Task Assignment Summary

This Task Assignment (TA) represents an indefinite delivery vehicle issued by the State of Florida Department of Environmental Protection (FDEP) to Aptim Environmental & Infrastructure, LLC under Contract Number HW689. The TA, numbered BF01C, is effective through October 27, 2023, and pertains to supplemental site assessment and well location marking activities at the U.S. 192 Solid Waste Management Facility (formerly Deseret Ranch) located at US Highway 192 at Clayton Road in Melbourne, Brevard County, Florida. The work is being conducted using federal funds from the State & Tribal Response Program (SRP) cooperative agreement administered by FDEP on behalf of the Environmental Protection Agency.

The scope of work consists of three subtasks: (1) Project Management at a cost of $1,302.51; (2) Supplemental Site Assessment Work Plan, Quality Assurance Project Plan, and Health and Safety Plan development at $2,332.23; and (3) Well location and groundwater sampling activities at $12,642.67. The total Task Assignment value is $16,277.41 on a fixed unit rate basis. Subtask 3 includes locating, documenting, and marking up to 47 existing on-site monitoring wells with 2-inch diameter galvanized terminal fence posts and collecting a groundwater sample from monitoring well MW-41 for total arsenic analysis by EPA Method 6020. Materials costs include terminal posts, caps, and orange paint procured from Home Depot at $1,876.53. Deliverables are due by September 22, 2023, with invoicing contingent upon FDEP approval of submitted documentation.

View the file

Other files

File Type Posted
CN-370000-HW689-BF01A.pdf PDF
CN-370000-HW689-BF1ACO1.pdf PDF
CN-370000-HW689-BIL01CC1.pdf PDF
CN-370000-HW689-BIL01D.pdf PDF
CN-370000-HW689-BIL01E.pdf PDF
CN-370000-HW689-CSS2AC02.pdf PDF
CN-370000-HW689-DC005A.pdf PDF
CN-370000-HW689-DC007A.pdf PDF
CN-370000-HW689-DC008A.pdf PDF
CN-370000-HW689-DC012B.pdf PDF
CN-370000-HW689-DC013A.pdf PDF
CN-370000-HW689-DC015D.pdf PDF
CN-370000-HW689-DC016A.pdf PDF
CN-370000-HW689-DC016B.pdf PDF
CN-370000-HW689-DC020B.pdf PDF
CN-370000-HW689-DC020C.pdf PDF
CN-370000-HW689-DC021B.pdf PDF
CN-370000-HW689-DC022B.pdf PDF
CN-370000-HW689-DC023A.pdf PDF
CN-370000-HW689-DC024C.pdf PDF
CN-370000-HW689-DC024D.pdf PDF
CN-370000-HW689-DC030A.pdf PDF
CN-370000-HW689-DC033A.pdf PDF
CN-370000-HW689-DC03BCO2.pdf PDF
CN-370000-HW689-DC04CCO1.pdf PDF
CN-370000-HW689-DC05CCO3.pdf PDF
CN-370000-HW689-DC06BCO1.pdf PDF
CN-370000-HW689-DC10ACO1.pdf PDF
CN-370000-HW689-DC11CCO2.pdf PDF
CN-370000-HW689-DC11CCO3.pdf PDF
CN-370000-HW689-DC11CCO4.pdf PDF
CN-370000-HW689-DC11DCO1.pdf PDF
CN-370000-HW689-DC13BCO1.pdf PDF
CN-370000-HW689-DC13BCO3.pdf PDF
CN-370000-HW689-DC14BCO2.pdf PDF
CN-370000-HW689-DC15CCO1.pdf PDF
CN-370000-HW689-DC15CCO2.pdf PDF
CN-370000-HW689-DC15DCO1.pdf PDF
CN-370000-HW689-DC15DCO2.pdf PDF
CN-370000-HW689-DC17BCO4.pdf PDF
CN-370000-HW689-DC18BCO2.pdf PDF
CN-370000-HW689-DC20CCO1.pdf PDF
CN-370000-HW689-DC30ACO2.pdf PDF
CN-370000-HW689-DC32ACO1.pdf PDF
CN-370000-HW689-DC35ACO1.pdf PDF
CN-370000-HW689-FIL 3.pdf PDF
CN-370000-HW689-FIL12.pdf PDF
CN-370000-HW689-FIL19.pdf PDF
CN-370000-HW689-FIL20.pdf PDF
CN-370000-HW689-FIL4.pdf PDF
Show 40 more

50 files listed here. See the rest on GovTribe.

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Funding Information:

Org. Code E.O. Object Code Budget Entity Appropriation

Category Grant # Project # Year Amount

☐ Additional Funding Information attached on separate page.

Rev. 8/26/2020

STATE OF FLORIDA

DEPARTMENT OF ENVIRONMENTAL PROTECTION

Task Assignment This Task Assignment (TA) is entered into between the Parties named below, pursuant to Contract Number: .

