Attachment_8_-_AF_Form_3052_-_Contractor_Proposal_Form_Base_Bid.xlsx
Air Force Form XLSX spreadsheet 33 KB Posted
- Attached to
- Design/Build Repair Roof B1025
- Solicitation number
- F2K2AC4029A001-1
View the file
Other versions and copies of AF Form 3052
Show all 20
Who attaches AF Form 3052
Other files
Show all 26
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
SUMMARY
INSTRUCTIONS FOR COMPLETING AF FORM 3052
| Col 1 Item. Description of materials required, work to be done, special equipment needed, etc. Breakdown should be in sufficient detail to |
| permit itemizing of all direct costs. |
| Col 2 Unit of Measure. Description of the unit in which each item is to be estimated (examples : square yards - SY, cubic yards - CY, square |
| feet - SF, linear feet - LF, board feet - BF, each - EA, pound -LB). |
| Col 3 Quantity. Contractor's estimate of quantity required in terms of unit of measure (column 2). Items and units of measure will be |
| funished by the Government. Quantity estimates will be furnished by the Government only when it is anticipated that a unit price contract will |
| be issued. Otherwise, the contractor is responsible for determining quantity estimates. |
| Col 4 and 5 Material Costs. Enter unit cost (Col 4) of material to be supplied and total cost (Col 5) for item listed in column 1. |
| Col 6, 7 and 8 Labor Costs. Enter in Col 6 the estimated number of manhours or mandays needed to perform the work listed in column 1. |
| Enter in Col 7 the average rate per manhour (manday) and in Col 8 the total labor cost. |
| Col 9 Other Direct Costs. Enter estimated costs of special equipment and other items (listed in column 1) which are special to the contract |
| and of significant dollar value. |
| Col 10 Line Total. Self-explanatory. |
| NOTE: In addition to the other totals entered on various pages, the grand total of column 10, plus overhead and profit will be shown on the last |
| page as follows. |
FOR OFFICIAL USE ONLY
TOTAL MATERIAL AND LABOR COSTS $
TOTAL OTHER DIRECT COSTS $
DESIGN $
TOTAL DIRECT COSTS $
GENERAL CONDITIONS % $
OVERHEAD % $
PROFIT % $
BOND % $
NMGRT 6.06250 % $
TOTAL PRICE $
DATE : FIRM NAME :
| TITLE : | BY : | |
| (Signature) |
INSTRUCTIONS TO OFFERORS
| 1. The purpose of this form is to provide a standard format by which the offeror submits to the Government a summary of incurred and |
| estimated costs (and attached supporting information) suitable for detaied review and analysis. Prior to the award of a contract resulting from |
| this proposal the offeror shall, under the conditions stated in ASPR 3-807.3, be required to submit a certificate of current cost or pricing data |
| (see ASPR 3-807.3(e) and 3-807.4) |
| 2. In addition to the specific information required by this form, the offeror is expected, in good faith, to incorporate in and submit with this |
| form any additional data, supporting schedules, or substantiation which are reasonably required for the conduct of an appropriate review and |
| analysis in the light of the specific facts of this procurement. For effective negotiations, it is essential that there be a clear understanding of |
| a. The existing, verifiable data. |
| b. The judgmental factors applied in projecting from known data to the estimate, and |
| c. The contingencies used by the offeror in his proposed price. |
| In short, the offeror's estimating process itself needs to be disclosed. |
