Attachment_19_-_Wage_Determination_NM140013_1-3-2014_NM13.pdf

PDF 132 KB Posted

Attached to
Design/Build Repair Roof B1025
Solicitation number
F2K2AC4029A001-1
Issued by

View the file

Other files

File Type Posted
Amendment_4.pdf PDF
Q_ _A.pdf PDF
Amendment_3.pdf PDF
Amendment_2.pdf PDF
Amendment_1.pdf PDF
Site_Visit_Sign-in_Sheet_2_Apr_14.pdf PDF
Attachment_18_-_Wage_Determination_NM140040_1-3-2014_NM40.pdf PDF
Attachment_17_-_Quiroga-Pfeiffer_Structural_Report_-_B1025_Roof_Loading_Analysis.pdf PDF
Attachment_12_-_AF_Form_3065__Progress_Report.pdf PDF
SF_Form_1442_-_Solicitation.pdf PDF
Attachment_2_-_95__Design_Guide_Submittal.pdf PDF
Attachment_14_-_AF_Form_66_-_Schedule_of_Material_Submittals.xls XLS spreadsheet
Attachment_16_-_DUSD(IE)_SECTION_438_EISA_2007_Policy_Memo_Signed_19_Jan_2010.pdf PDF
Attachment_20_-_Building_1025_Map.pdf PDF
Attachment_5_-_AF_LEED_SDD_Implementation_Guidance.pdf PDF
Attachment_11_-_AF_Form_3064_-_Progress_Schedule.xls XLS spreadsheet
Attachment_21_-_Kirtland_AFB_Map.pdf PDF
Attachment_3_-_Architectural_Compatibility_Plan_(ACP)_Dated_2_Oct_2010.pdf PDF
Attachment_7_-_Construction_ _Demolition_Waste_Management.pdf PDF
Attachment_10_-_Past_Performance_Information_Form.docx DOCX document
Attachment_13_-_AF_Form_3000-_Material_Approval_Submittal.pdf PDF
Attachment_1_-_Statement_of_Work_(SOW)_Dated_17_Dec_2013_-_Design-Build_Repair_Roof_B1025.pdf PDF
Attachment_8_-_AF_Form_3052_-_Contractor_Proposal_Form_Base_Bid.xlsx XLSX spreadsheet
Attachment_6_-_Waste_Summary_-_01_74_19_Appendix_A.xls XLS spreadsheet
Attachment_15_-_DD_Form_1354_-_Transfer_and_Acceptance_of_DoD_Real_Property.pdf PDF
Attachment_9_-_AF_Form_3052_-_Contractor_Proposal_Form_Additive.xlsx XLSX spreadsheet
Show all 26

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

General Decision Number: NM140013 01/03/2014 NM13

Superseded General Decision Number: NM20130013

State: New Mexico

Construction Type: Heavy

County: Bernalillo County in New Mexico.

HEAVY CONSTRUCTION PROJECTS

Modification Number Publication Date

0 01/03/2014

BRAZ0003-002 11/23/2009

Rates Fringes

BRICKLAYER.......................$ 24.62 4.57

CARP1319-002 06/01/2012

CARPENTER (Excluding Form

Work)............................$ 22.94 7.92

ELEC0611-008 01/01/2013

Electrician

Zone 1......................$ 29.90 9.70

ZONE 1: 0 to 40 miles from the main Post Office in

ALBUUERQUE.

ZONE 2: Extending up to 10 miles beyond Zone 1, shall receive

9% above Zone 1 rate.

ZONE 3: Extending up to 20 miles beyond Zone 1, shall receive 15% above Zone 1 rate.

ZONE 4: Extending more than 20 miles beyond Zone 1, shall receive 26% above Zone 1 rate.

* ENGI0953-005 04/01/2013

Power Equipment Operator

(2) Forklift................$ 19.23 5.64

(4) Bulldozer...............$ 19.54 5.64

SHAFT AND TUNNEL WORK - $.15 per hour above regular rate.

HAZARDOUS PAY - The following pay shall be applicable for every hour an operating engineer is required by governmental regulations and does wear special equipment for hazardous work at the designated levels. This is applicable in all three zones

LEVEL C - 10% above regular hourly wage

LEVEL B - 10% above regular hourly wage

LEVEL A - 15% above regular hourly wage

ZONE PAY The reference point for determining zone pay shall be from the intersection of Interstate Highway 25 and I-40.

Zone 1 - Albuquerque - 0 to 50 mile radius from I-40 shall be a Free Zone

- Farmington - 0 to 50 mile radius of Farmington City

Hall shall be a Free Zone

Zone 2 - Shall be $2.50 per hour above base pay. Will apply outside of above parameters up to 35 miles.

