Attachment_11_-_AF_Form_3064_-_Progress_Schedule.xls

Air Force Form XLS spreadsheet 86 KB Posted

Attached to
Design/Build Repair Roof B1025
Solicitation number
F2K2AC4029A001-1
Issued by

View the file

Other versions and copies of AF Form 3064

File Revision Posted Attached to
Attachment C - AF Form 3064.xlsx Revision not stated Airfield Blast Shield
AF Form 3064.xlsx Revision not stated Demo B5276 & B8129 Amendment 0001
Attachment F BLANK SAMPLE AF Form 3064.xlsx Revision not stated Robins AFB Paving Multi-Award IDIQ
Template - AF IMT 3064 and 66 Fillable - Progress Schedule.xlsx Revision not stated Demo Reef Dining Facility, Bldg 90326
SOW App 002 AF IMT 3064 Progress Schedule.pdf Revision not stated Amendment 002***Multiple Award Construction Contract (MACC), Joint Base Elmendorf-Richardson (JBER), AK – Solicitation
FNWZ 17-0021A - Att E - AF Form 3064.xlsx Revision not stated Demo B6142
FNWZ 21-0071 - Att E - AF Form 3064.xlsx Revision not stated Demo B6119
Attachment 16 - AF FORM 3064 Contract Progress Schedule.xlsx Revision not stated SABER IDIQ - Dover AFB
SOW Attach 9 - AF Form 3064 PSFB.xlsx Revision not stated Peterson SFB Bldg 3 Soil Erosion Repair
Attachment 3_AF IMT 3064_2003091_VI_Progress Schedule.pdf Revision not stated Hazardous Materials Abatement Contract - IDIQ
Attachment 9 - BLANK SAMPLE AF Form 3064.xlsx Revision not stated Dismantling of Modular Facility & Storage Racks
Attachment 2.7 - AF Form 3064 Schedule Template.xlsx Revision not stated Multiple Award Basic Ordering Agreement for Construction Services at Cannon AFB, NM
Attachment 12 - AF Form 3064 Contract Progress Schedule - Sample.xlsx Revision not stated Civil Works IDIQ 2024 - Hurlburt Field, FL
Attachment 12 - Af Form 3064 Contract Progress Schedule-Sample.xlsx Revision not stated Civil Works IDIQ 2024 - Hurlburt Field, FL
Attah 15 - AF Form 3064.xlsx Revision not stated SABER IDIQ - Hurlburt Field FL
ATCH L4 - Contract Progress Schedule_AF Form 3064 - Fillable.xlsx Revision not stated ADDITION TO CDC WEST BLDG 90306, CP1024656
Attachment 1k Mini-MACC SOW AF IMT 3064 Progress Schedule.pdf Revision not stated JBER Mini-MACC
BLANK SAMPLE AF Form 3064.xlsx Revision not stated Civil Engineering Multiple Award Construction Contract III, IDIQ
Atch BLANK SAMPLE AF Form 3064.xlsx Revision not stated Design/Build ANG ACS Weapons Facility
17. AF Form 3064 Contract Progress Schedule (3 pages) - EXAMPLE.pdf Revision not stated Simplified Acquisition of Base Engineer Requirements (SABER) IDIQ at Seymour Johnson AFB, Goldsboro, NC.
Show all 20

Who attaches AF Form 3064

Other files

File Type Posted
Amendment_4.pdf PDF
Q_ _A.pdf PDF
Amendment_3.pdf PDF
Amendment_2.pdf PDF
Amendment_1.pdf PDF
Site_Visit_Sign-in_Sheet_2_Apr_14.pdf PDF
Attachment_18_-_Wage_Determination_NM140040_1-3-2014_NM40.pdf PDF
Attachment_17_-_Quiroga-Pfeiffer_Structural_Report_-_B1025_Roof_Loading_Analysis.pdf PDF
Attachment_12_-_AF_Form_3065__Progress_Report.pdf PDF
SF_Form_1442_-_Solicitation.pdf PDF
Attachment_2_-_95__Design_Guide_Submittal.pdf PDF
Attachment_14_-_AF_Form_66_-_Schedule_of_Material_Submittals.xls XLS spreadsheet
Attachment_16_-_DUSD(IE)_SECTION_438_EISA_2007_Policy_Memo_Signed_19_Jan_2010.pdf PDF
Attachment_20_-_Building_1025_Map.pdf PDF
Attachment_5_-_AF_LEED_SDD_Implementation_Guidance.pdf PDF
Attachment_21_-_Kirtland_AFB_Map.pdf PDF
Attachment_3_-_Architectural_Compatibility_Plan_(ACP)_Dated_2_Oct_2010.pdf PDF
Attachment_7_-_Construction_ _Demolition_Waste_Management.pdf PDF
Attachment_10_-_Past_Performance_Information_Form.docx DOCX document
Attachment_19_-_Wage_Determination_NM140013_1-3-2014_NM13.pdf PDF
Attachment_13_-_AF_Form_3000-_Material_Approval_Submittal.pdf PDF
Attachment_1_-_Statement_of_Work_(SOW)_Dated_17_Dec_2013_-_Design-Build_Repair_Roof_B1025.pdf PDF
Attachment_8_-_AF_Form_3052_-_Contractor_Proposal_Form_Base_Bid.xlsx XLSX spreadsheet
Attachment_6_-_Waste_Summary_-_01_74_19_Appendix_A.xls XLS spreadsheet
Attachment_15_-_DD_Form_1354_-_Transfer_and_Acceptance_of_DoD_Real_Property.pdf PDF
Attachment_9_-_AF_Form_3052_-_Contractor_Proposal_Form_Additive.xlsx XLSX spreadsheet
Show all 26