1. TA Number: TA Completion Date:

TA Description:

2. Parties State of Florida Department of Environmental Protection

(Department)

Department Project Manager: Department Project Manager Phone:

Contractor Name: (Contractor ) ntractor’st ’s Project Manager: ontractor’s t’s Project Manager Phone:

3. Project Number:

(If different from TA Number)

Project Location(s):

Project Name:

4. As consideration for the services rendered by Contractor under the terms of this TA, the Department shall pay the Contractor on the following bases, up to the Total TA Value as indicated below:

☐ Fixed Price:

☐ Fixed Unit Rate: (Extended Price)

☐ Cost Reimbursement:

Total TA Value:

5. The Parties agree to comply with the terms and conditions of the underlying the Contract, and the following attachments which are hereby incorporated by reference:

Attachment 1:

☐ Additional Attachments (if necessary):

IN WITNESS WHEREOF, this TA shall be effective on the last date signed below.

State of Florida Department of Environmental Protection CONTRACTOR Department Name:

Title:

Secretary or Designee

(Authorized Signature) (Authorized Signature) Date:

☐ Additional signatures attached on separate page.

HW689

BF01C Completion October 27, 2023

Aptim will locate, inventory, and mark up to 47 existing on-site monitoring wells. If possible, groundwater samples will also be collected from MW-41, which was unable to be located during the last field event.

Justin Cross 850.245.8968 Contractor Contractor

Contractor Contractor

Contractor Contractor

Contractor

Aptim Environmental & Infrastructure, LLC

Aptim Environmental & Infrastructure, LLC

Eric Kramer 407.287.3216

ERIC_7391

US Hwy 192 at Clayton Road, Melbourne, Brevard County, Florida

U.S. 192 Solid Waste Management Facility / Former Deseret Ranch

✔ $ 16,277.41

$ 16,277.41

Scope of Work

Eric Kramer Digitally signed by Eric Kramer Date: 2023.08.01 09:54:31 -04'00'

Jennifer Farrell

Digitally signed by Jennifer Farrell Date: 2023.07.28 11:13:56 -04'00'

N/A

Task Assignment Notification/Change Order Deliverables and Invoice Schedule Attachment

WCP TAFORM 04-2017

Contract Number:

Task Assignment #:

Deliverables:

Deliverable Deliverable Due Date

Invoice Schedule:

Requirements for Invoice Submittal Amount to be Invoiced

TOTAL COST

Supplemental Site Assessment Workplan, QAPP, and Health and Safety Plan 08/11/2023

Field notes, photos, GW sampling logs, Chain of Custody, and Project Management 09/22/2023

FDEP approval of Supplemental Site Assessment Workplan, QAPP, and Health and Safety Plan (Subtask 2) $ 2,332.23

FDEP approval of field notes, MW installation logs, photos, GW sampling logs, Chain of Custody, and Project Management (Subtasks 1 & 3) $ 13,945.18

$ 16,277.41

HW689

BF01C

www.FloridaDEP.gov

FLORIDA DEPARTMENT OF

Environmental Protection

Bob Martinez Center 2600 Blair Stone Road

Tallahassee, FL 32399-2400

Ron DeSantis Governor

Jeanette Nuñez Lt. Governor

Shawn Hamilton Secretary

Memorandum

TO:

FROM:

DATE:

SUBJECT:

Aptim Environmental & Infrastructure, LLC, HW689 Contract File

Justin Cross, Contract Manager

July 28, 2023

Negotiation Summary - SRP18, TA BF01C Supplemental Site Assessment (SSA) / Well Location Activities U.S. 192 Brevard Co. Solid Waste Management Facility (SWMF) aka: Deseret Ranch, ERIC_7391

Aptim will attempt to locate and document all 47 site wells. Select wells will be sampled for total arsenic. The services are being conducted using federal funds from the State & Tribal Response Program (SRP) cooperative agreement that is administered by DEP on behalf of EPA. Specific subtasks detailed below:

Subtask 1 Project Management This subtask is a percentage of the overall project and has been negotiated as a contract rate. It includes project management, overhead, general and administrative, fringe and other direct costs. The cost of this subtask is $1,302.51.

Subtask 2: SSA/Well Location Work Plan/QAPP, and Health and Safety Plan In accordance with an EPA directive, this subtask includes the completion of a Work Plan/Quality Assurance Project Plan (QAPP), a Health and Safety Plan (HASP). The SSA QAPP Workplan will provide a brief summary of the scope of work and tables and figures showing the approximate well and sampling locations. The agreed upon cost of this subtask is $2,332.23.

Subtask 3 SSA/Well Location Activities Under this subtask, Aptim will attempt to locate all the existing 47 groundwater monitoring wells installed to date at the former Deseret Ranch assessment area. If located, each well will be observed and the current condition will be documented, including any damage observed to the well, manhole or pad. Following documenting the well conditions, the well will be marked with a 2-inch diameter galvanized terminal fence post, which will be installed to a depth of approximately 2 ft bls which will leave a 6 ft section above the surface (total length 8 ft). After all the wells are located, documented and marked with a post, a groundwater sample will be collected from monitoring well MW-41, to complete the previous TA groundwater sampling event. The groundwater sample from MW041 will be analyzed for the presence of total arsenic by EPA http://www.floridadep.gov/ www.FloridaDEP.gov

Negotiation Summary – Task Assignment (TA) BF01C US 192 Brevard Co. SWMF, aka Deseret Ranch

ERIC_7391

Western Brevard County SSA/Well Location Activities July 28, 2023

Method 6020. A SSAR report and site visit photo log will be authorized under a separate task assignment due to the end of the grant period.The cost of this subtask is $12,642.67.