Zone 3 - Shall be $1.50 cents per hour above Zone 2 for a total of $4.00 per hour and will apply after 35 miles of

Zone one's parameters.

PLUM0412-003 04/01/2013

PIPEFITTER.......................$ 31.14 12.43

SUNM2009-007 09/14/2010

CARPENTER (Form Work Only).......$ 16.84 4.71

CEMENT MASON/CONCRETE FINISHER...$ 18.05 3.19

IRONWORKER, REINFORCING..........$ 26.30 8.59

LABORER: Common or General......$ 12.68 1.97

LABORER: Flagger................$ 10.65 1.91

LABORER: Landscape..............$ 11.00 0.35

LABORER: Mason Tender -

Cement/Concrete..................$ 12.46 0.00

LABORER: Pipelayer..............$ 13.60 0.00

OPERATOR: Backhoe...............$ 19.14 4.08

OPERATOR: Bobcat/Skid

Steer/Skid Loader................$ 13.77 0.00

OPERATOR: Grader/Blade..........$ 18.56 0.00

OPERATOR: Loader (Front End)....$ 14.62 1.28

OPERATOR: Tractor...............$ 14.74 0.26

PAINTER: Brush, Roller and

Spray............................$ 17.10 0.44

TRUCK DRIVER: Dump Truck........$ 12.45 0.26

TRUCK DRIVER: Pickup Truck......$ 12.10 1.73

TRUCK DRIVER: Water Truck.......$ 14.74 0.00

WELDERS - Receive rate prescribed for craft performing operation to which welding is incidental.

Unlisted classifications needed for work not included within the scope of the classifications listed may be added after award only as provided in the labor standards contract clauses

(29CFR 5.5 (a) (1) (ii)).

The body of each wage determination lists the classification and wage rates that have been found to be prevailing for the cited type(s) of construction in the area covered by the wage determination. The classifications are listed in alphabetical order of "identifiers" that indicate whether the particular rate is union or non-union.

Union Identifiers

An identifier enclosed in dotted lines beginning with characters other than "SU" denotes that the union classification and rate have found to be prevailing for that classification. Example: PLUM0198-005 07/01/2011. The first four letters , PLUM, indicate the international union and the four-digit number, 0198, that follows indicates the local union number or district council number where applicable , i.e., Plumbers Local 0198. The next number, 005 in the example, is an internal number used in processing the wage determination.

The date, 07/01/2011, following these characters is the effective date of the most current negotiated rate/collective bargaining agreement which would be July 1, 2011 in the above example.

Union prevailing wage rates will be updated to reflect any changes in the collective bargaining agreements governing the rates.

0000/9999: weighted union wage rates will be published annually each January.

Non-Union Identifiers

Classifications listed under an "SU" identifier were derived from survey data by computing average rates and are not union rates; however, the data used in computing these rates may include both union and non-union data. Example: SULA2004-007

5/13/2010. SU indicates the rates are not union majority rates, LA indicates the State of Louisiana; 2004 is the year of the survey; and 007 is an internal number used in producing the wage determination. A 1993 or later date, 5/13/2010, indicates the classifications and rates under that identifier were issued as a General Wage Determination on that date.

Survey wage rates will remain in effect and will not change until a new survey is conducted.

WAGE DETERMINATION APPEALS PROCESS

1.) Has there been an initial decision in the matter? This can be:

* an existing published wage determination

* a survey underlying a wage determination

* a Wage and Hour Division letter setting forth a position on a wage determination matter

* a conformance (additional classification and rate) ruling

On survey related matters, initial contact, including requests for summaries of surveys, should be with the Wage and Hour

Regional Office for the area in which the survey was conducted because those Regional Offices have responsibility for the

Davis-Bacon survey program. If the response from this initial contact is not satisfactory, then the process described in 2.)

and 3.) should be followed.

With regard to any other matter not yet ripe for the formal process described here, initial contact should be with the

Branch of Construction Wage Determinations. Write to:

Branch of Construction Wage Determinations

Wage and Hour Division

U.S. Department of Labor

200 Constitution Avenue, N.W.

Washington, DC 20210

2.) If the answer to the question in 1.) is yes, then an interested party (those affected by the action) can request review and reconsideration from the Wage and Hour Administrator

(See 29 CFR Part 1.8 and 29 CFR Part 7). Write to:

Wage and Hour Administrator

U.S. Department of Labor

The request should be accompanied by a full statement of the interested party's position and by any information (wage payment data, project description, area practice material, etc.) that the requestor considers relevant to the issue.

3.) If the decision of the Administrator is not favorable, an interested party may appeal directly to the Administrative

Review Board (formerly the Wage Appeals Board). Write to:

Administrative Review Board

U.S. Department of Labor

4.) All decisions by the Administrative Review Board are final.

END OF GENERAL DECISION

File details come from the government source that posted it. Updated .