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

AF3064 PAGE 1

CONTRACT PROGRESS SCHEDULEForm Approved
(See Contractor's Instructions on Reverse)OMB NO. 0704-0188
Public reporting burden for this collection of information is estimated to average 15 minutes per response. Including the time for reviewing instructions, searching existing data sources, gathering maintaining the data needed, and completing and reviewing
the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing this burden to Department Defense of Washington Headquarters Services, Directorate for information
Operations and Reports, 1215 Jefferson Davis Highway, Suite 1204, Arlington VA 22202-4302, and to the Office of Management and Budget, Paperwork Reduction Project 0704-0188. Washington DC 20503. Please DO NOT RETURN your (form questionnaire) to
either of these addresses. Send your completed (form questionnaire) to: SAF AQCO. Washington DC 20330-1000.
1. CONTRACT NO.8. PROJECT TITLE10. APPROVAL RECOMMENDED BY:
Project XDATE SIGNEDINSTALLATIONS ENGINEERS'S SIGNATURE
2. STARTING DATE
3. COMPLETION DATE9. SUBMITTED BY:
4. PURCHASE REQUEST NO.DATE SIGNEDCONTRACTOR'S NAME (Last, First, Middle Initial)CONTRACTOR'S SIGNATURE11. APPROVED BY:
5. PROJECT NO.ADDRESS (Street, City, State, Zip Code)DATE SIGNEDCONTRACTING OFFICER'S SIGNATURE
6. ACTUAL STARTING DATE
7. ACTUAL COMPETION DATE
LINE NO.WORK ELEMENTS%4-Apr11-Apr18-Apr25-Apr2-May9-May16-May23-May30-May6-Jun13-Jun20-Jun27-Jun4-Jul
ABCDEFGHIJKLMNOPQ
1Bond2.00%2.00%
2Demo3.00%3.00%
3Site Work5.00%2.50%2.50%
4Foundation10.00%5.00%5.00%
5Framing10.00%5.00%5.00%
6Plumbing10.00%5.00%5.00%
7Electrical10.00%2.00%3.00%3.00%2.00%
8Comm10.00%5.00%5.00%
9Work Element10.00%5.00%5.00%
10Work Element10.00%
11Work Element10.00%
12Work Element5.00%
13Work Element
14Work Element
15Work Element
16Work Element
17Work Element
18Work Element
19Work Element
20Work Element
21Work Element
22Work Element
23Work Element
24Work Element
25Work Element
26Work Element
27Testing
28Pre Final2.50%
29Final and Punchlist2.50%
PER PERIOD100.00%2.00%3.00%2.50%2.50%5.00%5.00%7.00%13.00%8.00%2.00%5.00%5.00%5.00%5.00%
TOTAL2.00%5.00%7.50%10.00%15.00%20.00%27.00%40.00%48.00%50.00%55.00%60.00%65.00%70.00%
AF Form 3064, JUN 90 PREVIOUS EDITION IS OBSOLETE

AF3064 PAGE 2

CONTRACT PROGRESS SCHEDULE - CONTINUTED
(See Contractor's Instructions on Reverse)
Public reporting burden for this collection of information is estimated to average 15 minutes per response. Including the time for reviewing instructions, searching existing data sources, gathering maintaining the data needed, and completing and reviewing
the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing this burden to Department Defense of Washington Headquarters Services, Directorate for information
Operations and Reports, 1215 Jefferson Davis Highway, Suite 1204, Arlington VA 22202-4302, and to the Office of Management and Budget, Paperwork Reduction Project 0704-0188. Washington DC 20503. Please DO NOT RETURN your (form questionnaire) to
either of these addresses. Send your completed (form questionnaire) to: SAF AQCO. Washington DC 20330-1000.
1. CONTRACT NO.8. PROJECT TITLE
Project X
2. STARTING DATE
3. COMPLETION DATE9. SUBMITTED BY:
4. PURCHASE REQUEST NO.DATE SIGNEDCONTRACTOR'S NAME (Last, First, Middle Initial)CONTRACTOR'S SIGNATURE
5. PROJECT NO.ADDRESS (Street, City, State, Zip Code)
6. ACTUAL STARTING DATE
7. ACTUAL COMPETION DATE
LINE NO.WORK ELEMENTS%11-Jul18-Jul25-Jul1-Aug8-Aug15-Aug22-Aug
ABCDEFGHIJ
1Bond2.00%
2Demo3.00%
3Site Work5.00%
4Foundation10.00%
5Framing10.00%
6Plumbing10.00%
7Electrical10.00%
8Comm10.00%
9Work Element10.00%
10Work Element10.00%5.00%5.00%
11Work Element10.00%5.00%5.00%
12Work Element5.00%5.00%
13Work Element
14Work Element
15Work Element
16Work Element
17Work Element
18Work Element
19Work Element
20Work Element
21Work Element
22Work Element
23Work Element
24Work Element
25Work Element
26Work Element
27Testing
28Pre Final2.50%2.50%
29Final and Punchlist2.50%2.50%
PER PERIOD100.00%5.00%5.00%5.00%5.00%5.00%2.50%2.50%
TOTAL75.00%80.00%85.00%90.00%95.00%97.50%100.00%
AF Form 3064, JUN 90 PREVIOUS EDITION IS OBSOLETE