Summary DEP’s SRP Contract Manager and Aptim’s Contract Manager have both agreed to the scope of work and associated costs. The final cost associated with this TA is $16,277.41. Documentation of these costs is included in the Level of Effort/Cost Proposal (LOE-CP) Form and LOE-CP letter provided by Aptim on July 27, 2023, as well as the Task Assignment Form for BF01C prepared by DEP. The final deliverable must be received by FDEP no later than September 22, 2023.

FDEP COST ESTIMATE

Contractor: Aptim Environmental & Infrastructure, LLC

Date: 7/18/2023

Task #: HW689 BF01C ERIC_7391 SubTask 1 Project Management SubTask 6

Site: US192 Solid Waste Management Facility SubTask 2 2-Work Plan and QAPP SubTask 7

Activity/Phase: Supplemental SAR SubTask 3 3-Locate Wells, GW Sampling SubTask 8

Project Manager: Justin Cross (FDEP)/Eric Kramer (APTIM) SubTask 4 4-Reporting SubTask 9

SubTask 5 SubTask 10

Totals 1 2 3 4 5 6 7 8 9 10 Labor Rate Category

$68.41 Project Manager E. Kramer 7 7.3 $68.41 Engineer/Scientist 5 E. Kramer 5 5 0 0 0 0 0 0 0 0 $64.45 Engineer/Scientist 5 G. Roberts 5 2 3 0 0 0 0 0 0 0 $45.13 Engineer/Scientist 3 B. Dempsey 8 8 0 0 0 0 0 0 0 0 $25.12 Engineer/Scientist 1 R. Lindsay 35 0 35 0 0 0 0 0 0 0 $31.28 Engineering Technician 3 B. Skipper 33 0 33 0 0 0 0 0 0 0 $25.60 Engineering Technician 1 K. Gartland 33 0 33 0 0 0 0 0 0 0 $34.03 Designer 2 S. Ferianc 1 1 0 0 0 0 0 0 0 0 $28.89 Technical Publications Specialist 3 H. Vining 1 1 0 0 0 0 0 0 0 0

$0.00 0 0 0 0 0 0 0 0 0 0 Total Hours 128 7 17 104 0 0 0 0 0 0 0

Direct Labor $4,344.29 $499.79 $894.91 $2,949.59 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00

Overhead 85.58% $3,717.84 $427.72 $765.86 $2,524.26 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Gen & Admin 19.38% $841.92 $96.86 $173.43 $571.63 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Fringe 31.96% $1,388.43 $159.73 $286.01 $942.69 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Total Labor $10,292.48 $1,184.10 $2,120.21 $6,988.17 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00

Travel Vehicle Rental $600.00 $0.00 $600.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Mileage Costs $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Air Fare $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Per diem + Hotel $1,026.00 $0.00 $1,026.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Total Travel $1,626.00 $0.00 $1,626.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00

Subcontractor (Equipment Procurement) Materials $1,876.53 $0.00 $1,876.53 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00

$0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00

Subcontractor Subtotal $1,876.53 $0.00 $1,876.53 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Procurement Fee $187.65 $0.00 $187.65 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Total Subcontractor Cost $2,064.18 $0.00 $2,064.18 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00

Subcontractor (Services Procurement) Drilling (Conventional) $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Drilling (Non-conventional) $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Mobile Laboratory $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Surveying $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00

IDW $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00

Utilities $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Materials $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00

$0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00

Subcontractor Subtotal $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Handling Fee $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Total Subcontractor Cost $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00

Laboratory Analytical Costs $28.00 $0.00 $28.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Fast Turnaround Charges $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Sample Shipping $6.50 $0.00 $6.50 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Total Laboratory $34.50 $0.00 $34.50 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00

FDEP COST ESTIMATE

Contractor: Aptim Environmental & Infrastructure, LLC

Date: 7/18/2023

Task #: HW689 BF01C ERIC_7391 SubTask 1 Project Management SubTask 6

Site: US192 Solid Waste Management Facility SubTask 2 2-Work Plan and QAPP SubTask 7

Activity/Phase: Supplemental SAR SubTask 3 3-Locate Wells, GW Sampling SubTask 8

Project Manager: Justin Cross (FDEP)/Eric Kramer (APTIM) SubTask 4 4-Reporting SubTask 9

SubTask 5 SubTask 10

Totals 1 2 3 4 5 6 7 8 9 10 Field Expenses

Personal Protection $315.00 $0.00 $315.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Expendables $120.00 $0.00 $120.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Equipment (Drilling related) $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Equipment (Analytical related) $290.00 $0.00 $290.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Equipment (IDW related) $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Equipment (Other) $506.00 $0.00 $506.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Total Field Expenses $1,231.00 $0.00 $1,231.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00

Subtotal $15,248.16 $1,184.10 $2,120.21 $11,943.85 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Completion Fee $1,029.25 $118.41 $212.02 $698.82 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00

Total Estimated Cost $16,277.41 $1,302.51 $2,332.23 $12,642.67 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00

LEVEL OF EFFORT / EXPENSE WORKSHEET

SITE : US192 Solid Waste Management Facility

SUBTASK:

