waterproof sealer, spray | sqft | 12,736 | $ - 0 | sqft | 12,736 | $ - 0 | $ - 0 | $ - 0 | |
| Paints & coatings, walls, concrete masonry units (CMU), smooth surface, first coat, waterproof sealer, spray | sqft | 12,736 | $ - 0 | sqft | 12,736 | $ - 0 | $ - 0 | $ - 0 | |
| Cleaning masonry, add for masking doors and windows | sqft | 12,736 | $ - 0 | sqft | 12,736 | $ - 0 | $ - 0 | $ - 0 | |
| BO1 | $ - 0 | $ - 0 | $ - 0 | $ - 0 |
| BO 2 | |
| $ - 0 |
BO 2 $ - 0
| BO 3 | |
| $ - 0 |
BO 3 $ - 0
| BO 4 | |
| $ - 0 |
BO 4 $ - 0
BO 5
BO 5 $ - 0
BO 6
| BO 6 | $ - 0 | ||||||||
| BO2 | New Canopy | ||||||||
| Structural steel member, W-shapes, 0 to 30 plf, A992 steel, shop fabricated, incl shop primer, bolted connections | ton | 1 | $ - 0 | ton | 1 | $ - 0 | $ - 0 | ||
| $ - 0 | 0 | 0 | $ - 0 | $ - 0 | |||||
| Light Gauge Metal Roof Truss System | sqft | 510 | $ - 0 | sqft | 510 | $ - 0 | $ - 0 | ||
| Metal Roofing Panels, Standing Seams | sqft | 510 | $ - 0 | sqft | 510 | $ - 0 | $ - 0 | ||
| Mansard panels, colored aluminum roofing, accessories, soffits, .032" thick, to 1' wide | sqft | 510 | $ - 0 | sqft | 510 | $ - 0 | $ - 0 | ||
| Fascia, steel, galv. & enameled, stock, long panels, excl. furring | sqft | 100 | $ - 0 | sqft | 100 | $ - 0 | $ - 0 | ||
| Furring, ceilings, on steel, galvanized, 1-5/8" channels, 24" O.C. | sqft | 510 | $ - 0 | sqft | 510 | $ - 0 | $ - 0 | ||
| Concrete Column Pier/Pedestal | cuyd | 1.25 | $ - 0 | cuyd | 1.25 | $ - 0 | $ - 0 | ||
| Concrete Column Footing | cuyd | 11 | $ - 0 | cuyd | 11 | $ - 0 | $ - 0 | ||
| BO2 | $ - 0 | $ - 0 | $ - 0 | $ - 0 |
| BO3 | |||||||
| $ - 0 | 0 | 0 | $ - 0 | $ - 0 | |||
| $ - 0 | 0 | 0 | $ - 0 | $ - 0 | |||
| $ - 0 | 0 | 0 | $ - 0 | $ - 0 | |||
| $ - 0 | 0 | 0 | $ - 0 | $ - 0 | |||
| $ - 0 | 0 | 0 | $ - 0 | $ - 0 | |||
| $ - 0 | |||||||
| BO3 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | |||
| ` | |||||||
| BO4 |