AF3064 Back

INSTRUCTIONS TO CONTRACTORS
1. Prepare three copies of AF Form 3064, in accordance with these instructions and submit to the contracting officer at the time stated in the contract or as established
by the contracting officer.
2. Blocks 1,2, and 3. Enter the contract number, starting date, and completion date as shown on the contract.
3. Block 8. Enter the title of the project as shown on the contract.
4. Block 9. Enter the name and address of your firm. The three copies submitted to the contracting officer must be dated and signed by the contractor or an authorized
representative of the firm.
5. Lines 1 through 16. Major elements of work (whether unit price or lump sum contract) such as excavation, concrete work, carpentry, engineering, installation of
communication electronic facilities, etc., will be shown in Column B in logical sequence and in sufficient detail to identify the element.
6. The percentage of each listed work element to the complete job will be shown opposite each element in Column C. As an example, if 3 work elements are shown:
excavation, concrete work, and backfill, and it is estimated that excavation is 50% of the total job, concrete 30%, and backfill 20%, these percentages will be shown
opposite each element. The total must equal 100%.
7. Columns D through Q will be used to show planned periodic progress, as required by the contracting officer, during the period of the contract. Only the top half of the
space under these columns will be used by contractors. Using the example cited above and assuming that the contract period for performance is 8 weeks, and it
is planned to accomplish 10% of the excavation work the 1st week and 20% each week until excavation is complete, 10 would be shown in the upper half of Line 1
under Column D, 20 under Column E and 20 under Column F for a total of 50%. If it is planned to accomplish the concrete work during the 4th, 5th, and 6th weeks
in equal amounts, 10 would be enteredd under columns G, H, and I on Line 2. Assuming the backfill will be accomplished during the 7th and 8th weeks, 10 would be
entered under Columns J and K on Line 3. If the contract extends beyond 14 weeks, additional copies of AF Form 3064, with appropriate alterations, may be spliced on
as a continuation of performance record.
8. Total amount or work planned at intervals as shown in Columns D through Q will be totaled and entered in the top half of the space under the appropriate column on
Line 16. Again, using the example cited above, the totals under Column D through K would read 10, 20, 20, 10, 10, 10, 10, 10, for a total of 100%. These totals will be
used to lot an overlay graph using Lines 67 through 15, beginning with Column D and extending to the right that number of columns (weeks) authorized by the contract
for performance time.
9. Beginning at the lower left corner, Line 15, Column D, the graph will be plotted using a broken or dotted line showing the cumulative total progress for planned intervals.
Again, using the example cited above, the dotted line would, for the 1st week, extend from Line 15 to Line 14 under Column D for 10%. The second week the dotted line
would extend from Line 14 to Line 12 under Column E for 20%, making a cumulative total of 30%. The dotted line should end (100%) at the intersection of Line 5 and
Column K.
10. In the event the contract is modified by the contracting officer under terms of the contract, changing the progress of work as originally scheduled, adding or deleting
work or changing the original completion date, a revised progress schedule will be prepared and submitted to the contracting officer for approval. In preparing the revised
schedule, the amount of work completed will be considered, together with the changed new completion date set forth in the contract modification. Considering these
factors, the work under the contract will be rescheduled over the new total performance time in the same The new completion date will be entered in Block 3.
"First Revised Schedule," "Second Revised Schedule," etc., will be entered immediately underneath the form title. Time of submission of the revised schedule will be
determined by the contracting officer.
11. At such, intervals as may be established by the contracting officer, the contractor will submit to the contracting officer AF Form 3065 "Contract Progress Report,"
indicating the percentage of work accomplished for each work element during the established reporting period. Accurate reports are of the utmost importance to the
contractor and th the Government, since the percentage of completion, or progress, thus reported is used in administration of the contract and maybe used in connection
with approval of partial payments under the contract. Care should be taken to plan the work in such manner that it can be accomplished as stated in this schedule. If for
any reason it becomes known that any part of the progess under this contract will be delayed, this fact should be reported to the contracting officer immediately.
AF FORM 3064, JUN 90 (REVERSE)

File details come from the government source that posted it. Updated .