DATE: July 18, 2023

LABOR CATEGORY *PROVIDE TIME REQUIRED FOR EACH PERSON

TITLE STAFF WORK DESCRIPTION HOURS

Engineer/Scientist 5 E. Kramer 5

Engineer/Scientist 5 G. Roberts 2 Engineer/Scientist 3 B. Dempsey 8 Engineer/Scientist 1 R. Lindsay Engineering Technician 3 B. Skipper Engineering Technician 1 K. Gartland Designer 2 S. Ferianc Drafting 1 Technical Publications Specialis H. Vining 1

TOTAL LABOR 17

VEHICLE TYPE RATE UNIT USEAGE TOTALS

Automobile $80.00 Day 0 $0.00 Van or Truck $120.00 Day 0 $0.00 Van or Truck $480.00 Week 0 $0.00

TOTAL VEHICLE $0.00

PER DIEM STAFF RATE UNIT USEAGE TOTALS

Hotel 0 $110.00 Day 0 $0.00 Day 1-leave before 6:00 AM 0 $36.00 Day 0 $0.00 Day 1-Leave between 6 - Noon 0 $30.00 Day 0 $0.00 Day 1-leave before 6:00 PM 0 $19.00 Day 0 $0.00 Day 0 $36.00 Day 0 $0.00

TOTAL PER DIEM $0.00

SUBCONTRACTOR COSTS

NAME PURPOSE COST UNIT USEAGE TOTALS

Lump $0.00

TOTAL $0.00

LABORATORY COSTS

PARAMETER RATE # SAMPLES #QAQC TOTALS

EPA Method 8270 (PAHs) Soil $110.00 0 0 $0.00 EPA Method 8290 (Dioxins&Furans) Soil $950.00 0 0 $0.00 EPA Method 6010 (Total Arsenic) Soil $13.00 0 0 $0.00 Sample Shipping (Small Cooler) $110.00 0 $0.00 Sample Shipping (Large Cooler) $150.00 0 $0.00 Ice (Bag/Day) $6.50 0 $0.00

TOTAL LAB $0.00

EQUIPMENT ITEM RATE COSTING UNIT USEAGE TOTALS

Personnel Protection Equipment (Level D) $35.00 Day 0 $0.00 Expendables $40.00 Day 0 $0.00 Global Positioning System (Handheld GPS Un $175.00 Day 0 $0.00

TOTAL EQUIPMENT $0.00

Report Document Production, Formating Text, Compilation into Adobe Format for Submittal

Development of Updated Work Plan and QAPP Plan Report

2-Work Plan and QAPP

Update H&S Plan (2 hrs), Prepare, Update and Submit Work Plan, QAPP Tables, Figures and Email Deliverable (3 hrs) Development of Updated Work Plan and QAPP Plan Report

2-Work Plan & QAPP Page 3 of 4 BF01C est

LEVEL OF EFFORT / EXPENSE WORKSHEET

SITE : US192 Solid Waste Management Facility

SUBTASK:

DATE: July 18, 2023

LABOR CATEGORY *PROVIDE TIME REQUIRED FOR EACH PERSON

TITLE STAFF WORK DESCRIPTION HOURS

Engineer/Scientist 5 E. Kramer

Engineer/Scientist 5 G. Roberts

Engineer/Scientist 3 B. Dempsey

Engineer/Scientist 1 R. Lindsay

Engineering Technician 3 B. Skipper

Engineering Technician 1 K. Gartland

Designer 2 S. Ferianc Technical Publications Specialis H. Vining

TOTAL LABOR 104

VEHICLE TYPE RATE UNIT USEAGE TOTALS

Automobile $80.00 Day 0 $0.00 Van or Truck $120.00 Day 1 $120.00 Van or Truck $480.00 Week 1 $480.00

TOTAL VEHICLE $600.00

PER DIEM STAFF RATE UNIT USEAGE TOTALS

Hotel 3 Skipper, Lindsay, Gartland $120.00 Day 2 $720.00 Day 1-leave before 6:00 AM 0 $36.00 Day 0 $0.00 Day 1-Leave between 6 - Noon 3 Skipper, Lindsay, Gartland $30.00 Day 1 $90.00 Day 1-leave before 6:00 PM 0 $19.00 Day 0 $0.00 Day 3 Skipper, Lindsay, Gartland $36.00 Day 2 $216.00

TOTAL PER DIEM $1,026.00

SUBCONTRACTOR COSTS

NAME PURPOSE COST UNIT USEAGE TOTALS

Home Depot Terminal Posts, Paint $1,876.53 Lump 1 $1,876.53

TOTAL $1,876.53

LABORATORY COSTS

PARAMETER RATE # SAMPLES #QAQC TOTALS

EPA Method 6020 (Total Arsenic) GW $14.00 1 1 Equipment $28.00 EPA Method 1312 for SPLP Extraction Soil $45.00 0 $0.00 EPA Method 6020 (Total Arsenic) Leachate $14.00 0 $0.00 Sample Shipping (Small Cooler) $110.00 0 $0.00 Sample Shipping (Large Cooler) $150.00 0 $0.00 Ice (Bag/Day) $6.50 1 $6.50

TOTAL LAB $34.50

EQUIPMENT ITEM RATE COSTING UNIT USEAGE TOTALS

Personnel Protection Equipment (Level D) $35.00 Day 9 $315.00 Expendables $40.00 Day 3 $120.00 Hand Auger $12.00 Day 3 $36.00 Shallow Groundwater Sampling Kit $290.00 Day 1 $290.00 Global Positioning System (Handheld GPS Un $175.00 Day 2 $350.00 Metal Detector $40.00 Day 3 $120.00 55 Gallon Drums $100.00 each 0 $0.00

TOTAL EQUIPMENT $1,231.00

Collection of GW Sample from Monitoring Well MW-41 and equipment blank by EPA Method 6020 (if located).