| 3. When attachment of supporting cost or pricing data to this form is impracticable, the data will be described (with schedules as appropriate), |
| and made available to the contracting officer or his authorized representative upon request. |
| 4. By submission of this proposal the offeror grants to the contracting officer, or his authorized representative, the right to examine, for the |
| purpose of verifying the cost or pricing data submitted, those books, records, documents and other supporting data which will permit adequate |
| evaluation of such cost or pricing data, along with the computations and projections used herein. This right may be exercised in connection |
| with any negotiations prior to contract award. |
(Reverse of AF Form 3052., AUG 93)
RECAP
| FOR OFFICIAL USE ONLY | ||||||||
| CONSTRUCTION COST ESTIMATE BREAKDOWN | SHEET NO. | 1 | OF | 1 | ||||
| CONTRACTOR | ADDRESS | |||||||
| CONTRACTOR BID FORM | ||||||||
| CONTRACT FOR (Work to be performed) | PROPOSED TOTAL CONTRACT PRICE | |||||||
| Repair Roof B1025 | ||||||||
| PURCHASE REQUEST NUMBER | PROJECT NUMBER 120218 | WORK LOCATION : | Kirtland AFB |
| UNIT OF | LABOR AND MATERIAL COST* | LABOR COST | $ | $ | ||||||
| LINE | ITEM | MEASURE | QUANTITY | $ | $ | $ | $ | OTHER | LINE | |
| NO | UNIT | TOTAL | MANHOURS | AVERAGE | TOTAL | DIRECT | TOTAL | |||
| RATE* | UNIT COSTS** | |||||||||
| (1) | (2) | (3) | (4) | (5) | (6) | (7) | (8) | (9) | (10) | |
| 1 | Remove LPS | LS | ||||||||
| 2 | Remove additional components | LS | ||||||||
| 3 | Install 1/2" PW/OSB Decking | SF | ||||||||
| 4 | Install Vapor Barrier | SF | ||||||||
| 5 | Install SSR System | SQ. | ||||||||
| 6 | Reinstall and Certify LPS | LS | ||||||||
| 7 | Reinstall additional components | LS | ||||||||
| 8 | Flashing at Endwalls | LF | ||||||||
| 9 | Flashing at Sidewalls | LF | ||||||||
| 10 | Install Gutter | LF | ||||||||
| 11 | Install Downspouts | LF | ||||||||
| 12 | Install Skylights | EA | ||||||||
| 13 | Flashing for Skylights | LF | ||||||||
| 14 | ||||||||||
| 15 | ||||||||||
| 16 | ||||||||||
| 17 | ||||||||||
| 18 | ||||||||||
| 19 | ||||||||||
| 20 | ||||||||||
| TOTAL | ||||||||||
| (AF Form 3052., AUG 93) | *Cost Shown includes labor | **Subcontractor and Equipment |
Design
| FOR OFFICIAL USE ONLY | ||||||||
| CONSTRUCTION COST ESTIMATE BREAKDOWN | SHEET NO. | 1 | OF | 1 | ||||
| CONTRACTOR | ADDRESS | |||||||
| CONTRACTOR BID FORM | ||||||||
| CONTRACT FOR (Work to be performed) | PROPOSED TOTAL CONTRACT PRICE | |||||||
| Repair Roof B1025 | ||||||||
| PURCHASE REQUEST NUMBER | PROJECT NUMBER 120218 | WORK LOCATION : | Kirtland AFB |
| UNIT OF | MATERIAL COST | LABOR COST | $ | $ | ||||||
| LINE | ITEM | MEASURE | QUANTITY | $ | $ | $ | $ | OTHER | LINE | |
| NO | UNIT | TOTAL | MANHOURS | AVERAGE | TOTAL | DIRECT | TOTAL | |||
| RATE* | UNIT COSTS** | |||||||||
| (1) | (2) | (3) | (4) | (5) | (6) | (7) | (8) | (9) | (10) | |
| 1 | Architect | |||||||||
| 2 | Electrical Engineer | |||||||||
| 3 | Drafter/Designer | |||||||||
| 4 | Principal | |||||||||
| 5 | Other (Specify) | |||||||||
| 6 | Other (Specify) | |||||||||
| 7 | ||||||||||
| 8 | ||||||||||
| 9 | ||||||||||
| 10 | ||||||||||
| 11 | ||||||||||
| 12 | ||||||||||
| 13 | ||||||||||
| 14 | ||||||||||
| 15 | TOTAL | |||||||||
| (AF Form 3052., AUG 93) | *Labor Cost/ Unit UON | ** Equipment |
File details come from the government source that posted it. Updated .