Purchase Materials for Field Event (3 hrs), Round Trip Travel to Site (3 hrs). Attend Onsite H&S and Scoping meetings (1 hr), Locate Wells and Label, Mark with Posts, Paint. (26 hrs)

Purchase Materials for Field Event (3 hrs), Round Trip Travel to Site (3 hrs). Attend Onsite H&S and Scoping meetings (1 hr), Locate Wells and Label, Mark with Posts, Paint. (26 hrs), Site Work Notifications, Check Records to Ensure Access Agreements in Place (1 hr), Submit Sunshine One Markout Requests (1 hr), Preparation of Field Equipment, Uploading Proposed Well location Coordinates into GIS Equipment (4 hrs), Round Trip Travel to Site (3 hrs). Perform Onsite H&S and Scoping meetings (1 hr), Locate Wells and Label, Mark with Posts, Paint. (24 hrs), Collect groundwater sample from MW-41 for Arsenic Analysis by EPA Method 6020 (2 hrs), deliver samples to Laboratory (1 hr).

3-Locate Wells, GW Sampling

3-Locate&Mark Wells Page 4 of 4 BF01C est

Proposed Scope of Work U.S. 192 Solid Waste Management Facility Former Deseret Ranch Supplemental Site Assessment and Well Location Marking Task Assignment BF01C ERIC_7391 (Former COM_312749) Aptim Environmental & Infrastructure, LLC July 27, 2023

The following Task Assignment (TA) for the former Deseret Ranch and future U.S. 192 Brevard County Solid Waste Management Facility, located in Melbourne, Brevard County, Florida has been prepared to allow field personnel to locate and mark all the existing wells remaining at the subject site. Many wells, including MW041, which was proposed to be sampled on the previous TA, could not be located, and may be damaged, if found. As reported during the previous scope of services, the site appeared to have been cleared a tractor or skid steer brush cutter. For that reason, many of the wells could not be located and the stakes and flags previously placed at all the well locations for identification were missing, making location of the wells difficult.

Subtask 2 SSA Work Plan/WAPP, and Health and Safety Plan

As required by the FDEP, Subtask 2 includes updating the Supplemental Site Assessment Work Plan and Quality Assurance Project Plan (QAPP), and Health and Safety Plan (HASP). The report will be prepared to summarize the proposed scope of work, including the groundwater sampling proposed at monitoring well MW-41, and will be submitted to the FDEP and EPA for review and approval prior to commencement of the work.

Subtask 3: SSA Field Activities:

Subtask 3 includes a site visit to attempt to locate all the existing 47 groundwater monitoring wells installed to date at the former Deseret Ranch assessment area. If located, each well will be observed and the current condition will be documented, including any damage observed to the well, manhole or pad. Following documenting the well conditions, the well will be marked with a 2-inch diameter galvanized terminal fence post, which will be installed to a depth of approximately 2 ft bls which will leave a 6 ft section above the surface (total length 8 ft). After all the wells are located, documented and marked with a post, a groundwater sample will be collected from monitoring well MW-41, to complete the previous TA groundwater sampling event. The previous groundwater sampling event included the collection of groundwater samples from monitoring wells MW018, MW028, MW031, MW041 and MW042, however, monitoring well MW041 was not located and could not be sampled. The groundwater sample from MW041 will be analyzed for the presence of total arsenic by EPA Method 6020.

IDW will not be captured during the groundwater sampling event.

Field activities will commence upon approval of the task assignment with submittal of the Work Plan within 30 days, or around August 31, 2023. The field work will be scheduled for completion in September 2023. A SSAR report and site visit photo log will be authorized under a separate task assignment due to the end of the grant period. A Task Completion date should be set for October 22, 2023, to allow for the deliverable review and approval for task invoicing.

APTIM proposes to perform this scope of work in accordance with the terms and conditions of the contract executed between APTIM Environmental & Infrastructure, LLC and Florida Department of Environmental Protection No. HW689. APTIM will begin the proposed scope of work upon issuance of the Task Assignment Notification.

If you have any questions, please do not hesitate to call.

Item Description Units Unit Price Total

Amount Units Unit Price Total

Amount Units Unit Price Total

Amount Terminal Posts (Metal) 2" 47 $32.98 $1,550.06 47 $17.99 $845.53 47 $31.97 $1,502.59 Fence Post Caps 2" 47 $1.78 $83.66 47 $2.99 $140.53 47 $2.60 $122.20 Orange Paint (2 gallons) 2 $103.65 $207.30 20 $8.59 $171.80 2 $64.49 $128.98 Tax 7% $128.87 $128.87 7% $81.05 $81.05 7% $122.76 $122.76

Total $1,969.89 $1,238.91 $1,876.53

Note: Gallon Paints not Available at Ace, Equivilent fluids in ounces (Spray Cans).

Terminal Posts at Ace Hardware only Available at 2"x 6' Terminal Posts at Loews only Available at 2"x 7' Terminal Posts at Home Depot only Available at 2"x 8' (preferred)

Home Depot is only provided that can provide the specifications requested. Recommended as provider for Supplies.

Home DepotLowes Ace Hardware

Supplies Bid Summary U.S. 192 Solid Waste Management Facility

Former Deseret Ranch

Melbourne, Brevard County, Floirda 32940 FDEP Site ERIC_7391

July 17, 2023

U.S. 192 and Caracara Lane

�!&.)�*-�/*��0�1 ��2��� *��341 ��2��� *��34�5678�'*� 9�:�;<=�&� &* �A= �B �?�,��*� �ACDEFGDEF�HI�J8K�L�M�INOPQ�J8K�R�ST�GDK�U7VDW�XYDJ8�ZJ8[�\78]7�̂7E_J8DW�̀abV�c�d��ee�f��gh��g #����ijklllmn��op��iqnrskntuv�wxl

#$$�%&�'#(%) * #$$�%&�+,-%.���/��0 123 4���5��6������7 89�:8 ;<8 ��=12>8�9�?�@A�B/��� �.8

;���CDE �?����1@F��������������G/@F >�=

H�/;��1 �?��I�1

�J�������1;89C�KKL�M/N�

9�0 12�I�1

�O13��P �� ����6Q�� �����������!����B�;A�R M�STC�KK�U���PQ��

���� ��V��W�������X� ����YZ�[��6�5��\�]̂���_ ����̀��!��������Ia/>��1�:12�4��Qb�P���̀���������� �4���c

�� � � � !"#$ %& '$! (")*+,- (%.),- /01!"!$1 2+$!3 43$ 5%" '676 8!$)3!01$ 90.- :%;" (")*+,- <=%),!$> ?�?@ 4,! A+"3B+"!6 4,! A+"3B+"! +03 1=! 4,! A+"3B+"! .%C% +"! "!C)$1!"!3 1"+3!#+"D$ %& 4,! A+"3B+"!<%"E%"+1)%06 4.. ")C=1$ "!$!"*!365%" $,"!!0 "!+3!" E"%F.!#$ B)1= 1=)$ B!F$)1!G E.!+$! ,+.. �HIIIHI?JHK??@ %" L#+). '$6("),!$G E"%#%1)%0$G $1-.!$G +03 +*+).+F).)1- #+- *+"-6 ("),!$ +03 +*+).+F).)1- %& E"%3;,1$ +03 $!"*),!$ +"! $;FM!,1 1%,=+0C! B)1=%;1 0%1),!6

NOPQ RSTU VOWXOY Z[UVO\QP WQP]̂_Q àO[V ̀_Q bQUO[P_QU

�!&.)�*-�/*��0�1 ��2��� *��341 ��2��� *��34�5678�'*� 9�:�;<=�&� &* �A= �B

�?�,��*� �ACDEFGDEF�HIJJ�K8I�L�MNOPK8OP�QRST�UD6�V�6W�X�Y��ZZ�[��\]��\ #����̂_̀àbc̀ ��de��̂facggchifj

-./ 0���1��2������3 45�64 ��9-.:4�5�;�<=�>+��� �*4 7���?@A �;����-<B��������������C+<B :�9 D�+7��- �;��E�-

�F�������-745?�GGH�I+J�

5�, -.�E�-

�K-/��L �� ����2M�� �����������!����>�7=�N I�OP?�GG�Q���LM��

���� ��R��S�������T� ����UV�W��2�1��X�YZ���[ ����\��!��������E]+:��-�6-.�0��M̂�L���\���������� �0���_ àbcdef�&ghagihj k

�� � � �������� �!�� "�#$%&'�"�(#&' )*+����+�,%��-�.-� /���!010�2��#-�*+��3*(' 4�5��"�#$%&'�67�#&��8�9:9��.&��;%�-<%��0�.&��;%�-<%���%*-�+7��.&��;%�-<%���(�=��%�����=#�+���-�+�%-��%�>��� �.&��;%�-<%��6��?��%+#�*0�.((��#=7+�������$�-0/����&���*���%-���?��@(����<#+7�+7#��<�@�#+�A�?(�%���&%((�BCDDDCD9ECF99�����G�%#(�!�0"�#&��A�?����+#�*�A��+'(��A�%*-�%$%#(%@#(#+'��%'�$%�'0�"�#&���%*-�%$%#(%@#(#+'�� �?��-5&+��%*-����$#&���%����5@H�&+�+�&7%*=��<#+7�5+�*�+#&�0

IJKL�MNOP�QJRSJT UVPQJWLK�RLKXYZL [\JVQ�[ZL ]LPJVKZLP

�!&.)�*-�/*��0�1 ��2��� *��341 ��2��� *��34�5678�'*� 9�:�;<=�&� &* �A= �B

�?�,��*� �ACDEFG5H7DI�JKLI�M�NI6H7I78F�ODEPQKL8K�5LK8R7�S6LKT�UKV8F�WX�YZ�[�\��]]�̂�$�_̀]��� #����abcdedfb��gh��aijieklmjn

-./ 0���1��2������3 45�64 ��9-.:4�5�;�<=�>+��� �*4

7���?@A�4B4+C4DC��4���E+����-

�F �G����������H���4 D5���-

IJKLMNO�&PQJPRQS T)UQNRVRNWORKXY T

���������� ��������������
������� !�"�##�$�%��&'��()*+,�-./�0-1�2�,�3!/�45)6178��61#91.-:�;�"!��#�<=1-.�>-.?�@�.A�<B$.�$�CB !D�E FG�H�'��H�I�J�HK��H�D
E

�LM�� ��'��N*4OP�MQ�N5/OP�MR����N(S�T@@�Q�G�����M��UGM�'RQ'�V�WG�XLMH��GW����W��'�V�M���K�XM��Y�JWW�Q�R���M�Z�[����W���\��HG[���\M��]�<B#B.-1#�"!B$����'��H��X̂ J'H�����_��MQ�����'X̂GW�M��̀�\����'M� ���'%��'�V�����

Z�[� aG[&���I�\�[W�H'��H b��X'�V \LM'��a'�̂�b��X'�V \LM'��a'�̂�b��X����H�Hc c c c d*

����e��Jf�gh���W������i�jRR�����X�����[HY�k�Gl���HL�WW'�VTCmn�G��'�� ��W[ ���'%��'�V���*(,4,]�<B#B.-1# <1$!o���'��[HR��X��W�H�

'�0����*+��1�2 3(�(4

������������������-����'6�789�:*;��<�*=:�;�>�=<����89�8?�*+� ��=�@*<���A�A�+9

���B��C���D0������+�8?E.FF

�DCG�����DH�I�

�JK(�L�M>M�;MN;�E.FF &������,���

OPQRSQTUVW�XYSZ[U�\YZQU[QP

̂_J̀aaJ&���b�c� dCG���c�

F/ ��e�f��������M�g���1+��(#ehM*i��hM;>M��j�:�7+��;klmnmo_àpq dF/ �r9M���s��?�t��8���e�f�����u;*���*��v��+�rMwlxxo_JyK dF/ �2f(#�����g�(e(f0����hM;>M��j�:�7+��;�rM==�Mi�klzno_̀ Kp{fNMi F/ #�1+hM_̀

�7�;�8+ 7�;�8+ 7�;�8+

}[Y~�\[����YVVQ�U�YT��PY����QP��VU�lm�o

������������ !�" !#�$%!&%�'()*+� !,�-./0 !/0�1234���56��7 89�:����:�;�<�:=��:�6�7 >�?� @9?����;�A�?B�:���: C��D��E F�:��AGB:�;�H�B:I I I� �>�?���?B����?����J��G����K�9L���:M�BB��EN1OP�9����� ��B? Q��������E���)'+R+S��2.2! �. ��G�DM ��T4U������?:

������������������������ !"#$��%&�'()�*+,�--./�"#01�+ �2�3!%!��+% 4&%�5&6��7� !�.�8�8 9�������:�:�����:���;����<=�>"?&@0%&�,!06@&%�5&6,����"?&"#!0 A �!6�*0,��!B�B� ?

C�DEFGH�I�J�������� !"#KLMM N���O��J��I��:I�JP�QF��RS.)(T'�+5+�%+U%&KLMM VII��������

������������ !"#�$!%&�'�(&)"*&*+,�-""./�01!"&*%/�2%!+ *�3"4//�5+!&*"6!.+,�7896!:;<= ��> ?����@����A�B��C����= ��> �D��� EF@�� �������@F��EF@�� B������@G��EF@�� H�FI����EF@��J J J J��EK���BL�MN���O������P��QQ�����I�������R�S��T����U�OO@�V265W����@�� ��O� X��@G��@�V���Y8Z�Z[�04"4+.!" 0!%,\���@������FI����OF@��

0�1� 2�.� ���+1�� ��3 �����4�����5 67789 :;"7<$=9 ��A�5 B"77(?C D+�� � B"77(?E+1F�� �� G���5 �C ��� G+.

H ������� 2���I�����

J�KCK

L$"#$ M(%= N$O' P=(Q$R' S(

T9UVWXVYZ

\]̂_ZV̀/33

a�-����� !;8& !'(=$b%7 �c d b%7 �eCff �I����F��ghii j$78#$=kl$m?$9m"kn b%7 �eCff �I����F��ghii

US192 SWMF SSA Scope of Work 0122.pdf
1
2
3
4
5
Markouts Bid Summary 1221.pdf
UtilityBidSummary
Site Line
Site Lines Response
SITE: Former Deseret Ranch Site – Melbourne, Florida
Dear Mr. Roberts:
If you have any questions, please feel free to contact me. I look forward to working with you.
Sincerely,
Site Lines LLC
William L. Hardy II
Enclosure
SITE LOCATION
PROPOSED SCOPE OF WORK
RESULTS OF THE INVESTIGATION
PROJECT FEE
CLIENT REQUIREMENTS
DESCRIPTION OF COMPANY INVESTIGATION AND LIMITATIONS
SITE LINES PROPOSAL ACCEPTANCE
SIGNATURE PAGE
Site Lines Proposal Number: 01011p Proposal Date: December 18, 2021
Project Site: Former Deseret Ranch Site – Melbourne, FL
Project Fee: $700.00
Payment Terms: [PAYABLE WITHIN 30-DAYS OF INVOICE]
INVOICE TO:
Client: APTIM
Address: 725 U.S. 301 South, Tampa, FL 33619
Attention: Gregg Roberts, P.G.
Phone: 813-612-3687 Email: Gregg.roberts@aptim.com
Special Instructions:
In witness thereof, the parties hereto have made and executed this agreement
FOR [CLIENT] FOR SITE LINES LLC
geotec
GeoTek Reponse
gpr
Location Maps
Drilling Bid Summary 1221.pdf
Well Installations Bid Summary
gw
GW Protection
earth
Earth Tech Response
pref
ATI
DPT Drilling RFQ 1221
PDS Former Deseret Ranch1.pdf
Direct Push
IDW Bid Summary 1221.pdf
IDW Bid Summary
Clark
Clark Response
Safetykleen
Erwin
Erwin Remediation Response
usecology
REVISED_US192 SWMF Scope of Work 0122 V2.pdf
US192 SWMF Scope of Work 0122 V2
1
3
5
Markouts Bid Summary 1221
Site Line
Site Lines Response
SITE: Former Deseret Ranch Site – Melbourne, Florida
Dear Mr. Roberts:
If you have any questions, please feel free to contact me. I look forward to working with you.
Sincerely,
Site Lines LLC
William L. Hardy II
Enclosure
SITE LOCATION
PROPOSED SCOPE OF WORK
RESULTS OF THE INVESTIGATION
PROJECT FEE
CLIENT REQUIREMENTS
DESCRIPTION OF COMPANY INVESTIGATION AND LIMITATIONS
SITE LINES PROPOSAL ACCEPTANCE
SIGNATURE PAGE
Site Lines Proposal Number: 01011p Proposal Date: December 18, 2021
Project Site: Former Deseret Ranch Site – Melbourne, FL
Project Fee: $700.00
Payment Terms: [PAYABLE WITHIN 30-DAYS OF INVOICE]
INVOICE TO:
Client: APTIM
Address: 725 U.S. 301 South, Tampa, FL 33619
Attention: Gregg Roberts, P.G.
Phone: 813-612-3687 Email: Gregg.roberts@aptim.com
Special Instructions:
In witness thereof, the parties hereto have made and executed this agreement
FOR [CLIENT] FOR SITE LINES LLC
geotec
GeoTek Reponse
gpr
Location Maps
Well Installations Bid Summary V2
old.pdf
gw
GW Protection
earth
Earth Tech Response
pref
ATI
DPT Drilling RFQ 1221
PDS Former Deseret Ranch1.pdf
Direct Push
earth tech 1-19-2022.pdf
Direct Push
BF01B est.pdf
Cost Estimate
2-Work Plan&QAPP
3-SSA Field Activities
4-SSA Reporting
BF01B est.pdf
Cost Estimate
2-Work Plan&QAPP
3-SSA Field Activities
4-SSA Reporting
BF01C est.pdf
Cost Estimate
Bid Summary for Supplies.pdf
Supplies Bid Summary
Lowes 7-ft H x 2-in W 16-Gauge Silver Galvani...n Link Fencing department at Lowes
Lowes 2-in W x 2-in L Aluminum Post Cap- Fits...ence Post Caps department at Lowes
Lowes Rust-Oleum Gloss Kubota Orange Exterior...l Enamel Paint department at Lowes
Ace (6 ft) YardGard 72 in. H X 2-3_8 in. W 16 Ga. ..
Ace Cap YardGard 2.44 in
Ace Rust-Oleum Farm & Implement Husqvarna Orange Spray Paint 12 oz - Ace Hardware
Home Depot Corner Post Everbilt 2-3_8 in. Dia x 8 ft. 16-Gauge..
Home Deport Cap Everbilt Chain Link Fence 2-3_8 in
Home Depot Rust-Oleum 1 gal. Farm & Implement Alli..
BF01C est.pdf
Cost Estimate
2-Work Plan & QAPP
3-Locate&Mark Wells
Bid Summary for Supplies.pdf
Supplies Bid Summary
Lowes 7-ft H x 2-in W 16-Gauge Silver Galvani...n Link Fencing department at Lowes
Lowes 2-in W x 2-in L Aluminum Post Cap- Fits...ence Post Caps department at Lowes
Lowes Rust-Oleum Gloss Kubota Orange Exterior...l Enamel Paint department at Lowes
Ace (6 ft) YardGard 72 in. H X 2-3_8 in. W 16 Ga. ..
Ace Cap YardGard 2.44 in
Ace Rust-Oleum Farm & Implement Husqvarna Orange Spray Paint 12 oz - Ace Hardware
Home Depot Corner Post Everbilt 2-3_8 in. Dia x 8 ft. 16-Gauge..
Home Deport Cap Everbilt Chain Link Fence 2-3_8 in
Home Depot Rust-Oleum 1 gal. Farm & Implement Alli..